SUNING SOCCER STADIUM DESIGN - DESIGN COMPUTATION
NBBJ
PROJECT YEAR: 2018
PROJECT LOCATION: Nanjing, China
ON PROJECT STAGE: Design Competition
ROLE ON THE TEAM: Designer, Design Computation Lead
RESPONSIBILITY / CONTRIBUTION: Designed ETFE canopy of the stadium including the long span structure system. Generated the canopy’s shading pattern for light diffusion through computational methods to ensure comfort levels for spaces underneath. Drafted the multimedia presentation and coordinated with visualization company on the rendering images.
42