SPONGE COLLABORATIVE +
WEAVING WITH WATER Team
MULLASSERY CANAL FRAMEWORK AND CANAL EDGE MASTERPLAN
Table of contents Introduction
4
Chapter 1:Vision for the Mullassery Canal 1.1 Existing Scenario of the Mullassery Canal Precinct 1.2 Constraints and Opportunities - Precinct Level Precinct Level Challenges: (Based on the limited data available and Site analysis) Precinct Level Opportunities: (Based on the limited data available and Site analysis) 1.3 Planning Principles 1.4 Vision Statement Concepts underlying vision document
6 6 6 7 9 9 13 15
Chapter 2: Framework for the Mullassery Canal Precinct: Adapt, Connect and Empower 2.1 Sponge Framework - Adapt 2.1.2 Existing Scenario: Waterlogging in the Canal precinct 2.1.3 Sponge Approach for a Resilient Kochi: Investing in a Blue-Green Network to mitigate flooding and improving the public realm 2.1.4 Principles of the Sponge Approach: 2.1.5 Key typologies of cloudburst network blue-green streets and open spaces: 2.1.6 Framework 2.1.7 Scenarios: 2.1.8 On-Site Implementation of Sponge toolkits 2.1.9 Expected Outcomes 2.2 Mobility Framework 2.2.2 Approach - Prioritizing motor vehicles Vs Prioritizing People: 2.2.3 Principles: 2.2.4 Key components of mobility framework: 2.2.5 People-prioritized mobility scenario: 2.2.6 Expected outcomes: 2.3 Community Framework 2.3.1 Introduction 2.3.2 Challenges and Opportunities 2.3.3. Approach - Existing scenario Vs Canal community scenario 2.3.4 Principles: 2.3.5 Key components of community framework: 2.3.6 People-prioritized community scenario: 2.3.7 Expected outcomes:
17 19 19 22 27 29 31 32 37 39 40 41 42 43 45 46 47 47 48 49 51 52 53 54
Chapter 3: Canal Edge Masterplan 3.1 Introduction 3.2 Canal Rejuvenation Strategies Landscape Mobility:
55 55 56 57 58