CITY PROJECTS
O'Fallon Regional Law Enforcement Training Center Design
The project includes a new multi-faceted law enforcement training center with a classroom building with K-9 handling facilities, a simulated training “shoot house” , a new 200-yard, 20-lane firing range, an Emergency Vehicle Operator Course track for vehicular training with fleet building, and an obstacle course. This project is planned to be located on approximately 45 acres in the Northeast part of O’Fallon along Hwy 79. Design efforts were started in 2022 and one project is currently in the evaluation phase.
Senior Center ADA Upgrades
This project is bringing the access to the basement at the Senior Center into ADA compliance. This is the third, and final, phase of work at the Senior Center, which began back in 2014. The retaining walls are being removed and rebuilt to provide a switchback sidewalk. The project also will improve drainage and eliminate flooding issues in the building. The sidewalk from the parking lot to the front entrance will also be removed and replaced with ADA compliant access. CDBG was able to acquire HUD funding to assist with the cost of the project. The project is expected to be completed in the spring of 2023.