Co m p a ny Pro f i l e G l o b a l Co n s u l t a n c y, S u p p l y & Co n s t r u c t i o n
w w w. c a d i n i gro u p. co m
A NEW STADIUM FOR
COST: $ 107.000.000 SURFACE AREA: M2 97.500 CAPACITY: 30900 COVER SEATS COMMENTATOR POSITION: 96
VIP SEATS: 380 INTERNAL PARKING: 90 EXTERNAL PARKING: 250 RESTAURANT m2 800
G E N E R A L C O M PA N Y P R O F I L E This Company Profile is intended to illustrate Cadini Group, its affiliates, partners and collaborators. For any information please do not hesitate to contact our Headquarters: Via Masaccio, 105, 50132 Firenze, ITALY tel. (+39) 055 573401 fax. (+39) 055 579685 email. info@cadinigroup.com 2
www.cadinigroup.com
R BAGHDAD SPORT CLUB OTHER SPORTS EQUIPMENT: EIGHT-LANE RUNNING TRACK GYMNASIUM, BOWLING HALLS, TENNIS TABLES, BILLIARS
Contents 05
INTRODUCTION
07
D E S I G N, P M & S U P E RV I S I O N
07
OUR TEAM • M S A A S S O C I AT I • FRANCESCO BARBAGLI • I N.O P E RA • STEPHEN GEORGE • JUBB • FHPP • TODD & LEDSON
22
P ROJ E CT S • KA R B A LA I TA L I A N V I L LAG E • B A S RA H S PO RT C I TY • B AG H DA D S PO RT C L U B S TA D I U M • S I E N A S PO RT S TA D I U M, I TA LY • F U J A I RA H E N T E RTA I N M E N T PA R K • HAMMAM • A L AT LA L R E S O RT • I TA L I A N V I L LAG E • NATIONAL COUNCIL FOR RESEARCH (C.N.R. • SCIENTIFIC & TECHNOLOGICAL DEPARTMENT • C U LT U RA L C E N T E R I N ROYA L S TA B L E S
)
• ZAW RAA E N T E RTA I N M E N T PA R K
www.cadinigroup.com
3
H O T E L A C M I LA N O M I LA N , I TA LY Surface: 11,302 sq. mt. Capacity: 160 rooms
4
www.cadinigroup.com
Introduction C A D I N I G R O U P I S A G LO B A L C O N S U LTA N CY, LO G I S T I C S , C O N S T R U C T I O N A N D F A S H I O N G R O U P.
Cadini Group is an Italian company founded in 1983 and based in Florence, Italy. It operates under four separate divisions: Cadini Group Consultancy, Logistics, Construction, and Fashion. It has affiliate offices in the UK, China, Iraq, and Jordan. Combining unparalleled experience; Cadini Consultancy and Construction Divisions
THE
are able to deliver design and build projects in accordance with clients’ requirements,
A
specifications, program of works and project cost profile all to the highest standards.
I N T E G R AT E D C O M M U N I TY I N
Cadini Group through its Logistics Division provides high quality materials and equip-
A L - H I L LA H , I R A Q.
I TA L I A N
PROPOSAL
V I L LA G E FOR
A
IS NEW
ment with the relevant design and support service, in a timely manner, and at competitive rates.
A high quality development which provides a state of the art facilities
Cadini Group boasts an international team that has enabled it to enter important
for the residents, of A-Hilla. These
markets and cater to diverse business interests.
facilities do not just provide buildings, but create a community which adds real value to the region. It is
CONSULTANCY
ALTERNATIVE ENERGY ENGINEERING
a great investment opportunities.
H I S T O RY A N D T R A D I T I O N A R E OUR
SUPPLY & LOGISTICS
S TA R T I N G
POINT
FOR
P R O V I D I N G Q U A L I TY.
CONSTRUCTION
“No one knows everything, everyone knows something, all knowledge resides in humanity.”
www.cadinigroup.com
5
Design, Project Management and Supervision
Cadini
Group provides
range
of
Design,
Management, Surveying
a
Project Quantity
and
Cost
Management services on projects throughout the world.
MINISTRY OF INFORMATION - DESIGN PROPOSAL - MUSCAT - OMAN
C A D I N I G R O U P W E R E F O R M U LAT E D T O P R O V I D E A P R O F E S S I O N A L C O N S T R U C T I O N C O N S O R T I U M T O D E L I V E R H I G H Q U A L I TY C O N S U LTA N CY A N D D E S I G N S O L U T I O N S F O R T H E C O N S T R U CT I O N I N D U S T RY.
PROJECT MANAGEMENT
QUALITY CONTROL
DESIGN TEAM
ALTERNATIVE ENERGY ENGINEERING
AFB
6
www.cadinigroup.com
SGP
FHP
JUBB
T&L
MV LT&
In.O
Our Team C A D I N I G R O U P I S F O R M U LAT E D I N O R D E R T O M E E T T H E D E M A N D S A N D F U L F I L L T H E S P E C I F I C D E S I G N A N D CO N S T R U CT I O N N E E D S.
Cadini Group was formulated to provide a Professional Consultancy, Design, Project Management and Supervision firm to deliver high Quality Design and Build Solutions within the Construction Industry. The selected consultans, who are part of the Group, have all previously worked together as a team and were selected on the basis of their Knowledge experience
The team have expertise in all sectors
and professional approach. The team has a combined 150 years of experience working
of the construction industry, including:
within the UK, Europe, and the Middle East. The consultants are able to provide a full range of solutions in accordance with the clients’ requirements, program of works and project cost profile, all to the highest professional standards. The Project Management and Quality Control Team has extensive experience in the Construction of Highways, Roads, Bridges, transports, Residential, Facilities, Schools, railways, Hospital, etc. Cadini Group main Professional Design, Project Management and Quality Control Team consist of 11 Qualified Engineers.
