Portfolio
A Peri Urban Hybrid Node
By Attaining Equity And Resilience In Accommodating Haphazard Growth In The Urban Fringe
Guided By : Prof. Utkarsh Patel and Geet Khurana Sangami Nagarajan | PG190841 |TPS Manipur | Monsoon 2020 | MUP | CEPT University
Preface : About the Studio The Urban Expansion and Regeneration Planning (UERP) Studio of Monsoon 2020, aimed at exploring the micro level planning and methodology in green field and brown field areas. The students are edified in various micro planning mechanisms like TPS, LAP for TOD, Heritage, CBD, ABD etc. The studio equipped the students in understanding the different lenses including land market, infrastructure, costing, transport, finances etc. Also, the practical approaches of reconstitution, incentive based appropriation are embraced. The studio involves interactive process and the output is progressive and multi dimensional. The studio mainly focused on ground solution which is more practical, Also, provided with the freedom to explore different approaches.
About Manipur, Ahmedabad Manipur, an outgrowth in the western part of Ahmedabad Urban Development Authority (AUDA). This study area maintains a strong impact by the proposed DMIC, industrial estates, SIRs , development plan proposed institutional zone and also by the city growth influx. The UERP studio aimed to consider micro level planning in Manipur region by means of Town planning scheme, a planning intervention in this green field area which is the need of the hour considering the impacts. Town planning scheme is an green field planning mechanism, widely practiced in Gujarat as per GTPUDA, 1976, which required rationale thinking, the ability to overview and handle multiple concerns and also grounded practical thoughts.
Author’s Contribution The studio was an exhaustive study from existing situation Analysis to site specific proposals which was carried out in groups of 4. The studio was complemented with 2 hands on exercises, inferences in every page and key learnings are carried out by author individually. The following tags are attached in every page to indicate the authors contribution.
Individual contribution
Led the Group of 4 members
Contributed to the group
Contents
Author’s contribution
1 2 3 4 5
Initial Exposure Understanding Micro Level Planning Through Case Studies
Manipur, a Hot Spot of Growth Summary Of The Impacts Of Corridors, Magnets And GIDCs
Proposals for the Peri Urban Hybrid Node Idealizing Potentials Into Proposals ; Implementing The Interventions
Reconstitution, Valuation and Costing A Fair Play Through Equity
Summary and Learnings Key Take Aways Of The Project
...04
...10
...14
...22
...28
Section-1 Initial Exposure Understanding Micro level planning through case studies
1.Initial Exposure
Boulevard Town, Pondicherry Heritage Listing Plan A non statutory plan, 2003 Smart City proposal 2017 Area: 3.56 km
Zoning Plan for Boulevard Town 2011
Area in Master Plan Pondicherry Municipal Corporation (PMC) Residential Existing Commercial Existing Industrial Existing
Detailed Development Plan DDP -2036
Transportation Existing
Section 22of the said Puducherry Town And Country Planning Act,1969 vide G. O. Ms. No. 21/2015 Revised dated 31-10-2019
Public Utility Existing Semi Public Existing
Area: 2.04 km
Water Body Vacant
Section 21 of the said Puducherry Town And Country Planning Act,1969 revision sanction on 2001.
2.03 km² | 202.75 ha
Prepared by Puducherry Planning Authority (PPA)
Agricultural Land Open Space Existing
Comprehensive Development PlanInterim plan 2021
Area Of The Scheme
54%
21%
9%
6% 6% 4%
Boulevard Town, Detailed Development Plan 2036
Purpose & Vision
“ Preserving our historical past, maintaining the livability of the present, and transforming our future through the implementation of the highest quality planning, to enhance the level of infrastructure service. “ Aerial Image of Boulevard Town
Area: 19.3 km Residential Existing Residential Proposed Commercial Existing
Master plan 2021
Commercial Proposed
Section 32 of the said Puducherry Town And Country
Industrial Existing
Planning Act,1969 sanctioned on 1997
Area: 41.9 sq.km
Industrial Proposed Public Utility Existing Public Utility Proposed Semi Public Existing
Sustainable Regional Planning For Puducherry, Viluppuram, Auroville & Cuddalore 2025
Semi Public Proposed Open Space Existing Open Space Proposed
Published on February 15, 2012, Puducherry Town And Country Planing Act,1969
Area: 2345 .9 sq.km
Water Body 62%
13%
9%
6% 6% 4%
Sangami Nagarajan | PG190841 |TPS Manipur | Monsoon 2020 | MUP | CEPT University
5
Boulevard Town, Pondicherry Statutory/Legislative Framework
Puducherry Town And Country Planning Act, 1969 Duration
Development model
Land acquisition model, Amendment of the Land Acquisition Act, 1894
Plan Prepared by
Puducherry Planning Authority(PPA), ( Under section 21 of The Puducherry Town And Country Planning Act, 1969), Puducherry Town Planning Office, Puducherry.
