Envelope Detail + Prototype
ENVELOPE Yucheng Dai a 1 7 0 0 8 9 2 Xiaojia Li a 1 7 3 2 1 9 0 Jieyu Feng a 1 6 9 9 1 1 2
ARCHOISSEUR
D
E
S
I
G
N
S
T
U
D
I
O
PTY LTD
Semester 1 2020 ARCH 7033 - Advanced Construction (M) Master of Architecture (Postgraduate) School of Architecture and Built Environment University of Adelaide SA 5005 David Kroll | Course Coordinator
Assessment 3 - Group Envelope detail + Prototype 2020 Due on Tuesday 2nd of June 2020 Copyright © D.Y.C & all team members 2020
G F 1
E 426
2
0
D
325
C
3
0
B A
100 00
550 0
4
EXHIBITION SPACE
0
455
5
ATRIUM
0
945
6 ATRIUM
0
649
WORKSHOP SPACE
7 EXHIBITION SPACE
50
145 0 587 A02
1
0 208
0
FIRST FLOOR PLAN
610
0
750
799
1:200
0
750
0
0
500 0
550
0
750
Assessment 2: Developed Construction Model ARCH 7033 Advanced Construction (M) Student: Dai, Yucheng (a1700892)
G F 1
E 426
D
0
2
325
C
3
0
B A
100 00
550 0
4
EXHIBITION SPACE
0
455
5
ATRIUM
0
945
6 ATRIUM
0
649
WORKSHOP SPACE
7 EXHIBITION SPACE
50
145 0 587 A02
0
1
208
0
THIRD FLOOR PLAN
610
0
750
799
1:200
0
750
0
0
500 0
550
0
750
Assessment 2: Developed Construction Model ARCH 7033 Advanced Construction (M) Student: Dai, Yucheng (a1700892)
1
4260
2
3
3250
4
5750
5
9450
6
6490
7
1275
Roof Level 23696
Third Floor 15617 Second Floor Ceiling 14717
Second Floor 11317 First Floor Ceiling 10417
First Floor 7017 Ground Floor Ceiling 6117
Ground Floor 1177 Ground level 0
SECTION A 1:200
Assessment 2: Developed Construction Model ARCH 7033 Advanced Construction (M) Student: Dai, Yucheng (a1700892)
PRODUCED BY AN AUTODESK STUDENT VERSION
4292
23696
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
EXTERNAL FAÇADE SYSTEM CONSISTS OF LIGHTWEIGHT PANEL BOLTED TO PANEL GRID
DOUBLE GLAZING PANEL FIXED TO THE PANEL SYSTEM
STRUCTURAL DOUBLE GLAZING CONSISTS OF TWO 6mm CLEAR FLOAT GLASS PANELS WITH 0.76mm PVB ACOUSTIC INTERLAYER
NORTH ELEVATION 1:200
NORTH ELEVATION DAI
1:200
A1700892
COURSE
ASSESSMENT
SHEET TITLE
ADVANCED CONSTRUCTION
DEVELOPED CONSTRUCTION MODEL
NORTH
PRODUCED BY AN AUTODESK STUDENT VERSION
YUCHENG
D R A W I NModel G Assessment DATE 2: Developed Construction 10.05.2020 : ARCHSIZE 7033 Advanced Construction (M) A3 : ELEVATION Student: Dai, Yucheng (a1700892) REV : A
SCALE :
1 : 200
01 OF
23696
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
MAIN ENTRANCE WITH STRUCTURAL DOUBLE GLAZING PANELS
STAIRS INCORPORATE A WHEELCHAIR ACCESS RAMP
NORTH ELEVATION 1:200
WEST ELEVATION DAI
1:200
A1700892
COURSE
ASSESSMENT
SHEET TITLE
ADVANCED CONSTRUCTION
DEVELOPED CONSTRUCTION MODEL
NORTH
PRODUCED BY AN AUTODESK STUDENT VERSION
YUCHENG
DRAWING AssessmentDATE 2: Developed Model 10.05.2020Construction : ARCH 7033 Advanced Construction (M) A 3 SIZE : ELEVATION Student: Dai, Yucheng (a1700892) REV : A
SCALE :
1 : 200
01 OF
01
S1
H/WD.