• • • • • • • • • • • • • • • • • •
Alternative Energy Engineering Amusement Parks Residential Retail Mixed Use Development Leisure Social Housing Conservation / Refurbishment Transport Private Housing Offices Industrial Food Hospitals and Healthcare Education Sports Master Planning Hotels
“We have a wide ranging experience in the Construction sector.”
www.cadinigroup.com
7
L U C C A , I TA LY T E C H N O LO G I C A L C E N T E R Cost: $ 5.100.000 Surface Area: 300 sq. mt. Date: 2009-2011
8
www.cadinigroup.com
Photovoltaic Pergola in university library
MSA Associati www.msaassociati.it
FLORENCE / ITALY DATE: 2004 CLIENT: Florence University
B U I L D I N G - I N T E G R AT E D A LT E R N AT I V E E N E R G Y E N G I N E E R I N G FUNDING: Ministry of Environment, “PV ENLARGEMENT”, EU program, Tuscany Region WORKING TEAM: Arch. Marco Sala, Arch.
A Professional Consultant expert in the and Implementation of BuildingLucia Design Ceccherini, Arch. Alessio Rullani, Arch. Arch. Michele integrated photovoltaics (BIPV) are photovoltaic materials that Zingarelli are used to replace con-
ventional building materials in parts of the building envelope such as the roof, skylights, COST: € 350.000 or facades. SURFACE: m² 300
Sustainability is a term nowadays largely used in architecture, but MSA Associates has been pioneering this sector since over 20 years, and now we’re proud to manage a vast knowledge, use of scientific technologies and practical experiences that not many other competitors can praise. This achievements have been possible thanks to the strict collaboration between our office and ABITA (Architettura Bioecologica e Innovazione Tecnologica per l’Ambiente) the Interuniversity Center of Florence of whom Marco Sala is the founder and director. MSA Associalti takes into account a number of imposrtant factors such as: - Highly efficient envelope integrated - Roof Garden - Active integrated system for the exploitation of solar energy (solar and photovoltaics) - Use of geothermal heat pumps and combined with rigeneration - Use of natural ventilation - Analisys of natural lighting
P H O T O V O LTA I C P E R G O LA I N U N I V E R S I TY L I B R A RY F LO R E N C E / I TA LY
CLIENT: Florence University FUNDING: Ministry of Environment, “PV ENLARGEMENT”, EU program, Tuscany Region WORKING TEAM: Arch. Marco Sala, Arch. Lucia Ceccherini, Arch. Alessio Rullani, Arch. Arch. Michele Zingarelli COST: € 350.000 SURFACE: m² 300
- Use of innovative Intelligent windows system - Slidings shutters for vertical and horizontal surfaces - Use of radiant floor and roof - Use of “natural” materials (mortar, plaster, stone and wood coatings, natural insulating) - Use of hydraulic systems to recycle rainwater and optimize water consumption - Integration of power generators elements.
“Sustainable Buildings and Envrionmental Technologies”
www.cadinigroup.com
9
A N E W S TA D I U M F O R B A G H D A D S P O R T C L U B Cost: $ 107.000.000 Surface Area: 97.500 sq. mt. Capacity: 30.900 Seats
10
www.cadinigroup.com
Francesco Barbagli www.ec2.it/francescobarbagli
A R C H I T E C T U R E , LA N D S C A P E , U R B A N P LA N N I N G .
Francesco Barbagli has a long and extensive experience in project management and project coordination. The firms’ activity is mainly based in Italy, but has also completed important projects abroad. In Paris, the office carried out an important urban renovation, improvement
R E COV E RY
and intervention project. Most of the assignments were awarded by participating in
S TA B L E S , P O G G I O A C A I A N O,
National and International com¬petitions.
I TA LY.
The projects’ value; range from €1m to € 40m. The projects cover most work stages:
The project involved the structural
starting from feasibility studies to detailed design and project management
strengthening and restoration of this
OF
THE
MEDICI
his-toric building. The construction of a The projects carried out by the firm were all finished to the highest standards, on time
conference centre, an area for temporary
and on budget.
exhibitions, a meeting space and a residential Unit
• • • • •
Most important clients: EDUCATION AND RESEARCH BUILDING INDUSTRIAL BUILDING URBAN RENOVATION AND UPGRADING RESTORATION AND REFURBISHMENT OF HISTORIC BUILDINGS MASTER PLANNING
• • • • • • • • •
University of Florence (Italy) National Research Council (Italy) Department of Equipment (France) Marseille University (France) Municipality of Bologna (Italy) Municipality of Florence (Italy) District Council of Arezzo (Italy) Condotte Spa Roma (Italy) Servizi tecnici Spa Roma (Italy)
“Francesco Barbagli Architects have been established for over 4 decades, working in Architecture, Landscaping and Master Planning. ”
www.cadinigroup.com
11
H OT E L N H P R E S I D E N T M I LA N O, I TA LY Surface Area: 7.500 sq. mt. Capacity: 130 rooms
12
www.cadinigroup.com
In.Opera www.in-opera.it
E N G I N E E R S A N D A RC H I T E CT S
In.Opera was established in 2002, founded on thirty years of work experience of its members along with the expertise and support of Prof. Eng. Andrea Chiarugi. In.Opera provides quality structural engineering, site supervision, project management and quality survey. We are committed to work in partnership with our clients to deliver solutions to each individual need. The practice is located in Florence and has a staff of around 20 professionals including engineers, architects, quantity surveyors and graphic designers and site supervisors with a wide experience in both private and public projects. In the last ten years the aquired experience on projects has allowed In.Opera to become one of the most recognized firms in the hospitality sector in Italy, working with some of the most important clients operating in the Italian market. In.Opera focuses on providing clients the full range of services required, giving professional advice in many sectors. In.Opera has expertise and experience, and can offer comprehensive services in the following:
• • • • • •
PROJECT MANAGEMENT DESIGN MANAGEMENT
H O T E L A C M I LA N O, I TA LY Surface Area: 7.500 sq. mt. Capacity: 130 rooms Designs:
• • • •
Architectural Design Structural Design Mechanical & Electric Design Interior Design
Interior Design Key Hotel projects:
• • • • •
Hotel Savoia Excelsior Trieste Hotel Porta Rossa Firenze AC Hotel Milano Hotel President Milano AC Hotel Torino
COST AND PROCUREMENT ADVICE RISK MANAGEMENT TECHNICAL SERVICE ADVICE BRAND STANDARDS MONITORING
“The goal of our company is stated in our name: IN.OPERA.”
