‘‘We shape our buildings;thereafter they shape us’’ Sir Winston Churchill
FOREWORD The OD Group was founded in 2004 by Jon Kearney to work within the construction industry alongside many of the professional bodies in the interiors market to deliver high quality interior projects across commercial, residential, and leisure sectors. Over the past decade, steady growth and the consistent delivery of projects through some of the UK’s most exciting and challenging times has resulted in OD gaining respect from not only the professional bodies that we work with but also our peers and the wider business community. OD is one of the Capital’s leading integrated design, project management and construction companies. With our partners we undertake various different projects in terms of scale and complexity for a diverse client base. We provide the very best specialist expertise in all facets of the construction process, from project initiation to completion. Our talented and experienced team has been hand picked, trained and supported so that they can achieve the very best results. The team is made up of like-minded individuals who understand the importance of attention to detail and the essential need for a high quality end product. We do not consider ourselves to be builders or contractors, but craftsmen who can be proud of what we produce from conception to completion. We genuinely enjoy working with a diverse range of companies from large multinationals to small privately owned businesses, taking care that each solution we design and implement reflects the individual needs of the client. OD enjoys a high level of repeat business from many of our clients; a testament indeed to the professionalism and dedication of all our staff, which is something we believe that sets us apart in the market. Our trademark is combining high quality interior design and commercial acumen with best practice delivery in the market place. The OD Management team is extremely passionate about what we do and supports all the staff within our business who enable us to deliver beyond our client’s expectations. What each client has in common, is a desire that their project is undertaken with complete attention to detail, is within budget, and delivered on time by a professional team. They also wish for the project, which can often be the cause of great stress within an organisation, to be as pleasurable an experience as possible. At OD, we believe we can exceed all of our client’s needs and expectations.
Steve Cherry Construction Director
PAGE 2
Jon Kearney Managing Director
Greg Pinchin Commercial Director
PREPARED BY OD SOLUTIONS FOR SHULTE ROTH & ZABEL LLP
• Od appointed on Savills Estate Agency office fitout framework
HISTORY
• Repeat business levels at 70% of turnover and growing • Notable project wins for Dow Jones, Royal London Asset Management, Fendi,National Australia Group and Berkeley Group Marketing Suites
• Education sector expansion with successful fitout projects for Partnerships For Schools and North Herts College
• Client base expanded to include Royal & Sun Alliance, O2, AIB, Morley Fund, and GIS Interpublic. In January Jon Kearney founds OD Projects.
2004
• Consultants include Gensler, Cushman & Wakefield, Barr Gazetas, and Leslie Clark. • Royal & Sun Alliance approved contractor status.
2005
• OD Projects client list includes Arsenal FC, Scott Brownrigg, AYH, and Price & Myers. • Recruitment of Commercial Director (Managing Surveyor of top fit out company) • Recruitment of Construction Director (BCO & FX Quality Award Winner)
2006
• OD Projects complete £4 million, 107 Leadenhall, fit out. • OD Projects achieve ISO9001 status.
• Savills approved contractor • High end residential team acknowledged as leading contractor within sector • Awarded refurbishment for Royal Albert Hall
2007
2008
2009
2010
• Od completes its first hotel refurbishment for launch of exciting new venture for Safestay in London • Od working on over 50000sqft of Londons super prime residential projects in Knightsbridge, Kensington & Hampstead • Od Group formed, divisions focused on Commercial Fitout, Super prime Residential and Commercial Design & Build • OD Expand office space to take another floor at Sun St HQ
2011
2012
• Rolls Royce Framework contractor • Green Apple Award for Digitas Saatchi & Saatchi
• Forecast record turnover of circa £20m in with Business Plan.
• Sign 5 year lease and fit out Moorgate HQ.
• Instutute of Chartered Accountants Framework contractor
• Successful completion of first Irish project for Marcus Evans HQ in Dublin.
