Ahead of the curve Aussie Trenchless has developed its pipe segment technology to be suitable for any size of circular and non-circular pipe.

the service life of pipes, and this method is ideal for man entry pipeline rehabilitation for gravity sewer mains. Installation can take place in low flow conditions, and the technology has low capital costs and a small site footprint. PST lining panels are made of polypropylene material, providing a smooth surface with effective hydraulic performance capacities. Significantly, PST is semi-transparent, mitigating risk and removing guesswork during the completion of gap grouting works. PST panels are lightweight, easy to install, and ideal for positioning in tight locations, with the product suitable for all pipe types, including round, ovoid and box culverts. Segment pipe rehabilitation technologies are recommended for sewers with complicated and nonstandard shapes.

“Mr Meredith has seen significant growth in the implementation of trenchless solutions in Australia and abroad. He and his team offer practical advice to infrastructure owners and contractors on a variety of underground pipeline rehabilitation techniques.”

PST is specifically designed for traversable trunk sewers and stormwater culverts.

T

he team at Aussie Trenchless is passionate about progressing future infrastructure opportunities and accomplishing superior outcomes. Headquartered in New South Wales, Director Chris Meredith and the team are committed to pioneering state-of-theart solutions and furthering businesses in the trenchless industry. Founded in 2014, the company offers a range of unique products in Australia and internationally. Mr Meredith is something of an industry mogul, with 40 years in utilities and having pioneered the development of several well-known rehabilitation methods through decades of contracting. Throughout his years in the industry, Mr Meredith has seen significant growth in the implementation of trenchless solutions in Australia and abroad. He and his team offer practical advice to infrastructure owners and contractors on a variety of underground pipeline rehabilitation techniques. Importantly, they offer hands-on service for industry contractors backed by years of expertise. They have developed multiple complementary technologies for underground service installation. PST Pipe segment technology (PST) is one solution for pipe rehabilitation that is easy to build and fast to install. It is specifically designed for traversable trunk sewers and stormwater culverts. Pipe lining technologies have the capacity to substantially increase 56 TRENCHLESS AUSTRALASIA SEPTEMBER 2021

PST panels are ideal for positioning in tight locations.


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

ASTT Corporate Members

1min
pages 72-73

Breakthrough technology for drain blockages

3min
pages 70-71

Destigmatising poor mental health in construction

4min
pages 68-69

No-dig innovator takes service to new heights

5min
pages 66-67

Australia’s first online drain cleaning refresher

4min
pages 64-65

ImpulseRadar offers a different view

5min
pages 62-63

Hydro excavation in Brisbane’s Southbank

4min
pages 50-51

The future in pipeline rehabilitation

3min
pages 58-59

Ahead of the curve

3min
pages 56-57

KAISER forges new partnerships

3min
pages 54-55

The superior alternative in SMS rehab

2min
pages 60-61

SECA unveils eCityJet

2min
pages 52-53

The most powerful truck-mounted vacuum excavator yet

2min
pages 48-49

Boretech leading WA’s HDD utility installations

4min
pages 46-47

Getting the edge over the competition

4min
pages 40-41

Bohrtec machine guides sewer works

3min
pages 38-39

Good practices for HDD project management

5min
pages 42-43

Rob Carr in the driver’s seat in WA

4min
pages 36-37

HDI Lucas stays tuned in on Channel Island

3min
pages 32-33

Zipping past the competition

2min
pages 34-35

NSW rolls on through COVID storm

6min
pages 28-31

What to expect at No-Dig

0
pages 24-25

From the President

2min
pages 10-11

No-Dig Down Under postponed

1min
pages 20-21

News in brief

7min
pages 16-19

Councillor’s reports

3min
pages 14-15

Editor’s letter

4min
pages 8-9

From the ASTT Secretary

3min
pages 12-13

Herrenknecht becomes No-Dig Gold Sponsor

2min
pages 22-23
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.