6 months 2 months
Relevant Sections of the Act: Sections :
3 years
10,11,12,16,17,19,20,-31,33,34,34(a),40,44,91
2 months 30 days
Institutional Framework
3 months
Scheme is prepared by
Puducherry Town and Planning Authority through (The Puducherry Town And Country Planning Act, 1969 )
Activities
Legal Provision
Institution Involved
Consent for Preparation of draft comprehensive plan by the PPA
Section 6
Puducherry Town and Planning Authority ,
Declaration of planning area Constitution of town and country planning authorities
Section 8 Section 11
PMC & State Government Puducherry Town and Planning Authority
Functions and Powers of the appropriate planning Preparation of present land and building use Declaration of intention to make or adopt detailed development plan Contents of Detailed development plan Preparation and submission of detailed development plan Consent of government to publication of notice of preparation of plan Public notice of the preparation of the Detailed Development Plan. Consideration of suggestions and Revision of Master plan Approval by Government Issue of the plan by the government
Section 12 Section 17 Section 24 Section 28 Section 26 Section 30 Section 31 Section 34 Section 32 Section33
and State Government Puducherry Town and Planning Authority , Private Public Partnership and State Government Puducherry Town and Planning Authority Puducherry Town and Planning Authority and State Government Puducherry Town and Planning Authority and State Government
Planning Implementation
Scheme is sanctioned by
Scheme is maintained by Puducherry Municipal Corporation
Coming into operation of the DDP (Section 36)
Heritage conservation and maintenance by
Variation and modification of DDP (Section 42)
Acquisition and disposal of land (Section 48-52)
Levy & development charge (Section 53-56)
Finance, accounts and audit (Section 57-60)
Promotion and execution of works (Sections 61)
30 days
Under Section 33, Area Based Proposal, Smart City, Puducherry
30 days
Scheme is implemented by
30 days
Government of Puducherry in 2015, revised in 2018
Hear any appeal (Section 91)
INTACH
Review and Plan Upgradation Information on registered land detail
Patta transfer detail of registered land FMB sub division of patta transferred
Approved Plot details under RER act
Community Participation Once in 5 years review and updation (Section 45) Satellite imagery with through Bhuvan Portal
Review of Plan Individual Land Use Updation
6
Updation of CDP Process
Sangami Nagarajan | PG190841 |TPS Manipur | Monsoon 2020 | MUP | CEPT University
Details on government proposals under land grant rules of GP land
Land Use Updation
Set up of GIS division for CDP GO issue to start GIS division after CDP publication. Amendment of act in order to have continuous flow
Award pass on any new proposal from different department through the right to fair compensation in LARR act,2013
Transportation, Water-bodies, Public and semi public, industries and residential proposal from TCP Department
Community group discussion on the proposed plan and taking their suggestions Interviews both formal and informal Theme Based Workshops to educate the people about the plan and the details Surveys to find the requirement and Vision Survey Field Visits
1.Initial Exposure
Boulevard Town, Pondicherry Delayering The Plan
Comparative study
Built Vs Open
Public Amenities
Land Distribution
Boulevard town , Kochi, Kerala, India Puducherry, India Area: 2.04 sq.km
Area: 1.0 sq. km
23%
Development model 60.5%
5% 3% 1.5%
Appropriation
Land Acquisition
Develop, implement,Maintain
PPA: PSCP: PMC
Poor Class 23%
Open space Water body Public open Private open Built 68%
12%
16%
4%
Street Network
P. Utility
47%
Urban Form
19%
20%
6% 4%4%
11.5%
23%
14%
Block Sizes 420 m (110*100m) 532 m (136*130m)
Transport Heritage
GKDA: KSCP : KMC
Land in Public Domain
7%
Beach front
Land Acquisition
For Public use
For Roads
For Poor Class
For Heritage
For open space
Area Returned
Permissible Vs Consumed FSI 0.78
CRZ norms,2019 Consumed FSI
Transferable Development Rights
For both private and public domain- 30%
Only for public purpose lands
Costing Funding is through Area based Development for Heritage and tourism under Smart City Mission of 1828 Cr.
Permissible FSI
Funding Mechanism Facade Control 12%
24%
17%
8 m wide 12 m wide
13% Built to line edge Building line
15 m wide
Key Take Aways
18 m wide 20 m wide
12%
14%
14%
48%
12%
18%
16%
Built to Line
AFD Loan PF cash flow PPP World Bank Schemes Central Government
Other regulations TDR, which is for both private and public domain.
Intermediate plan in effective implementation Funding mechanisms Regulations governing the built form Walkable Blocks : 110 x 110 m
Sangami Nagarajan | PG190841 |TPS Manipur | Monsoon 2020 | MUP | CEPT University
7
Feasibility Study Location in the City
Site Details
About site The site is located in the growing extension which is predominantly used by as commercial and institutional. The selected site falls under commercial use according to Master plan 2001.
