Tax and Waterworks and Sewer System Surplus Revenue Certificates of Obligation, Series 2005B
Principal Amount Refunded: $1,285,000 Interest Savings: $204,207 Proceeds from the 2005B Certificates of Obligation funded: - A portion of Pump Station #2 Bond Issuance Total Cost: $65,000 All proceeds from the 2014A General Obligation Refunding have been spent.
197