Intro to od resijune13

Page 1

AN INTRODUCTION TO OD

RESIDENTIAL EXPERIENCE

Od


WELCOME Od is London’s leading fit-out and refurbishment company in commercial, residential and leisure. We provide the very best specialist construction skills from project initiation to completion, and we can cope with any scale project including new builds. We’re experts in organising people and materials within tight timescales. Jon Kearney has put together a dedicated team with over 50 years’ collective experience as London and the South East’s leading high-quality contractor Within this document you will find a selection of our recently completed commercial office projects



COMPANY HISTORY Founded in 2004 by Jon Kearney (Managing Director). OD Projects has over 50 years collective experience as London and South East’s leading High Quality fitout contractor and we are keen to demonstrate our team player approach by working closely with all members of professional teams on their projects. We believe we have the best team of individuals available who have extensive knowledge and experience. These benefits will ensure a smooth delivery that will exceed a project team’s expectations.

In January Jon Kearney founds OD Projects.

2004

• • •

Client base expanded to include Royal & Sun Alliance, O2, AIB, Morley Fund, and GIS Interpublic.

Consultants include Gensler, Cushman & Wakefield, Barr Gazetas, and Leslie Clark.

Royal & Sun Alliance approved contractor status.

2005

OD Projects client list includes Arsenal FC, Scott Brownrigg, AYH, and Price & Myers. Recruitment of Commercial Director (Managing Surveyor of top fit out company) Recruitment of Construction Director (BCO & FX Quality Award Winner)

2006

OD Projects complete £4 million, 107 Leadenhall, fit out.

OD Projects achieve ISO9001 status.

2007

2008

AIB framework contractor.

OD Projects currently employ 25 staff.

Achieve British Council for offices corporate member status.

Sign 5 year lease and fit out Moorgate HQ.

Jon Kearney finalist for G4_ New Generation Awards – Entrepreneurship Award.

Od appointed on Savills Estate Agency office fitout framework

Repeat business levels at 70% of turnover and growing

Notable project wins for Dow Jones, Royal London Asset Management, Fendi,National Australia Group and Berkeley Group Marketing Suites

Od completes its first hotel refurbishment for launch of exciting new venture for Safestay in London

Education sector expansion with successful fitout projects for Partnerships For Schools and North Herts College

Od working on over 50000sqft of Londons super prime residential projects in Knightsbridge, Kensington & Hampstead

Savills approved contractor

High end residential team acknowledged as leading contractor within sector

Od Group formed, divisions focused on Commercial Fitout, Super prime Residential and Commercial Design & Build

Awarded refurbishment for Royal Albert Hall

OD Expand office space to take another floor at Sun St HQ

2009

2010

2011

2012

• •

Rolls Royce Framework contractor Green Apple Award for Digitas Saatchi & Saatchi

Forecast record turnover of circa £20m in with Business Plan.

Official launch of aftercare team ‘ZEROdEFECTS’.

Instutute of Chartered Accountants Framework contractor

Successful completion of first Irish project for Marcus Evans HQ in Dublin.

Awarded Vogue /Condenast HQ fitout

Notable project wins for clients such as Finchatton, BMB Property, United Continental Airlines, Safestay and Royal London Asset Management.

Commitment to sustainability – BREEAM ‘Excellent’ achieved on refurbishment of RLAM property in Crawley, LEED silver certification achieved for Harris Williams fit out in Mayfair, SKA silver certificate achieved for Paradigm Housing in High Wycombe.

Rebrand of Od which defines our focus and disciplined approach to achieving quality.


TURNOVER OD GROUP TURNOVER 2014/2015 (Projected)

Secured

2013/2014 (Projected)

Secured

2012/2013 2011/2012 0

2

4

6

8

10

12

14

(Turnover £m April-April)

2013/2014 (Projected) OD Projects

Secured

OD Interiors

Secured Secured

0

2

OD Solutions 4

6

8

10

(Turnover £m April-April)

12

14

16

18

20

22

24

26


CONFIDENTIALITY In order for Od to be able to operate effectively we need to ensure that we maintain the confidence and respect of our clients. The clients of Od need to have confidence in their dealings with the Company in the knowledge that any information they provide will not be passed on to any other person or organisation. All staff employed by and associates contracted to Od will be expected to adhere to the company guidelines on confidentiality at all times.



PROJECT EXPERIENCE

Od




RESIDENTIAL EXPERIENCE 9

8 5

4 10

2

3

1 7

1 Knightsbridge • Rutland Gardens • Montpelier Hall 2 Kensington • Faroe Road • De Vere Gardens • Launceston Place • Phillimore Gardens 3 Belgravia • Yeomans Row • Eaton Square

11

6

4 Mayfair • Shepherd Street

8 St Johns Wood • Blenheim Road

10 Nottinghill • Pembridge Place

5 Bayswater • St Petersburgh Place

9 Hampstead • Beaumont Gardens • Wildwood Road • West Heath Road • Kenwood Place • Winnington Close • Whitelodge Close • Pine Grove

11 Southwark • Bear Pit Apartments

6 Central London • Canadian Pacific House 7 Chelsea • Shawfield Street • Cheyne Court



RUTLAND GARDENS KNIGHTSBRIDGE

Architect: Quantity Surveyor: Services Consultant: Structural Engineer:

Originate Architects Ltd Vincent & Partners Chapman Bathurst Michael Alexander

Duration:

63 weeks

Value:

£5,000,000

The demolition of an existing two storey property with this prime location in Knightsbridge, forming a 16m deep basement to the entire site. •

Complete demolition & soft strip

High quality stonework

Secant piling to the site boundaries

A complicated temporary support system & 10m deep basement formation, carried out as CDP

Whole house ventilation, air-conditioning, i-Light systems audio visual package



KENWOOD PLACE HAMPSTEAD

Project Manager: Architect: Quantity Surveyor: Services Engineer: Interior Design:

AYH Hamilton AYH AWA Keech Green

Duration:

48 weeks

The fit out of a penthouse apartment with 3 bedrooms and bathrooms comprising: Works included: • New mechanical & electrical services

• Extensive stonework

• Audio visual & IT networks

• High quality finishes.

• Specialist joinery



CHEYNE COURT CHELSEA

Architect: Quantity Surveyor: Services Engineer:

Orbit Architects Ridge & Partners LLP Hoare Lea

Duration:

20 weeks

Alterations, refurbishment and fitting out works to form a 3 Bedroom Apartment, including: • High spec joinery works

• Electric ceiling heating

• Underfloor heating

• Audio visual installation



WINNINGTON CLOSE HAMPSTEAD

Project Manager: Architect: Structural Engineer: Interior Design:

Cubic Stuart Henley & Partners Knapp Hicks & Partners Gerald Moran

Detached new build house, comprising 7 bedrooms and bathrooms, contiguous piled caltite concrete basement and swimming pool. Features of this property include: • Swimming pool, jacuzzi & sauna • Lutron lighting • Gym

• Underfloor heating

Duration:

55 Weeks

• Cinema

• Full home automation

• Air conditioning



WHITELODGE CLOSE HAMPSTEAD

Project Manager: Architect: Structural Engineer: Interior Design:

Cubic Stuart Henley & Partners Knapp Hicks & Partners Gerald Moran

Detached new build house, comprising 7 bedrooms and bathrooms, contiguous piled caltite concrete basement and swimming pool. Features of this property include: • Swimming pool, jacuzzi & sauna • Lutron lighting • Gym

• Underfloor heating

Duration:

55 Weeks

• Cinema

• Full home automation

• Air conditioning


EATON SQUARE BELGRAVIA Architect: Quantity Surveyor: Services Consultant:

Lifschutz Davidson Sandilands Measur Tasc

Duration:

56 weeks

The project comprises the design, construction and fitting out to basement, lower ground and upper ground levels of approximately 606m² gross internal area. Works included: • Basement swimming pool and leisure facility • Rear mews extension • High level residential finishes • Installation of access lift to all floors • High spec AV installation • External rooftop inside outside facility • Staff quarters


BEAUMONT GARDENS LONDON, NW3 Architect: Quantity Surveyor: Structural Engineer:

DMFK Pierce Hill Michael Alexander

Duration:

70 weeks

The demolition of the existing dwelling and the formation of a new dwelling with a subterranean basement complete with swimming pool. Providing five bedrooms and a conservatory area. The works comprised: • Demolition & Soft strip; • Basement formation; • New superstructure; • High specification joinery; • Air conditioning; • New architectural finishes; • Hard landscaping.• Staff quarters


SUSTAINABILITY Od is taking positive steps to reduce its own carbon footprint – from the office environment to the manufacturing process. Wherever possible we control emissions, recycle, use renewable resources and conserve energy. We and have received numerous environmental awards and accreditations including: • SKA – Silver • BREEAM – Excellent • LEED™ – Silver • Green Apple Award


“

Just a quick note to thank you for all your hard work on Crawley, In particular I think the BREEAM Excellent is a fantastic result. Well done, great team effort and thank you once again Philip Sutton Developments Project Manager - Property Royal London Asset Management

�


ZEROdEFECTS Zero Defects is a commitment Od give to every project. • Dedicated Aftercare Manager – Paul Kent • Active involvement in FF&E, Client IT and the migration process • O & M manuals issued and approved • Maintenance Contracts in place • Defect awareness process – simple effective and reactive



Od 1 Sun Street London EC2A 2EP


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.