AN INTRODUCTION TO Od COMMERCIAL OFFICE
Od
WELCOME Od is London’s leading fit-out and refurbishment company in commercial, residential and leisure. We provide the very best specialist construction skills from project initiation to completion, and we can cope with any scale project including new builds. We’re experts in organising people and materials within tight timescales. Jon Kearney has put together a dedicated team with over 50 years’ collective experience as London and the South East’s leading high-quality contractor Within this document you will find a selection of our recently completed commercial office projects
COMPANY HISTORY Founded in 2004 by Jon Kearney (Managing Director). OD Projects has over 50 years collective experience as London and South East’s leading High Quality fitout contractor and we are keen to demonstrate our team player approach by working closely with all members of professional teams on their projects. We believe we have the best team of individuals available who have extensive knowledge and experience. These benefits will ensure a smooth delivery that will exceed a project team’s expectations.
In January Jon Kearney founds OD Projects.
2004
•
Client base expanded to include Royal & Sun Alliance, O2, AIB, Morley Fund, and GIS Interpublic.
•
Consultants include Gensler, Cushman & Wakefield, Barr Gazetas, and Leslie Clark.
•
Royal & Sun Alliance approved contractor status.
2005
•
OD Projects client list includes Arsenal FC, Scott Brownrigg, AYH, and Price & Myers.
•
Recruitment of Commercial Director (Managing Surveyor of top fit out company)
•
Recruitment of Construction Director (BCO & FX Quality Award Winner)
2006
•
OD Projects complete £4 million, 107 Leadenhall, fit out.
•
OD Projects achieve ISO9001 status.
2007
2008
•
AIB framework contractor.
•
OD Projects currently employ 25 staff.
•
Achieve British Council for offices corporate member status.
•
Sign 5 year lease and fit out Moorgate HQ.
•
Jon Kearney finalist for G4_ New Generation Awards – Entrepreneurship Award.
•
Od appointed on Savills Estate Agency office fitout framework
•
Repeat business levels at 70% of turnover and growing
•
Notable project wins for Dow Jones, Royal London Asset Management, Fendi,National Australia Group and Berkeley Group Marketing Suites
•
Od completes its first hotel refurbishment for launch of exciting new venture for Safestay in London
•
Education sector expansion with successful fitout projects for Partnerships For Schools and North Herts College
•
Od working on over 50000sqft of Londons super prime residential projects in Knightsbridge, Kensington & Hampstead
•
Savills approved contractor
•
•
High end residential team acknowledged as leading contractor within sector
Od Group formed, divisions focused on Commercial Fitout, Super prime Residential and Commercial Design & Build
•
Awarded refurbishment for Royal Albert Hall
•
OD Expand office space to take another floor at Sun St HQ
2009
2010
2011
2012
• •
Rolls Royce Framework contractor Green Apple Award for Digitas Saatchi & Saatchi
•
Forecast record turnover of circa £20m in with Business Plan.
•
Official launch of aftercare team ‘ZEROdEFECTS’.
•
Instutute of Chartered Accountants Framework contractor
•
Successful completion of first Irish project for Marcus Evans HQ in Dublin.
•
Awarded Vogue /Condenast HQ fitout
•
Notable project wins for clients such as Finchatton, BMB Property, United Continental Airlines, Safestay and Royal London Asset Management.
•
Commitment to sustainability – BREEAM ‘Excellent’ achieved on refurbishment of RLAM property in Crawley, LEED silver certification achieved for Harris Williams fit out in Mayfair, SKA silver certificate achieved for Paradigm Housing in High Wycombe.
•
Rebrand of Od which defines our focus and disciplined approach to achieving quality.
TURNOVER Recently Od were delighted to announce the formation of the Od Group (Od Holdings) This has provided a transparent platform for our service to continually improve, allowing our key staff to drive their core skills specifically within their respective specialist division The group organisation commenced from the 2013/ 2014 financial period and is currently forecasting an overall turnover of £24million, £12 million of our forecast was secured prior to commencement of the new April to Apil financial period.
OD GROUP TURNOVER 2014/2015 (Projected)
Secured
2013/2014 (Projected)
Secured
2012/2013 2011/2012 0
2
4
6
8
10
12
14
(Turnover £m April-April)
2013/2014 (Projected) OD Projects
Secured
OD Interiors
Secured Secured
0
2
OD Solutions 4
6
8
10
(Turnover £m April-April)
12
14
16
18
20
22
24
26
CONFIDENTIALITY In order for Od to be able to operate effectively we need to ensure that we maintain the confidence and respect of our clients. The clients of Od need to have confidence in their dealings with the Company in the knowledge that any information they provide will not be passed on to any other person or organisation. All staff employed by and associates contracted to Od will be expected to adhere to the company guidelines on confidentiality at all times.