Location in the Neighborhood
Planning Feasibility
Location in the Master Plan 2001
Description
DCR, 2010
TNCBDR, 2019
Description
Minimum Road Width
6m
18m
Proposed Land use - MP 2001
3.25
Site / Plot area in sq.m
4923
4923
Permissible FSI
2
3.25
Residential
Commercial Commercial
Maximum FSI
2.0
Premium FSI
50%
Maximum GC
-
50%
Total Permissible Built Up Area
9846
15999.75
Maximum Height
G+2 (Stilt + 3)
-
Permissible Height for residential
Stilt +3 (G+2)
Stilt +7
Maximum number DU
Up to 16 units, up to 300 sq.m commercial use
Number of floors
3
8
Tentative floor Plate
3282
2461
Front – 6m 7m Side & rear – 1.5m-1.5m- Setback - maximum of 1.5m 20m
Ground Coverage
66.67%
50%
Floor to floor Height in m
11.5 with plinth
31.05 with plinth
One car space and One 2 wheeler space for floor area up to 75 sq.m. In case of more than 75 sq. then One car space and One 2 wheeler space for every 75 sq.m
OSR - 10%
492.3
492.3
Area under Setback
942
1792
Area after setback
3488.7
2638.7
FSI Exemption area
2953.8
4799.925
Area Statement in sq.m
12799.8
20799.675
Minimum Setback
Parking - Commercial Parking – Residential
8
Feasible Built up Area Statement
Open Space Reservation
10% of the area with minimum 10m as dimension
Plot subdivision and layout
Minimum 72 sq.m as min plot
Sangami Nagarajan | PG190841 |TPS Manipur | Monsoon 2020 | MUP | CEPT University
1.Initial Exposure
Feasibility Study Market Feasibility
Development Feasibility
Land Rate Residential
Hence it would be profitable of the developer builds a hotel or a mixed use building. The master plan and the development regulation are not in same pace.
Circle rate /sq.m Market rate / sq.m A
11612.5
4046856
B
14399.5
4856227.2
15793
6070284
C
20623.8
6677312.4
D
23225
7284340.8
E
27870
8903083.2
30471.2
10117140
38553.5
11169322.6
Site Detail
Commercial
Recommendations
Site Detail F
Occupancy and Vacancy Residential -2BHK
Potentiality of site: According to master plan and site surrounding conditions. It has high potential of Commercial, residential and hospitality development Residential 100%
Commercial 100%
Scenario 1
Scenario 2
Mixed Use Development
Hotel development
50% 50%
Scenario 3
100%
Scenario 4
Residential -3BHK Commercial
Development Scenario
A
B
C
D
100% Residential
100% Commercial
50-50% Mixed
Hospitality hotel
Land Area
4923 sq.m
4923 sq.m
4923 sq.m
4923 sq.m
Land Rate
15793 sq.m
30471 sq.m
23132 sq.m
30471 sq.m
Land Cost
Rs. 7.77 Cr.
Rs. 15.0 Cr.
Rs. 11.3 Cr.
Rs. 15.0 Cr.
Built up area
9846 sq.m
15999 sq.m
12922 sq.m
15999 sq.m
Super Built up
12799 sq.m
20799 sq.m
16799 sq.m
20799 sq.m
C. Cost
Rs. 16.6 Cr.
Rs.28.9 Cr.
Rs.22.6 Cr.
Rs.34.7Cr.
Other Fees
Rs.18.1 Cr.
Rs.33.5 Cr.
Rs.12.5 Cr.
Rs.33.1 Cr.
Total Cost
Rs.42.4Cr.
Rs.77.5Cr.
Rs.46.5 Cr.
Rs.82.9 Cr.
Market Rate
Rs. 39018
Rs. 60385
Rs. 49701
Rs. 76642
Total Revenue
Rs.49.9Cr.
Rs.125.6Cr.
Rs.83.5 Cr.
Rs.159.4Cr.
Profit
Rs.7.35Cr.
Rs.48.1Cr.
Rs.36.9 Cr.
Rs.76.45Cr.
% Profit
15%
38%
44%
48%
• • • • •
Built to line concept or need for front margin, Permissible heights based on Road Widths Plot amalgamation Incentive based development Commercial viability etc
Key Take Aways • The valuation process in TP scheme depends on the market feasibility. • The value of each plot is understood through the process and considered in reconstitution. • For the costing, land cost, construction cost and other fees are considered. • For Revenue, betterment charge, sale of land, premium FSI are considered.
Sangami Nagarajan | PG190841 |TPS Manipur | Monsoon 2020 | MUP | CEPT University
9
Section-2 Manipur , A Hot-spot of Growth Existing Situation Analysis And Summary Of Impact Of Corridors, Magnets And GIDC
2.Manipur, A Hot-Spot of Growth
Apprehending the Study Area
Ahmedabad located on the banks of Sabarmati River as emerged as an important economic and industrial hub in India. The effects of liberalization of the Indian economy have energized the city’s economy towards tertiary sector activities such as commerce, institutional and construction.
The DMIC Corridor passes through western side of the Ahmedabad region. This is because of the presence of major industrial estates there.
Location
Connectivity
Manipur is strongly influenced by Sanand, Chandgodar SIR and the proposed DMIC corridor. Due to these impacts, a corridor strong development is seen. Manipur is known for the water-bodies and institutional developments.
Manipur has a very strong inter and intra connectivity. The area is also proposed with 90m outer ring road in the Development Plan 2021. Manipur also has a strong railway corridor and freight corridor supporting the industrial influence.
Infrastructure
Economy
Manipur is been proposed by DP 2021 with large scale infrastructures like WTP ,STP etc. The Gamtal are sprawled and their living condition is improved after water supply through Narmada Canal.
A shift in workforce from agriculture to industrial is seen. This has changed zones anticipating the pressure for development. Currently the predominant economy is industrial based.