www.cadinigroup.com
13
S A LA LA H F R E E Z O N E A D M I N I S T R AT I V E H Q S U LTA N AT E O F O M A N Zone is to be 1,500 ha of mixed use development including warehousing and industrial manufacture, residential, commercial, educational and infrastructure buildings. The administrative HQ is the operational hub of Free Zone and will accommodate the company and all its functions.
14
www.cadinigroup.com
Salalah Free Zone - Oman Business Centre
Stephen George www.stephengeorge.co.uk A N D PA R T N E R S L L P
Key Features of the Development • 50,000 sq ft offices for administrative HQ
Founded in 1970, Stephen George & Partners has established • 50,000 sq ft offices for investors to Freezoneitself as one of the UK’s Atrium with landcaped and roof gardens leading architectural practices.• Stephen George sqaures & Partners is placed in the ‘Top 100’ • Highly sustainable design
practices by the Architects’ Journal and has recently been included in the ‘Top 100 16
Companies to work for’ listing in The Sunday Times. We have extensive experience within both private and public sectors, offering quality
S A LA LA H F R E E Z O N E B U S I N E S S
architectural design services supported by technical expertise. Commitment
C E N T R E - S U LTA N AT E O F O M A N
to quality, service and innovation are the basis of our practice philosophy and working closely with our clients is a key element of our success. We believe that the founda-
Proposals for a business center provided
tions of good design lie in strong relationships.
to support Salalah Free Zone’s business
Our varied and diverse work portfolio demonstrates our success in most sectors of the
marketing objectives. Facility will com-
construction industry. Our ability to respond rapidly to client requirements, resolve
prise of a boutique hotel, leisure club and
complex site issues and produce innovative design solutions is evident through our
conference center. The building is located
strong client base and design portfolio. We believe our strength lies in the quality of
on cliff top overlooking the Arabian sea
our staff and the ability to use our intellect and imagination.
and the developing Free Zone towards
Our ISO 9001:2000 quality management system ensures that projects are managed
Salalah City.
efficiently and effectively to meet the desired end result for all parties concerned in the design process. We operate and are committed to an environmental policy
Our experience is wide ranging and
designed to optimize sustainability in all aspects of our work and we are currently
covers the majority of construction sec-
working towards ISO14001 accreditation .
tors. However, our core experience is in masterplanning and the delivery of
At Stephen George & Partners we are passionate about our projects. Our designs
commercial and industrial projects. We
speak for themselves. Stephen George & Partners has collected a number of awards
are interested not just in designs and
over the years, and we have enjoyed the design journey with our clients.
masterplans, but in the impact we have
We pride ourselves on delivery of quality, whether the project is large or small.
on people’s lives.
“Our architects design with flair, and we design for the future.”
www.cadinigroup.com
15
THE DEEP HULL The Deep is a landmark Millennium project which is a major visitors’ attraction at Hull, housing the deepest aquarium tank in Europe. The building is visually stunning with inclined walls clad in concrete, aluminium, acrylic render and glass.
16
www.cadinigroup.com
Jubb
www.jubb.uk.com C O N S U LT I N G E N G I N E E R S L I M I T E D
Jubb Consulting Engineers is a firm of Chartered Civil and Structural Engineers. The firm was established in 1963 and currently we are commissioned on a variety of projects across the UK. We work closely with private and public sector clients which include local authorities, government bodies, developers, contractors, funding institutions etc.
R A D S T O C K R E G E N E R AT I O N
The scope of our works from highways, maritime to building projects summarRadstock is are a Brownfield
site redevelopment of the former GWR ily mentioned in the following pages. Please contact us for details about any of theto provide and station intended used of Radstocka ismixed a Brownfield sitedevelopment redevelopunits and retail / business ment units, including of e projects or disciplines. of the former GWRhistorical railway lines re-use and and part We enjoy team work and innovation and are aware ofbuildings our responsibilities andinfrastructure. the station intended to provide a mixed used impacts we may create on the national and built environment. We proactively pursue
The inprinciple vision proficiency in design, value engineering, options and quality construction.
development of 210 residential units and
is to improve the vehicular and pedestrian lin retail / business units, including historical ofseek theto main Frome Road and to redefine and e We undertake quality management in all aspects of ourdiversion works and we deliver A362re-use of existing railway buildings and town centre public realm for Radstock. a quality service during the whole design and construction process. We are an Investor part infrastructure.
in People employer with an active program of training and design development. Our
Design works include Full Transport Assessment for the develop The principle vision is to improve the centre; Flood Risk Assessment; Service Infrastructure a confident in the role of Civil, Structural, Environmental & Geotechnical and Highway vehicular and pedestrian linkage involvInfrastructure and offsite improvements. expertise has both breadth and depth and we are, therefore, ideally qualified and Engineers and enjoy working as part of a multi-disciplinary team.
ing diversion of the main A362 Frome
Road to redefineto andthe enhance a new ecologica All works required due consideration sensitive town center public realm for Radstock. site ultimately receiving approval through consultation with Plan Design works include Full Transport EA and Drainage authorities.
Jubb Consulting Engineers have expertise and experience in and offer the following comprehensive services:
• • • •
Assessment for the development and
CLIENT CLIENT:
STRUCTURAL ENGINEERING CIVIL ENGINEERING
town center; Flood Risk Assessment; BELLWAY HOMES Service Infrastructure and Drainage
GEOTECHNICAL, CONTAMINATED LAND
CONSTRUCTION VALUE: Infrastructure and offsite £22m improvements.
