‘‘We shape our buildings;thereafter they shape us’’ Sir Winston Churchill
FOREWORD The OD Group was founded in 2004 by Jon Kearney to work within the construction industry alongside many of the professional bodies in the interiors market to deliver high quality interior projects across commercial, residential, and leisure sectors. Over the past decade, steady growth and the consistent delivery of projects through some of the UK’s most exciting and challenging times has resulted in OD gaining respect from not only the professional bodies that we work with but also our peers and the wider business community. OD is one of the Capital’s leading integrated design, project management and construction companies. With our partners we undertake various different projects in terms of scale and complexity for a diverse client base. We provide the very best specialist expertise in all facets of the construction process, from project initiation to completion. Our talented and experienced team has been hand picked, trained and supported so that they can achieve the very best results. The team is made up of like-minded individuals who understand the importance of attention to detail and the essential need for a high quality end product. We do not consider ourselves to be builders or contractors, but craftsmen who can be proud of what we produce from conception to completion. We genuinely enjoy working with a diverse range of companies from large multinationals to small privately owned businesses, taking care that each solution we design and implement reflects the individual needs of the client. OD enjoys a high level of repeat business from many of our clients; a testament indeed to the professionalism and dedication of all our staff, which is something we believe that sets us apart in the market. Our trademark is combining high quality interior design and commercial acumen with best practice delivery in the market place. The OD Management team is extremely passionate about what we do and supports all the staff within our business who enable us to deliver beyond our client’s expectations. What each client has in common, is a desire that their project is undertaken with complete attention to detail, is within budget, and delivered on time by a professional team. They also wish for the project, which can often be the cause of great stress within an organisation, to be as pleasurable an experience as possible. At OD, we believe we can exceed all of our client’s needs and expectations.
Steve Cherry Construction Director
PAGE 2
Jon Kearney Managing Director
Greg Pinchin Commercial Director
PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGY
HISTORY
In January Jon Kearney founds OD Projects.
2004
PAGE 3
•
Client base expanded to include Royal & Sun Alliance, O2, AIB, Morley Fund, and GIS Interpublic.
•
Consultants include Gensler, Cushman & Wakefield, Barr Gazetas, and Leslie Clark.
•
Royal & Sun Alliance approved contractor status.
2005
•
OD Projects client list includes Arsenal FC, Scott Brownrigg, AYH, and Price & Myers.
•
Recruitment of Commercial Director (Managing Surveyor of top fit out company)
•
Recruitment of Construction Director (BCO & FX Quality Award Winner)
2006
• •
OD Projects complete £4 million, 107 Leadenhall, fit out.
2008
•
AIB framework contractor.
•
OD Projects currently employ 25 staff.
•
Achieve British Council for offices corporate member status.
•
Sign 5 year lease and fit out Moorgate HQ.
•
Jon Kearney finalist for G4_ New Generation Awards – Entrepreneurship Award.
•
Repeat business levels at 70% of turnover and growing
•
Notable project wins for Dow Jones, Royal London Asset Management, Fendi,National Australia Group and Berkeley Group Marketing Suites
•
Od completes its first hotel refurbishment for launch of exciting new venture for Safestay in London
Education sector expansion with successful fitout projects for Partnerships For Schools and North Herts College
•
Od working on over 50000sqft of Londons super prime residential projects in Knightsbridge, Kensington & Hampstead
•
Savills approved contractor
•
•
High end residential team acknowledged as leading contractor within sector
Od Group formed, divisions focused on Commercial Fitout, Super prime Residential and Commercial Design & Build
•
Awarded refurbishment for Royal Albert Hall
•
OD Expand office space to take another floor at Sun St HQ
2009
• •
Od appointed on Savills Estate Agency office fitout framework
•
OD Projects achieve ISO9001 status.
2007
•
2010
2011
2012
Rolls Royce Framework contractor Green Apple Award for Digitas Saatchi & Saatchi
•
Forecast record turnover of circa £20m in with Business Plan.
•
Official launch of aftercare team ‘ZEROdEFECTS’.