AUDA G.agriculture
AMC
NH / SH
P. Agriculture
Rail Corridor Industrial
Evolution 3,35,655
Population 68%
13,268
2%
Growth rate
9%
7%
Before 2000
Freight Corridor Commercial
Literacy Rate
32,525
2000
2005
2010
2015
Present
Past Planning Efforts 1965
1987
2000
2005
Industrial Estates
2002
2021
2010 Growth influence
2015
2020
Road
Sangami Nagarajan | PG190841 |TPS Manipur | Monsoon 2020 | MUP | CEPT University
11
Factor Impacting Prospects of Manipur Growth Pattern
Planning Efforts
3% 2000
6.5% 2005
11.5% 2010
21.5% 2015
29% Present - 2020
2 Schemes DP Delineated TP Scheme
4 Schemes Draft TP Scheme
9 Schemes Sanctioned TP Scheme
DFC and GIDCs
NA conversion
DFC
7.1m DFC Altitude
NA Conversion
91% Single Crop Pattern
Sanand Rail yard
Road Based - DMIC
Rail Based - DMIC
100m DFC buffer Sanand
12
96%
Sangami Nagarajan | PG190841 |TPS Manipur | Monsoon 2020 | MUP | CEPT University
3% Dual Crop Pattern
6% Grass/ Shrub
2.Manipur, A Hot-spot of Growth
Narrating the Existing Situation Layers Land use
16%
Jantri Rate
INR 3501-7250
26% 1% Institutional
2% Residential
4% Gamtal
INR 1501-2001
32% INR 1001-1500
18% INR 2001-3500
8% INR 250-1000
Road Network
Built Vs Open 1250 x 1250m Block Size of Ex. Roads
16.43 km Length of Existing Roads
966 x 966 m Block Size of DP Roads
22.44 km Length of DP roads
1% Institutional
7% Built
90.2% Open
2.8% Water-body
Sangami Nagarajan | PG190841 |TPS Manipur | Monsoon 2020 | MUP | CEPT University
13
Section-3 Proposals for the Peri Urban Hybrid Node Idealizing Potentials into Proposals ; Implementing the interventions
3.Proposals For the Peri Urban Hybrid Node
Vision and Strategies
Urban Fringe
Can Manipur Develop as a “Peri Urban Hybrid Node” ???
To develop Manipur as a
Transitional space
AUDA Development Plan 2021
Peri Urban Hybrid Node
Self Sustaining economic center
“ People centric Integration of hybrid node which promotes
and enhances the transport transit & institutional hub on the periphery of the city with robust road connectivity and green blue network.
Growth polarization Cheaper Land rates
“
Rural
Peri Urban
Concerns And Strategies
Live
Urban
Work
Manipur : Under Pressure For Development Manipur region is influenced spatial by GIDC and freight corridors. The DP proposed zone also triggers and governs the growth. Hence understanding Manipur and accommodating the institutional and logistic developments are of prime importance.
Integrating & accommodating the Gamtal
AUDA Development Plan 2021
Accommodate the residential zone with RAH overlay.
Play
Institutional Zone
Logistic zone
Conserving and Interlinking it through blue green network.
Facilitate the need for logistics hub
Learn
To develop an institutional hub in proposed Zone
To develop an industrial training institute hub.
Sangami Nagarajan | PG190841 |TPS Manipur | Monsoon 2020 | MUP | CEPT University
15
Institutional Hub State’s Vision
The recent trends in globalization underscore the importance of ‘market ready’ trained human resources. This trait of being ‘market ready’ is not attainable without quality education.
“ Gujarat an Education Hub for the country
“
35 Km Catchment Radius :
Locational Bubbles
AUDA’s Efforts • Encourage development of educational and research facilities through provision of Knowledge and Institution Zone • Provision of land for educational facilities through Town Planning Mechanism • Seeking private sector participation in development of education facilities Institute Zone
• Uses Promoted: Special Node: IT Finance services, Technology and Bio Park, Health Node, Knowledge Township.
How much to Zone?
AUDA Development Plan 2021
Total Population of the catchment
225 Nos
Total Area Required for ITI
Student Population to Cater
54 lakhs
Total area to be Zoned
Population one College could cater URDPFI
Total Colleges Required Student Population to Cater *Sanand GIDC
Population one ITI could cater URDPFI
16
Proposed Institutional Zone
Total Area Required for Colleges
Villages Covered
*Census 2011
Existing Institutional Zone
1.08 Cr
Total Colleges Required
Sangami Nagarajan | PG190841 |TPS Manipur | Monsoon 2020 | MUP | CEPT University
1 lakhs 54 Nos
80-86 Ha 410-490 Ha
Case Studies for Institutional Sarkhej ITI, A’bad
16.2 lakhs 0.75 lakhs 22 Nos
324-405 Ha
3 Ha
CEPT University
YUPA ITI, Madurai
5.3 Ha
4.0 Ha
3.Proposals For the Peri Urban Hybrid Node
Institutional Hub Population Estimation
Logistics Zone
Locational Bubbles
Institutional Zone
X Institute Unit Size
5 Ha
Workers per Unit
Population per Unit
900
5,000
Contradicting characters Logistics
Institute Zoned
430 Ha
Institute Workers
Institute Population
0.78Lakhs
1.40 Lakhs
Calculating the logistics and commercial influx with institute population
Institute -1
Majorly attracts LIG and MIG Total Population
~1.0 Lakhs
~3.35 Lakhs
Logistics
Case Studies for SEWS SEWS, Satellite, A’bad
1.0 Ha
Need for social Housing
Rationale For Location Of Zoning
SEWS, Nikol, A’bad
20% of Working Population in Institute
~15000
80% of Working Population in Institute
~12000
50% of Working Population in Institute
~4000
City Influx
~5000
Total S.E.W.S Population
4.5 Ha • Sanskar Dham acts as a catalytic project which would pool and attract other developers to develop institutions • Cheaper Land rates • Possibility of Plot amalgamation • Land Availability • Vision of Work-Play-Learn-Live • Self sustaining Peri urban node
Institute -1
Institute Zone is categorized into 2, considering the requirement. Institute 1 zone would cater to the higher and technical education while Institute Zone which is envisaged with more open space and workshop spaces with 1.2 FSI while for institute 1 its 1.5.
