Mullassery Canal Resiliency Framework

Page 63

SPONGE COLLABORATIVE +

WEAVING WITH WATER Team

MULLASSERY CANAL FRAMEWORK AND CANAL EDGE MASTERPLAN

Stretch A - Near KSRTC Bus Stand

Figure 61: Canal section along the (Image Credit: Sponge Collaborative)

The meeting point of the Mullassery Canal with the Thevara Perandoor Canal is fraught with problems of waste dumping and obstructed flow of water, which lead to extreme flooding. While it is recommended to consider this stretch as a complete project in itself, the canal masterplan framework proposes a solution to effectively manage the waste from downstream Mullassery Canal and Vivekananda Canal. As the water flows through a culvert before reaching the wetlands, waste filtration screens are proposed on both sides to filter out the waste and localise the pollution. Along with dredging, the screens should be maintained regularly to prevent clogging of the canal. Along the Green Mobility Corridor, maintenance gratings or trash traps are proposed on top of the Vivekananda Canal, to curb the dumping of solid waste. Opportunities - The proposed Green Mobility Corridor project has the potential to turn the stretch along the Railway line into a public realm, as an extension of the neighbourhood’s social spaces. Constraints - As the depth of the Mullassery Canal in stretch A is less deeper than TP canal, the flow of water is obstructed and leads to silting. The depth of the and the culvert must be increased to streamline the flow of water towards the wetlands.


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

D. An Integrated approach

2min
pages 98-100

3. Stakeholder Engagement

4min
pages 101-103

MOBILITY

3min
pages 87-92

4.2.4 Phasing of Pilot Projects and Long-term policy initiatives

0
page 83

Canal Cleanup Strategies

2min
page 95

4.2.4.3 Additional Pilots

1min
page 82

C. For collaborative governance and community participation

2min
pages 96-97

4.2.4.2 Subsite C - Pilot project

1min
page 81

4.2.4 Glimpse into Pilot Projects

0
page 79

4.2.3.1 Post-implementation Community Waste management Strategies

3min
pages 77-78

4.2.2 Implementation - Mobility framework

1min
page 74

Stretch F - Karunakaran Lane, Outside Jewish Cemetery

1min
page 68

Stretch G - Canal Mouth

1min
page 69

Stretch E - KMC Waste Collection Centre

1min
page 67

4.2.3 Implementation - Community framework

0
pages 75-76

Stretch D - Padikathukulam East colony

1min
page 66

Stretch B - Karikkamuri Neighbourhood

1min
page 64

Stretch C - Fashion Street

1min
page 65

Stretch A - Near KSRTC Bus Stand

1min
page 63

3.3 Comprehensive Canal Edge Masterplan

0
pages 60-61

Mobility

1min
page 58

Community

1min
page 59

Landscape

1min
page 57

3.2 Canal Rejuvenation Strategies

0
page 56

2.3.4 Principles

1min
page 51

2.3.6 People-prioritized community scenario

1min
page 53

2.3.7 Expected outcomes

0
page 54

2.3.5 Key components of community framework

2min
page 52

2.3.3. Approach - Existing scenario Vs Canal community scenario

2min
pages 49-50

2.2.6 Expected outcomes

0
page 46

2.3.2 Challenges and Opportunities

2min
page 48

2.2.4 Key components of mobility framework

4min
pages 43-44

2.1.9 Expected Outcomes

1min
page 39

2.1.6 Framework

0
page 31

2.2.2 Approach - Prioritizing motor vehicles Vs Prioritizing People

1min
page 41

2.1.8 On-Site Implementation of Sponge toolkits

3min
pages 37-38

2.1.7 Scenarios

2min
pages 32-36

2.2.3 Principles

0
page 42

2.2 Mobility Framework

1min
page 40

2.1.5 Key typologies of cloudburst network blue-green streets and open spaces

2min
pages 29-30

Concepts underlying vision document

2min
pages 15-16

Introduction

3min
pages 4-5

1.3 Sponge Approach for a Resilient Kochi: Investing in a Blue-Green Network to mitigate flooding and

2min
pages 2-3

improving the public realm

8min
pages 22-26

Precinct Level Challenges: (Based on the limited data available and Site analysis

3min
pages 7-8

1.4 Vision Statement

3min
pages 13-14

2.1.4 Principles of the Sponge Approach

2min
pages 27-28

Chapter 2: Framework for the Mullassery Canal Precinct: Adapt, Connect and Empower

3min
pages 17-18
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.