Summer Throne Booklet

Page 1


? R & R y Wh The R&R System allows us to measure in a transparent way the performance of the LCs depending on the fulfilment of the Summer Goal, and recognize our members’ work! Where to find the tool? Enter here: bit.ly/summerthrone

Summer’s r o f e n li e im How’s the t ? recognition FEB

Release

ConnACT Spring 19

Follow-up

MAY 31ST

Stop counting

ConnACT Summer 19

ConnACT Autumn 19

Recognitions’ prize

Summer Awards


o r t n I s ’ Tool

You can visualize the National Goal until May, the total progress and the Monthly Progress.


tro n I s ’ l Too

You can also find the Scores (how the points are allocated), the point system in the focus of the month and the conditions to give an award at the end of the contest


Grou

uses c o F ps &

The LCs were divided in three different groups, in which was considered the cluster, the HR allocated for the R&R contest and the number of products that are being run. Months: Each Month has a focus to be considered in the Score.


g n i k c a Tr s t l u s Re

The measurement will happen in the Months Tab. The Goal and the Achieved are per area, but the allocation of the numbers are per Member. Each day, the VP needs to report how the numbers are allocated and the MC responsible will cross-check in EXPA


es n o t s Mile -

Per each Milestone of PF, your LC have the opportunity to: - Fulfill one challenge and obtain extra points! Post a Back Office synergy proof (picture, video, tool screen shot) and get extra points! - Post one (1) meme of your LC per milestone and get extra points ;)


g n i k n Ra -

s

There are monthly Rankings that’ll be divided per groups. Therefore, there’ll be 3 winners per month There will be a final Overall Ranking that’ll sum month by month: One final winner :D!


? s t r o p o Re

Wh

For February, the numbers can be reported and allocated until February 28th (to catch up with the month) Since March 1st, each VP should send their daily report with: What numbers were achieved on the day? To which MMs should it be allocated? (the VPs operations will have access to edit their respective cells, the MC responsibles will cross-check the numbers in EXPA)

nced u o n n a

?

l it be l i w e From March 1st: Every day, the last day’s report will be done in the Rise Up group. Wher Every Monday, the last week’s report will be in the MC FB Page.


Good luck, AIESECers! Let’s see who will sit on the SUMMER THRONE of AIESEC IN HUNGARY!


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.