Auxiliary Uses
Total Employment
Institute -2
Institute -2
Required Units
S.E.W.S Reservation
Assuming 50 sq.m as standard size, Built up Area with 35% loading
SEWS, Prahlad Nagar, A’bad
RAH Overlay
11 Ha
~36,000 8000 nos 5.50 lakhs sq.m
Area per Floor: Considering 3-4 floors
~1.35 lakhs sq.m
Land requirement considering 50% GC
~2.75 lakhs sq.m
Sangami Nagarajan | PG190841 |TPS Manipur | Monsoon 2020 | MUP | CEPT University
17
Strengthening the Road Network 5.1%
Green Integrations
Road network contribution
966 x 966m Avg. Block Size
8.65% Road network contribution
600*422 m
The road network proposal is an outcome of rigorous iterations considering the DP roads, Narmada Canal, DFC corridor which are not aligned with contour and doesn’t contemplate each other.
Road Infrastructure
Avg. Block Size
13.5% Road network contribution
380 x 380 m Avg. Block Size
Proposed 90m Outer Ring Road - High speed Corridor
Also, the natural drain of the water-body linkages are broken which has resulted in dried state. Hence an option of providing green trail integrated with the road infrastructure but not included in ROW.
Natural Drain and Linkages
The green trails are provided along the natural flow of drains on the lowest side of the road according to contour. The trail is also considered as a green realm, hence a 12m wide stretch is provided on one side.
Green trail along roads 18
Sangami Nagarajan | PG190841 |TPS Manipur | Monsoon 2020 | MUP | CEPT University
3.Proposals For the Peri Urban Hybrid Node
Zonal Plan
Logistics : 1.0 FSI
MIMU : 2.4 FSI
Institute 1: 1.5 FSI
HIMU Overlay : 4.0 FSI
RAH : 2.7 FSI
Mid Intensity Mixed Use Zone
Institute 1 Zone
Logistics Zone
Water bodies
High Intensity Mixed Use Zone
Institute 2 Zone
Gamtal
Parks and Greens
38.9%
72.6%
17.2%
27.4%
15.5%
5.2%
5%
The block sizes promotes each zone, which is a understood from case studies. The rationale behind zone is logistic zone complementing DFC corridor, Mix intensity Mixed Use Zone for the residential influx which has RAH overlay.
High intensity Mixed Use zone overlay with 200m buffer along the proposed BRTS corridor. Institute zone considering the existing institutional developments. Training institutes complementing the logistic zone with greens integrating blues and live.
Mid Intensity Mixed Use Zone
High Intensity Mixed Use - Overlay
Institute Zone
Logistic Zone
13.5% 3.9% 1.3% 1.6%
Overlays
Road Section: 36m ROW with BRTS Public Transport service
Road Section: 36m ROW with AMTS Public Transport Service
Sangami Nagarajan | PG190841 |TPS Manipur | Monsoon 2020 | MUP | CEPT University
19
Green Integration Water Body and its Natural Drain
Conserving Water-body With Buffer Green Trails Integrating With Drains
Neighborhood Green Pockets
The play is achieved by preserving the existing water body as the potential realm. The broken inter-linkages are to be enhanced to preserve the water-body. The preservation is done by providing a buffer of 15m around the water body and creating green pockets. The green pockets are parks and open spaces. The green pockets are linked through green trail considering the natural drain linkages. The main reason is to avoid water-logging during monsoon season. The green trail opens into neighborhood park. Thus this forms a complete network from city level parks to neighborhood parks. The greens create an identity.
Green Trail View Visualization showing the integration of green trail along roads which creates an identity.