TRAFFIC PLANNING / HIGHWAY ENGINEERING
“Jubb Consulting Engineers have expertise and experience and offer comprehensive services.”
www.cadinigroup.com
17
LTD
M A N C H E S T E R’ S V E LO D R O M E , B R I TA I N ’ S P R I M A RY I N D O O R O LY M P I C CY C L E T R A C K , First class facilities for basket ball, net ball & swimming pools, bowling allies in a variety of locations, a luxury leisure facility in Nottingham, Multi-screen cinema and retail units in Lincoln together with a number of new build shopping center, incorporating multi-storey car parks in Middlesborough, Stockton, Corby, Bury, Leeds and York.
18
www.cadinigroup.com
FHPP www.fhpp.com LIMITED
As one of the UK’s leading building services consultants, FHP Partnership Ltd has established an enviable reputation for excellence. In all projects, large or small, we strive to achieve the highest level of design and coordination standards from concept to completion. R E S E A R C H LA B O R AT O R I E S We also pride ourselves on our ability to deliver on time and within budget. In addi-
UNITED KINGDOM
tion, our experienced building services design team is committed to providing the most comfortable energy-efficient and cost-effective solutions for your building
FHP Partnership was appointed to design
environment. Whatever the challenges of your project, we have the expertise to meet
and coordinate the mechanical and elec-
them.
trical services associated with the construction of a new 5,300m2 Toxicology
FHP Partnership Ltd has skillfully applied its expertise to a range of new and refur-
facility in the grounds of the existing site
bishment projects/developments including:
complex.
• • • • • • • • • • •
The services installation includes the COMMERCIAL OFFICES
provision of 5No new air handling units
TOWN CENTER REDEVELOPMENTS
to serve the research rooms, necropsy
INDUSTRIAL
suite, cage-wash facility and associated
LEISURE
administration areas, providing a mini-
HEALTH
mum of 20No air changes per hour to
TRANSPORT
the majority of the building. Each of the
RETAIL
71No research rooms is provided with
LABORATORIES/CLEAN ROOMS
individual environmental control via the
RESIDENTIAL
BMS, to meet the stringent regulatory
EDUCATION
board requirements for the temperature,
LOCAL AUTHORITY
humidity, lighting and noise levels to be achieved.
“Excellence from concept to completion.”
www.cadinigroup.com
19
S T C AT H E R I N E S H O S P I TA L , B I R K E N H E A D C L I E N T – N H S W I R R A L A N D I N T E G R AT E D H E A LT H P R O J E C T S New build Community Hospital providing a range of healthcare facilities, along with extensive external works. Construction Cost - £28m
20
www.cadinigroup.com
Todd & Ledson
www.toddandledson.co.uk
C H A R T E R E D Q U A L I TY S U R V E Y O R S
Todd and Ledson is a well-established quantity surveying practice with a modern,and professional, but still personal, approach to meeting client needs. The philosophy of the practice is to ensure that there is direct partner involvement for each commission. This core value has been maintained since the inception of the practice in 1946, and it has contributed greatly to our success as a practice that highly values its client
PIERHEAD
relationships.
B U I L D I N G.
We have been, and continue to be, commissioned for a wide range of professional
New build ferry terminal building and
services to both public and private clients throughout the construction industry.
office accommodation. Also includes the
These have ranged from small building works to multi-million pound developments
new Beatles Experience Museum and a
throughout the UK. Our services include Cost Management / Quantity Surveying,
shell space for a new restaurant.
F E R RY T E R M I N A L
Employers Agent, Project Management / Coordination, Monitoring Surveyors, Whole Life Costing & Sustainability advice, Management Consultancy, Appraisal Services,
Todd & Ledson have worked on proj-
Feasibility Studies, Option Appraisals, and Masterplanning.
ects of all sizes throughout the United Kingdom, in many sectors of the con-
The partnership provides a professional approach to the provision of services. Our sta-
struction industry.
tus as Chartered Surveyors is an assurance of our expertise and professional integrity.
All services are based on application of
Quality of service is a priority, and is demonstrated by our ISO9001 accreditation. All
knowledge, experience, expertise and
work is supervised and quality assurance procedures are adhered to at every stage.
information, gained working on many projects over the last sixty years. All
Todd & Ledson add value to projects by introducing technical, financial and cost man-
members of our team recognize that
agement expertise and experience to the construction process. We have expertise in
every project, no matter how large or
providing accurate cost forecasting and effective cost and risk management, ensuring
small, requires an innovative and tai-
projects are delivered within budget, thus maximizing our client’s return on invest-
lored approach to ensure that it meets
ment.
all client requirements.
“Todd and Ledson is a well-established construction consultancy practice with a modern and professional, but still personal, approach to meeting client needs.�
www.cadinigroup.com
21
Masterpaln
RESIDENTIAL TOWER VIEW 2 44
www.cadinigroup.com
+0.00
,96
5,0 9
23
,50
33
+0.00
63
62
78
85
84
T.7 18 storey tower + basement 61
+0.00 70
60
80
86
79
+0.00
69
59
68
,57
64
65
3,0 0
56
90
66
67
15
88 89
83
+0.00
58
82
+1.10
57
87
81
+1.15
55 91
54 53 52
92
51 50 49
93
+1.15
48 47
10
+1.10
0
3,0
,10
,96
21
5,05
33
33
,96
6,0 8
15
94
,9
,90
42
T.6 18 storey tower + basement
+1.10
+1.15
5,11
+0.00
T.4 18 storey tower + basement
,50
4,0 0
+1.15
+0.00
1
10
23
+0.00
,50
7,4
7
23
KARBALA ITALIAN VILLAGE - IN PROGRESS
2
46
45
44
+1.10
43
t.8 13 storey tower + basement
10 2
29
+1.10
3
10
30
10
North
4
31
10 5
32
10 6
0
3,0
0
3,0
7 10
+0.00
16
+1.15
+1.10
t.5 14 storey tower + basement
+1.15 ,60
t.3 14 storey tower + basement
16
+0.00
13
9
,96
+1.15
14 13
3
13 7
13
154
155
156
157
0
5,65
11
11
11
11
11
Country: IRAQ Location within country: KARBALA
Florence, Italy. Duration of assignment (months): 9 months In addition to the above mentioned is to be designed a high rise building for and one nursery school building.
