Spring and Summer 2020 Activity Guide

Page 8

BEAUMONT SPORT AND RECREATION CENTRE

COMING SOON COMING SOON IN 2020 project is to be built on the lands adjacent The Project adjacent to to the the Aqua-Fit Aqua-Fit pool, pool, and and include includethe thefollowing followingamenities: amenities: NHL sized ice with seating and viewing areas •• NHL

•• Concession, Concession,multi-purpose multi-purposerooms, rooms,tuck tuckshops shopsand andoffices offices

Fieldhouse that can accommodate indoor soccer, lacrosse, •• Fieldhouse and host events with seating and

•• Pool Poolimprovements improvementsto tomechanical mechanicaland andthe thebuilding buildingenvelope envelope

High School gymnasium that can accommodate multi•• High court play court Climbing wall and running/walking track •• Climbing

88

•• Other updates will include updates to the pool Estimated completion timemechanical is 20 months and with a project filtration system. (2017 dollars). cost of $29.5M

• Other updates will include mechanical updates to the pool filtration system.

Spring Summer 2020 Activity Guide Beaumont.ab.ca For more information information visit visit beaumont.ab.ca/289 letstalkbeaumont.ca/BSRC.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.