‘‘We shape our buildings; thereafter they shape us’’ Sir Winston Churchill
FOREWORD The OD Group was founded in 2004 by Jon Kearney to work within the construction industry alongside many of the professional bodies in the interiors market to deliver high quality interior projects across commercial, residential, and leisure sectors. Over the past decade, steady growth and the consistent delivery of projects through some of the UK’s most exciting and challenging times has resulted in OD Projects gaining respect from not only the professional bodies that we work with but also our peers and the wider business community. OD Projects is one of the Capital’s leading integrated design, project management and construction companies. With our partners we undertake various different projects in terms of scale and complexity for a diverse client base. We provide the very best specialist expertise in all facets of the construction process, from project initiation to completion. Our talented and experienced team has been hand picked, trained and supported so that they can achieve the very best results. The team is made up of like-minded individuals who understand the importance of attention to detail and the essential need for a high quality end product. We do not consider ourselves to be builders or contractors, but craftsmen who can be proud of what we produce from conception to completion. We genuinely enjoy working with a diverse range of companies from large multinationals to small privately owned businesses, taking care that each solution we design and implement reflects the individual needs of the client. OD Projects enjoys a high level of repeat business from many of our clients; a testament indeed to the professionalism and dedication of all our staff, which is something we believe that sets us apart in the market. Our trademark is combining high quality interior design and commercial acumen with best practice delivery in the market place. The OD Management team is extremely passionate about what we do and supports all the staff within our business who enable us to deliver beyond our client’s expectations. What each client has in common, is a desire that their project is undertaken with complete attention to detail, is within budget, and delivered on time by a professional team. They also wish for the project, which can often be the cause of great stress within an organisation, to be as pleasurable an experience as possible. At OD, we believe we can exceed all of our client’s needs and expectations.
Steve Cherry Construction Director
PAGE 2
Jon Kearney Managing Director
Greg Pinchin Commercial Director
PREPARED BY OD SOLUTIONS FOR SCHULTE ROTH & ZABEL LLP
• Od appointed on Savills Estate Agency office fitout framework
HISTORY
• Repeat business levels at 70% of turnover and growing • Notable project wins for Dow Jones, Royal London Asset Management, Fendi,National Australia Group and Berkeley Group Marketing Suites
• Education sector expansion with successful fitout projects for Partnerships For Schools and North Herts College
• Client base expanded to include Royal & Sun Alliance, O2, AIB, Morley Fund, and GIS Interpublic. In January Jon Kearney founds OD Projects.
2004
• Consultants include Gensler, Cushman & Wakefield, Barr Gazetas, and Leslie Clark. • Royal & Sun Alliance approved contractor status.
2005
• OD Projects client list includes Arsenal FC, Scott Brownrigg, AYH, and Price & Myers. • Recruitment of Commercial Director (Managing Surveyor of top fit out company) • Recruitment of Construction Director (BCO & FX Quality Award Winner)
2006
• OD Projects complete £4 million, 107 Leadenhall, fit out. • OD Projects achieve ISO9001 status.
• Savills approved contractor • High end residential team acknowledged as leading contractor within sector • Awarded refurbishment for Royal Albert Hall
2007
2008
2009
2010
• Od completes its first hotel refurbishment for launch of exciting new venture for Safestay in London • Od working on over 50000sqft of Londons super prime residential projects in Knightsbridge, Kensington & Hampstead • Od Group formed, divisions focused on Commercial Fitout, Super prime Residential and Commercial Design & Build • OD Expand office space to take another floor at Sun St HQ
2011
2012
• Rolls Royce Framework contractor • Green Apple Award for Digitas Saatchi & Saatchi
• Forecast record turnover of circa £20m in with Business Plan.
• Sign 5 year lease and fit out Moorgate HQ.
• Instutute of Chartered Accountants Framework contractor
• Successful completion of first Irish project for Marcus Evans HQ in Dublin.
• Jon Kearney finalist for G4_ New Generation Awards – Entrepreneurship Award.