ALUM.
350
UB.
PB.
TGU.
TGU.
TGU.
TGU.
TGU.
TGU.
TGU.
1000
15717
770
650
TGU.
Third Floor
RCC.
TGU.
ALUM.
Second Floor Ceiling
ALUM.
1010
14717
ALUM.
TGU.
TGU.
TGU.
ALUM. TGU.
TGU.
TGU.
TGU.
TGU.
PRODUCED BY AN AUTODESK STUDENT VERSION
ALUM.
ALUM. ALUM.
TGU. TGU.
TGU.
ALUM.
ALUM.
TGU.
1750
1090
TGU.
3300
960
1630
TGU.
TGU.
TGU.
TGU.
ALUM.
S2
TGU.
02
H/WD. ALUM. ALUM.
9910
655
1000
11417
ALUM.
UB.
990
Second Floor
RCC.
ALUM.
First Floor Ceiling 10417
ALUM.
TGU. TGU.
1800
820
PB.
ALUM.
ALUM. TGU.
TGU.
ALUM.
TGU.
ALUM.
TGU.
TGU.
TGU.
TGU.
D2
04 03
1225
ALUM. ALUM. ALUM.
3300
1790
685
ALUM.
TGU.
ALUM.
TGU.
ALUM. ALUM.
TGU. TGU.
TGU.
ALUM. TGU. TGU.
TGU.
ALUM.
TGU.
1000
ALUM. ALUM. ALUM.
H/WD.
03 02
7117
PB.
LEGENDS ALUM.
TGU.
1000
First Floor 1740
ALUM.
UB.
D1
745
RCC.
ALUM.
TGU.
TGU. ALUM. TGU.
TGU.
TGU.
TGU.
Ground Floor Ceiling
ALUM.
TGU.
ALUM. H/WD. RCC. PB. TGU.
Aluminium panel Hardwood Reinforced Concrete Gypsum Plasterboard Triple Glazing Unit
6117
SECTION 1
ELEVATION
1:50
1:50
YUCHENG
CLIENT
D A I (D Y L A N) A1700892 ARCHOISSEUR E
S
I
G
N
S
T
U
D
I
P R O J E C T
LU M I N A R I A
A D D R E S S
CONSTRUCTION II
SA Cultural & Performing Art Centre
PROJECT
T I T L E
LOT 50 McALLAN AVE 135-139 West Terrace SA, Australia Façade study BURNSIDE -located between West Terrace, Alfred Street, Wright Street and Mary Street
Section 1 + Elevatio
O
PRODUCED BY AN AUTODESK STUDENT VERSION
D
4A Bristol Street, Eastwood Adelaide SA 5063, Australia Tel: 08 7915 3701 / 08 8745 3712 Email: steph@archoisseur.com Web: www.archoisseur.com.au
Assessment 3: Envelope Details +Prototype ARCH 7033 Advanced Construction (M) Student: Dai, Yucheng (a1700892) Li, Xiaojia (a1732190); Feng, Jieyu (a1699112) SHEET TITLE
D A T E
DRAWN
UPDATED SECOND 2020 DC FLOOR PLAN 30 May th
DATE :
05.06.2018
SIZE :
A3
REV :
XJ
A
SCALE :
1 : 100
CHECKED
DRAWING
01
REV
SCALE
A
1:50
OF
16
NUMBER
01
253 386 385 1089 1090
2450 2449
430 431 1390 1391
2540 2542
ID
a1700892
1470 1471
9070 9069
NAME
1845 1843
YUCHENG DAI SHEET TITLE
CONSTRUCTION - SECOND FLOOR
175
830 833
1095 1097
3690 3692
PRODUCED BY AN AUTODESK STUDENT VERSION
1000 997
350 353
420 421
D3 D2 05 03
1:50 1945 1947
1935 1936
2940
SCALE
Assessment 3: Envelope Details DATE+Prototype ARCH 7033 Advanced Construction (M) Student: Dai, Yucheng (a1700892) Li, Xiaojia (a1732190); Feng, Jieyu (a1699112)
SECTION 2
17/11/2017
1:50
E
S
I
G
N
S
T
U
D
I
O
P R O J E C T
LU M I N A R I A
SA Cultural & Performing Art Centre
A D D R E S S
PRODUCED BY AN AUTODESK STUDENT VERSION
