IMIESA August 2021

Page 32

WATER & WASTEWATER

Lowara e-SV pump booster sets with the new fifth-generation Hydrovar are now available with eXpress delivery

Xylem Africa’s market-leading Lowara GHV booster sets are now available to local customers from stock or manufactured in two weeks or less.

eXpress booster sets meet the demand

S

ince being launched in 2014, Lowara’s GHV boosters – now locally marketed as eXpress boosters – have been in high demand. The booster sets are fully automatic for water supply, water pressure increase, and water transfer in buildings, industrial and allied applications. The Lowara eXpress series operates in conjunction with the Xylem

Hydrovar® pump controller and is capable of delivering up to a 70% saving on energy bills. To reduce delivery times, Xylem South Africa has invested in fabrication and assembly facilities in South Africa, reducing the waiting period of eight weeks by more than 75%. Delivery times are confirmed at the time of order placement. “Xylem's Lowara eXpress boosters are a hit with our customers because they provide excellent value,” says Vinesan Govender, engineering manager: Africa, Xylem. “Xylem Africa can now deliver eXpress boosters to customers in less than two weeks and continue to support installation and maintenance through our vast domestic presence and partner network.” Xylem Africa has localised the assembly of six models within the eXpress booster set series.

The booster that delivers The GHV/eXpress series is equipped with up to four e-SV vertical multistage pumps, each one fitted with a Hydrovar HVL variablefrequency drive, pressure transmitters and a

The GHV/eXpress series is equipped with up to four e-SV vertical multistage pumps, each one fitted with a Hydrovar HVL variable-frequency drive, pressure transmitters and a control panel

30

IMIESA August 2021

LOWARA EXPRESS BOOSTER FEATURES ● Fully automatic ● Certified for use with potable water ● All pumps are individually variablespeed controlled for best economy and system reliability ● Equipped with 1 to 4 Lowara e-SV multistage pumps and Hydrovar HVL variable-speed controllers ● Easy to install and commission – no advanced programming necessary ● Communicates with BMS systems ● Delivery: up to 640 m³/h ● Head: up to 160 m

control panel – all mounted on a frame for easy installation. This series is easy to program, designed for maximum energy efficiency, and can communicate with a BMS system via Modbus or BACnet. End-users benefit from a host of features, including dry-run protection, low noise, small plant room footprints, no large pressure vessels, soft-start, no hydraulic shock, autochangeover, fault history, protection against under-/overvoltage, and backflow protection through the use of a Cat 5 break tank type A/B air gap. It has a timed-delay fill mode, which ensures the pumping system does not flood the building on start-up during a power failure due to the hydraulic surge.


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

From rock to road

5min
pages 54-56

Digital transformation in Africa

3min
page 57

A hydraulic breakthrough for tracked carriers

2min
page 53

Outsourcing FM in the public sector

2min
page 52

Gabions are evolving

5min
pages 50-51

Novel culvert bridge design for village

3min
page 49

Ways to manage readymix waste streams

2min
page 47

Extenders can affect concrete curing

1min
page 48

IWM projects key to solving SA’s waste crisis

8min
pages 44-46

Environmental clean-ups require collective action

4min
pages 42-43

Digital twins to the rescue

4min
pages 40-41

Water Wise: An environmental brand over two decades old

2min
pages 37-38

Design innovation shapes Mhlabatshane Bulk Water project

8min
pages 34-36

Pump shafts and flow measurement

4min
pages 30-31

Pressure control to fight water shortages in Eastern Cape

5min
pages 28-29

Ultrafiltration and reverse osmosis work together

1min
page 33

eXpress booster sets meet the demand

2min
page 32

Closing the gap

5min
pages 26-27

Small town road upgrades strengthen their economies

5min
pages 24-25

Lesotho Highlands bridge programme takes shape

2min
page 23

Reducing South Africa’s infrastructure deficit with more funding

7min
pages 12-14

Mobilising the opportunities for construction

5min
pages 10-11

Implementation of PG binder specification in South Africa

9min
pages 16-19

Industry innovators beyond the imaginable

3min
pages 8-9

Obituary: Saying farewell to a changemaker

2min
page 15

World-renowned road safety campaigner to address SA conference

4min
pages 20-21

President’s comment

2min
page 7

Editor’s comment

4min
pages 5-6
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.