• Awarded Vogue /Condenast HQ fitout
• Notable project wins for clients such as Finchatton, BMB Property, United Continental Airlines, Safestay and Royal London Asset Management.
• AIB framework contractor. • OD Projects currently employ 25 staff. • Achieve British Council for offices corporate member status.
• Official launch of aftercare team ‘ZEROdEFECTS’.
• Commitment to sustainability – BREEAM ‘Excellent’ achieved on refurbishment of RLAM property in Crawley, LEED silver certification achieved for Harris Williams fit out in Mayfair, SKA silver certificate achieved for Paradigm Housing in High Wycombe. • Rebrand of Od which defines our focus and disciplined approach to achieving quality.
COMPANY
OD HOLDINGS Jon Kearney Managing Director
OD INTERIORS OD Andy INTERIORS Torlot Director
Specialising in interior fit out and construction to the professional construction industry. Working closely with Architects, Project Managers, Quantity Surveyors and direct for end user clients.
Steve Cherry Construction Director
Greg Pinchin Commercial Director
OD PROJECTS Graham Cann Director
Specialist high end residential refurbishment and construction company working closely with high net worth clients, developers and architects to deliver unique boutique interiors
OD SOLUTIONS Andrew Wright Director
Set up to cater for direct End User clients requiring a ‘one stop shop’ turnkey solution. Working with interior design and architecture companies Od are procurement specialist to take a client from concept to completion under one roof.
Covering all sectors including Commercial, Retail and Leisure
PAGE 4
PREPARED BY OD SOLUTIONS FOR SCHULTE ROTH & ZABEL LLP
TURNOVER
OD GROUP TURNOVER 2014/2015 (Projected)
Secured
2013/2014 (Projected)
Secured
2012/2013 2011/2012 0
2
4
6
8
10
12
14
(Turnover ÂŁm April-April)
2013/2014 (Projected) OD Projects
Secured Secured Secured
COMPANY
0
2
OD Interiors
OD Solutions 4
6
8
10
12
14
16
18
20
22
24
26
MCM – INTRODUCTION MCM Architecture was founded in 1989 and is one of Europe’s leading workplace strategy and architectural design practices. We have a staff compliment of 43 talented architects, designers, space planners and technicians. We have built our award winning reputation on listening to our clients’ business aspirations and designing imaginative solutions that inspire their people to perform and enjoy their work experience. Our clients are challenging, forward thinking and demanding businesses of all sizes from blue chip multinationals to entrepreneurial enterprises. We are proud of the many long–term relationships we have developed with key clients over the years. As one of the leading workplace architects, we firmly believe that the exploration and development of workplace strategies is an integral part of the design process. We can offer our clients a wide range of tools to optimise the efficiency of their real estate, reduce costs and maximise space utilisation. Aligned to efficiency considerations our clients often adopt new flexible working models and we have facilitated a number of successful change management procedures. The early involvement of our team not only delivers real estate benefits to developers, landlords, but also to occupiers and end-users seeking to maximise space efficiencies and return on investment. Internationally, our primary focus is to deliver strategic workplace solutions and design excellence to our clients regardless of their office location, and we are therefore in the process of developing our reach further. We have a growing network of European alliance partners with established regional offices and the requisite knowledge of local regulations and code compliance to support the effective delivery of projects on the ground. In the USA, we have a strong and very active working alliance with Ted Moudis Associates (TMA), who are based in New York and Chicago, and can assemble joint teams to support clients both sides of the Atlantic. In September 2012 we incorporated our Singapore business, MCM East Pte Ltd, to deliver high quality design and professional services to our clients across the ASEAN region.