153
12,50 118
116
117
3
4
5
11
of 25.785 m2.
Mainly the project consists of 10 buildings of 16 floors for a total of 800 apartments .
152
13
9
10 0
1
2
+0.00
South-East in the Karbala city center, adjacent at road to Hella. The area has a surface
For the planning of the intervention the task was assigned to Cadini Group of
5
2
12
4
Master Plan scale 1:500
13
4 13
3 13 12
13
12
8
12
6
,96 33 2
1
12
7
12
13
1
,50
It is going to be a settlement for mainly residential purposes through an area located
12
6
12
23
0
151
5
12
150
9
The Italian Village Residential Complex is going to be implemented in Karbala.
7
3,0 0 12
11
149
5,89 ,50
23
+0.00
+0.00
Beginning of Assigmnet: October 2014
The high rise building includes Mall, 5 Stars Hotel and other multifunctional activities, situated next to the main entrance
End of Assignment:
Each floor of the apartment buildings will be composed in respect of the iraqi tradi-
March 2015
14
3
8
33
2
+0.00
148
+0.00
,60
8
Holy Shrines
33
10
N A R R AT I V E D E S C R I P T I O N O F P R O J E C T :
tions Status: In Progress
“The most important Residential Development in Karbala.�
www.cadinigroup.com
45
+0.00
158
Main stadium Generl View
46
www.cadinigroup.com
BASRAH SPORT CITY - VIP LEVELS N A R R AT I V E D E S C R I P T I O N O F P R O J E C T :
New Sports City for Basra is the first such large project launched as part of rebuilding works throughout Iraq. With this 65,000-seater at its centrepiece, the complex comprising several other stadiums and numerous other sports and leisure facilities is among the most impressive built to date. Country: IRAQ Designed by American practice 360 Architecture, the stadium has classical double-tier
Location within country: BASRAH
layout with running track around the pitch. Cadini Group is responsable of all the Funrishing of the Sport City, expecially the ones
Duration of assignment (months):
related to the VIP and VVIP areas of the main Stadium Complex and the 8 Appartment
11 months
Buildings annexed. Name of Client: Ministery of Sport and Youth. Total No. of staff-months of the assignment: N 25 (5 staff x 5 months). No. of professional staff-months provided by associated Consultants: N 19 (1 staff x 2 months, 1 staff x 5 months, 3 staff x 4 months).
“Main stadium with capacity of 60,000 people, secondary stadium with capacity of 20,000.�
www.cadinigroup.com
47
Hotels Generl View
48
www.cadinigroup.com
BASRAH SPORT CITY - 8 HOTEL BUILDINGS D E S C R I P T I O N O F A C T U A L S E R V I C E S P R O V I D E D B Y Y O U R S TA F F W I T H I N T H E A S S I G N M E N T:
Cadini Group and its Consultant provided a series of solutions to satisfy the requests of the Minstry Of Youth and Sport according to the Conceptual Design provided by the American practice 360 ArchitectureIn detail Cadini Group provided the following furniture and services. Selection of high
Country: IRAQ
quality and Made in Italy furniture according to specifications. Supply, transportation
Location within country: BASRAH
on site and installation of 4.400 peaces in 14 different srtuctures including the MAin and Secondary Stadiums, Guest House, 8 five storey appartment Buildings, 2 Training Fields and a Fire Station. The Furnishing was especially important for what regards
Duration of assignment (months):
the VIP and VVIP areas inside and outside the Main Stadium.
11 months
Cadini Group Provided high quality materials and equipment with the relevant design
Name of Client:
and support service, including specialized technicians for the assembling process in a
Ministery of Sport and Youth.
timely manner, and at competitive rates. Total No. of staff-months of the assignment: N 25 (5 staff x 5 months). No. of professional staff-months provided by associated Consultants: N 19 (1 staff x 2 months, 1 staff x 5 months, 3 staff x 4 months).
“The complex offers VIP lounges and restaurants and spectator facilities.�
www.cadinigroup.com
49
Stadium Interior Generl View
50
www.cadinigroup.com
BAGHDAD SPORT CLUB STADIUM N A R R AT I V E D E S C R I P T I O N O F P R O J E C T :
The stadium plan is a semi-elliptical shape with a major axis of 252m to a minor axis of 199m. The perimeter is enclosed by vertical structures (pennons) that support both the rings of the bleachers and the roofing with steel strands. The vertical structures, called pennons (like flagpoles), are of varied heights from 48m
Country: IRAQ
to 60m.
Location within country: BAGHDAD
The playing field will be on the same level as the external area. The bleachers go from level + 0.50m to level + 22.00m on the lateral sides, and up to level +16.50m on the
Duration of assignment (months):
north and south stands. The roofing is set at a level of + 27.00m corresponding to the
6 months
external vertical structures. The internal ring of the roofing has been designed at level + 34.00m Name of Client: The spotlights are positioned on the internal ring of the roofing to illuminate the field,
Baghdad Mayority, Design Directorate
at an angle with the field axis of about 29° in accordance with FIFA rules (25°>45°) Total No. of staff-months of the assignThe internal ring of the roofing (50%) is made of translucent material to reduce
ment: No. 15
the effect of shadow in the field that disrupts filming. The external ring is made of sandwich panels of sheet insulation to reduce the effect of irradiation on the higher grandstand of spectators.
