SUB-FAIRINGS™ Lower & Upper Tether Fairings The Deep Green power plant converts
current creates a lift force on the wing which
turbine and a nacelle. By means of a rudder,
withstand the high loads created by the
renewable energy from tidal and ocean
pushes the kite forward. The kite is steered
a servo system and a control system the kite
wing and to accommodate power cables
currents into electricity by way of a novel
in an 8-shaped trajectory by a rudder
is steered in its predestined trajectory. The
out from the generator and communication
principle, somewhat similar to the posture
and reaches a speed 10 times the water
struts are connected to the tether which
cables for the control system. For optimal
of a wind kite. The kite assembly, consisting
current speed. As the kite moves, water
attaches the kite to a swivel fastened to
performance the tether has a fairing in order
of a wing and turbine, is attached by a
flows through the turbine and electricity is
a foundation on the seabed. The 110 mtr
to minimise the overall drag of the device.
tether to a fixed point on the ocean bed.
produced in the gearless generator. Deep
long tether has two functions; to work as
As water flows over the wing, the water
Green consists of a wing, which carries a
the force-bearing element designed to
PO-1134-SES-045-016