Intro odgroup2014

Page 1



WELCOME The Od Group is London’s leading fit-out and refurbishment company in commercial, residential and leisure. We provide the very best specialist construction skills from project initiation to completion, and we can cope with any scale project including new builds. We’re experts in organising people and materials within tight timescales. Jon Kearney has put together a dedicated team with over 50 years’ collective experience as London and the South East’s leading high-quality contractor Within this document you will find a selection of our recently completed projects


TURNOVER

OD GROUP TURNOVER SECURED

2014/2015 (Projected)

SECURED

2013/2014 (Projected) 2012/2013 2011/2012 0

2

4

6

8

10

12

14

16

(Turnover £m April-April)

18

20

22

24

26

28

30


• Od appointed on Savills Estate Agency office fitout framework • Repeat business levels at 70% of turnover and growing

HISTORY

• Notable project wins for Dow Jones, Royal London Asset Management, Fendi,National Australia Group and Berkeley Group Marketing Suites • Education sector expansion with successful fitout projects for Partnerships For Schools and North Herts College

• Client base expanded to include Royal & Sun Alliance, O2, AIB, Morley Fund, and GIS Interpublic.

In January Jon Kearney founds OD.

2004

• Consultants include Gensler, Cushman & Wakefield, Barr Gazetas, and Leslie Clark. • Royal & Sun Alliance approved contractor status.

2005

2006

• Savills approved contractor • OD complete £4 million, 107 Leadenhall, fit out. • OD achieve ISO9001 status.

2007

2008

• High end residential team acknowledged as leading contractor within sector

• Od completes its first hotel refurbishment for launch of exciting new venture for Safestay in London • Od working on over 50000sqft of Londons super prime residential projects in Knightsbridge, Kensington & Hampstead • OD Expand office space to take another floor at Sun St HQ

• Awarded refurbishment for Royal Albert Hall

2009

2010

2011

• OD Projects client list includes Arsenal FC, Scott Brownrigg, AYH, and Price & Myers.

• AIB framework contractor.

• Rolls Royce Framework contractor

• Forecast record turnover of circa £20m in with Business Plan.

• OD Projects currently employ 25 staff.

• Recruitment of Commercial Director Greg Pinchin (Managing Surveyor of top fit out company)

• Green Apple Award for Digitas Saatchi & Saatchi

• Achieve British Council for offices corporate member status.

• Official launch of aftercare team ‘ZEROdEFECTS’.

• Instutute of Chartered Accountants Framework contractor

• Successful completion of first Irish project for Marcus Evans HQ in Dublin.

• Recruitment of Construction Director Steve Cherry (BCO & FX Quality Award Winner)

• Sign 5 year lease and fit out Moorgate HQ. • Jon Kearney finalist for G4_ New Generation Awards – Entrepreneurship Award.

• Awarded Vogue /Condenast HQ fitout

2012

2013

• Od Group formed, divisions focused on Commercial Fitout, Super prime Residential and Commercial Design & Build • OD Group launch OD Solutions to cater for direct End User clients requiring a ‘one stop shop’ turnkey, Design & Build solution

• Notable project wins for clients such as Finchatton, BMB Property, United Continental Airlines, Safestay and Royal London Asset Management.

• OD Group employ 2 new company Directors, Andrew Wright to head up OD Solutions and Robert Cole to head up OD Projects the residential sector of the Group.

• Commitment to sustainability – BREEAM ‘Excellent’ achieved on refurbishment of RLAM property in Crawley, LEED silver certification achieved for Harris Williams fit out in Mayfair, SKA silver certificate achieved for Paradigm Housing in High Wycombe.

• Successful completion of first laboratory project for BTG.

• Rebrand of Od which defines our focus and disciplined approach to achieving quality.

