Mullassery Canal Resiliency Framework

Page 2

SPONGE COLLABORATIVE +

WEAVING WITH WATER Team

MULLASSERY CANAL FRAMEWORK AND CANAL EDGE MASTERPLAN

Table of contents Introduction

4

Chapter 1:Vision for the Mullassery Canal 1.1 Existing Scenario of the Mullassery Canal Precinct 1.2 Constraints and Opportunities - Precinct Level Precinct Level Challenges: (Based on the limited data available and Site analysis) Precinct Level Opportunities: (Based on the limited data available and Site analysis) 1.3 Planning Principles 1.4 Vision Statement Concepts underlying vision document

6 6 6 7 9 9 13 15

Chapter 2: Framework for the Mullassery Canal Precinct: Adapt, Connect and Empower 2.1 Sponge Framework - Adapt 2.1.2 Existing Scenario: Waterlogging in the Canal precinct 2.1.3 Sponge Approach for a Resilient Kochi: Investing in a Blue-Green Network to mitigate flooding and improving the public realm 2.1.4 Principles of the Sponge Approach: 2.1.5 Key typologies of cloudburst network blue-green streets and open spaces: 2.1.6 Framework 2.1.7 Scenarios: 2.1.8 On-Site Implementation of Sponge toolkits 2.1.9 Expected Outcomes 2.2 Mobility Framework 2.2.2 Approach - Prioritizing motor vehicles Vs Prioritizing People: 2.2.3 Principles: 2.2.4 Key components of mobility framework: 2.2.5 People-prioritized mobility scenario: 2.2.6 Expected outcomes: 2.3 Community Framework 2.3.1 Introduction 2.3.2 Challenges and Opportunities 2.3.3. Approach - Existing scenario Vs Canal community scenario 2.3.4 Principles: 2.3.5 Key components of community framework: 2.3.6 People-prioritized community scenario: 2.3.7 Expected outcomes:

17 19 19 22 27 29 31 32 37 39 40 41 42 43 45 46 47 47 48 49 51 52 53 54

Chapter 3: Canal Edge Masterplan 3.1 Introduction 3.2 Canal Rejuvenation Strategies Landscape Mobility:

55 55 56 57 58


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

D. An Integrated approach

2min
pages 98-100

3. Stakeholder Engagement

4min
pages 101-103

MOBILITY

3min
pages 87-92

4.2.4 Phasing of Pilot Projects and Long-term policy initiatives

0
page 83

Canal Cleanup Strategies

2min
page 95

4.2.4.3 Additional Pilots

1min
page 82

C. For collaborative governance and community participation

2min
pages 96-97

4.2.4.2 Subsite C - Pilot project

1min
page 81

4.2.4 Glimpse into Pilot Projects

0
page 79

4.2.3.1 Post-implementation Community Waste management Strategies

3min
pages 77-78

4.2.2 Implementation - Mobility framework

1min
page 74

Stretch F - Karunakaran Lane, Outside Jewish Cemetery

1min
page 68

Stretch G - Canal Mouth

1min
page 69

Stretch E - KMC Waste Collection Centre

1min
page 67

4.2.3 Implementation - Community framework

0
pages 75-76

Stretch D - Padikathukulam East colony

1min
page 66

Stretch B - Karikkamuri Neighbourhood

1min
page 64

Stretch C - Fashion Street

1min
page 65

Stretch A - Near KSRTC Bus Stand

1min
page 63

3.3 Comprehensive Canal Edge Masterplan

0
pages 60-61

Mobility

1min
page 58

Community

1min
page 59

Landscape

1min
page 57

3.2 Canal Rejuvenation Strategies

0
page 56

2.3.4 Principles

1min
page 51

2.3.6 People-prioritized community scenario

1min
page 53

2.3.7 Expected outcomes

0
page 54

2.3.5 Key components of community framework

2min
page 52

2.3.3. Approach - Existing scenario Vs Canal community scenario

2min
pages 49-50

2.2.6 Expected outcomes

0
page 46

2.3.2 Challenges and Opportunities

2min
page 48

2.2.4 Key components of mobility framework

4min
pages 43-44

2.1.9 Expected Outcomes

1min
page 39

2.1.6 Framework

0
page 31

2.2.2 Approach - Prioritizing motor vehicles Vs Prioritizing People

1min
page 41

2.1.8 On-Site Implementation of Sponge toolkits

3min
pages 37-38

2.1.7 Scenarios

2min
pages 32-36

2.2.3 Principles

0
page 42

2.2 Mobility Framework

1min
page 40

2.1.5 Key typologies of cloudburst network blue-green streets and open spaces

2min
pages 29-30

Concepts underlying vision document

2min
pages 15-16

Introduction

3min
pages 4-5

1.3 Sponge Approach for a Resilient Kochi: Investing in a Blue-Green Network to mitigate flooding and

2min
pages 2-3

improving the public realm

8min
pages 22-26

Precinct Level Challenges: (Based on the limited data available and Site analysis

3min
pages 7-8

1.4 Vision Statement

3min
pages 13-14

2.1.4 Principles of the Sponge Approach

2min
pages 27-28

Chapter 2: Framework for the Mullassery Canal Precinct: Adapt, Connect and Empower

3min
pages 17-18
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.