PE Express 1 July 2015

Page 1

PORT ELIZABETH

90 000 COPIES WEEKLY WEDNESDAY July 1, 2015 |0 041 503 6111 | E­mail express@media24.com | www.pe­express.co.za |

PE Express Newspaper |

@PEExpress1

EDITOR: BETTIE GILIOMEE

LOADSHEDDING: NO POWER OUTAGES FOR KRAGGA KAMMA SUBSTATION

Substation will only be fixed later in the year

LIZEKA TANDWA

shedding. “We have not been told about it. This is unESIDENTS who recieve power via acceptable and unfair to the people who are the Kragga Kamma substation subjected to load-shedding. It’s one thing if can breathe a sigh of relief as load- it is an area that includes a hospital for inshedding is not on the horison stance, that area may not be able to be switched off because you can’t switch off a here anytime soon. hospital, but for you to have areas which have “This is due to the switch gear and trans- no load-shedding without any explanation former capability of that network,” explained save that it will be rectified later is unfair. If Director of Metro Communications Roland this is true, I will demand an explanation,” said Lawack. Williams. Meanwhile Williams explained that while Residents in areas which include Framessome parts by, Westerof the city ing, and “This is unacceptable and unfair to were enjoySunridge the people who are subjected to ing uninterPark can rupted powexpect to load­shedding.” er supply escape ­ JONATHAN LAWACK, DA COUNCILLOR the now alload-shedmost daily ding until the “latter part of the 2015/’16 financial year,” occurrence of load-shedding was placing enormous strain on the rest of the power inWilliams told PE Express. He said that once the repair, recapitalisa- frastructure. “Like a jet engine on an aircraft that is detion and upgrade of the substation was complete “all residents could look forward to be- signed to run continuously to be at its most ing part of the revised load-shedding proc- efficient, operating the distribution networks are the same. Constant interruption to the ess.” DA spokesperson for Infrastructure and supply place stress on switch gear transformEngineering, Jonathan Lawack said he was ers and cables. This is due to the natural inappalled by the news that certain parts crease in loads and the loss of diversity when around the substation were exempt from load- power is switched off for extended periods.”

R

SMS US

your comments or news. Start your SMS with the word ‘PE’, followed by your comment. Each SMS cost R1.50

45530

Local bartender to compete with country’s best

AJ Snetler (25), a bartender at the Soho Lounge in Richmond Hill, is one of the six finalists in the Diageo Reserve World Class Bartender­of­the­year competition to be held in Johannesburg from July 14 to 16. Read more about him on page 8. PHOTO: THEO JEPTHA

WE’RE TAKING BIG STRIDES INTERNATIONAL SHOE BRAND NOW AT BAYWEST

SupergaSA

@superga_sa

Most folks are not deaf in the conventional sense. ENHANCE YOUR HEARING - ENRICH YOUR LIFE

A New Era in Hearing Enhancement BOOKINGS: 041 360 9304

INVISIBLE

ADVANCED IN THE EAR CANAL TECHNOLOGY

PE: Cnr 6th Ave/125 Fordyce Road, Walmer JEFFREY’S BAY: Weekly testing at Policlinic

It’s not a question of volume it’s a question of clarity: ”I hear you talking, but I can’t make out what you are saying.“

FREE

SCREENING HEARING TESTS

Including a 2 weeks trial with the latest technology

* A New Address * A New Era of Service Excellence Cnr 6th Ave/125 Fordyce Rd, Walmer

Welcome to PE’s New Home of Hearing!

www.hearclearly.co.za * Registered Hearing Aid Acousticians

Reduce Mental Stress: Constant repetition and frustration can test even the best relationships, at home and work.

X1Q8H7J1-010715-PX-mglpet-hear2


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
PE Express 1 July 2015 by PE Express - Issuu