RECONNECTING
FINAL REVIEW / WEN QIAN CHUA ARCH 402 / KEN TADASHI OSHIMA
GOULD
COMMUNITY ENGAGEMENT
INTERNAL CONNECTIVITY
ENVIRONMENTAL CONNECTION
NE CORNER PERSPECTIVE
INTERNAL CONNECTIVITY COMMUNITY ENGAGEMENT
Interdepartment RE, March, Arch, CM, Larch, UP, CEP
Departmental Freshman, Sophomore, Junior, Senior
INTERNAL
GROWTH
CONNECTION
EXTERNAL
Practicing Professionals Architects, Landscape Architects
Aspiring Professionals Post Graduates, Intern Architects
DOUBLE-HEIGHT EVENT SPACE LECTURE HALL
EXHIBITION TERRACE
NEW INTEGRATED STUDIO SPACE
CLASSROOMS
COMMUNITY TERRACE
FUTURE LIBRARY EXTENSION STUDIO SPACE
MAKER SPACE EXHIBITION
FUTURE ADMIN / FACULTY FUTURE NS SECTION LIBRARY PERSPECTIVE EXTENSION
CBE LIBRARY
NEW INTEGRATED STUDIO SPACE DIGITAL COMMONS
Intercollegiate Industrial Design, Graphic Design, Interior Design
Youth Community Middle School, High School, Community College
ENVIRONMENTAL CONNECTION
1
Climate Responsive Biophillic Design that consider the local climate conditions, reduce environmental pollutants.
4
Waste Management Introduce effective waste management system within the building.
1
2
4
3
SUN SHADE LOUVER ON SOUTH WEST FACADE
INCREASE DENSITY
ADAPTIVE REUSE
WASTE MANAGEMENT
EW SECTION PERSPECTIVE
Adaptive Reuse
2
Reimagining existing space, limiting the carbon emission through avoiding tearing down unnecessary parts.
3
Increase Density Expand vertically maximize efficiency per square footage.
BROOK
LYN A VE NE
STAIRS Mirroring the existing language of Gould, the new set of stairs in the new addition will connect inter-floors.
GLAZED ELEVATOR Transparency and connectivity across all floors from the lowest to the top, connecting the old and new.
ELEVATED CORRIDORS UW
Additional transitional space within the floors, also serving as a platform for the glaze elevators.
POL
ICE ENTRANCE FROM NE 40TH ST
AER
IAL
NS
SEC
TIO
N P ERS P
ECT
IVE
GROUND FLOOR PLAN
CIRCULATION
FROM
NE 40 TH ST
UW CHILDREN’S CENTER AT PROTAGE BAY FUTURE DEVELOPMENT MAPLE HALL
FUTURE DEVELOPMENT
CHURCH LOCAL POINT LANDER HALL
UW POLICE POPULATION HEALTH ALDER HALL
COMMODORE APARTMENTS ARCH HALL
DISTRICT MARKET
COLLEGE INN PUB UN IV ER SI T
Y
WA
Y
NE
NE
US
MP
CA
NE Y NE NS WA
VE W STE
15
TH
AV
E
NE
Y
WA
RK
PA
US
MP
CA
Y
WA
RK
PA
ELM HALL
MORE VISITOR COMING FROM THE AVE WITH THE COMPLETION OF THE NEW LINK LIGHT RAIL STATION
THE MAIN GATEWAY TO ENTER UNIVERSITY OF WASHINGTON, 15 AVE NE WILL ALSO BRING IN VISITORS
SITE CONTEXT
LOUVER ON SOUTH/WEST
WINDOW FRAMING
Sun shading strategy
Continuing vertical language of exsiting Gould
EXPLODED AXON
GLASS Introducing new material,contrasting with heavy concrete
STRUCTURE
Using concrete core as both circulation and support to the new addition
SKYLIGHT
Uniting all the spaces together with central glazed elevator
PHASE I - MAJOR RENOVATIONS
PHASE II - ADAPTIVE REUSE EXTENSION
2025
PHASE III - UPZONE 100’
PHASE IV - UPZONE 150’ AND ABOVE
2030
2045
2050
100’
Introduce new entrance
Renovate existing area
Upzone to Population Health Scale
Elevate volume to contrast difference
150’
Upzone to 150’ Scale
Elevate volume to contrast difference
Offset, Skylights and circulation
Refine details
SOUTH FACING PERSPECTIVE
PHASE I - MAJOR RENOVATIONS
STRATEGIES MAIN ENTRANCE LOUNGE
MAIN ENTRANCE
Establishing a new main entrance that brings in the new influx of visitor, giving a formal sense to Gould as a deisgn school for the built environments.