•
Instutute of Chartered Accountants Framework contractor
•
Successful completion of first Irish project for Marcus Evans HQ in Dublin.
•
Awarded Vogue /Condenast HQ fitout
•
Notable project wins for clients such as Finchatton, BMB Property, United Continental Airlines, Safestay and Royal London Asset Management.
•
Commitment to sustainability – BREEAM ‘Excellent’ achieved on refurbishment of RLAM property in Crawley, LEED silver certification achieved for Harris Williams fit out in Mayfair, SKA silver certificate achieved for Paradigm Housing in High Wycombe.
•
Rebrand of Od which defines our focus and disciplined approach to achieving quality.
PREPARED BY OD SOLUTIONS FOR SAVILLS WEST END LONDON
OD HOLDINGS Jon Kearney Managing Director
OD INTERIORS OD Andy INTERIORS Torlot Director
Specialising in interior fit out and construction to the professional construction industry. Working closely with Architects, Project Managers, Quantity Surveyors and direct for end user clients.
Steve Cherry Construction Director
Greg Pinchin Commercial Director
OD PROJECTS Graham Cann Director
Specialist high end residential refurbishment and construction company working closely with high net worth clients, developers and architects to deliver unique boutique interiors
OD SOLUTIONS Andrew Wright Director
Set up to cater for direct End User clients requiring a ‘one stop shop’ turnkey solution. Working with interior design and architecture companies Od are procurement specialist to take a client from concept to completion under one roof.
Covering all sectors including Commercial, Retail and Leisure
PAGE 4
PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGY
TURNOVER
OD GROUP TURNOVER 2014/2015 (Projected)
Secured
2013/2014 (Projected)
Secured
2012/2013 2011/2012 0
2
4
6
8
10
12
14
16
18
20
22
24
26
(Turnover £m April-April)
PAGE 5
PREPARED BY OD SOLUTIONS FOR SAVILLS WEST END LONDON
PAGE 6
PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGY
OD SOLUTIONS: INTERIOR DESIGN & ARCHITECT PARTNERS At OD we select the very best UK and International design partners to work on all projects. The scope of professional services that we offer includes:
Master planning Due diligence and building evaluation Design team leader Feasibility studies Condition surveys Lease support Development and base build monitoring Brief gathering Workplace strategy and change management Space planning Architectural and interior design through all RIBA work stages Building refurbishment to the following standards: - Shell andCore - Cat A - Cat B
Building extensions Core reconfigurations and other major structural interventions Planning applications and local authority liaison Contract administration Post occupancy evaluation Furniture audits, selection and procurement Assistance with artwork selection Computer generated imagery – animation and stills Graphic design Signage and way finding
We also have associations with a number of other specialist consultancies and can offer the following additional services fully integrated into our overall offer:
PAGE 7
Catering design and specification Acoustics Fire engineering Measured surveys Specialist lighting – internal and external External landscaping – hard and soft Audio visual design and specification Relocation management
PREPARED BY OD SOLUTIONS FOR SAVILLS WEST END LONDON
DESIGN & BUILD: OD CONSTRUCTIVE DESIGN STAGE 4 CONSTRUCTION • Setting up of site & Logistics • Coordination of works • Construction Programme management • Reporting structure • Financial control • Close-out • ZerOdefects
STAGE 3 PROCUREMENT • Identification of packages • Long lead Items • Specialist Packages • Placing of all orders • Coordination of project deliverables