20
Sangami Nagarajan | PG190841 |TPS Manipur | Monsoon 2020 | MUP | CEPT University
3.Proposals For the Peri Urban Hybrid Node
Implementing the Interventions
Delayering the Functional Uses of the Road
TP Scheme -1
TP Scheme -3
TP Scheme -2
TP Scheme -4
TP Scheme 3
TP Scheme 1
TP Scheme 1
Area: 402 Ha
TP Scheme 2
Area: 381 Ha
To pool institutional zone-1, logistic zone, land required for 90m outer ring road, natural interlinking drains of water bodies and integrate Gamtal
To pool institutional zone-2 & logistic zone and the land required for 90m outer ring road
Freight corridor
Local Roads
Collector Roads
TP Scheme 4
TP Scheme 2 Mid Intensity Mixed Use Zone
Institute 1 Zone
Logistics Zone
Water bodies
High Intensity Mixed Use Zone
Institute 2 Zone
Gamtal
Parks and Greens
16.3%
72.6%
27.3%
27.4%
12.2%
17.9%
4.0% 3.4% 9.9%
Major Roads
9.0% High Speed Corridor
Overlays According Section 41
TP Scheme 3
Area: 317 Ha
To pool institutional zone-1 and logistic zone and cater to the residential need trigger of the developments
To accommodate the repel effect of logistics, DFC & existing growth and implementing DP envisaged interventions For Developing the institute zone
TP Scheme 4
Area: 396Ha
Enhance the natural interlinking drains of water bodies and cater to the residential need trigger of the developments
18m TP Roads
12m TP Roads
For facilitating the Logistics zone To implement the 90m outer ring road To Integrate Gamtal with other proposed zones
TP Roads
To develop a compact and connected neighborhood Sangami Nagarajan | PG190841 |TPS Manipur | Monsoon 2020 | MUP | CEPT University
21
Section-4 Reconstitution, Valuation and Costing A Fair Play Through Equity
4. Reconstitution, Valuation and Costing
Reconstitution and Appropriation Plot Size Analysis
Appropriation Principle
47% Bigger Plot sizes >20,000 sq.m
38% Average Plot Size 8,500 - 12,000 sq.m
15% Smaller Plots <5,400 sq.m
Open Greens
Social Amenity
S.E.W.S
Roads
Sale of Plots
12.4%
10.05%
1.61%
17.9%
5%
47% appropriation * 50% allowable in Act Ownership Analysis
16%
Reconstitution Principles
Public Ownership
11%
Institutional 5000 sq.m
Combined Ownership
1.0
MIMU 250 sq.m
1.5
73% Private Ownership
Jantri Rate Analysis
1.75
1.0
1.0 2.5
2.0 1.0
Connectivity and Access Min. 12m access
Organization Plots would have a common line
Locational FP Over OP 47% deduction
Build ability Maintaining the Minimum plot area
Shape Ratio 1:1.5-1.25
10% INR 1710 0 40
14%
m
Greens
INR 1640
34% INR 1540
42% INR 1390
Public Reservations
No Deduction
Plots > 250 sq.m
Gamtal, Canal and water-body
Green open space. The maximum accessibility
Displacement Considering the village boundary
Displacement For greens and Public Reservation
Walk ability 110 * 100m blocks. Green trail links
Sangami Nagarajan | PG190841 |TPS Manipur | Monsoon 2020 | MUP | CEPT University
23
Creating Equity Through Equal Appropriation Manipur Town Planning Scheme
Displacement of Plots for Reservations
DFC
4.3% 398
Corridor
24 m Road with Green trail
12m Road
Gamtal
410 OPs
18 m road
18 m road
12m Road
398
18 m Road with Green trail
anal Narmada C ng Road
12m Road
90 Outer Ri
12m Road
18m Road
380
Plots displaced for Green Reservations
398 S.No 36 m BRTS
380
12m Road
18 m Road with Green trail
24 m Road with Green trail
397 397
397
397
438
452 FPs
Plots displaced for Green Reservation
24
30 m freight corridor
24 m Road
8.3%
ad l Ro Can a 18 m
12m Road
18m Road
12m Road
24 m road
18 m road
18 m road
24 m Road with Green trail
18 m road
18 m road
12m Road
18 m road
ad Ro
18m Road
l na Ca
ad Ro
m
12m Road
l na Ca
24 m Road with Green trail
m 24
18m Road
12m Road
Plots displaced for Institute Reservation
305
319
18 m road
319
18 m road
305
45 m AMTS Corridor
315
315
315 397
Sale of Plots Reservation
456
Reservation for Public Purpose
Plots displaced for Public Institute Reservation
2.4% Plots displaced for Logistic Reservation
127
127
119 119 109
109 109
3.6%
Sale for Commercial
24
1.5%
Sale for Residential
1.6%
Reserved for S.E.W.S
Sangami Nagarajan | PG190841 |TPS Manipur | Monsoon 2020 | MUP | CEPT University
10.05%
Reserved for Social Amenity
109
424
Plots displaced for Public Logistic Reservation
4. Reconstitution, Valuation and Costing
Visualizing the Proposals Canal Front Development A city level green space with informal market in mornings & food joint at evenings, Party plots and playground
Visualizing The Zones Logistics FSI : 1.0
Garden integrated with Water body
DFC
SEWS
Godhavi Gamtal
Joggers Park
High Intensity Mixed Use Zone FSI : 4.0
Railway Track
WDS
SEWS
SEWS Social Amenity
Godh av
SEWS
i Lake
Green Trail
Water Body Buffer
nal Road
18 m Ca
Mid Intensity Mixed Use Zone FSI : 2.4
r ute
m 24 FSI : 1.5 Institute 1 Zone
l
d Roa
ad
l Ro
na Ca
al Can
ana da C ma Nar
9
er Ov
24 m
O 0m
ce pen Spa
lO
e City Lev
A joggers and walking park accommodating the daily exercise and relaxing needs of the people.
ad Ro g n Ri
ly -F
High Intensity Mixed Use Zone Visualization Green Tra il Mid intensity Mixed use zone GC: 50% : FSI: 2.2
Lake Front Development
High intensity Mixed use zone GC: 42%;FSI: 3.2
WDS
BRTS Bus Station
6m high and 4m wide
wa y
dW alk wa y
OSR 10%
Wa lk
High intensity Mixed use zone GC: 30%;FSI: 3.8
Bus
Arc ade d
A dedicated pedestrian walkway connecting the water bodies and green road along Narmada canal.