• Jon Kearney finalist for G4_ New Generation Awards – Entrepreneurship Award.
• Awarded Vogue /Condenast HQ fitout
• Notable project wins for clients such as Finchatton, BMB Property, United Continental Airlines, Safestay and Royal London Asset Management.
• AIB framework contractor. • OD Projects currently employ 25 staff. • Achieve British Council for offices corporate member status.
• Official launch of aftercare team ‘ZEROdEFECTS’.
• Commitment to sustainability – BREEAM ‘Excellent’ achieved on refurbishment of RLAM property in Crawley, LEED silver certification achieved for Harris Williams fit out in Mayfair, SKA silver certificate achieved for Paradigm Housing in High Wycombe. • Rebrand of Od which defines our focus and disciplined approach to achieving quality.
COMPANY
Od
OD HOLDINGS Jon Kearney Managing Director
OD INTERIORS OD Andy INTERIORS Torlot Director
Specialising in interior fit out and construction to the professional construction industry. Working closely with Architects, Project Managers, Quantity Surveyors and direct for end user clients.
Steve Cherry Construction Director
Greg Pinchin Commercial Director
OD PROJECTS Graham Cann Director
Specialist high end residential refurbishment and construction company working closely with high net worth clients, developers and architects to deliver unique boutique interiors
OD SOLUTIONS Andrew Wright Director
Set up to cater for direct End User clients requiring a ‘one stop shop’ turnkey solution. Working with interior design and architecture companies Od are procurement specialist to take a client from concept to completion under one roof.
Covering all sectors including Commercial, Retail and Leisure
PAGE 4
PREPARED BY OD SOLUTIONS FOR SHULTE ROTH & ZABEL LLP
TURNOVER
OD GROUP TURNOVER 2014/2015 (Projected)
Secured
2013/2014 (Projected)
Secured
2012/2013 2011/2012 0
2
4
6
8
10
12
14
16
18
20
22
24
26
(Turnover ÂŁm April-April)
2013/2014 (Projected) OD Projects
Secured Secured Secured
COMPANY
0
2
OD Interiors
OD Solutions 4
6
8
10
12
14
Od
PAGE 6
PREPARED BY OD SOLUTIONS FOR SHULTE ROTH & ZABEL LLP
OD SOLUTIONS: INTERIOR DESIGN & ARCHITECT PARTNERS At OD we select the very best UK and International design partners to work on all projects. The scope of professional services that we offer includes:
Master planning Due diligence and building evaluation Design team leader Feasibility studies Condition surveys Lease support Development and base build monitoring Brief gathering Workplace strategy and change management Space planning Architectural and interior design through all RIBA work stages Building refurbishment to the following standards: - Shell andCore - Cat A - Cat B
Building extensions Core reconfigurations and other major structural interventions Planning applications and local authority liaison Contract administration Post occupancy evaluation Furniture audits, selection and procurement Assistance with artwork selection Computer generated imagery – animation and stills Graphic design Signage and way finding
We also have associations with a number of other specialist consultancies and can offer the following additional services fully integrated into our overall offer:
COMPANY
Catering design and specification Acoustics Fire engineering Measured surveys Specialist lighting – internal and external External landscaping – hard and soft Audio visual design and specification Relocation management
Od
DESIGN & BUILD: OD CONSTRUCTIVE DESIGN STAGE 4 CONSTRUCTION