ARCHOISSEUR D
4A Bristol Street, Eastwood Adelaide SA 5063, Australia Tel: 08 7915 3701 / 08 8745 3712 Email: steph@archoisseur.com Web: www.archoisseur.com.au
135-139 West Terrace SA, Australia -located between West Terrace, Alfred Street, Wright Street and Mary Street
T I T L E
D A T E
Façade study Section 2
2020 30th May
DRAWN
CHECKED
DC
XJ
REV
SCALE
A
1:50
NUMBER
02
FLOOR SUPPORT POST SERVED AS SUBSTRATE TO SUPPORT TIMBER FLOORBOARDS BOLTED TO 200mm REINFORCED CONCRETE SLAB
13mm OAK HARDWOOD FLOORING WITH LAMINATED FINISH NAILED TO 19mm PLYWOOD FLOORBOARDS 3mm REGUPOL ACOUSTIC UNDERLAY SIT BETWEEN THE TWO LAYERS OF FLOORBOARDS
APPLIED RONDO KEY-LOCK® SUSPENDED CEILING SYSTEM CEILING SUSPENSION BON-NUT CONNECTED TO THE RONDO SUSPENSION ROD
60mm STRUCTURAL TRIPLE GLAZING UNITS GLASS PANEL CONSISTS OF THREE CLEAR FLOAT GLASS PANELS WITH 0.76mm PVB ACOUSTIC INTERLAYER AND 16mm DESICCATED CAVITY SPACE FILLED WITH AIR. ALUMINIUM TRIPLE GLAZING FRAME PROFILE WITH TRADITIONAL PUTTY LINE EDGE AND 4 CHAMBER SASH WITH OPTIONAL RCM INSERTS 110mm GLASSWOOL THERMAL INSULATION WITH DAMP PROOF COURSE 200mm REINFORCED CONCRETE SLAB WITH 1mm THICKNESS STRUCTURAL LYSAGHT BONDEK 304×165mm STRUCTURAL UNIVERSAL BEAM BOLTED WITH 210mm ANGLE STEEL CLEAT WITH M16 GALVANISED HEX HEAP BOLT 3mm ALUMINIUM BRACKET COVER ON THE EDGE OF THE REINFORCED CONCRETE FLOOR SLAB RONDO 122 SUSPENSION THREADED ROD 5.3mmØ M6 SOFT GALVANISED CONNECTED WITH RONDO 127 TOP CROSS RAIL ROUND RECESSED LIGHT FIXED TO ALUMINIUM BRACKET CUSTOM-BUILT BLINDER SHADING SYSTEM
25MM RONDO 127 TOP CROSS RAIL 0.75BMT FIXED TO 28mm RONDO 129 FURRING CHANNEL
WHITE 12.5MM GYPSUM PLASTERBOARD FIXED TO THE RONDO KEY-LOCK® CONCEALED SUSPENDED CEILING SYSTEM
DUCTWORK (SUPPLY AIR AND RETURN AIR SYSTEM) CONNECTED WITH DIFFUSER VIA 200MMØ FLEX DUCT
RONDO 140 FURRING CHANNEL TRACK 125×75×5mm RECTANGULAR HOLLOW SECTION STRUCTURAL STAINLESS-STEEL SPACE SHELL FRAME SUPPORT THE BUILDING ENVELOPE SYSTEM
RONDO 124N SUSPENSION CLIP WITH THREAD NUT
Assessment 3: Envelope Details +Prototype ARCH 7033 Advanced Construction (M) Student: Dai, Yucheng (a1700892) Li, Xiaojia (a1732190); Feng, Jieyu (a1699112)
SECTION DETAIL 1 1:10
ARCHOISSEUR D
E
S
I
G
N
S
T
U
D
I
O
4A Bristol Street, Eastwood Adelaide SA 5063, Australia Tel: 08 7915 3701 / 08 8745 3712 Email: steph@archoisseur.com Web: www.archoisseur.com.au
P R O J E C T
LU M I N A R I A
SA Cultural & Performing Art Centre
A D D R E S S
T I T L E
D A T E
135-139 West Terrace SA, Australia
Detail Section Detail 1
2020
-located between West Terrace, Alfred Street, Wright Street and Mary Street
30th May
DRAWN
CHECKED
DC
XJ
REV
SCALE
A
1:10
NUMBER
03
110mm GLASSWOOL THERMAL INSULATION FIXED TO THE PROFILE ALUMINIUM FRAME
METAL FIXING BRACKET
ALUCOBOND©PLUS 900×1200mm 10mm THICK ALUMINUM CLADDING CONNECTED TO THE SUPPORTS
CUSTOMISED STEPPED GLAZING SUPPORTS FIXED TO THE GLAZING PANELS
M12 THREAD BOLTS FIXED TO THE MAIN SPACE SHELL FRAME STRUCTURE (RECTANGULAR HOLLOW SECTION)
60mm (12mm-16mm-6mm-16mm10mm) STRUCTURAL TRIPLE GLAZING UNITS GLASS PANEL CONSISTS OF THREE CLEAR FLOAT GLASS PANELS WITH 0.76mm PVB ACOUSTIC INTERLAYER AND 16mm AIR-FILLED SPACE
125×75×5mm RECTANGULAR HOLLOW SECTION STRUCTURAL STAINLESS-STEEL SPACE SHELL FRAME SUPPORT THE BUILDING ENVELOPE SYSTEM
UV RESISTANT GLASS SILICONE CENTRAL STAINLESS-STEEL SLEEVE FIXED WITHIN TUBULAR FRAME FOR MAXIMUM ASSEMBLY TOLERANCE APPLIED WITH CONTINUOUS FRAME CONNECTION AND REBATE VENTILATION
Assessment 3: Envelope Details +Prototype ARCH 7033 Advanced Construction (M) Student: Dai, Yucheng (a1700892) Li, Xiaojia (a1732190); Feng, Jieyu (a1699112)
SECTION DETAIL 2 1:10
ARCHOISSEUR D
E
S
I
G
N
S
T
U
D
I
O
4A Bristol Street, Eastwood Adelaide SA 5063, Australia Tel: 08 7915 3701 / 08 8745 3712 Email: steph@archoisseur.com Web: www.archoisseur.com.au
P R O J E C T
LU M I N A R I A
SA Cultural & Performing Art Centre
A D D R E S S
T I T L E
D A T E
135-139 West Terrace SA, Australia
Detail Section Detail 2
2020
-located between West Terrace, Alfred Street, Wright Street and Mary Street
30th May
DRAWN
CHECKED
DC
XJ
REV
SCALE
A
1:10
NUMBER
04
THE FLOOR PLA THE INFORMAT DIMENSIONS O SECOND FLOOR METAL CAP FLASHING FIXED TO METAL BOX GUTTER VIA M8 BOLTS
150mm BOX GUTTER FIXED TO THE EDGE OF THE BUILDING
RAINWATER DOWNPIPE CONNECTED TO THE METAL GUTTER AND FIXED TO THE BUILDING ENVELOPE
10mm MILD STEEL CLADDING
1mm FULLY ADHERED ROOF MEMBRANE
70mm DRAINAGE HARDCORE LAYER
100mm GLASSWOOL THERMAL INSULATION
PRODUCED BY AN AUTODESK STUDENT VERSION
CANT STRIP 110mm GLASSWOOL THERMAL INSULATION WITH DAMP PROOF COURSE
GLASS PANEL MULLION WITH DRAINAGE HOLE BOLTS WITH STRUCTURAL BEAM
ID 100MM CONCRETE ROOF DECK
a1700892
100×75mm CUT LENGTH (100mm) UNEQUAL SIDE ANGLE CONNECTION FILLET M12 BOLTS CONNECTION WITH C100-10H C SECTION PURLIN AND STEEL PARALLEL CHORD TRUSS
NAME
YUCHENG DAI SHEET TITLE
CONSTRUCTION - SECOND FLOO
STRUCTURAL TRUSS
SCALE Assessment 3: Envelope Details +Prototype ARCH 7033 Advanced Construction (M) Student: Dai, Yucheng (a1700892) Li, Xiaojia (a1732190); Feng, Jieyu (a1699112)