‘Without doubt MCM was absolutely the right choice for the project from strategic input and workplace consultancy, all the way through design and delivery’ Sean Monie, Director Savills
PAGE 6
PREPARED BY OD SOLUTIONS FOR SCHULTE ROTH & ZABEL LLP
SERVICES The scope of professional services that we offer in–house includes:
Master planning Due diligence and building evaluation Design team leader Feasibility studies Condition surveys Lease support Development and base build monitoring Brief gathering Workplace strategy and change management Space planning Architectural and interior design through all RIBA work stages Building refurbishment to the following standards: - Shell andCore - Cat A - Cat B
Building extensions Core reconfigurations and other major structural interventions Planning applications and local authority liaison Contract administration Post occupancy evaluation Furniture audits, selection and procurement Assistance with artwork selection Computer generated imagery – animation and stills Graphic design Signage and way finding
We also have associations with a number of other specialist consultancies and can offer the following additional services fully integrated into our overall offer:
COMPANY
Catering design and specification Acoustics Fire engineering Measured surveys Specialist lighting – internal and external External landscaping – hard and soft Audio visual design and specification Relocation management
DESIGN & BUILD: OD CONSTRUCTIVE DESIGN STAGE 4 CONSTRUCTION
STAGE 1 DESIGN
• Setting up of site & Logistics • Coordination of works • Construction Programme management • Reporting structure • Financial control • Close-out • ZerOdefects
• Feasibility – Test Fits • Concept Design • Detailed Design • Technical Design • Specialist Design • Construction Supervision
STAGE 3 PROCUREMENT • Identification of packages • Long lead Items • Specialist Packages • Placing of all orders • Coordination of project deliverables
PAGE 8
PROJECT LIFECYCLE
STAGE 2 PRE CONSTRUCTION • Initial Scope of Project • Budget setting & development • Programme management • Technical Coordination • Services & Systems Integration • Approval Coordination • Contract negotiation
PREPARED BY OD SOLUTIONS FOR SCHULTE ROTH & ZABEL LLP
OD SOLUTIONS & MCM ARCHITECTURE
DESIGN
COORDINATION PROFESSIONAL
COMPANY
PRE CONSTRUCTION
COLLABORATION
CONSTRUCTION
QUANTIFICATION ACCOUNTABLE
EXECUTION
SPECIALIST PARTNERS • IT & AV • FURNITURE
COMPLETION RESPONSIBLE
PAGE 10
PREPARED BY OD SOLUTIONS FOR SCHULTE ROTH & ZABEL LLP
SIMPSON THATCHER BARTLETT CITY POINT
›› ›› ›› ››
Project Manager: Quantity Surveyor: M & E: Duration:
PROJECT PROFILES
Murray Symonds Currie & Browns TB & A 8 weeks
The fit out of the kitchen/staff dining areas consisting of the removal of the old kitchen and installation of a complete new updated catering facility. The works comprised • Stripout; • New ceilings fitted throughout; • Installation of a new kitchen; • New lighting, wall and floor coverings;
• New timber flooring; • Finishes including ceramic tiles and carpet; • New state of the art equipment with complimenting units.
PAGE 12
PREPARED BY OD SOLUTIONS FOR SCHULTE ROTH & ZABEL LLP
MCCARTHY TETRAULT GRAYS INN ROAD, WC1
›› Value ›› Size: ›› Duration:
£600,000 7,000 sq ft 8 weeks
CAT B fit out of occupied building comprising: • New Bene double glazed partitions, • High spec bespoke joinery to reception and meeting rooms/ board room, • Modifications to mechanical services to suit new layout, • High class finishes including stone floor to reception, • Support areas including comms room, • Bespoke kitchen/breakout area.
PROJECT PROFILES
PAGE 14
PREPARED BY OD SOLUTIONS FOR SCHULTE ROTH & ZABEL LLP
ADDLESHAW GODDARD CHISWELL STREET, LONDON
›› ›› ›› ››
Procurement: Architect: Completion: Size
Design & Build MCM Architects 2009 175,000 sq ft
The client areas are designed on a highly serviced hotel principle. Clients and visitors from other offices are encouraged to drop in to use the facilities which comprise a variety of work and meeting settings again, supported by appropriate technology, including extensive wi-fi areas, tele-conferencing and video conferencing facilities. The project had a tight programme, where client decisions needed to be made quickly - the challenge to MCM was to provide timely information for these far reaching decisions. The transformation was completed well within budget and on programme, reflectingand supporting Addleshaw Goddard’s ambitions for their business, and has set a new benchmark for the 21st century legal office.
PROJECT PROFILES
PAGE 16
PREPARED BY OD SOLUTIONS FOR SCHULTE ROTH & ZABEL LLP
PINSENT MASONS 30 CROWN PLACE, LONDON, UK
›› Procurement: ›› Completion
Design & Build 2011
›› Size
160,000 sq ft
Following a review of moving to a non-cellular working model and addressing key drivers such as communication, interaction, team working, privacy, concentration and confidentiality, the decision was taken to move to open plan. Generic workplace components have been used, which staff can personalise and jewelled colours in similar tones are dotted around, injecting life into the open plan area. The new environment has succeeded in making the workforce more efficient, effective and responsive, and it truly supports everyone’s individual needs. Pinsent Masons’ aspirations to make this the best non-cellular working environment in London are reflected in what is a truly bespoke creative, yet practical fit-out. In order to support our client’s sustainability initiatives, MCM introduced its sustainability charter on this project, which assists in understanding and quantifying the range of sustainable initiatives available and identifying those which the client wishes to embed in the process.
PROJECT PROFILES
PAGE 18
PREPARED BY OD SOLUTIONS FOR SCHULTE ROTH & ZABEL LLP
NORTON ROSE 3 MORE LONDON RIVERSIDE, LONDON
›› Procurement: ›› Size: ›› Completion:
Design & Build 240,000 sq ft 2007
The typical fee earning floors were specifically generic in layout to support effective and efficient churn with minimal disruption to support the client’s growing business. Client facilities on the 9th floor, accessed by scenic lifts from the atrium, take full advantage of spectacular views and were designed to offer world class meeting, dining and entertaining spaces. At ground floor there is staff dining, including a coffee shop, retail outlet, lounge area for staff presentations and informal meetings, along with a large servery. In addition a large training facility and auditorium, all with audio visual equipment, demonstrate the client’s commitment to continuous professional development.
PROJECT PROFILES
CERTIFICATION
PAGE 20
PREPARED BY OD SOLUTIONS FOR SCHULTE ROTH & ZABEL LLP
SUSTAINABLE CREDENTIALS
Fit‐out Sustainability Assessment This is to certify that
Paradigm Housing Group Building A1 Glory Park High Wycombe Bucks HP10
has achieved the Ska rating of
Silver
Pringle Brandon LLP Accredited Assessor
Paradigm Housing Group On behalf of
Savills Commercial Ltd Project Manager
Mansfield Monk Architect
OD Projects Contractor
Capita Symonds Building Services Engineer
Glory Park, High Wycombe Certificate Reference
29/06/2010 Date This certificate has been produced using Ska Rating Offices version 1.0
CERTIFICATION
PAGE 22
PREPARED BY OD SOLUTIONS FOR SCHULTE ROTH & ZABEL LLP
WHY OD & MCM? In appointing OD Solutions and MCM Architecture, potential clients will be taking full advantage of the following key areas that we believe differentiate us from our competitors: • NO LEARNING CURVE - A proven understanding of London’s fit-out market, standards and quality expectations. • LOCAL & INTERNATIONAL – A dedicated team of professionals based in both London and Singapore • DESIGN – A partnership with “BEST IN CLASS” leading interior design & architect practice MCM with extensive experience of financial clients and up to date knowledge of trends and regulations. A design with Integrity • COST CERTAINTY – commercial competitiveness and understanding of clients’ value aspirations • COMMUNICATION – Open and honest communication; we won’t make promises we know we can’t keep • COORDINATION – A thorough understanding of all the approvals process and associated requirements • DEDICATED – Project Manager & Site Manager assigned to project for the duration of the project • QUALITY – A team who care about the end product, service and delivery • DETAIL - A design with Integrity and high finished product – Not Design & Dump • EXPERIENCE - An extensive proven sub-contractor and supplier base • ENGINEERED - A cohesive application of the building environment and “In house” MEP coordination • TRANSPARENCY - A clearly thought out process within an open and honest culture
OD SOLUTIONS 1 SUN STREET LONDON EC2A 2EP