BRTS Lane
Ar ca de
Green-trails linking Water-bodies
Fu V ll ab iabi utt lity c in g for om ro ad bu me ild rci in al gs
Side Margin as 4.5 m -4.5m-4.5m
A double storey green layer where the first level is more of garden space and second level for walking .
Sangami Nagarajan | PG190841 |TPS Manipur | Monsoon 2020 | MUP | CEPT University
25
An Equity Model Pay For What You Get Valuation Process
Understanding a range of 0.86 as the lowest for plots in logistics zone and highest of 1.87 for plots in HIMU zone .
Elements of Valuation
Increment Value
Area • Final Plot Area • Original Plot Area
OP Original Plot Value • Original Plot Area • Original Rate
47%
100%+37%
+27%
Rate • 3.6% inflated Jantri rate • Semi Final Rate • Final Plot Rate
Compensation
Deduction
FP
To the plot owners 50% for public reserved plots
Increment Value
100% - Base Factor
Semi Final Plot Value • Final Plot Area • Semi Final Rate
+12%
-22%
Net Demand
Increment Factors
Amount to be paid as betterment charge
FP
Total Increment Factor : 154%
• Final Plot Area • Final Rate
To the Authority 40% of Cumulative Increment
+27% - Develop-ability • Increased ROW and access • Commercial development
+12% -
Contribution Final Plot Value
• Logistic Zone • Plots with one access • Min 12m road access
The increment values are set with reference to the current variations in neighboring context of Manipur. Also variation is provided according to the zone developabillity where they pay for what they get.
Locational
• Access / Facing green
+05%-Locational • Public transport / Amenity
+25%-Zone Developabillity • Institutional
FSI:1.0
+37%-Zone Developabillity • MIMU
FSI:2.4
+43%-Zone Developabillity • HIMU
-15/22%-Depreciation • SEWS/ WDS/ Buildings
26
Sangami Nagarajan | PG190841 |TPS Manipur | Monsoon 2020 | MUP | CEPT University
FSI:4.0
4. Reconstitution, Valuation and Costing
A Fair Play Through Equity Costing Transportation
Revenue Model
Phasing of Development 76.28 Cr
Qty: 27.4 km
Physical Infrastructure to development in 5 to 7 years from Draft TPS & 5 to 7 years for development from Final TPS Phase -1 – 2021-2024
Phase -2 – 2024-2027
Bridges
Qty: 9.4 km
10.07 Cr
Expenditure 122.4 Cr.
Expenditure 53.5 Cr.
Street Infrastructure
Qty: 54.8 km
10.46 Cr
Qty 15.57 sq.km
Qty 8.77 sq.km
Trunk Infrastructure
Qty: 27.4 km
89.60 Cr
Revenue 0 Cr.
Revenue 0.5 Cr.
11.60 Cr
Greens
Qty: 60 Ha
Canal Development
Qty: 0.39 Sq.km
7.83 Cr
Contingency
7%
1.39 Cr
Escalation
35%
56.69 Cr
Compensation
Column 9
244.7 Cr
526.4 Cr Total Cost of the Scheme
Phase -3 – 2027-2030
515.43 Cr
531.4 Cr.
Revenue
Expenditure
15.97Cr Deficient
Sale of Plots Scenario 100% Development Net Demand: 15.97 Cr.
Phase -4 – 2030-2033 Expenditure 29.7 Cr.
Expenditure 0
Qty 3.07 sq.km
Qty 0
Revenue 180 Cr.
10% - 2 Ha 75% Development Net Demand: 144.8 Cr.
Revenue 7 Cr.
Incentives for Institute
20% - 4 Ha
50% Development Net Demand: 273 Cr.
2658 INR
35% - 7 Ha
Cost per sq.m
Contribution Scenario 50% Contribution
ND: -112.90 Cr 40% contribution
Equity is brought in by giving increment value as per the develop ability criteria.
Underutilized FSI of institute 1 could be traded off and FSI and land bank
30% Contribution
ND: 144.83 Cr.
Other Incentives
TDR
ND: 15.97 Cr.
DPC
The Development Penalty charge year is increased to 5 years.
Development
The residential commercial Mix is increased to 45% from 30%.
With 10% increase in contribution from land owners, the net cost would be decreased by 86%
Sangami Nagarajan | PG190841 |TPS Manipur | Monsoon 2020 | MUP | CEPT University
27
Section-5 Summary and Learnings Key Take Aways Of The Project
5. Summary and learnings
Key Take Aways Why Zonal Plan ??
Contextualizing the Micro Planning
Zonal plan is not a part of the statutory plans of GTPUDA, 1976. Cities like Jaipur, Bhuvaneshwar, Pondicherry etc. has an intermediate plan which helps them achieve the envisaged proposals. Development plan which deals with city and urban scale often tends to leave the deals micro level details. While Town planning scheme which are mainly for the implementation of the DP proposals, thus missing out the contextualisation.
