Od charity nfp

Page 1

AN INTRODUCTION TO Od CHARITY & NOT FOR PROFIT

Od


WELCOME The OD Group was founded in 2004 by Jon Kearney to work within the construction industry alongside many of the professional bodies in the interiors market to deliver high quality interior projects across commercial, residential, and leisure sectors. Over the past decade, steady growth and the consistent delivery of projects through some of the UK’s most exciting and challenging times has resulted in OD Projects gaining respect from not only the professional bodies that we work with but also our peers and the wider business community. Od is one of the Capital’s leading integrated design, project management and construction companies. With our partners we undertake various different projects in terms of scale and complexity for a diverse client base. We provide the very best specialist expertise in all facets of the construction process, from project initiation to completion. Our talented and experienced team has been hand picked, trained and supported so that they can achieve the very best results. The team is made up of like-minded individuals who understand the importance of attention to detail and the essential need for a high quality end product. We do not consider ourselves to be builders or contractors, but craftsmen who can be proud of what we produce from conception to completion. We genuinely enjoy working with a diverse range of companies from large multinationals to charities, taking care that each solution we design and implement reflects the individual needs of the client. OD Projects enjoys a high level of repeat business from many of our clients; a testament indeed to the professionalism and dedication of all our staff, which is something we believe that sets us apart in the market. Our trademark is combining high quality interior design and commercial acumen with best practice delivery in the market place. The OD Management team is extremely passionate about what we do and supports all the staff within our business who enable us to deliver beyond our client’s expectations. What each client has in common, is a desire that their project is undertaken with complete attention to detail, is within budget, and delivered on time by a professional team. They also wish for the project, which can often be the cause of great stress within an organisation, to be as pleasurable an experience as possible. At Od, we believe we can exceed all of our client’s needs and expectations.



COMPANY HISTORY Founded in 2004 by Jon Kearney (Managing Director). OD Projects has over 50 years collective experience as London and South East’s leading High Quality fitout contractor and we are keen to demonstrate our team player approach by working closely with all members of professional teams on their projects. We believe we have the best team of individuals available who have extensive knowledge and experience. These benefits will ensure a smooth delivery that will exceed a project team’s expectations.

In January Jon Kearney founds OD Projects.

2004

Client base expanded to include Royal & Sun Alliance, O2, AIB, Morley Fund, and GIS Interpublic.

Consultants include Gensler, Cushman & Wakefield, Barr Gazetas, and Leslie Clark.

Royal & Sun Alliance approved contractor status.

2005

OD Projects client list includes Arsenal FC, Scott Brownrigg, AYH, and Price & Myers.

Recruitment of Commercial Director (Managing Surveyor of top fit out company)

Recruitment of Construction Director (BCO & FX Quality Award Winner)

2006

OD Projects complete £4 million, 107 Leadenhall, fit out.

OD Projects achieve ISO9001 status.

2007

2008

AIB framework contractor.

OD Projects currently employ 25 staff.

Achieve British Council for offices corporate member status.

Sign 5 year lease and fit out Moorgate HQ.

Jon Kearney finalist for G4_ New Generation Awards – Entrepreneurship Award.

Od appointed on Savills Estate Agency office fitout framework

Repeat business levels at 70% of turnover and growing

Notable project wins for Dow Jones, Royal London Asset Management, Fendi,National Australia Group and Berkeley Group Marketing Suites

Od completes its first hotel refurbishment for launch of exciting new venture for Safestay in London

Education sector expansion with successful fitout projects for Partnerships For Schools and North Herts College

Od working on over 50000sqft of Londons super prime residential projects in Knightsbridge, Kensington & Hampstead

Savills approved contractor

High end residential team acknowledged as leading contractor within sector

Od Group formed, divisions focused on Commercial Fitout, Super prime Residential and Commercial Design & Build

Awarded refurbishment for Royal Albert Hall

OD Expand office space to take another floor at Sun St HQ

2009

2010

2011

2012

• •

Rolls Royce Framework contractor Green Apple Award for Digitas Saatchi & Saatchi

Forecast record turnover of circa £20m in with Business Plan.

