Tim Yim - Architectural Design Portfolio

Page 1

opography - hong kong

opography - singapore

section cutting through singapore

500

section cutting through hong kong islan

0



01 Reclaiming Hong Kong 2047 02 The Urban Living Room 03 inside-out 04 Discontinuous continuity 05 The Elevated 06 The Pool Market 07 Graphic work






01 Reclaiming Hong Kong 2047 topography - hong kong

section cutting through hong kong islan, kowloon and new terriotories

topography - singapore

section cutting through singapore

Architectural design 6 - Hong Kong Nation University of Hong Kong Spring 2018 Tutor - Sony, Devabhaktuni BAAS (IV)

information of reclamation site

1:50000 0

500

1500

1 : 400000 The project takes reclamation as the starting point to rethink the issue of 2047 in Hong Kong that is the 50th year after the handover of Hong Kong to China. It explores Hong Kong’s potential development through reclaiming land. the project conveys the notion of Hong Kong becoming independent from China as a city state. Intervention is done how how the city state operates

35 0 0



the reclamation proposal is passed and the construction work begins.

Phase 0 2018

the first phase of reclamation would be completed by 2027, the area along the coast between Aberdeen and Ap Lei Chau would be reclaimed. The standardzed courtyard grid system would be imposed on the land.

Phase 1 2027 total area reclaimed = 1.53 km

the second phase of reclamation is expected to be finished by 2047, the reclaimed area expanded along the outermost coast of Ap Lei Chau, thus, it generates a new coastline for South Island. The grid is introduced with variated elements that attempts to break the rigid logic of a conventional grid

Phase 2 2047 total area reclaimed = 3.12 km






02 The Urban Living Room

li

lo

ng

/里

N 5

17

75

25

1: 0

25

el

ec

tr

ic

al

p ap

li

an

la

r

gh in ng - li iew v vi li ght n li sio vi e l te

r

co

nd

i

sh

in

g

c

e

-

g

w

間 作 工 g in e/ ac heat ing / rk ing ng wo li net ght ing o li ht co - lig - er p r t de pu lam t on com gh ti li

k

r wo

ai

wa

ma

n hi

y/ shin a

dr

un

m/ ing oo t g

s ce

房 廚 n/ g he olin g n co ti - igh e l g id fr ght li

tc

ki

Architectural design 4 University of Hong Kong Spring 2017 Tutor - Kenan, Liu BAAS (III)

sp

plan 1:500 N

0

5

15

35

electrical appliances

The project explores a brand new prototype of urban space by introducing a series of household activities that relates to the infrastructure of electricity. The household activities are brought out from an internalized condition to the urban condition as a communal centre. It suggests the idea that household activities are blown up from a individual level to a collective level in the urban living room.


PROTOTYPE PROTOTYPE PROTOTYPE



b

a’

L02

a b’

G CIRCULATIO N PEDESTRIAN VEHICLE 1:200

N

0

2

6

14


4 6 3

4

5

6 3 8

5

6

8

7

6 7

2

1

2

1

1

1

0

0 0

P ROG R A M ME L0 1 D EL IV ERY C ENT R E 0 lo adi ng/ unl o a d 1 so r t i ng/ pa ck a gi ng 2 stora ge

0

L0 2 C OM MU NA L C ENTR E 3 w a s hi ng ma chi ne / l a undr y 4 e lect ri c s t ove / co o k i ng 5 ra di o / da nci ng 6 tv / mi ni t he a t re 7 air- co n/ me di t a t i o n 8 c o mput e r/ ga mi ng

1:400 28

1:400

N

0

4

12

28




03 Inside out Community Project University of Hong Kong Summer 2017 Tutor - Juan, Du BAAS (IV)

The project is to design for the residents who live in the subdivided units in Hong Kong, the design responds to the need of the occupants in the unit, who is having the problem of the lack of shading in house, privacy problem and incoming incests from the unhygienic envrionment downstairs. It is a window frame, that is customized to incorporate both the mosquito net and curtain.

clothes hanger metal rod fixed between partition of the toilet the upper deck of the bed double-deck bed upper deck is purely for storage purpose, there area lot fo useless objects onthe bed and it generates hygienic problem in the unit. fridge the fridge situates right next to the double-deck bed. It generatesheat and noise. electric stove there is no separate kitchen in the unit. Electric stove is used for cooking.

