AN INTRODUCTION TO OD
WELCOME Od is London’s leading fit-out and refurbishment company in commercial, residential and leisure. We provide the very best specialist construction skills from project initiation to completion, and we can cope with any scale project including new builds. We’re experts in organising people and materials within tight timescales. Jon Kearney has put together a dedicated team with over 50 years’ collective experience as London and the South East’s leading high-quality contractor Within this document you will find a selection of our recently completed commercial office projects
COMPANY HISTORY Founded in 2004 by Jon Kearney (Managing Director). OD has over 50 years collective experience as London and South East’s leading High Quality fitout contractor and we are keen to demonstrate our team player approach by working closely with all members of professional teams on their projects. We believe we have the best team of individuals available who have extensive knowledge and experience. These benefits will ensure a smooth delivery that will exceed a project team’s expectations.
In January Jon Kearney founds OD Projects.
2004
•
Client base expanded to include Royal & Sun Alliance, O2, AIB, Morley Fund, and GIS Interpublic.
•
Consultants include Gensler, Cushman & Wakefield, Barr Gazetas, and Leslie Clark.
•
Royal & Sun Alliance approved contractor status.
2005
•
OD Projects client list includes Arsenal FC, Scott Brownrigg, AYH, and Price & Myers.
•
Recruitment of Commercial Director (Managing Surveyor of top fit out company)
•
Recruitment of Construction Director (BCO & FX Quality Award Winner)
2006
•
OD Projects complete £4 million, 107 Leadenhall, fit out.
•
OD Projects achieve ISO9001 status.
2007
2008
•
AIB framework contractor.
•
OD Projects currently employ 25 staff.
•
Achieve British Council for offices corporate member status.
•
Sign 5 year lease and fit out Moorgate HQ.
•
Jon Kearney finalist for G4_ New Generation Awards – Entrepreneurship Award.
•
Od appointed on Savills Estate Agency office fitout framework
•
Repeat business levels at 70% of turnover and growing
•
Notable project wins for Dow Jones, Royal London Asset Management, Fendi,National Australia Group and Berkeley Group Marketing Suites
•
Od completes its first hotel refurbishment for launch of exciting new venture for Safestay in London
•
Education sector expansion with successful fitout projects for Partnerships For Schools and North Herts College
•
Od working on over 50000sqft of Londons super prime residential projects in Knightsbridge, Kensington & Hampstead
•
Savills approved contractor
•
•
High end residential team acknowledged as leading contractor within sector
Od Group formed, divisions focused on Commercial Fitout, Super prime Residential and Commercial Design & Build
•
Awarded refurbishment for Royal Albert Hall
•
OD Expand office space to take another floor at Sun St HQ
2009
2010
2011
2012
• •
Rolls Royce Framework contractor Green Apple Award for Digitas Saatchi & Saatchi
•
Forecast record turnover of circa £20m in with Business Plan.
•
Official launch of aftercare team ‘ZEROdEFECTS’.
•
Instutute of Chartered Accountants Framework contractor
•
Successful completion of first Irish project for Marcus Evans HQ in Dublin.
•
Awarded Vogue /Condenast HQ fitout
•
Notable project wins for clients such as Finchatton, BMB Property, United Continental Airlines, Safestay and Royal London Asset Management.
•
Commitment to sustainability – BREEAM ‘Excellent’ achieved on refurbishment of RLAM property in Crawley, LEED silver certification achieved for Harris Williams fit out in Mayfair, SKA silver certificate achieved for Paradigm Housing in High Wycombe.
•
Rebrand of Od which defines our focus and disciplined approach to achieving quality.
TURNOVER Recently Od were delighted to announce the formation of the Od Group (Od Holdings) This has provided a transparent platform for our service to continually improve, allowing our key staff to drive their core skills specifically within their respective specialist division The group organisation commenced from the 2013/ 2014 financial period and is currently forecasting an overall turnover of £24million, £12 million of our forecast was secured prior to commencement of the new April to Apil financial period.
OD GROUP TURNOVER 2014/2015 (Projected)
Secured
2013/2014 (Projected)
Secured
2012/2013 2011/2012 0
2
4
6
8
10
12
14
(Turnover £m April-April)
2013/2014 (Projected) OD Projects
Secured Secured Secured
OD Solutions
OD Interiors
16
18
20
22
24
26
OD HOLDINGS Jon Kearney Managing Director
OD INTERIORS OD Andy INTERIORS Torlot Director
Steve Cherry Construction Director
Greg Pinchin Commercial Director
OD PROJECTS Jon Kearney Director
OD SOLUTIONS Andrew Wright Director
** Company No: 06494819
** Company No: 5029142
** Company No: 8401423
Specialising in interior fit out and construction to the professional construction industry.
Specialist high end residential refurbishment and construction company working closely with high net worth clients, developers and architects to deliver unique boutique interiors
Set up to cater for direct End User clients requiring a ‘one stop shop’ turnkey solution. Working with interior design and architecture companies Od are procurement specialist to take a client from concept to completion under one roof.
Working closely with Architects, Project Managers, Quantity Surveyors and direct for end user clients. Covering all sectors including Commercial, Retail and Leisure
** 1 Sun Street, London, EC2A 2EP
SAPINDA
LEVEL 5, 25 PARK LANE, W1
Procurement:
Design & Build
Strip out and new fit out of existing occupied offices in two separate phases.