SECTION DETAIL 3
1:50
1:10
E
S
I
G
N
S
T
U
D
I
O
P R O J E C T
LU M I N A R I A
SA Cultural & Performing Art Centre
A D D R E S S
T I T L E
D A T E
135-139 West Terrace SA, Australia
Detail Section Detail 3
2020
-located between West Terrace, Alfred Street, Wright Street and Mary Street
DRAWN
CHECKED
XJ
DC
30th May
PRODUCED BY AN AUTODESK STUDENT VERSION
ARCHOISSEUR D
4A Bristol Street, Eastwood Adelaide SA 5063, Australia Tel: 08 7915 3701 / 08 8745 3712 Email: steph@archoisseur.com Web: www.archoisseur.com.au
REV
SCALE
A
1:10
DATE NUMBER
17/11/2017
05
Hand sketch
Procreate
Google Earth+
Google Map
Preliminary Concept | Mapping | Site analysis
Illustrator
Sketchup+
Rhino 6.0
Rhino 7.0 (WIP)
Concretization
Grasshopper
Karamba3D
Revit
Refinement
3D modelling | Form generation | Structural analysis | Performance optimisation
Photoshop
Illustrator
Indesign
Revit
Curation
Documentation | Graphic design
Assessment 3: Envelope Details +Prototype ARCH 7033 Advanced Construction (M) Student: Dai, Yucheng (a1700892) Li, Xiaojia (a1732190); Feng, Jieyu (a1699112)
7
1 2 3
4
Building envelope Structural space frame 150 mm reinforced concrete slab supported by 1mm thick structural LYSAGHT bondek & suspended ceiling system Building vertical core
5
400mm concrete columns & 310 UB 40 & trusses
6 7
Secondary beams Roof structure
3D VIEWS A 5 4
3
2
3D VIEWS B
3D VIEWS C
1
Assessment 3: Envelope Details +Prototype ARCH 7033 Advanced Construction (M) Student: Dai, Yucheng (a1700892) Li, Xiaojia (a1732190); Feng, Jieyu (a1699112)
Façade Prototype
Assessment 3: Envelope Details +Prototype ARCH 7033 Advanced Construction (M) Student: Dai, Yucheng (a1700892) Li, Xiaojia (a1732190); Feng, Jieyu (a1699112)
Façade Prototype
7
Exploded view
6 5 1
ALUCOBOND©PLUS 10mm THICK ALUMINUM CLADDING CONNECTED TO THE SUPPORTS
2
STRUCTURAL TRIPLE GLAZING UNITS GLASS PANEL WITH CUSTOMISED STEPPED GLAZING SUPPORTS FIXED TO THE GLAZING PANELS
7 M12 THREAD BOLTS FIXED TO THE MAIN SPACE SHELL FRAME STRUCTURE (RECTANGULAR HOLLOW SECTION)
TUBULAR FRAME
CENTRAL STAINLESS-STEEL SLEEVE FIXED WITHIN TUBULAR FRAME FOR MAXIMUM ASSEMBLY TOLERANCE
6
5
4
3
1 2
2 2 Assessment 3: Envelope Details +Prototype ARCH 7033 Advanced Construction (M) Student: Dai, Yucheng (a1700892) Li, Xiaojia (a1732190); Feng, Jieyu (a1699112)
Assessment 3: Envelope Details +Prototype ARCH 7033 Advanced Construction (M) Student: Dai, Yucheng (a1700892) Li, Xiaojia (a1732190); Feng, Jieyu (a1699112)