“An unique and modern design”
www.cadinigroup.com
51
Stadium Generl View
52
www.cadinigroup.com
SIENA SPORT CLUB STADIUM - ITALY N A R R AT I V E D E S C R I P T I O N O F P R O J E C T :
The project develops the insertion of a large sport complex in a prestigious environmental context. The Council of Siena, after identifying a large area in the south of the city, left the designers the responsibility to choose the most appropriate collocation for the stadium. Our proposal was to preserve the environmental integrity of the area and with great
A multifunctional area that is well
attention the project appears like a kind of natural incident caused by an idrogeologi-
served by infrastructures and parking
cal phenomenon or by an earthquake. Like the ancient Greek Theater, the stadium for
lots for visitors to the stadium, an
20.000 spectators is set within the Fossatone slopes, and takes shape as it curves
area which is able to produce diversi-
through its bends, opening out to create a spacious area for concerts and outdoor
fied revenues that can guarantees the
events, excavated to form an inclined plane, offering a view of Siena in the background.
continuation of the system’s financial independence.
On the west side the “inhabited roof” is the sole built element of the stadium: this is a
As a suburban alternative of the city
thick deck that emerges from the ground, projects over the grandstand and ends with
centre, the Borgo Vecchio Park is found-
a pronounced overhang above the curves.
ed.
The facing material, specifically developed with a mini-beton technology using sienese tuff as inert, guarantee a perfect integration of the stadium in the surrounding area. With regards to the dynamics of use the project transforms the stadiums classical typology from an enclosed and intermittent container to an open place living “seven days a week”; from Cassia street to Arbia stream, from Renaccio to Isola, a complex system is foreseen where sport practices coexist with other activities such as educational, tertiary and commercial.
“A complex system where sport practices coexist with other activities.”
www.cadinigroup.com
53
View from the park
Main entrance
30
Propylaea
Amwaj Aljazeera for Investiments www.cadinigroup.com
Magic Carpet Generl View
54
www.cadinigroup.com
MAGIC CARPET FUJAIRAH ENTERTAINMENT PARK N A R R AT I V E D E S C R I P T I O N O F P R O J E C T :
To be developed in two phases, the project concerns an entertainment park and its hospitality services (hotel and villas). The first phase entertainment park covers an area of 500,000 sqm and hosts a Theme and Mechanical Park, a Water Park, a Mini Golf course, a Go-Kart track, an Aquarium, a Botanic garden with butterfly pavilion and educational museum, besides from client and staff parking lots.
Country: U.A.E. Location within country:
The second phase (250,000 sqm) will see the construction of a 5-star hotel of 300
FUJAIRAH CITY - FUJAIRAH EMIRATE
rooms and a Resort of 50-100 villas, as well of the extension of the visitor’s parking lot. Both phases will be supported by the project of a new road network connected to Duration of assignment (months):
the city of Fujairah.
1° Phase: 3 months (completed) The Entertainment Park is located West of Fujairah City in an area predisposed in
2° Phase: 20 months (to execute)
the past for the realization of a park. It consists of a perfect rectangle of 1,000 x 500
3° Phase: 12 months (to execute)
meters. The connection whit the town of Fujairah is currently guaranteed by a road coming from the sulfuric baths. Taking into account the considerable afflux of people
Name of Client:
expected for the park, the road should be enhanced so as to have characteristic similar
Amway Aljazeera
to the town’s roads (2 lanes with central and side docks). Characteristics of the connec-
Establishments
for
Investments
tion road should however be established by competent Public Authority. Total No. of staff-months of the assignThe program plans an entertainment park for the region of Fujairah. The program will
ment:
develop in two phases: the first is the entertainment park, the second will develop
1° Phase: No 7
the hospitality services.
2° Phase: No ... (to execute)
“An amazing project for a fast growing region..”
www.cadinigroup.com
55
New Hammam - Erbil Generl View
56
www.cadinigroup.com
HAMMAM N A R R AT I V E D E S C R I P T I O N O F P R O J E C T :
Over the past decade the new city of Erbil has greatly developed. Development has not however included the construction of one or more hammams in the new town. This is unbelievable considering the fortune that hammams, saunas and more generally spas have had around the world. This project originated from this consideration. Country: IRAQ The project is based on classical models, both for what concerns the distribution of
Location within country: ERBIL
the rooms that for architecture. With respect to the models used as reference, a cafeteria was added to the plan. This is disposed so that it can be frequented separately from the bath. The symmetrical layout is set so that the complex can be built two
Duration of assignment (months):
phases. With the construction of the first phase the bath could be used by both sexes
No 30 months
in alternated days or at different times of the same day. With the completion of the two phases the bath conformation allows simultaneous use by both men and women
Name of Client:
without contact between the two sexes, except for the central cafeteria.
Sultan Group
The entries to the two sections are separated from the cafeteria’s kitchen room and
Total No. of staff-months of the assign-
are provided of a large entrance yard accessible from the road. From the entrance yard
ment:
it’s also possible to access to the outdoor pool area equipped with its own changing
No 30 months
rooms, restrooms and café. The lot is of about 4,250 square meters, of which 2,100 square meters of built area, 1,850 square meters of gardens and yards and 300 square meters for the service yards. The internal usable area is divided for each of the 2 sections as follows: Entrance hall, Two level changing rooms, Cool room, Tepidarium and massage room, Kaplica (warm pool), Calidarium. For each of the two outdoor pools: Entrance Hall, Changing rooms and restrooms, Café. For the central spaces and common areas: Cafeteri, Restrooms, Kitchen, Warehouse, facilities room.