LOUNGE
LOUNGE
Additional space for visitors and students to connect and socialize in between class period. GLAZED ELEVATOR
GOULD COURT
EXTENDED CAFE
CAFETERIA
GLAZED ELEVATOR
New form of circulation connectivity in between the old and new addition, the transparency with the elevator also celebrates the openess of Gould.
EXTENDED CAFE
Double it’s size, serving more options than the existing cafe.
FAB LAB
EXPANDED CAFETERIA
Converting the studio space into an extended cafeteria to provide space for students and faculty to connect in between classes.
GROUND LEVEL WALL LEGEND EXISTING WALL NEW CONCRETE WALL REMOVED WALLS
PHASE I - MAJOR RENOVATIONS
STRATEGIES NEW STUDIO SPACE
NEW INTEGRATED STUDIO SPACE
Removing all the partitions in the adminsitration space, this space will be converted into an open studio space that have the flexibilty to adapt to different configurations
GLAZED ELEVATOR FACULTY/ ADMIN
GLAZED ELEVATOR
GOULD COURT
GALLERY
New form of circulation connectivity in between the old and new addition, the transparency with the elevator also celebrates the openess of Gould. An additional walkway is added to connect the elevator to the floor plates.
DIGITAL COMMONS DIGITAL COMMONS
NEW STAIRS
Moving Digital Commons from the basement to top, this floor will serve as the a large computer lab that will serve as classroom to accomodate the needs.
STAIR SEATING
At the East side of the new digital commons, large stair seating will be introduced to provide a place for relaxation while connecting to the upper floors.
STREET LEVEL WALL LEGEND EXISTING WALL NEW CONCRETE WALL REMOVED WALLS
PHASE I - MAJOR RENOVATIONS
STRATEGIES NEW STUDIO SPACE
NEW INTEGRATED STUDIO SPACE
The current landscape studio will transform into an open studio space that have the flexibilty to adpat to different configurations, and studio spaces will no longer be sorted through department. FACULTY/ ADMIN
LECTURE HALL
GLAZED ELEVATOR
GOULD COURT
GLAZED ELEVATOR
New form of circulation connectivity in between the old and new addition, the transparency with the elevator also celebrates the openess of Gould. An additional walkway is added to connect the elevator to the floor plates.
CBE LIBRARY NEW STAIRS
The new CBE Library is envisioned to be a new gathering hub for students to not only a place for intelectual endeavors, but also place to do work.
STAIR SEATING
The stair seating will connect the CBE Library and the digital commons. CBE LIBRARY
3RD LEVEL WALL LEGEND EXISTING WALL NEW CONCRETE WALL REMOVED WALLS
PHASE II - ADAPTIVE REUSE EXTENSION
STRATEGIES NEW STUDIO SPACE
Removing all the partitions in the adminsitration space, this space will be converted into an open studio space that have the flexibilty to adapt to different configurations.
NEW INTEGRATED STUDIO SPACE
FACULTY/ ADMIN
FACULTY/ ADMIN
GLAZED ELEVATOR
New form of circulation connectivity in between the old and new addition, the transparency with the elevator also celebrates the openess of Gould. An additional walkway is added to connect the elevator to the floor plates.
