Mullassery Canal Resiliency Framework

Page 95

SPONGE COLLABORATIVE +

WEAVING WITH WATER Team

MULLASSERY CANAL FRAMEWORK AND CANAL EDGE MASTERPLAN

Annexure 1. Background of Flood Mitigation Efforts in Kerala There have been a number of engineering-focused flood mitigation efforts in the Mullassery Canal precinct, beginning with the Esteem Report in 2004 and culminating with Phase 1 and Phase II of Operation Breakthrough in 2020, in the aftermath of the Kerala floods of 2018 caused by an extreme rainfall event. Esteem Report Recommendations ● To avoid flooding in MG Road, a new west flowing drain is proposed from Chittoor road across MG road at Padma Junction and discharging into Market Basin Canal. ● To avoid water logging in KSRTC bus stand, Karikkumari neighbourhood the canal is proposed to be widened to uniform width of 3m from KSRTC premises upto the point where the canal is having 4m at present. ● To relieve the pressure in Karikkumari area another west flowing drain is proposed along Hospital road cutting across MG road from Chitoor road. ● For effective discharge at all times the invert level has to be kept above the high tide level of +0.44 during rainy months. Operation Breakthrough Recommendations: The Operation Breakthrough progress report 20209 observes that under an AMRUT scheme, the bed of the Mullasserry canal was concreted and raised by 2.5m for a length of 400m so that it was at a higher level than the Thevara-Perandoor canal into which it drains. Prior to the concreting of the canal bed, the canal depth was at 4m depth. The report states that as a result of the concreting of the canal bed, the KSRTC bus stand and South Railway station began to see waterlogging during normal rainfall due to a reduction in the carrying capacity of the canal. Operation Breakthrough was implemented in the aftermath of the 2018 flooding, in two phases. ● In phase 1, the drains of the city were renovated to avoid flooding for a budget of Rs 10 crore. ● In phase 2, the mouths of canals were desilted and cleared of obstruction, including the Mullasserry canal. Increasing the carrying capacity of the canal will go some way towards reducing waterlogging in the case of a normal rainfall event. However, the issues of desilting and canal maintenance is not a long term solution.10 Plastic waste and illegal sewage connections into canals, too, add to the problem of obstructions in the carrying capacity of the canal which require long-term and ongoing action under a unified framework.

9

http://www.irrigation.kerala.gov.in/images/pdf/Breakthrough.pdf https://www.thehindu.com/news/cities/Kochi/crores-spent-but-citys-canal-system-still-in-tatters/article31752643.ece

10


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

D. An Integrated approach

2min
pages 98-100

3. Stakeholder Engagement

4min
pages 101-103

MOBILITY

3min
pages 87-92

4.2.4 Phasing of Pilot Projects and Long-term policy initiatives

0
page 83

Canal Cleanup Strategies

2min
page 95

4.2.4.3 Additional Pilots

1min
page 82

C. For collaborative governance and community participation

2min
pages 96-97

4.2.4.2 Subsite C - Pilot project

1min
page 81

4.2.4 Glimpse into Pilot Projects

0
page 79

4.2.3.1 Post-implementation Community Waste management Strategies

3min
pages 77-78

4.2.2 Implementation - Mobility framework

1min
page 74

Stretch F - Karunakaran Lane, Outside Jewish Cemetery

1min
page 68

Stretch G - Canal Mouth

1min
page 69

Stretch E - KMC Waste Collection Centre

1min
page 67

4.2.3 Implementation - Community framework

0
pages 75-76

Stretch D - Padikathukulam East colony

1min
page 66

Stretch B - Karikkamuri Neighbourhood

1min
page 64

Stretch C - Fashion Street

1min
page 65

Stretch A - Near KSRTC Bus Stand

1min
page 63

3.3 Comprehensive Canal Edge Masterplan

0
pages 60-61

Mobility

1min
page 58

Community

1min
page 59

Landscape

1min
page 57

3.2 Canal Rejuvenation Strategies

0
page 56

2.3.4 Principles

1min
page 51

2.3.6 People-prioritized community scenario

1min
page 53

2.3.7 Expected outcomes

0
page 54

2.3.5 Key components of community framework

2min
page 52

2.3.3. Approach - Existing scenario Vs Canal community scenario

2min
pages 49-50

2.2.6 Expected outcomes

0
page 46

2.3.2 Challenges and Opportunities

2min
page 48

2.2.4 Key components of mobility framework

4min
pages 43-44

2.1.9 Expected Outcomes

1min
page 39

2.1.6 Framework

0
page 31

2.2.2 Approach - Prioritizing motor vehicles Vs Prioritizing People

1min
page 41

2.1.8 On-Site Implementation of Sponge toolkits

3min
pages 37-38

2.1.7 Scenarios

2min
pages 32-36

2.2.3 Principles

0
page 42

2.2 Mobility Framework

1min
page 40

2.1.5 Key typologies of cloudburst network blue-green streets and open spaces

2min
pages 29-30

Concepts underlying vision document

2min
pages 15-16

Introduction

3min
pages 4-5

1.3 Sponge Approach for a Resilient Kochi: Investing in a Blue-Green Network to mitigate flooding and

2min
pages 2-3

improving the public realm

8min
pages 22-26

Precinct Level Challenges: (Based on the limited data available and Site analysis

3min
pages 7-8

1.4 Vision Statement

3min
pages 13-14

2.1.4 Principles of the Sponge Approach

2min
pages 27-28

Chapter 2: Framework for the Mullassery Canal Precinct: Adapt, Connect and Empower

3min
pages 17-18
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.