3D PRINT Entire Building
Assessment 3: Envelope Details +Prototype ARCH 7033 Advanced Construction (M) Student: Dai, Yucheng (a1700892) Li, Xiaojia (a1732190); Feng, Jieyu (a1699112)
3D PRINT Entire Building
Assessment 3: Envelope Details +Prototype ARCH 7033 Advanced Construction (M) Student: Dai, Yucheng (a1700892) Li, Xiaojia (a1732190); Feng, Jieyu (a1699112)
3D PRINT Entire Building
Assessment 3: Envelope Details +Prototype ARCH 7033 Advanced Construction (M) Student: Dai, Yucheng (a1700892) Li, Xiaojia (a1732190); Feng, Jieyu (a1699112)
3D PRINT Entire Building
Assessment 3: Envelope Details +Prototype ARCH 7033 Advanced Construction (M) Student: Dai, Yucheng (a1700892) Li, Xiaojia (a1732190); Feng, Jieyu (a1699112)
3D PRINT Entire Building
Assessment 3: Envelope Details +Prototype ARCH 7033 Advanced Construction (M) Student: Dai, Yucheng (a1700892) Li, Xiaojia (a1732190); Feng, Jieyu (a1699112)
3D PRINT Facade Unit
Assessment 3: Envelope Details +Prototype ARCH 7033 Advanced Construction (M) Student: Dai, Yucheng (a1700892) Li, Xiaojia (a1732190); Feng, Jieyu (a1699112)
3D PRINT Facade Unit
Assessment 3: Envelope Details +Prototype ARCH 7033 Advanced Construction (M) Student: Dai, Yucheng (a1700892) Li, Xiaojia (a1732190); Feng, Jieyu (a1699112)
3D PRINT Facade Unit
Assessment 3: Envelope Details +Prototype ARCH 7033 Advanced Construction (M) Student: Dai, Yucheng (a1700892) Li, Xiaojia (a1732190); Feng, Jieyu (a1699112)
3D PRINT Facade Unit
Assessment 3: Envelope Details +Prototype ARCH 7033 Advanced Construction (M) Student: Dai, Yucheng (a1700892) Li, Xiaojia (a1732190); Feng, Jieyu (a1699112)
3D PRINT Facade Unit
Assessment 3: Envelope Details +Prototype ARCH 7033 Advanced Construction (M) Student: Dai, Yucheng (a1700892) Li, Xiaojia (a1732190); Feng, Jieyu (a1699112)
3D PRINT Facade Unit
Assessment 3: Envelope Details +Prototype ARCH 7033 Advanced Construction (M) Student: Dai, Yucheng (a1700892) Li, Xiaojia (a1732190); Feng, Jieyu (a1699112)
3D PRINT Facade Unit
Assessment 3: Envelope Details +Prototype ARCH 7033 Advanced Construction (M) Student: Dai, Yucheng (a1700892) Li, Xiaojia (a1732190); Feng, Jieyu (a1699112)
3D PRINT Facade Unit
Assessment 3: Envelope Details +Prototype ARCH 7033 Advanced Construction (M) Student: Dai, Yucheng (a1700892) Li, Xiaojia (a1732190); Feng, Jieyu (a1699112)
3D PRINT Facade Unit
Assessment 3: Envelope Details +Prototype ARCH 7033 Advanced Construction (M) Student: Dai, Yucheng (a1700892) Li, Xiaojia (a1732190); Feng, Jieyu (a1699112)