ANNUAL PERFORMANCE REPORT
Interim Performance Report The imterim report is required for grant activities that are in the first year of operation. The imterim report is usually due in the spring following the initial funding year.
Annual Performance Report
In addition to the quarterly reports, an Annual Performance Report (APR) should also be completed by each activity director. This report is a final narrative of the year’s activity and is due by November 30 after the grant year ends on September 30. The Annual Performance Report Narrative format is provided each year.
27