Official launch of aftercare team ‘ZEROdEFECTS’.

Instutute of Chartered Accountants Framework contractor

Successful completion of first Irish project for Marcus Evans HQ in Dublin.

Awarded Vogue /Condenast HQ fitout

Notable project wins for clients such as Finchatton, BMB Property, United Continental Airlines, Safestay and Royal London Asset Management.

Commitment to sustainability – BREEAM ‘Excellent’ achieved on refurbishment of RLAM property in Crawley, LEED silver certification achieved for Harris Williams fit out in Mayfair, SKA silver certificate achieved for Paradigm Housing in High Wycombe.

Rebrand of Od which defines our focus and disciplined approach to achieving quality.


TURNOVER Recently Od were delighted to announce the formation of the Od Group (Od Holdings) This has provided a transparent platform for our service to continually improve, allowing our key staff to drive their core skills specifically within their respective specialist division The group organisation commenced from the 2013/ 2014 financial period and is currently forecasting an overall turnover of £24million, £12 million of our forecast was secured prior to commencement of the new April to Apil financial period.

OD GROUP TURNOVER 2014/2015 (Projected)

Secured

2013/2014 (Projected)

Secured

2012/2013 2011/2012 0

2

4

6

8

10

12

14

(Turnover £m April-April)

2013/2014 (Projected) OD Projects

Secured

OD Interiors

Secured

OD Solutions

Secured

0

2

4

6

8

10

(Turnover £m April-April)

12

14

16

18

20

22

24

26



PARADIGM HOUSING ASSOCIATION HIGH WYCOMBE

Architect: Quantity Surveyor: Services Consultant: Structural Engineer:

Mansfield Monk Heasmans Capita Symonds BAM

Duration: Environmental Award:

9 Weeks Silver Ska Rating

The 40,000sq ft fit out from CAT A of Building 1A, Glory Park for Paradigm Housing Association to provide them with their headquarters. Works include: • Structural modifications;

• New Reception;

• Revision of basebuild services;

• 5 New kitchens & Breakout station;

• Dedicated comms room with UPS backups;

• Board room with integral AV installation;

• Formation of new glazed offices;

• Third project in UK to achieve Silver SKA Rating for environmental sustainability.

• General fit out of office space over all floors;



THE ROYAL ALBERT HALL KENSINGTON GORE

Internal photography by Stephen Frak

Architect: Quantity Surveyor: Services Consultant:

BDP Wheelers Logi-Tek (UK) Ltd

Duration:

26 weeks

Refurbishment works at The Royal Albert Hall, works included: • Demolition of an existing Workshop at Basement 2 Level • Stripping out of an existing basement level 2 workshop and refitting as a kitchen/servery area with ancillary rooms and a new smaller workshop • New storage facilities located on a new mezzanine decking in the loading bay • Stripping out of existing kitchen facility located at basement level 1 and construction of high quality dressing rooms in the vacated spaces

http://www.royalalberthall.com



PARTNERSHIP FOR SCHOOLS GREYCOAT STREET Architect Quantity Surveyor

Arcadis AYH Arcadis AYH

Project Value: Duration

£260,000 5 Weeks

The project involved the strip out and refurbishment of levels four, three, two, one, ground and basement to provide a mixture of open plan office space and meeting rooms. The works comprised: • Strip out of architectural finishes; • Minor modifications to partitions; • Refurbishment and modifications to existing mechanical and electrical systems; • Structured cabling modifications; • New architectural and decorative finishes throughout; • Cleaning of existing retained fixtures and finishes.

SCOPE BRIGHTON & HOVE Architect Quantity Surveyor

Curie & Brown Curie & Brown

Cat A fit out for Scope, works included;

Project Value:

£250,000

• New front door entry system;

Duration

10 Weeks

• Suspended ceiling to the open office spaces and plaster boards ceiling to the wet areas.

• Installation of new mechanical and electrical services;

• Back painted mirrors on the Sensory Room ceilings. • Decorations • Floor finishes • Installation of uPVC lean to roof including new gutter


Od www.odprojects.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.