Architect Project Manager Quantity Surveyor
Gensler Gensler Montie
The works undertaken comprised:
Duration Value Size
11 Weeks £600,000 3000 sq ft
• New Cellularized Offices,
• Specialist joinery,
• New Meeting and Board rooms,
• New Lighting inclusive of feature lighting installed throughout into the existing suspended ceiling and the new plasterboard.
• High spec stone reception, • Stone flooring,
HARRIS WILLIAMS LEVEL 2, BROOK STREET MAYFAIR
Procurement:
Design & Build
CAT B fit out of the first floor newly refurbished occupied building to provide a high quality office.
Project Manager Gensler Architect Gensler
The works comprised: • High quality bespoke joinery,
• Handmade carpet flooring,
Duration Value Size
• Mechanical & electrical modifications,
• Audio visual installations.
10 weeks £535,000 7000 sqft
• Double glazed BENE partitions & doors,
PARADIGM HOUSING HIGH WYCOMBE
Quantity Surveyor: Architect:
Heasmans Mansfield Monk
The 40,000sq ft fit out from CAT A of Building 1A, Glory Park for Paradigm Housing Association to provide them with their headquarters. Works included:
Duration: Size:
9 weeks 40,000 sq ft
• Structural modifications;
• New Reception;
• Revision of basebuild services;
• 5 New kitchens & Breakout station;
• Dedicated comms room with UPS backups;
• Board room with integral AV installation;
• Formation of new glazed offices;
• Third project in UK to achieve Silver SKA Rating for sustainability.
• General fit out of office space over all floors;
DOW JONES GRAYS INN RAOD, LONDON
Procurement:
Design & Build
Refurbishment of office floor whilst the building remained in full occupation, works included:
Architect: Quantity Surveyor: Services Consultant:
Edge Arcadis Arcadis
Duration: Value: Size:
12 weeks £1m 30,000 sq ft
• Strip out • Installation of new electrical & mechanical services • Glass partitions • Fit Out of new toilets
• Tea Points • High specification restaurant • Floor coverings
WINCOR NIXDORF DARTFORD
Architect: Project Manager:
Pure Design Savills
The complete strip out of the existing office building and installation of a CAT B fit out comprising
Project Value: Duration:
£1,100,000 14 Weeks
• Raised floor & ceilings;
• Toilet fit out;
• New partition layout including glazed walls;
• External works.
• Air conditioning;
MARCUS EVANS SIMMONSCOURT HOUSE DUBLIN
Procurement:
Design & Build
Cat B commercial office fit out at Simmonscourt House in Dublin,
Architect:
BLDA
Works included:
Duration: Value: Size
12 Weeks £700,000 9000 sq ft
• New Offices,
• Staff break out areas,
• New Meeting and Board rooms,
• New comms Room,
• High spec reception,
SUSTAINABILITY Od is taking positive steps to reduce its own carbon footprint – from the office environment to the manufacturing process. Wherever possible we control emissions, recycle, use renewable resources and conserve energy. We and have received numerous environmental awards and accreditations including: • SKA – Silver • BREEAM – Excellent • LEED™ – Silver • Green Apple Award
“
Just a quick note to thank you for all your hard work on Crawley, In particular I think the BREEAM Excellent is a fantastic result. Well done, great team effort and thank you once again Philip Sutton Developments Project Manager - Property Royal London Asset Management
�
CERTIFICATION CERTIFICATION
Presented to
Patrick Mcloone Of
OD Developments and Projects Ltd For
Portland Building
Robert Biggs Chairman, Considerate Constructors Scheme Ltd.
Issue Date: 16 September 2011 Site ID: 52602
PAGE 96
PREPARED BY OD SOLUTIONS FOR TEMASEK INTERNATIONAL (EUROPE) LIMITED
SUSTAINABLE CREDENTIALS
Fit‐out Sustainability Assessment This is to certify that
Paradigm Housing Group Building A1 Glory Park High Wycombe Bucks HP10
has achieved the Ska rating of
Silver
Pringle Brandon LLP Accredited Assessor
Paradigm Housing Group On behalf of
Savills Commercial Ltd Project Manager
Mansfield Monk Architect
OD Projects Contractor
Capita Symonds Building Services Engineer
Glory Park, High Wycombe Certificate Reference
29/06/2010 Date This certificate has been produced using Ska Rating Offices version 1.0
CERTIFICATION
ZER
efects
Od operates a ‘zero defects’ plan. This is more commonly known as a quality plan. The plan is written at the commencement of the project and sets out to achieve as high a quality delivery as possible. This is not just in the finished product, it covers every stage of the project including management techniques as follows; STAGE 1 – PLANNING FOR QUALITY • Zero Defects Introduction Meeting • Detailed Design Review • Identify Quality Risks • Identify Work Zones/ Sequencing/ Phasing • Sub-contractor Target Programme STAGE 2 – INFORMATION RELEASE • Drawing/ Information Release Schedule • Sample Schedule • Off Site Inspection Schedule STAGE 3 – SETTING QUALITY STANDARDS • Benchmarking • Sample Approval • Key Inspections • Protection Regime
COMPANY
STAGE 4 – REVIEW & QUALITY CONTROL SIGN OFF • Review • Monitoring • Handover STAGE 5 – SNAGGING & DEFECTS • Defects Process • Identifying Defects • Site Mark Ups • Sub-Contractor Defect Management • Defect Reporting STAGE 6 – PROJECT CLOSE OUT • Finalisation Plan • Close Out Programmes • Defect Reporting • Record Document • Client Familiarisation