Achieving the Vision The vision of AUDA is taken forth in Zonal level, which is further achieved in town planning scheme, reconstitution and also during Valuation. Through all the vision, it states to be more people centric. The streets which are more for mobility are integrated with green trails which are dedicated for pedestrians. Also, traffic calming elements and safe junctions are incorporated. Integrating greens also helps in increasing the livability and preservation of water-bodies.
Socio - Economic Benefits Benefits and inferences on the economic aspect to owners and to authority.
Why Collect Betterment Charge This creates equity by that people pay for what they get.
Creating Equity For any planing intervention, the market feasibility, demand and supply of the area is very essential to cater to the need.
The logistics and institute zone contradict each other in character and also in uses. Thus, there is an intervention of training institute zone.
Benefits given to the land owners based on the potentiality factor.
In case of Manipur, planning efforts should consider Narmada Canal, Water-bodies and its interlinkages, Institutional growth, DFC and Sanand influence. Also the extension of BRTS service would trigger commercial developments.
47% 250sq.m
Stake Holder Benefits
To the Plot Owners Serviced infrastructure plots
To the Authority Monetary benefits for other investments and sale of plots
Market push for mixed use development
TDR generated on private land
Increased livability
10 % of the total transaction cost as share
Financial Benefits Increased build ability
Carving Green Spaces as recreational spaces
40 % of contribution is taken
Opportunity to develop land
Enhancing the social infrastructure and Access to the amenities.
Revenue generated from betterment charges.
To the City Controlled the haphazard growth on periphery of the city. Due to Peri urban hybrid node, mixed use development would promote tertiary economy sector.
Land deduction from individual land parcel.
each
Minimum plot area below which land would not be deducted.
40%
Contribution of increment charges collected from owners
83%
Final plots with access to greens.
55%
Final plots amenities.
30%
As compensation (column11) to incentivize institutional and logistic zone as they loose on developabillity.
50%
Amenities leased/sold at 50% of the market rate promoting PPP.
with
access
Sangami Nagarajan | PG190841 |TPS Manipur | Monsoon 2020 | MUP | CEPT University
to
29
Taking Forward DP’s Vision to TP Scheme Development plan 2021
Vision
“Ahmedabad” a livable, environmentally sustainable and efficient city for all its citizens; a city with robust social and physical infrastructure, vibrant economy and a distinct identity; a globally preferred investment destination.”
• Looking at the NA conversion rate, the general agriculture zone is rezoned to Mid intensity Mixed use zone. • The institution zone is split into 2 zones, which would cater to institutions and Industrial training centers. • The logistic zone is extended till north and restricted within canal. • The water-bodies are provided with 15m buffer and linking green corridor • From Integrated Development plan, the BRTS extension is considered as high intensity overlay.
Interventions from Zonal to TP Level • The major changes being, the introduction of TP roads i.e. 12m ROW roads, restricted the permissible height and development viability of few plots. • As the plot sizes are huge, to achieve the envisaged height, more open spaces are achieved. • In Zonal it was 68% built, which after reconstitution it was 52% • Public Reservations
Intermediate - Zonal Plan
To develop Manipur as a Peri Urban Hybrid Node with people centric Integration of hybrid node which promotes and enhances the transport transit & institutional hub on the periphery of the city with robust road connectivity and green blue network.
Manipur TP Scheme
A walkable ,compact and livable neighborhood with mixed use development and green integration. Also, to accommodate the repel effect of logistics, DFC & existing growth and implementing DP envisaged interventions.
30
Interventions from DP to Zonal Level
Sangami Nagarajan | PG190841 |TPS Manipur | Monsoon 2020 | MUP | CEPT University
5. Summary and learnings
Summary of the Scheme Physical benefit
Environmental Benefit Walk ability Condition : Best
150 x 135 m TP Roads
Walk ability Condition : Good
425 x 425 m Zonal Level Roads
Walk ability Condition : Bad
840 x 840m
DP Intervention Walk ability not considered
1260 x 1260 m Existing Situation
Apart from the road intervention and Walk ability, the reconstitution gives an advantage in form of rectangular 1:2 shape ratio plots. Every plot is been given a road access.
5.3% Green Parks
4.0% Water Body
3.45% Green Trail
9.9%
Narmada Canal
The trails which combines to the water-body and parks along with the walkways form a network within the TP. Retaining the natural drainage pattern, green pockets include cycle tracks, continuous walk ability, joggers area and recreational.
Social benefit - Reservations
Nolliâ&#x20AC;&#x2122;s Map - Ownership Analysis
3.6% Sale of Commercial
0.75% Social Amenity
9.3% Public Reservation
1.6% S.E.W.S
1.5%
67% Private Realm
32% Semi Public / Private Realm
11% Public Realm
Sale of Residential
The 47% deduction from every plot 16% is reserved for public reservations like logistics, institutes, sale of plots, S.E.W.S. The deficient could be covered by these reservation. The sale of plot would be sufficient.
Including Roads, where water-bodies and green are a part of public ownership. The green trail which is public connects to all neighborhood greens which are semi public/ private. Sangami Nagarajan | PG190841 |TPS Manipur | Monsoon 2020 | MUP | CEPT University
31
A Peri Urban Hybrid Node Prepared by : Sangami Nagarajan | PG190841 Guided by : Prof. Utkarsh Patel and Geet Khurana TPS Manipur | Monsoon 2020 | MUP | CEPT University