CBE LIBRARY NEW STAIRS
The extention towards south o the CBE Library will provide more square footage for students. The individual labs in the library will also be accomodating needs of different design students. Non structural walls are removed to have an open space.
STAIR SEATING LAB 1
LAB 4
LAB 2
LAB 5
LAB 3
4TH LEVEL WALL LEGEND EXISTING WALL NEW CONCRETE WALL REMOVED WALLS
CBE LIBRARY EXTENSION
LAB 6
The stair seating will connect the CBE Library and the digital commons from the street level all the way to the 4th level.
PHASE II - ADAPTIVE REUSE EXTENSION
STRATEGIES REMOVE SKYLIGHT
The removed skylight will serve as a guideline to organize the roof terrace programs. The sairs locating at the four courners will continue to extend up for roof access.
GLAZING
Floor to ceiling glazings with surrounding the removed skylight. DESIGN BUILD
GLAZED ELEVATOR
GOULD COURT
DESIGN BUILD
GLAZED ELEVATOR
New form of circulation connectivity in between the old and new addition, the transparency with the elevator also celebrates the openess of Gould.
FLEXIBLE SEATING
Flecible in three ways: conventional benches, circular seating for gathering, and irregular seat-shaped
DESIGN BUILD
Two designated spot at the East and West side of the corner is for Design Build. When class is not in session, this place can be a place for outdoor exhibits or temporary exhibition.
ROOF TERRACE WALL LEGEND EXISTING WALL NEW CONCRETE WALL REMOVED WALLS
PHASE II - ADAPTIVE REUSE EXTENSION
PHASE II - ADAPTIVE REUSE EXTENSION
CONFIGURATION 2 - 1
PHASE III - UPZONE 100’
studio
S
IR A T S
PANTRY WITH FOLDABLE DOOR
STEPPED SEATING REST AREA
GL
PANTRY WITH FOLDABLE DOOR
S
IR A T S
AZ
UNDEGRADUATE STUDIO
ED
EL
EV
S AIR
ST
AT
OR
RESTROOM
CLASSROOM
PRESENTATION SPACE CLASSROOM
FLEXIBLE SPACE FOR AUDIENCE
S
IR A T S
CLASSROOM
RESTROOM
CONFIGURATION 1 - 3
studio
2
PHASE III - UPZONE 100’
pantry
S
IR A T S LANDSCAPE STUDIO
PANTRY WITH FOLDABLE DOOR
STEPPED SEATING REST AREA MARCH STUDIO
GL
PANTRY WITH FOLDABLE DOOR
S
IR A T S
AZ
UNDEGRADUATE STUDIO
ED
EL
EV
S AIR
ST
AT
OR
RESTROOM
CLASSROOM
PRESENTATION SPACE CLASSROOM
FLEXIBLE SPACE FOR AUDIENCE
S
IR A T S
CLASSROOM
RESTROOM
CONFIGURATION 1 - 2
studio
1
PHASE III - UPZONE 100’
pantry
S
IR A T S MARCH STUDIO
PANTRY WITH FOLDABLE DOOR
STEPPED SEATING REST AREA
GL
PANTRY WITH FOLDABLE DOOR
S
IR A T S
AZ
UNDEGRADUATE STUDIO
ED
EL
EV
S AIR
ST
AT
OR
RESTROOM
CLASSROOM
PRESENTATION SPACE CLASSROOM
FLEXIBLE SPACE FOR AUDIENCE
S
IR A T S
CLASSROOM
RESTROOM
PHASE III - UPZONE 100’
IRS
STA
GL
IRS
STA
AZ
ED
EL
EV
IRS
STA
IRS
STA
AT
OR
PHASE IV - UPZONE 150’ AND ABOVE
NS SECTION IN DETAIL: DAY
PHASE IV - UPZONE 150’ AND ABOVE
NS SECTION IN DETAIL: NIGHT
SOUTH FACING NIGHT PERSPECTIVE
NE CORNER NIGHT PERSPECTIVE