Exploring Pondicherry Heritage Local Area Plan
Boulevard Town, Pondicherry Heritage Listing Plan A non statutory plan, 2003 Smart City proposal 2017 Area: 3.56 km
Zoning Plan for Boulevard Town 2011
Area in Master Plan Pondicherry Municipal Corporation (PMC) Residential Existing Commercial Existing Industrial Existing
Detailed Development Plan DDP -2036
Transportation Existing
Section 22of the said Puducherry Town And Country Planning Act,1969 vide G. O. Ms. No. 21/2015 Revised dated 31-10-2019
Public Utility Existing Semi Public Existing
Area: 2.04 km
Water Body Vacant
Section 21 of the said Puducherry Town And Country Planning Act,1969 revision sanction on 2001.
2.03 km² | 202.75 ha
Prepared by Puducherry Planning Authority (PPA)
Agricultural Land Open Space Existing
Comprehensive Development PlanInterim plan 2021
Area Of The Scheme
54%
21%
9%
6% 6% 4%
Boulevard Town, Detailed Development Plan 2036
Purpose & Vision
“ Preserving our historical past, maintaining the livability of the present, and transforming our future through the implementation of the highest quality planning, to enhance the level of infrastructure service. “ Aerial Image of Boulevard Town
Area: 19.3 km Residential Existing Residential Proposed Commercial Existing
Master plan 2021
Commercial Proposed
Section 32 of the said Puducherry Town And Country
Industrial Existing
Planning Act,1969 sanctioned on 1997
Area: 41.9 sq.km
Industrial Proposed Public Utility Existing Public Utility Proposed Semi Public Existing
Sustainable Regional Planning For Puducherry, Viluppuram, Auroville & Cuddalore 2025
Semi Public Proposed Open Space Existing Open Space Proposed
Published on February 15, 2012, Puducherry Town And Country Planing Act,1969
Area: 2345 .9 sq.km
Water Body 62%
13%
9%
6% 6% 4%
Sangami Nagarajan | PG190841 |TPS Manipur | Monsoon 2020 | MUP | CEPT University
3
Boulevard Town, Pondicherry Statutory/Legislative Framework
Puducherry Town And Country Planning Act, 1969 Duration
Development model
Land acquisition model, Amendment of the Land Acquisition Act, 1894
Plan Prepared by
Puducherry Planning Authority(PPA), ( Under section 21 of The Puducherry Town And Country Planning Act, 1969), Puducherry Town Planning Office, Puducherry.
6 months 2 months
Relevant Sections of the Act: Sections :
3 years
10,11,12,16,17,19,20,-31,33,34,34(a),40,44,91
2 months 30 days
Institutional Framework
3 months
Scheme is prepared by
Puducherry Town and Planning Authority through (The Puducherry Town And Country Planning Act, 1969 )
Activities
Legal Provision
Institution Involved
Consent for Preparation of draft comprehensive plan by the PPA
Section 6
Puducherry Town and Planning Authority ,
Declaration of planning area Constitution of town and country planning authorities
Section 8 Section 11
PMC & State Government Puducherry Town and Planning Authority
Functions and Powers of the appropriate planning Preparation of present land and building use Declaration of intention to make or adopt detailed development plan Contents of Detailed development plan Preparation and submission of detailed development plan Consent of government to publication of notice of preparation of plan Public notice of the preparation of the Detailed Development Plan. Consideration of suggestions and Revision of Master plan Approval by Government Issue of the plan by the government
Section 12 Section 17 Section 24 Section 28 Section 26 Section 30 Section 31 Section 34 Section 32 Section33
and State Government Puducherry Town and Planning Authority , Private Public Partnership and State Government Puducherry Town and Planning Authority Puducherry Town and Planning Authority and State Government Puducherry Town and Planning Authority and State Government
Planning Implementation
Scheme is sanctioned by
Scheme is maintained by Puducherry Municipal Corporation
Coming into operation of the DDP (Section 36)
Variation and modification of DDP (Section 42)
Heritage conservation and maintenance by
Acquisition and disposal of land (Section 48-52)
Levy & development charge (Section 53-56)
Finance, accounts and audit (Section 57-60)
Promotion and execution of works (Sections 61)
30 days
Under Section 33, Area Based Proposal, Smart City, Puducherry
30 days
Scheme is implemented by
30 days
Government of Puducherry in 2015, revised in 2018
Hear any appeal (Section 91)
INTACH
Review and Plan Upgradation Information on registered land detail
Patta transfer detail of registered land FMB sub division of patta transferred
Community Participation Once in 5 years review and updation (Section 45) Satellite imagery with through Bhuvan Portal
Review of Plan Individual Land Use Updation
Award pass on any new proposal from different department through the right to fair compensation in LARR act,2013 Details on government proposals under land grant rules of GP land
Land Use Updation
Community group discussion on the proposed plan and taking their suggestions Interviews both formal and informal Theme Based Workshops to educate the people about the plan and the details
Approved Plot details under RER act Set up of GIS division for CDP GO issue to start GIS division after CDP publication. Amendment of act in order to have continuous flow
4
Updation of CDP Process
Sangami Nagarajan | PG190841 |TPS Manipur | Monsoon 2020 | MUP | CEPT University
Transportation, Water-bodies, Public and semi public, industries and residential proposal from TCP Department
Surveys to find the requirement and Vision Survey Field Visits
Boulevard Town, Pondicherry Delayering The Plan
Comparative study
Built Vs Open
Public Amenities
Land Distribution
Boulevard town , Kochi, Kerala, India Puducherry, India Area: 2.04 sq.km
Area: 1.0 sq. km
23%
Development model 60.5%
5% 3% 1.5%
Appropriation
Land Acquisition
Develop, implement,Maintain
PPA: PSCP: PMC
Poor Class 23%
Open space Water body Public open Private open Built 68%
12%
16%
4%
Street Network
P. Utility
47%
Urban Form
19%
20%
6% 4%4%
11.5%
23%
14%
Block Sizes 420 m (110*100m) 532 m (136*130m)
Transport Heritage
GKDA: KSCP : KMC
Land in Public Domain
7%
Beach front
Land Acquisition
For Public use
For Roads
For Poor Class
For Heritage
For open space
Area Returned
Permissible Vs Consumed FSI 0.78
CRZ norms,2019 Consumed FSI
Transferable Development Rights For both private and public domain- 30%
Only for public purpose lands
Costing Funding is through Area based Development for Heritage and tourism under Smart City Mission of 1828 Cr.
Permissible FSI
Funding Mechanism Facade Control 12%
24%
17%
8 m wide 12 m wide
13% Built to line edge Building line
15 m wide
Key Take Aways
18 m wide 20 m wide
12%
14%
14%
48%
12%
18%
16%
Built to Line
AFD Loan PF cash flow PPP World Bank Schemes Central Government
Other regulations TDR, which is for both private and public domain.
Intermediate plan in effective implementation Funding mechanisms Regulations governing the built form Walkable Blocks : 110 x 110 m
Sangami Nagarajan | PG190841 |TPS Manipur | Monsoon 2020 | MUP | CEPT University
5
Sangami Nagarajan_Exploring Pondicherry Heritage Local Area Plan