PAGE 8
STAGE 1 DESIGN
PROJECT LIFECYCLE
• Feasibility – Test Fits • Concept Design • Detailed Design • Technical Design • Specialist Design • Construction Supervision
STAGE 2 PRE CONSTRUCTION • Initial Scope of Project • Budget setting & development • Programme management • Technical Coordination • Services & Systems Integration • Approval Coordination • Contract negotiation
PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGY
OD SOLUTIONS & BLUEBOTTLE
DESIGN
PRE CONSTRUCTION
BLUeBOTTLe
COORDINATION PROFESSIONAL
PAGE 9
Od SOLUTIONS
COLLABORATION
CONSTRUCTION
Od SOLUTIONS
QUANTIFICATION ACCOUNTABLE
EXECUTION
SPECIALIST PARTNERS • IT & AV • FURNITURE
COMPLETION RESPONSIBLE
PREPARED BY OD SOLUTIONS FOR SAVILLS WEST END LONDON
PAGE 10
PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGY
SAPINDA LEVEL 5, 25 PARK LANE, W1
› › › › › › ›
Procurement: Architect Project Manager Quantity Surveyor Duration Value Size
Design & Build Gensler Gensler Montie 11 Weeks £600,000 3000 sq ft
Strip out and new fit out of existing occupied offices in two separate phases. The works undertaken comprised: • New Cellularized Offices, • New Meeting and Board rooms, • High spec stone reception, • Stone flooring, • Specialist joinery, • New Lighting inclusive of feature lighting installed throughout
PAGE 11
PREPARED BY OD SOLUTIONS FOR SAVILLS WEST END LONDON
PAGE 12
PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGY
HARRIS WILLIAMS LEVEL 2, 63 BROOK STREET, MAYFAIR, W1
› › › › ›
Project Manager: Architect: Duration: Size: Value:
Gensler Gensler 14 weeks 10,000 sq ft £535,000
CAT B fit out of the first floor newly refurbished occupied building to provide a high quality office. The works comprised: • High quality bespoke joinery, • Mechanical & electrical modifications, • Double glazed BENE partitions & doors, • Handmade carpet flooring, • Audio visual installations.
PAGE 13
PREPARED BY OD SOLUTIONS FOR SAVILLS WEST END LONDON
PAGE 14
PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGY
MARCUS EVANS SIMMONSCOURT HOUSE
› › › › ›
Procurement: Architect: Duration: Value: Size
Design & Build Barrett Lloyd Davis Associates 12 Weeks £700,000 9000 sq ft
Cat B commercial office fit out at Simmonscourt House in Dublin, Works included: • New Offices, • New Meeting and Board rooms, • High spec reception, • Staff break out areas, • New comms Room,
PAGE 15
PREPARED BY OD SOLUTIONS FOR SAVILLS WEST END LONDON
PAGE 16
PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGY
DOW JONES GRAYS INN ROAD, WC1
› › › › › ›
Procurement: Architect Quantity Surveyor Duration Value Size
Design & Build Edge Arcadis 12 Weeks £1,000,000 30,000 sq ft
Refurbishment of office floor whilst the building remained in full occupation, works included: • Strip out • Installation of new electrical & mechanical services • Glass partitions • Fit Out of new toilets • Tea Points • High specification restaurant • Floor coverings
PAGE 17
PREPARED BY OD SOLUTIONS FOR SAVILLS WEST END LONDON
PAGE 18
PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGY
ROLLS ROYCE PRIDE PARK, DERBY
› › › › › ›
Quantity Surveyor: Architect: Services Consultant: Project Value Duration Size:
PAGE 19
Gleeds DEGW ARUP £2,000,000 21 weeks 60,000 sq ft
Under the design and build contract the fit out and refurbishment of two floors of G-Wing evolved to a negotiated second phase involving a further three floors of similar works comprising, new suspended ceilings, new partition layouts with glazed walls, air conditioning modifications, new electrical installations, toilet fit out and specialist joinery.
PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGY
PAGE 20
PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGY
ARTEMIS ST JAMES ST, SW1
› › › › › › ›
Procurement: Quantity Surveyor: Architect: Project Manager: Project Value Duration Size:
Design & Build DTZ Bluebottle DTZ £1,400,000 14 weeks 6000 sq ft
• Total strip out of existing offices including M&E. • New ceilings, largely MF ceilings with integrated recessed lighting features • New meeting rooms, walnut hardwood fold back glazed doors • Horizontally laid walnut veneered sliding folding walls • Privalight glazing to boardroom • Wide planked white oiled oak floor • Specialist macassar ebony joinery • Specialist lighting
PAGE 21
PREPARED BY OD SOLUTIONS FOR SAVILLS WEST END LONDON
PAGE 22
PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGY
PERMAL ST JAMES ST, SW1
› › › › › › ›
Procurement: Architect: Quantity Surveyor: Project Manager: Project Value Duration Size:
PAGE 23
Design & Build Bluebottle Savills Savills £1,800,000 12 weeks 18,000 sq ft
Fit out of a Grade II listed building in St James’s Square. • The design and co-ordination of a bespoke polished stainless steel staircase linking the two occupied floors • Bespoke leather and high gloss polished joinery • Bespoke translucent feature glazing screen between reception and breakout space • Large breakout space
PREPARED BY OD SOLUTIONS FOR SAVILLS WEST END LONDON
PAGE 24
PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGY
ORIEL SECURITIES CHEAPSIDE, EC2
› › › › › › ›
Procurement: Architect: Quantity Surveyor: Project Manager: Project Value Duration Size:
Traditional Bluebottle Bigham Anderson Partnership King Sturge £1,500,000 12 weeks 16,000 sq ft
Fit out of a recently completed Cat A development • Project divided into two halves. • The front of house, client facing reception and meeting suits. • The private work area, incorporating 170 open plan desks, quiet and internal meeting rooms as well as a large break out space. • Large pivoting glass screen doors to the boardroom • Bespoke ebony stained feature ceiling • Integrated bespoke joinery • MF ceiling with inset circular lighting features
PAGE 25
PREPARED BY OD SOLUTIONS FOR SAVILLS WEST END LONDON
CERTIFICATION
PAGE 26
PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGY
SUSTAINABLE CREDENTIALS
)LW RXW 6XVWDLQDELOLW\ $VVHVVPHQW 7KLV LV WR FHUWLI\ WKDW
3DUDGLJP +RXVLQJ *URXS %XLOGLQJ $ *ORU\ 3DUN +LJK :\FRPEH %XFNV +3 KDV DFKLHYHG WKH 6ND UDWLQJ RI
3ULQJOH %UDQGRQ //3 $FFUHGLWHG $VVHVVRU
3DUDGLJP +RXVLQJ *URXS 2Q EHKDOI RI
6DYLOOV &RPPHUFLDO /WG 3URMHFW 0DQDJHU
0DQVILHOG 0RQN $UFKLWHFW
6LOYHU
2' 3URMHFWV &RQWUDFWRU
&DSLWD 6\PRQGV %XLOGLQJ 6HUYLFHV (QJLQHHU
*ORU\ 3DUN +LJK :\FRPEH &HUWLILFDWH 5HIHUHQFH
'DWH
7KLV FHUWLILFDWH KDV EHHQ SURGXFHG XVLQJ 6ND 5DWLQJ 2IILFHV YHUVLRQ
PAGE 27
PREPARED BY OD SOLUTIONS FOR SAVILLS WEST END LONDON
PAGE 28
PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGY
WHY OD? In appointing OD Solutions potential clients will be taking full advantage of the following key areas that we believe differentiate us from our competitors: • NO LEARNING CURVE - A proven understanding of London’s fit-out market, standards and quality expectations. • LOCAL & INTERNATIONAL – A dedicated team of professionals based in both London and Singapore • DESIGN – A partnership with “BEST IN CLASS” leading interior design & architect practice Bluebottle with extensive experience of financial clients and up to date knowledge of trends and regulations. A design with Integrity • COST CERTAINTY – commercial competitiveness and understanding of clients’ value aspirations • COMMUNICATION – Open and honest communication; we won’t make promises we know we can’t keep • COORDINATION – A thorough understanding of all the approvals process and associated requirements • DEDICATED – Project Manager & Site Manager assigned to project for the duration of the project • QUALITY – A team who care about the end product, service and delivery • DETAIL - A design with Integrity and high finished product – Not Design & Dump • EXPERIENCE - An extensive proven sub-contractor and supplier base • ENGINEERED - A cohesive application of the building environment and “In house” MEP coordination • TRANSPARENCY - A clearly thought out process within an open and honest culture
Od
OD SOLUTIONS 1 SUN STREET LONDON EC2A 2EP
DESIGN