“The plan geometry is inspired by a typical ceramic wall decoration.”
www.cadinigroup.com
57
Generl View
58
www.cadinigroup.com
AL ATLAL RESORT RESORT OVERLOOKING THE DEAD SEA N A R R AT I V E D E S C R I P T I O N O F P R O J E C T :
The work is planned in two phases. The first completed phase concerns the Site master Plan and the concept design of the buildings. The second phase will start after approval of the Business Plan and will concern the completion of the Master Plan with a Parcel Plan, Landscape Design and Infrastructure Master Plan. The Project concerns a touristic and therapeutic eco-friendly Resort on the South-East hills that overlook
Country: JORDAN
the Dead Sea, on an area of about 678,000 sqm.
Location within country: AMMAN
The area is located in Mazra’a valley and has an average slope of 20%. This position allows a view on the valley from almost every point and at the same time guarantees
Duration of assignment (months):
a better microclimate (gentle breezes, less humidity, lower temperature) with respect
1° Phase: 4 months (completed)
to the Dead Sea level.
2° Phase: 18 months (to execute)
The whole complex of the Resort follows bioclimatic principles in order to reduce
Name of Client:
energy demand and minimize groundwater consumption. Renewable energy, both
JORDANIAN MARKAZYAN FOR
solar thermal and medium depth thermal energy of the ground produced by geother-
TOURISM PROJECTS & INVESTMENTS
mal heat pumps will supply the necessary heat.
LTD
The electrical energy required to drive the pump and its auxiliary systems will be pro-
Total No. of staff-months of the assign-
duced locally by photovoltaic panels. A part of the electrical energy for civil use will be
ment:
produced by a system of wind turbines installed in the upper part of the Resort Area.
1° Phase: 4 months (completed)
Almost all the water will be reused, purified and recycled for irrigation and to aliment
2° Phase: 18 months (to execute)
the separate flushing system. The lodges will take advantage of the natural ground slope and dispose some rooms partially underground, helping summer cooling.
“A touristic and therapeutic eco-friendly Resort on the South-East hills that overlook the Dead Sea.”
www.cadinigroup.com
59
SCHE
Generl View
60
www.cadinigroup.com
ITALIAN VILLAGE RESIDENTIAL BUILDINGS N A R R AT I V E D E S C R I P T I O N O F P R O J E C T :
The project consists in the Master Plan of a new residential neighborhood in the Western outskirts of Al-Hillah. The new area includes residential buildings (582 apartments), health care center, elementary and nursery schools, sports facilities, mall, restaurant, public spaces and a central square, besides the new road network. The Master Plan is designed for a new integrated community and develops:
Country: IRAQ
- A residential plan including infrastructures and three development sites provided
Location within country: AL HILLAH
with connections that can enable future development. - A fully developed scheme including high quality residential units, clinic and health
Duration of assignment (months):
care centre, mosque, schools, crèche and sports facilities, covered mall, supermarket,
5 months
restaurants, public spaces and central square. All of these functions will have highest design and constructions standards.
Name of Client: Cadini Group
The layout is designed to respond to the geometry of surrounding areas, using the scheme of adjacent lots from the river to the diagonal South West street. This gives
Total No. of staff-months of the assign-
a distinctive identity and avoids facing of residential properties directly onto the
ment:
highway. Each tower consists of four apartments on each floor, each with three open
No 8 months
sides. This guarantees privacy and a good cross ventilation. Each tower consists of 9 to 12 storey. This conformation adds interest to the skyline and provides large roof gardens and variation of residential types by introducing duplex apartments at roof level. The linear buildings provide a variation to the residential accommodation mix: these consists of 8 to 12 storeys with the ground floor units with large private gardens. Again, the 10637 Cadini Masterplan Proposals 15012010 stepping of the blocks provides various opportunities for roof gardens.
The covered mall provides multi- storey commercial spaces including a supermarket for the community. The access and parking spaces are located so as to avoid impact on the village and its facilities.
“A fully developed scheme including high quality residential units.”
www.cadinigroup.com
61
Generl View
62
www.cadinigroup.com
NATIONAL COUNCIL FOR RESEARCH (C.N.R.) QUARTERS - AREA OF FLORENCE N A R R AT I V E D E S C R I P T I O N O F P R O J E C T :
The assignment is the outcome of a competition. The project consist in several buildings divided in to six blocks hosting all the scientific research institutes of Florence of the National Council for Research (C.N.R.). Country: ITALY The lot surface is of about 11,430 sqm and the gross floor area of 85,000 cbm.
Location within country: SESTO FIORENTINO - FLORENCE
As well as the scientific research laboratories, in the complex are planned other complementary functions. In particular: a library, a convention area with two confer-
Duration of assignment (months):
ence halls, a restaurant.
16 months
Studio Barbagli provided Data Collection and Analysis, alternatives for the layout of
Name of Client:
all functions in all the buildings, Final Design Project of the selected option, Executive
Condotte Acqua SPA
Design and Artistic Direction with Director of works Studio Barbagli also provided open space and landscape executive Design.
Total No. of staff-months of the assignment: No 68 months
“The most advanced scientific research laboratories to the highest international standards.�
www.cadinigroup.com
63
Generl View
64
www.cadinigroup.com
SCIENTIFIC AND TECHNOLOGICAL DEPARTMENT OF UNIVERSITY OF FLORENCE N A R R AT I V E D E S C R I P T I O N O F P R O J E C T :
The project concerns the Scientific and Technological Campus of University of Florence, in which are located the Mathematic, Physics and Science Biology Faculties, as well as the Engineering and Agriculture Faculties. The project was obtained after winning the international competition. Country: ITALY After a complex history and procedural policies, works began in 1985 with a team of
Location within country:
architects whom head leader is Architect Francesco Barbagli. The 1° phase Master
SESTO FIORENTINO - FLORENCE
Planning and building’s Schematic Design (approx. value of works 147 mln US$) conDuration of assignment (months):
cluded in 1986.