upper row of windows facing the view of the clubhouse of the newly built residential building, the window is covered with newspaper for the sake of privacy. insufficient table space the desk is occupied by objects. There is not enough desk space for the child to do his study. casement windows there is not a proper grill for the window, it may cause danger to Ms Chen’s four-year-old son mattress (mini-living room) the family sits on the mattress to watch television programs. However the mattress is old and in a bad condition,undesirable odor comes from mattress.

clothes hangers there is no washing machine and Ms Chan needs to wash clothes on her own.

water basin there is also water leakage problem from pipes, n rainy days.


4829

809

desk

refrigerator

television

958

667

383

cooking set

220

625

677

1098

1893

beam

937

801 408

double-deck bed

1584

4276

5860

Air conditioner

Double Bed

Fluoroscent Light Tube

Clothes Hanger

the AC is always turned on because of the great heat during daytime.

the upper level of the bed is used for storage purpose.

this is the only light source in the unit, the light is hung on the ceiling.

the clothes are hang on a rod.

1484

1930

1630

1893

958

2030

625

450 320

930 1130

250

460

air-conditioner

2458

1208 1207

light tube

436

2321

mattress

809

511

old mattress the family sits on the old mattress to watch TV,

electric socket

electric stove

Fridge

Water Basin

there is no kitchen, the mom can only cook food with an electric stove

for storage of food and ingredients.

the basin is used to contain the water that is leaked out from the water pipe.


1

|

6

2

|

5

3

5

|

2

6

|

4

|

4

1

|

3


5

20 10.9 6.2

30 25

65

20 6 13

aluminum frame rubber curtain track

2

3 4

curtain hook 1

16 67 window grille

65

ets

7 4

mosquito net

d

curtain fabric

op window grille

5

3 2

1

10 4

leather clip

steel wire

T-shape screw stainless steel bracket support screw expansion anchor

50

4


02 Discontinuous Continuity

Architectural design 5 UCLA Fall 2017 Tutor - Katy, Barkan BAAS (III)

The project explores the contradiction between the continuity of a spiraling surface and the discontinuity produced by a central core. The project is takes as a starting point a thick and a thin continuous surface and superimposes them to form the spatial framework for the cooking school and the spa; the thick surface defining large spaces and the thin articulating specificities within the larger space. The spatial narrative is then interrupted by the insertion of a thicken party wall that also serves as the circulation core. The alienated party wall is abruptly inserted into the existing framework of surfaces and disrupts both their directionality and continuity producing a hybrid paradigm of continuity/discontinuity .


ex p lo d ed a xo n o m etr ic s




st orage re s t a n r a n t o ffi ce bath and s auna

locke r ro o m

ou t door area


de mo -k i tche n & co mmunal l o ungr

l ab k i tche n bath and s auna

lib r a r y t re a t m e n t ro o m


04 The Elevated

freeing up the view

freeing up the circulation

10

frame

7 6

8

cantilever 3

4

5

columns 2

core

Architectural design 3 University of Hong Kong Fall 2016 Tutor - Ying, Zhou BAAS (III)

This design studio is based on a specific parameter of design - context. The design embodies the context and response to the site context and condition. The building embodies the gesture of elevation and free up the ground below. It brings a new condition to the site. It becomes a node in the circulation from different district, such as the Jordon, XRL Station and the Kowloon station. Moreover, it also creates a continuous experience as the person enters directly to the waterfront area of the cultural district without any blockage of building.

1


9

10

B

B

9

10

B

B

B

B

2 3

5

8 4

7

6

N

0

2

1

N

0

5

10

25m 1:500

20

40

100m 1:2000



06 The Pool Market

Architectural design 2 University of Hong Kong Spring 2016 Tutor - Kam, Ku BAAS (II)

The pool market is located under an Apartment House in Bangkok's Chinatown. Most of the dwellers in the Apartment House are retired man and new-immigrants. The market has a nice location because it is convenient for the dwellers to buy food. Unlike, normal wet market, the pool market initiates a diverse flow of people in it with the "pool� space introduced.




Rendering by Vray


Rendering by Vray


Rendering by Vray


Rendering by Vray





Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.