Mullassery Canal Resiliency Framework

Page 13

SPONGE COLLABORATIVE +

WEAVING WITH WATER Team

MULLASSERY CANAL FRAMEWORK AND CANAL EDGE MASTERPLAN

9) Delivering high-quality public amenities & Services: Considering a precinct-level framework also allows for the provision of basic public conveniences within 10-minute walking distance. These amenities are an important link in the chain of enhancing public health and social well-being. Potential locations for clustering public convenience such as - Bio-toilets, drinking water kiosks, inclusive seating, vendor zone, trash bin, shaded shelter - are marked out with relative walkshed as part of the framework. The present state of the Mullassery canal is a clear evidence of the failure of existing unregulated solid waste management practices. The framework also proposes a decentralised solid waste management mechanism by giving spatial definition and involving the community as a key actor.

1.4 Vision Statement This report consists of two major components, which are linked by a common vision: The Framework for Mullassery Canal Precinct in Chapter 2, which considers the entire neighbourhood within which Mullassery Canal is situated, and the Comprehensive Canal Edge Master Plan in Chapter 3, which considers the canal and the immediate bounds of the canal with a buffer of approximately 3 meters on either side. This vision for the Mullassery Canal precinct in downtown Ernakulam leverages Kochi’s natural assets, monsoon culture, and social capital to make the city more resilient, vibrant, and inclusive by means of a set of comprehensive principles and strategies: ADAPT, CONNECT, EMPOWER.

Figure 9: Toolkits of ADAPT+CONNECT+EMPOWER and their respective stakeholders (Image Credit: Sponge Collaborative)


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

D. An Integrated approach

2min
pages 98-100

3. Stakeholder Engagement

4min
pages 101-103

MOBILITY

3min
pages 87-92

4.2.4 Phasing of Pilot Projects and Long-term policy initiatives

0
page 83

Canal Cleanup Strategies

2min
page 95

4.2.4.3 Additional Pilots

1min
page 82

C. For collaborative governance and community participation

2min
pages 96-97

4.2.4.2 Subsite C - Pilot project

1min
page 81

4.2.4 Glimpse into Pilot Projects

0
page 79

4.2.3.1 Post-implementation Community Waste management Strategies

3min
pages 77-78

4.2.2 Implementation - Mobility framework

1min
page 74

Stretch F - Karunakaran Lane, Outside Jewish Cemetery

1min
page 68

Stretch G - Canal Mouth

1min
page 69

Stretch E - KMC Waste Collection Centre

1min
page 67

4.2.3 Implementation - Community framework

0
pages 75-76

Stretch D - Padikathukulam East colony

1min
page 66

Stretch B - Karikkamuri Neighbourhood

1min
page 64

Stretch C - Fashion Street

1min
page 65

Stretch A - Near KSRTC Bus Stand

1min
page 63

3.3 Comprehensive Canal Edge Masterplan

0
pages 60-61

Mobility

1min
page 58

Community

1min
page 59

Landscape

1min
page 57

3.2 Canal Rejuvenation Strategies

0
page 56

2.3.4 Principles

1min
page 51

2.3.6 People-prioritized community scenario

1min
page 53

2.3.7 Expected outcomes

0
page 54

2.3.5 Key components of community framework

2min
page 52

2.3.3. Approach - Existing scenario Vs Canal community scenario

2min
pages 49-50

2.2.6 Expected outcomes

0
page 46

2.3.2 Challenges and Opportunities

2min
page 48

2.2.4 Key components of mobility framework

4min
pages 43-44

2.1.9 Expected Outcomes

1min
page 39

2.1.6 Framework

0
page 31

2.2.2 Approach - Prioritizing motor vehicles Vs Prioritizing People

1min
page 41

2.1.8 On-Site Implementation of Sponge toolkits

3min
pages 37-38

2.1.7 Scenarios

2min
pages 32-36

2.2.3 Principles

0
page 42

2.2 Mobility Framework

1min
page 40

2.1.5 Key typologies of cloudburst network blue-green streets and open spaces

2min
pages 29-30

Concepts underlying vision document

2min
pages 15-16

Introduction

3min
pages 4-5

1.3 Sponge Approach for a Resilient Kochi: Investing in a Blue-Green Network to mitigate flooding and

2min
pages 2-3

improving the public realm

8min
pages 22-26

Precinct Level Challenges: (Based on the limited data available and Site analysis

3min
pages 7-8

1.4 Vision Statement

3min
pages 13-14

2.1.4 Principles of the Sponge Approach

2min
pages 27-28

Chapter 2: Framework for the Mullassery Canal Precinct: Adapt, Connect and Empower

3min
pages 17-18
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.