1th phase Start date: Feb 2004 From 1988 to 1992 the roads and utilities projects have been prepared and works
Completion: gen 2006
began. In 2005 University of Florence modified the building intervention program and
2th phase Start date: Dec 2004
gave a new assignment to Arch. Barbagli (in this document) to plan important changes
Completion date): Oct 2010
to the Master Plan, a new road and bridge and green areas crossed by a bicycle path. Name of Client: The 1° phase concerned the Master Plan of the new Scientific and Technological
University of Florence
Universities of Florence which includes: Departments of Physical Sciences, Mathematic and Biology, Engineering and Agrarian Faculties, student’s and guest professor’s resi-
Total No. of staff-months of the assign-
dences and various Research Institutes.
ment: 1° phase: 8 months
The 2° phase concerned Schematic and Final Design of streets and pedestrian roads
2° phase: 12 months
and green areas. The Master Plan concerned an area of about 720,000 sqm with a building gross floor area of 430,000 sqm. The project for streets and green areas concerned a total area of 50,000 sqm.
“The Master Plan concerned an area of about 720,000 sqm with a building gross floor area of 430,000 sqm.”
www.cadinigroup.com
65
Generl View
66
www.cadinigroup.com
CULTURAL CENTER IN ROYAL STABLES N A R R AT I V E D E S C R I P T I O N O F P R O J E C T :
The Medici Stables were built in the first half of the sixteenth century with a basilica type of layout, similar to the one of the San Marco stables in Florence. On the ground floor there are the two stables, each with three cross vaulted naves that conclude in a huge room intended originally as carriages shelter. On the first floor there were thirty lodges for the people manning the horses and the villa. The dimensions are of 107,45 x 30,60 x 15,60 m in height. Owner of the building is the Municipality of the City. After the collapse of a portion of the building caused by a fire, the municipality administration announced a competition by invitation for the recovery of the building as a convention center and hi
Country: ITALY Location within country: POGGIO A CAIANO – PRATO Duration of assignment (months): 1° phase. No 24 months 2° phase No 30 months
education center. The competition was won by our group that then was in charge of the design. The design and restoration projects have been developed in two phases. Between 1998 and 2000 the Schematic Design, Executive Design and Works of the first lot have been done. Between 2005 and 2008 the design and works for the second lot have been done. The total amount for the works is approximately of € 4,600,000, the total gross floor
Name of Client: Municipality of Poggio a Caiano Total No. of staff-months of the assignment: 1° phase. No 48 months 2° phase No 40 months
area for consolidation works is of 5,800 sqm, the floor space recovered in both the 2 lots including functional completion and furniture is approximately of 2,400 sqm.
“The Medici Stables were built in the first half of the sixteenth century ”
www.cadinigroup.com
67
Master Plan Generl View
68
www.cadinigroup.com
ZAWRAA DREAMLAND ENTERTAINMENT PARK N A R R AT I V E D E S C R I P T I O N O F P R O J E C T :
The project is an extension of a preexistent amusement park. The enlargement Master Plan includes new rides and attractions and three new buildings hosting restaurants and cafeterias, indoor games, administration offices, technical rooms and restrooms. The Project includes connection with the existing road network and a landscape
Country: IRAQ
and green area project.
Location within country: BAGHDAD
The original park was built on a small area near the western border of the Zawraa Park. The parking lot and entrance to the Park is from one of the monumental doors
Duration of assignment (months):
situated on Az Zaytun St. The park was built by adding and substituting over the year’s
1°phase: 2 months
areas and elements without a project.
2° phase: 12 months
In response to great public interest, the owner has programmed a complete restruc-
Name of Client: Al Zawra’a Entertainment
turing and enlargement, including attractions and landscape. The owner’s requests
City
merge between a Luna park, a mechanical park and a theme park, with respect to the
Co.
borders of the area, external appearance of the Park with traditional Iraq architectural themes, with the aim for a children/families/teenagers audience.
Total No. of staff-months of the assignment: No. 30 No. of professional staff-months provided by associated Consultants: No. 24
“Al Zawraa Entertainment Park: a modern and ambitious project.”
www.cadinigroup.com
69
Construction Site Date:. October 2013
70
www.cadinigroup.com
ZAWRAA DREAMLAND ENTERTAINMENT PARK D E S C R I P T I O N O F A C T U A L S E R V I C E S P R O V I D E D B Y Y O U R S TA F F W I T H I N T H E A S S I G N M E N T:
Description of actual services provided by your staff within the assignment: - Survey and topography and logistics of designated perimeter; - Preliminary Architectural Design, Structural and Installation layouts and preliminary Cost Estimate; - Final and Detail Design of Architectural, Structural and Installations components
Name of senior professional staff
with Bill of Quantities, Cost
involved and functions performed
Estimate, Technical Report and Technical Specification; - Tender Dossier
Eng. Naseer Al Doreky: Site Team Leader
- Continuous coordination and meetings with Client and on-site inspection;
Eng. Udai Hassan: Project Manager
- Organization and training in Italy with workshops arranged in our Headquarters in
Eng. Ammar Abdurrahman: Structural
Florence.
Engineer Eng. Ali Sinan: Head of Administration and Finance Eng. Maher Al Asam: Mechanical Engineer
“The green lung of Baghdad�
www.cadinigroup.com
71
Global Supply, Co n s t r u c t i o n & Consultancy email: info@cadinigroup.com w w w. c a d i n i g r o u p . c o m Co r p o r a t e H e a d q u a r t e r s Via Masaccio, 105 5 0 1 3 2 F i r e n z e , I T A LY tel: (+39) 055 573401 fax: (+39) 055 5001190 Office
in
Jordan
A l B a k r i Co m p l ex , b u i l d ing 111, floor 4, Gardens St., Amman, Jordan tel: (+962) 6
5544511
fax: (+962) 6 5522450 Office
in
Iraq
tel: ( +964) 770 2849416 Flat 14 - Ibrahiem Al-Awsaj B ui l d i ng, A l -Mans oor St . Ba gh d a d
-
Ir a q
Office in Kurdistan Salm street, rawaz building -S u l a i m a n y a hKurdistan Region
w w w. cad i n ig r o u p.co m
-
Iraq