• Successful completion of Kia Motors UK Headquarters in Walton Upon Thames • Od Solutions secure preferred partner status for Royal London Asset Management’ own nationwide corporate workspace refurbishment programme • Od Interiors successfully complete 25000sqft fitout for Bridgepoint Advisors at 95 Wigmore St • Od Solutions secure fitout for Hedge Fund Muzinich & Co, our 3rd floor within 8 Hanover St


COMPANY STRUCTURE

JON KEARNEY

MANAGING DIRECTOR

ANDY TORLOT DIRECTOR

Specialising in interior fit out and construction to the professional construction industry. Working closely with Architects, Project Managers, Quantity Surveyors and direct for end user clients. Covering all sectors including Commercial, Retail and Leisure

STEVE CHERRY

CONSTRUCTION DIRECTOR

GREG PINCHIN

COMMERCIAL DIRECTOR

ROBERT COLE DIRECTOR

ANDREW WRIGHT DIRECTOR

Specialist high end residential refurbishment and construction company working closely with high net worth clients, developers and architects to deliver unique boutique interiors

Specialist company working directly with End-User Clients and their Consulting teams delivering a ‘one stop shop’ turnkey solution. Working with interior design and architecture companies Od Solutions are procurement specialist that take a client from concept to completion under one roof.


MANAGEMENT STRUCTURE

JON KEARNEY

MANAGING DIRECTOR

GREG PINCHIN

ACCOUNTS MANAGER

COMMERCIAL MANAGERS

GAVIN HAWKINS

STEVE CHERRY

COMMERCIAL DIRECTOR

PRE CONSTRUCTION DIRECTOR

CONSTRUCTION DIRECTOR

OD PROJECTS ROBERT COLE DIRECTOR

OD INTERIORS ANDY TORLOT DIRECTOR

OD SOLUTIONS ANDREW WRIGHT DIRECTOR

CONTRACTS MANAGERS

CONTRACTS MANAGERS

HEAD OF CONSTRUCTION

CONSTRUCTION MANAGERS

CONSTRUCTION MANAGERS

CONSTRUCTION MANAGERS

ASSISTANT CONSTRUCTION MANAGERS

ASSISTANT CONSTRUCTION MANAGERS

PRE CONSTRUCTION MANAGERS

ACCOUNTS ASSISTANT

ADMINISTRATION SUPPORT

PRE CONSTRUCTION MANAGERS

BID MANAGER

BID COORDINATOR



›OD › SOLUTIONS

Specialist company working directly with End-User Clients and their Consulting teams delivering a ‘one stop shop’ turnkey solution. Working with interior design and architecture companies Od Solutions are procurement specialist that take a client from concept to completion under one roof.



ROYAL LONDON MUTUAL INSURANCE GRACECHURCH STREET

›› ›› ›› ›› ››

Client: Location: Size: Value: Completion:

Royal London Mutual Insurance Gracechurch Street, London 9,000 sq ft Confidential December 2013

Full Design & Build of their UK Head Quarters. Works Include: Client facing front of house: • Meeting rooms • Lounges • Catering Facilities • Presentation Suites with full Audio Visual Capacity

Back of House: • Main Board Directors executive Suite • Administration support area • General working office and ancillary areas



TEMASEK HOLDINGS (UK) LIMITED KING STREET, LONDON

›› ›› ›› ›› ››

Architect: MCM Project Manager: Savills Quantity Surveyor: Confidential Value Confidential Size: 8,000 sq ft

Full Design & Build CAT B fit out of levels 5 & 6, 23 King Street, London. The works comprised: CLIENT FACING FRONT OF HOUSE: • High specification Meeting rooms • Lime-washed oak floor • White marble cladding • Presentation Suites with full Audio Visual capacity

BACK OF HOUSE: • Main Board Directors Executive Suite • Central focal hub clad in a black lacquered finish with inset joinery • Administration support area • General working office and ancillary areas



SCHULTE ROTH & ZABEL LLP ONE EAGLE PLACE, LONDON

›› ›› ›› ›› ››

Architect: MCM Project Manager: Savills Duration: 13 weeks Size: 10,000 sq ft Value: £1,200,000

The design and fit out of a high quality office environment commensurate with a Legal institution of this calibre Works include: • Lime-washed oak floors • Double-glazed fronted offices • High-spec modern finishes • Polished plaster walls

