Mullassery Canal Resiliency Framework

Page 69

SPONGE COLLABORATIVE +

WEAVING WITH WATER Team

MULLASSERY CANAL FRAMEWORK AND CANAL EDGE MASTERPLAN

Stretch G - Canal Mouth

Figure 67: Section showing living coastal edge scenario (Image Credit: Weaving with Water team)

The widening of the canal near its mouth includes softening the edge to build resilience towards sea-level rise and sea water intrusion. Rather than a hard seawall which reduces the biodiversity of the area, a living shoreline is proposed to tackle climate change risks, including coastal erosion and saltwater intrusion. The quality of the living shoreline to adapt to the seasons is effective in nurturing an ecosystem which needs less maintenance and can reduce the impacts of extreme climate events. Breakwaters with rocks and local coir are proposed to effectively reduce the force of the water before reaching the shoreline, thus reducing the impact of erosion. The living shoreline is envisaged as a recreational realm, with decks and open spaces for people to interact. Opportunities - The canal mouth when developed in a holistic manner with Priyadarshini Park and Marine Drive has the potential to be transformed as a key biodiversity hotspot. The project will also bring in more visibility to the entire canal and present it as a punctuated landmark that prioritizes people and ecology. Constraint - The development of design layout and detailed specifications can be done only with site-specific information on water table, tidal action, soil condition, water levels, and the influence of other geographic features. The section has to be worked out in a conscious manner so as to avoid any negative impact on the site ecology. The intervention along the marine drive that influences the current coastal line, will require insights and approvals from multiple agencies which can both strengthen and delay the process.


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

D. An Integrated approach

2min
pages 98-100

3. Stakeholder Engagement

4min
pages 101-103

MOBILITY

3min
pages 87-92

4.2.4 Phasing of Pilot Projects and Long-term policy initiatives

0
page 83

Canal Cleanup Strategies

2min
page 95

4.2.4.3 Additional Pilots

1min
page 82

C. For collaborative governance and community participation

2min
pages 96-97

4.2.4.2 Subsite C - Pilot project

1min
page 81

4.2.4 Glimpse into Pilot Projects

0
page 79

4.2.3.1 Post-implementation Community Waste management Strategies

3min
pages 77-78

4.2.2 Implementation - Mobility framework

1min
page 74

Stretch F - Karunakaran Lane, Outside Jewish Cemetery

1min
page 68

Stretch G - Canal Mouth

1min
page 69

Stretch E - KMC Waste Collection Centre

1min
page 67

4.2.3 Implementation - Community framework

0
pages 75-76

Stretch D - Padikathukulam East colony

1min
page 66

Stretch B - Karikkamuri Neighbourhood

1min
page 64

Stretch C - Fashion Street

1min
page 65

Stretch A - Near KSRTC Bus Stand

1min
page 63

3.3 Comprehensive Canal Edge Masterplan

0
pages 60-61

Mobility

1min
page 58

Community

1min
page 59

Landscape

1min
page 57

3.2 Canal Rejuvenation Strategies

0
page 56

2.3.4 Principles

1min
page 51

2.3.6 People-prioritized community scenario

1min
page 53

2.3.7 Expected outcomes

0
page 54

2.3.5 Key components of community framework

2min
page 52

2.3.3. Approach - Existing scenario Vs Canal community scenario

2min
pages 49-50

2.2.6 Expected outcomes

0
page 46

2.3.2 Challenges and Opportunities

2min
page 48

2.2.4 Key components of mobility framework

4min
pages 43-44

2.1.9 Expected Outcomes

1min
page 39

2.1.6 Framework

0
page 31

2.2.2 Approach - Prioritizing motor vehicles Vs Prioritizing People

1min
page 41

2.1.8 On-Site Implementation of Sponge toolkits

3min
pages 37-38

2.1.7 Scenarios

2min
pages 32-36

2.2.3 Principles

0
page 42

2.2 Mobility Framework

1min
page 40

2.1.5 Key typologies of cloudburst network blue-green streets and open spaces

2min
pages 29-30

Concepts underlying vision document

2min
pages 15-16

Introduction

3min
pages 4-5

1.3 Sponge Approach for a Resilient Kochi: Investing in a Blue-Green Network to mitigate flooding and

2min
pages 2-3

improving the public realm

8min
pages 22-26

Precinct Level Challenges: (Based on the limited data available and Site analysis

3min
pages 7-8

1.4 Vision Statement

3min
pages 13-14

2.1.4 Principles of the Sponge Approach

2min
pages 27-28

Chapter 2: Framework for the Mullassery Canal Precinct: Adapt, Connect and Empower

3min
pages 17-18
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.