SAPINDA LEVEL 5, 25 PARK LANE, W1
Procurement:
Design & Build
Strip out and new fit out of existing occupied offices in two separate phases.
Architect Project Manager Quantity Surveyor
Gensler Gensler Montie
The works undertaken comprised:
Duration Value Size
11 Weeks £600,000 3000 sq ft
• New Cellularized Offices,
• Specialist joinery,
• New Meeting and Board rooms,
• New Lighting inclusive of feature lighting installed throughout into the existing suspended ceiling and the new plasterboard.
• High spec stone reception, • Stone flooring,
HARRIS WILLIAMS LEVEL 2, BROOK STREET MAYFAIR
Procurement:
Design & Build
CAT B fit out of the first floor newly refurbished occupied building to provide a high quality office.
Project Manager Gensler Architect Gensler
The works comprised: • High quality bespoke joinery,
• Handmade carpet flooring,
Duration Value Size
• Mechanical & electrical modifications,
• Audio visual installations.
10 weeks £535,000 7000 sqft
• Double glazed BENE partitions & doors,
MARCUS EVANS SIMMONSCOURT HOUSE DUBLIN
Procurement:
Design & Build
Cat B commercial office fit out at Simmonscourt House in Dublin,
Architect:
BLDA
Works included:
Duration: Value: Size
12 Weeks £700,000 9000 sq ft
• New Offices,
• Staff break out areas,
• New Meeting and Board rooms,
• New comms Room,
• High spec reception,
INSTITUTE OF CHARTERED ACCOUNTANTS MOORGATE, LONDON, EC2
Architect: Quantity Surveyor: Project Manager:
Pringle Brandon Sense Jones Lang LaSalle
Considerable refurbishment of Grade II listed building including Cat B fit out whilst the building remained in full occupation
Duration: Finish Date: Value: Size:
18 weeks September 2010 £1m 8,000 sq ft
• Strip out/demolition; • Installation of new floor slab linking library & members lounge; • Removal of structural walls & installation of steel support work; • Installation of new electrical & mechanical services & DDA lift;
Works included: • Relocation and new central plant serving 3 buildings • New partitions; • Fit out of new toilets; • Construction of a new mezzanine floor.
DOW JONES GRAYS INN RAOD, LONDON
Procurement:
Design & Build
Refurbishment of office floor whilst the building remained in full occupation, works included:
Architect: Quantity Surveyor: Services Consultant:
Edge Arcadis Arcadis
Duration: Value: Size:
12 weeks £1m 30,000 sq ft
• Strip out • Installation of new electrical & mechanical services • Glass partitions • Fit Out of new toilets
• Tea Points • High specification restaurant • Floor coverings
MCCARTHY TETRAULT LEVEL 26, 125 OLD BROAD STREET
Architect: Project Manager: Quantity Surveyor: M & E:
Gensler Gensler Montie Associates Chapman Bathurst
Value Size: Duration:
£600,000 7,000 sq ft 8 weeks
CAT B fit out of occupied building comprising: • New Bene double glazed partitions, • High spec bespoke joinery to reception and meeting rooms/ board room, • Modifications to mechanical services to suit new layout,
• High class finishes including stone floor to reception, • Support areas including comms room, • Bespoke kitchen/breakout area.
RLAM PORTLAND, CRAWLEY
Architect: Quantity Surveyor: Services Consultant: Structural Engineer:
Orbit Architects Cyril Leonard Lamorbey Associates Connisbee
Duration: Finish Date: Value: Size: Form of Contract:
18 weeks September 2011 £2.3m 25,000 sq ft JCT D&B
Complete refurbishment of town centre office premises set over 3 floors, to Cat A standard • BREEAM ‘Excellent’ rated;
• New entrance canopy and internal reception;
• Full Design & Build;
• External landscaping;
• Complete replacement of main plant and all on floor services;
• Refurbishment of multi-storey car park.
SUSTAINABILITY Od is taking positive steps to reduce its own carbon footprint – from the office environment to the manufacturing process. Wherever possible we control emissions, recycle, use renewable resources and conserve energy. We and have received numerous environmental awards and accreditations including: • SKA – Silver • BREEAM – Excellent • LEED™ – Silver • Green Apple Award
“
Just a quick note to thank you for all your hard work on Crawley, In particular I think the BREEAM Excellent is a fantastic result. Well done, great team effort and thank you once again Philip Sutton Developments Project Manager - Property Royal London Asset Management
�
ZEROdEFECTS ZERO DEFECTS IS A COMMITMENT OD GIVE TO EVERY PROJECT • Dedicated Aftercare Manager – Paul Kent • Active involvement in FF&E, Client IT and the migration process • O & M manuals issued and approved • Maintenance Contracts in place • Defect awareness process – simple effective and reactive
Od 1 Sun Street London EC2A 2EP