• Vertical timber shutters • Noise-cancelling panels



›OD › INTERIORS

Specialising in interior fit out and construction to the professional construction industry. Working closely with Architects, Project Managers, Quantity Surveyors and direct for end user clients. Covering all sectors including Commercial, Retail and Leisure



SAPINDA LEVEL 5, 25 PARK LANE, W1

›› ›› ›› ›› ›› ›› ››

Procurement: Design & Build Architect Gensler Project Manager Gensler Quantity Surveyor Montie Duration 11 Weeks Value £600,000 Size 3000 sq ft

Strip out and new fit out of existing occupied offices in two separate phases. The works undertaken comprised: • New Cellularized Offices, • New Meeting and Board rooms, • High spec stone reception, • Stone flooring, • Specialist joinery, • New Lighting inclusive of feature lighting installed throughout



DOW JONES GRAYS INN ROAD, LONDON

›› ›› ›› ›› ›› ›› ››

Procurement: Design & Build Architect: MCM Architecture Quantity Surveyor: Arcadis Services Consultant: Arcadis Duration: 12 weeks Value: £1m Size: 30,000 sq ft

Refurbishment of office floor whilst the building remained in full occupation, works included: • Strip out • Installation of new electrical & mechanical services • Glass partitions • Fit Out of new toilets • Tea Points

• High specification restaurant • Floor coverings



HARRIS WILLIAMS LEVEL 2, 63 BROOK STREET, MAYFAIR, W1

›› ›› ›› ›› ››

Project Manager: Gensler Architect: Gensler Duration: 14 weeks Size: 10,000 sq ft Value: £535,000

CAT B fit out of the first floor newly refurbished occupied building to provide a high quality office. The works comprised: • High quality bespoke joinery, • Mechanical & electrical modifications, • Double glazed BENE partitions & doors, • Handmade carpet flooring, • Audio visual installations.



BRIDGEPOINT ADVISORS 95 WIGMORE STREET, LONDON

›› ›› ›› ›› ›› ›› ››

Procurement: Design & Build Architect KKS Project Manager Savills Quantity Surveyor Fanshawe Duration 15 Weeks Value £2,400,000 Size 28,000 sq ft

5th, 6th & 7th Floors, Category B Office Fit Out at 95 Wigmore Street, works included: • Formation of the main reception & 5 meeting suites on 7th floor • Completion and early handover of the comms room on 5th & 7th floor • Offices and open plan areas to 5th & 6th floors



SHIATZU HOLDINGS LTD CAT A REFURBISHMENT – LEADENHALL STREET, LONDON

›› ›› ›› ›› ›› ››

Architect: Barr Gazetas Quantity Surveyor Quantem Consulting Services Consultant: The Engineering Practice Duration: 40 weeks Value: £4.2m Size: 40,000 sq ft

Works Included: • Lightwell infills on 3 floors • Cat A refurb on Ground, Mezzanine, 3rd – 7th floors • Cat B client possession on Ground, Mezz, 6th & 7th floors • Link Bridge & lift shaft from Ground – 5th & 6th Floors

• Phased Common Part refurbishment to WC’s & Lobbies on 3rd – 7th floors • Central Plant replacement to Basement Incoming & Roof Mounted AHU’s & Chillers • Refurbishment of Crittall windows



RLAM – DRAGON COURT CAT A REFURBISHMENT – COVENT GARDEN, LONDON

›› ›› ›› ›› ›› ›› ››

Architect: Orbit Architects Quantity Surveyor: Quantem Consulting Project Manager: APS Chartered Surveyors Services Consultant: The Anslow Partnership Size: 27,000 sq ft Duration: 24 weeks Value: £2.6m

Refurbishment of the existing offices to a CAT A fit out across three floors with one floor remaining occupied by the tenant. The works comprised: • Heavy strip out;

• New suspended ceilings;

• Structural modifications;

• New raised floors;

• Complete mechanical plant renewal;

• Curtain walling

• Toilets/reception fit out;



RLAM

CAT A REFURBISHMENT – PORTLAND, CRAWLEY

›› ›› ›› ›› ›› ›› ››

Architect: Orbit Architects Quantity Surveyor: Cyril Leonard Services Consultant: Lamorbey Associates Structural Engineer: Connisbee Duration: 18 weeks Value: £2.3m Size: 25,000 sq ft

Complete refurbishment of town centre office premises set over 3 floors, to Cat A standard • BREEAM ‘Excellent’ rated;

• External landscaping;

• Full Design & Build;

• Refurbishment of multi-storey car park.

