IMIESA August 2021

Page 28

WATER & WASTEWATER

Pressure control to fight water shortages in Eastern Cape Nelson Mandela Bay Municipality (NMBM) is experiencing a drought, with its largest supply dam, Kouga Dam, dropping to its lowest level since it was commissioned in 1969. Water pressure management is considered as the most effective real loss and water demand management intervention by NMBM.

N

MBM is a water services authority (WSA) and water services provider (WSP). It encompasses the Gqeberha (formerly Port Elizabeth), Kariega (formerly Uitenhage), Despatch and KwaNobuhle areas, and supplies water to Kouga Municipality (its largest water consumer). High water pressure contributes towards an increased number of burst pipes and a greater volume of water lost due to underground leaks. The aim of pressure management

St Georges Strand PRV during construction

Lyle Francis, acting deputy director: Water Demand Management, NMBM

Pieter Joubert, professional engineer at Engineering Advice & Services

is to reduce pressure to an acceptable level and, therefore, actual water losses. Water pressure management also decreases water consumption and increases the asset life. NMBM has appointed two service providers – Re-Solve Consulting and Engineering Advice & Services – to formulate and implement a water pressure management plan. “The NMBM region is divided into supply zones, with plans to install one or more pressure-reducing valves (PRVs) into as many zones as possible. Currently, there are 68 pressure-managed zones within NMBM, which covers approximately 25% of the water network,” explains Lyle Francis, acting deputy director: Water Demand Management, NMBM.

26

IMIESA August 2021


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

From rock to road

5min
pages 54-56

Digital transformation in Africa

3min
page 57

A hydraulic breakthrough for tracked carriers

2min
page 53

Outsourcing FM in the public sector

2min
page 52

Gabions are evolving

5min
pages 50-51

Novel culvert bridge design for village

3min
page 49

Ways to manage readymix waste streams

2min
page 47

Extenders can affect concrete curing

1min
page 48

IWM projects key to solving SA’s waste crisis

8min
pages 44-46

Environmental clean-ups require collective action

4min
pages 42-43

Digital twins to the rescue

4min
pages 40-41

Water Wise: An environmental brand over two decades old

2min
pages 37-38

Design innovation shapes Mhlabatshane Bulk Water project

8min
pages 34-36

Pump shafts and flow measurement

4min
pages 30-31

Pressure control to fight water shortages in Eastern Cape

5min
pages 28-29

Ultrafiltration and reverse osmosis work together

1min
page 33

eXpress booster sets meet the demand

2min
page 32

Closing the gap

5min
pages 26-27

Small town road upgrades strengthen their economies

5min
pages 24-25

Lesotho Highlands bridge programme takes shape

2min
page 23

Reducing South Africa’s infrastructure deficit with more funding

7min
pages 12-14

Mobilising the opportunities for construction

5min
pages 10-11

Implementation of PG binder specification in South Africa

9min
pages 16-19

Industry innovators beyond the imaginable

3min
pages 8-9

Obituary: Saying farewell to a changemaker

2min
page 15

World-renowned road safety campaigner to address SA conference

4min
pages 20-21

President’s comment

2min
page 7

Editor’s comment

4min
pages 5-6
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.