STAGE 1 DESIGN
• Setting up of site & Logistics • Coordination of works • Construction Programme management • Reporting structure • Financial control • Close-out • ZerOdefects
• Feasibility – Test Fits • Concept Design • Detailed Design • Technical Design • Specialist Design • Construction Supervision
STAGE 3 PROCUREMENT • Identification of packages • Long lead Items • Specialist Packages • Placing of all orders • Coordination of project deliverables
PAGE 8
PROJECT LIFECYCLE
STAGE 2 PRE CONSTRUCTION • Initial Scope of Project • Budget setting & development • Programme management • Technical Coordination • Services & Systems Integration • Approval Coordination • Contract negotiation
PREPARED BY OD SOLUTIONS FOR SHULTE ROTH & ZABEL LLP
OD SOLUTIONS:INTERIOR DESIGN & ARCHITECTURE DESIGN
DESIGN LEADING INTERIOR DESIGN & ARCHITECTURE
PRE CONSTRUCTION
Od SOLUTIONS
CONSTRUCTION
Od SOLUTIONS
SPECIALIST PARTNERS • IT & AV • FURNITURE
UK PROJECT MANAGERS & BUILDING CONSULTANCY
COORDINATION PROFESSIONAL
COMPANY
COLLABORATION
QUANTIFICATION ACCOUNTABLE
EXECUTION
COMPLETION RESPONSIBLE
Od
PAGE 10
PREPARED BY OD SOLUTIONS FOR SHULTE ROTH & ZABEL LLP
MCCARTHY TETRAULT GRAYS INN ROAD, WC1
›› ›› ›› ›› ›› ›› ››
Architect: Project Manager: Quantity Surveyor: M & E: Value Size: Duration:
PROJECT PROFILES
Gensler Gensler Montie Associates Chapman Bathurst £600,000 7,000 sq ft 8 weeks
CAT B fit out of occupied building comprising: • New Bene double glazed partitions, • High spec bespoke joinery to reception and meeting rooms/ board room, • Modifications to mechanical services to suit new layout, • High class finishes including stone floor to reception, • Support areas including comms room, • Bespoke kitchen/breakout area.
Od
PAGE 12
PREPARED BY OD SOLUTIONS FOR SHULTE ROTH & ZABEL LLP
SIMPSON THATCHER BARTLETT CITY POINT
›› ›› ›› ››
Project Manager: Quantity Surveyor: M & E: Duration:
PROJECT PROFILES
Murray Symonds Currie & Browns TB & A 8 weeks
The fit out of the kitchen/staff dining areas consisting of the removal of the old kitchen and installation of a complete new updated catering facility. The works comprised • Stripout; • New ceilings fitted throughout; • Installation of a new kitchen; • New lighting, wall and floor coverings;
• New timber flooring; • Finishes including ceramic tiles and carpet; • New state of the art equipment with complimenting units.
Od
PAGE 14
PREPARED BY OD SOLUTIONS FOR SHULTE ROTH & ZABEL LLP
SAPINDA LEVEL 5, 25 PARK LANE, W1
›› ›› ›› ›› ›› ›› ››
Procurement: Design & Build Architect Gensler Project Manager Gensler Quantity Surveyor Montie Duration 11 Weeks Value £600,000 Size 3000 sq ft
Strip out and new fit out of existing occupied offices in two separate phases. The works undertaken comprised: • New Cellularized Offices, • New Meeting and Board rooms, • High spec stone reception, • Stone flooring, • Specialist joinery, • New Lighting inclusive of feature lighting installed throughout
PROJECT PROFILES
Od
PAGE 16
PREPARED BY OD SOLUTIONS FOR SHULTE ROTH & ZABEL LLP
HARRIS WILLIAMS LEVEL 2, 63 BROOK STREET, MAYFAIR, W1
›› ›› ›› ›› ››
Project Manager: Architect: Duration: Size: Value:
Gensler Gensler 14 weeks 10,000 sq ft £535,000
CAT B fit out of the first floor newly refurbished occupied building to provide a high quality office. The works comprised: • High quality bespoke joinery, • Mechanical & electrical modifications, • Double glazed BENE partitions & doors, • Handmade carpet flooring, • Audio visual installations.
PROJECT PROFILES
Od
PAGE 18
PREPARED BY OD SOLUTIONS FOR SHULTE ROTH & ZABEL LLP
MARCUS EVANS SIMMONSCOURT HOUSE
›› ›› ›› ›› ››
Procurement: Architect: Duration: Value: Size
Design & Build Barrett Lloyd Davis Associates 12 Weeks £700,000 9000 sq ft
Cat B commercial office fit out at Simmonscourt House in Dublin, Works included: • New Offices, • New Meeting and Board rooms, • High spec reception, • Staff break out areas, • New comms Room,
PROJECT PROFILES
Od
PAGE 20
PREPARED BY OD SOLUTIONS FOR SHULTE ROTH & ZABEL LLP
DOW JONES GRAYS INN ROAD, WC1
›› ›› ›› ›› ›› ››
Procurement: Architect Quantity Surveyor Duration Value Size
Design & Build Edge Arcadis 12 Weeks £1,000,000 30,000 sq ft
Refurbishment of office floor whilst the building remained in full occupation, works included: • Strip out • Installation of new electrical & mechanical services • Glass partitions • Fit Out of new toilets • Tea Points • High specification restaurant • Floor coverings
PROJECT PROFILES
Od
PAGE 22
PREPARED BY OD SOLUTIONS FOR SHULTE ROTH & ZABEL LLP
ROLLS ROYCE PRIDE PARK, DERBY
›› ›› ›› ›› ›› ››
Quantity Surveyor: Architect: Services Consultant: Project Value Duration Size:
PROJECT PROFILES
Gleeds DEGW ARUP £2,000,000 21 weeks 60,000 sq ft
Under the design and build contract the fit out and refurbishment of two floors of G-Wing evolved to a negotiated second phase involving a further three floors of similar works comprising, new suspended ceilings, new partition layouts with glazed walls, air conditioning modifications, new electrical installations, toilet fit out and specialist joinery.
Od
CERTIFICATION
PAGE 24
PREPARED BY OD SOLUTIONS FOR SHULTE ROTH & ZABEL LLP
SUSTAINABLE CREDENTIALS
Fit‐out Sustainability Assessment This is to certify that
Paradigm Housing Group Building A1 Glory Park High Wycombe Bucks HP10
has achieved the Ska rating of
Silver
Pringle Brandon LLP Accredited Assessor
Paradigm Housing Group On behalf of
Savills Commercial Ltd Project Manager
Mansfield Monk Architect
OD Projects Contractor
Capita Symonds Building Services Engineer
Glory Park, High Wycombe Certificate Reference
29/06/2010 Date This certificate has been produced using Ska Rating Offices version 1.0
CERTIFICATION
Od
PAGE 26
PREPARED BY OD SOLUTIONS FOR SHULTE ROTH & ZABEL LLP
WHY OD? In appointing OD Solutions potential clients will be taking full advantage of the following key areas that we believe differentiate us from our competitors: • NO LEARNING CURVE - A proven understanding of London’s fit-out market, standards and quality expectations. • LOCAL & INTERNATIONAL – A dedicated team of professionals based in both London and Singapore • DESIGN – A partnership with “BEST IN CLASS” leading interior design & architect practice MCM with extensive experience of financial clients and up to date knowledge of trends and regulations. A design with Integrity • COST CERTAINTY – commercial competitiveness and understanding of clients’ value aspirations • COMMUNICATION – Open and honest communication; we won’t make promises we know we can’t keep • COORDINATION – A thorough understanding of all the approvals process and associated requirements • DEDICATED – Project Manager & Site Manager assigned to project for the duration of the project • QUALITY – A team who care about the end product, service and delivery • DETAIL - A design with Integrity and high finished product – Not Design & Dump • EXPERIENCE - An extensive proven sub-contractor and supplier base • ENGINEERED - A cohesive application of the building environment and “In house” MEP coordination • TRANSPARENCY - A clearly thought out process within an open and honest culture
OD SOLUTIONS 1 SUN STREET LONDON EC2A 2EP
Od
Od
OD SOLUTIONS 1 SUN STREET LONDON EC2A 2EP