• Complete replacement of main plant and all on floor services; • New entrance canopy and internal reception;



›OD › PROJECTS

Specialist high end residential refurbishment and construction company working closely with high net worth clients, developers and architects to deliver unique boutique interiors



EATON SQUARE BELGRAVIA

›› ›› ›› ››

Architect: Quantity Surveyor: Services Consultant: Duration:

Lifschutz Davidson Sandilands Measur Tasc 56 weeks

The project comprises the design, construction and fitting out to basement, lower ground and upper ground levels of approximately 606m² gross internal area. Works included: • Basement swimming pool and leisure facility • Rear mews extension • High level residential finishes

• Installation of access lift to all floors • High spec AV installation • External rooftop inside outside facility



RUTLAND GARDEN KNIGHTSBRIDGE

›› ›› ›› ›› ›› ››

Architect: Quantity Surveyor: Services Consultant: Structural Engineer: Duration: Value:

Originate Architects Ltd Vincent & Partners Chapman Bathurst Michael Alexander 63 weeks £5,000,000

The demolition of an existing two storey property with this prime location in Knightsbridge, forming a 16m deep basement to the entire site. • Complete demolition & soft strip • Secant piling to the site boundaries • A complicated temporary support system & 10m deep basement formation, carried out as CDP

• High quality stonework • Whole house ventilation, air-conditioning, i-Light systems audio visual package



KENWOOD PLACE HAMPSTEAD

›› ›› ›› ›› ›› ››

Project Manager: AYH Architect: Hamilton Quantity Surveyor: AYH Services Engineer: AWA Interior Design: Keech Green Duration: 48 weeks

The fit out of a penthouse apartment with 3 bedrooms and bathrooms comprising: Works included: • New mechanical & electrical services • Audio visual & IT networks • Specialist joinery

• Extensive stonework • High quality finishes.



Od operates a ‘zero defects’ plan. This is more commonly known as a quality plan. The plan is written at the commencement of the project and sets out to achieve as high a quality delivery as possible. This is not just in the finished product, it covers every stage of the project including management techniques as follows; STAGE 1 – PLANNING FOR QUALITY • Zero Defects Introduction Meeting • Detailed Design Review • Identify Quality Risks • Identify Work Zones/ Sequencing/ Phasing • Sub-contractor Target Programme STAGE 2 – INFORMATION RELEASE • Drawing/ Information Release Schedule • Sample Schedule • Off Site Inspection Schedule STAGE 3 – SETTING QUALITY STANDARDS • Benchmarking • Sample Approval • Key Inspections • Protection Regime

STAGE 4 – REVIEW & QUALITY CONTROL SIGN OFF • Review • Monitoring • Handover STAGE 5 – SNAGGING & DEFECTS • Defects Process • Identifying Defects • Site Mark Ups • Sub-Contractor Defect Management • Defect Reporting STAGE 6 – PROJECT CLOSE OUT • Finalisation Plan • Close Out Programmes • Defect Reporting • Record Document • Client Familiarisation


CERTIFICATION


SUSTAINABLE CREDENTIALS

Fit‐out Sustainability Assessment This is to certify that

Paradigm Housing Group Building A1 Glory Park High Wycombe Bucks HP10

has achieved the Ska rating of

Silver

Pringle Brandon LLP Accredited Assessor

Paradigm Housing Group On behalf of

Savills Commercial Ltd Project Manager

Mansfield Monk Architect

OD Projects Contractor

Capita Symonds Building Services Engineer

Glory Park, High Wycombe Certificate Reference

29/06/2010 Date This certificate has been produced using Ska Rating Offices version 1.0


1 SUN STREET LONDON EC2A 2EP


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.