1 minute read

NETWORK MISSION

Next Article
WERCHTER PARKLIFE

WERCHTER PARKLIFE

N E T W O R K M I S S I O N

Stageco’s summer 2021 activity included the erection of a 35m high temporary mobile phone mast in Meer, a village in the Belgian municipality of Hoogstraten, close to the Dutch border.

Installed by the company in a single day (on August 2nd), the mast is employed by all three of Belgium’s telecoms operators: Proximus, Telenet and Orange Belgium.

Once again, Stageco has been able to demonstrate its creative versatility in being able to deploy its equipment and crew in a wide range of industrial applications outside of entertainment during the ongoing pandemic.

This article is from: