years NEW HORIZONS, NEW CHALLENGES


years NEW HORIZONS, NEW CHALLENGES


80 YEARS NEW HORIZONS, NEW CHALLENGES

08

26

INTERNATIONALIZATION 2013 2003

STABLE FLOWS 2003 1993

46

66

DIVERSIFICATION 1993 1983

EXPERIENCE 1983 1949

88

104

VALUES 1949 1933

TIME LINE 1933 2013

© GRAÑA Y MONTERO S.A.A. Av. Recavarren 909 – Surquillo Lima – Peru Developed by Graña y Montero S.A.A. under the publishing direction of Empresa Editora El Comercio S.A.

4

FOR GRAÑA Y MONTERO S.A.A. Chairman of the Board: José Graña Miró Quesada General Director: María Teresa Graña Cánepa - Corporate Image Copy Editing: Juan José Arrieta Ocampo - Corporate Responsibility Manager Joaquín LLosa Grau - GyM Assistant Business Manager Collaboration: Antonio Maggiorini Neira FOR EMPRESA EDITORA EL COMERCIO S.A. General Director: Leonor de Barclay - Director of Barclay Editores S.A.C. Editing, Layout and infographic: Barclay Editores S.A.C. Research and Graphic Editing: Herman Schwarz Production Editor and Style: Ana María Velando Design: Studioa Photography: Graña y Montero S.A.A. Archives Walter O. Runcie Photographic Archive / AFWOR Photos: Edificio Wiese ca. 1939, p. 95; aerial view of the Miraflores Baths ca. 1940, p. 122 Pre-press and Printing: Gráfica Biblos S.A. Calle Morococha 152, Surquillo Lima – Peru First Edition: June 2013 Print Run 28,000 copies. ISBN: 978-612-45249-0-5 Legal Copyright Deposit made with the National Library of Peru No. 2013-08692 Barcode: 978-612-45249-0-5 All rights reserved. Without authorization from the copyright holders, subject to the penalties established by applicable laws in force, reproduction in full or in part of the articles, photographs and computer graphics in this publication by any electronic or mechanical means or procedure, photocopy, recording or other means, as well as distribution of copies by rental or public loan are strictly forbidden.

108 OUR MAIN PROJECTS 2013 1933


80 YEARS NEW HORIZONS, NEW CHALLENGES

08

26

INTERNATIONALIZATION 2013 2003

STABLE FLOWS 2003 1993

46

66

DIVERSIFICATION 1993 1983

EXPERIENCE 1983 1949

88

104

VALUES 1949 1933

TIME LINE 1933 2013

© GRAÑA Y MONTERO S.A.A. Av. Recavarren 909 – Surquillo Lima – Peru Developed by Graña y Montero S.A.A. under the publishing direction of Empresa Editora El Comercio S.A.

4

FOR GRAÑA Y MONTERO S.A.A. Chairman of the Board: José Graña Miró Quesada General Director: María Teresa Graña Cánepa - Corporate Image Copy Editing: Juan José Arrieta Ocampo - Corporate Responsibility Manager Joaquín LLosa Grau - GyM Assistant Business Manager Collaboration: Antonio Maggiorini Neira FOR EMPRESA EDITORA EL COMERCIO S.A. General Director: Leonor de Barclay - Director of Barclay Editores S.A.C. Editing, Layout and infographic: Barclay Editores S.A.C. Research and Graphic Editing: Herman Schwarz Production Editor and Style: Ana María Velando Design: Studioa Photography: Graña y Montero S.A.A. Archives Walter O. Runcie Photographic Archive / AFWOR Photos: Edificio Wiese ca. 1939, p. 95; aerial view of the Miraflores Baths ca. 1940, p. 122 Pre-press and Printing: Gráfica Biblos S.A. Calle Morococha 152, Surquillo Lima – Peru First Edition: June 2013 Print Run 28,000 copies. ISBN: 978-612-45249-0-5 Legal Copyright Deposit made with the National Library of Peru No. 2013-08692 Barcode: 978-612-45249-0-5 All rights reserved. Without authorization from the copyright holders, subject to the penalties established by applicable laws in force, reproduction in full or in part of the articles, photographs and computer graphics in this publication by any electronic or mechanical means or procedure, photocopy, recording or other means, as well as distribution of copies by rental or public loan are strictly forbidden.

108 OUR MAIN PROJECTS 2013 1933


A NEW DAWN. Eighty years ago, when our founders decided to establish a technical corporation, they set the course of technical training and professionalism that inspires and identifies us till today. This purpose, innovative at the time, was captured in our charter.

6

years NEW HORIZONS, NEW CHALLENGES

Forty years later, as the second generation joined the Group, we established the values of quality, compliance and seriousness inherited from our founders, and laid out the vision of “being the most trusted engineering group in Latin America.� Though this sounded ambitious, by persevering along the chartered course, today we can feel that we have almost accomplished that dream. That is the story we want to tell you, as we now advance towards new horizons and face new challenges.


A NEW DAWN. Eighty years ago, when our founders decided to establish a technical corporation, they set the course of technical training and professionalism that inspires and identifies us till today. This purpose, innovative at the time, was captured in our charter.

6

years NEW HORIZONS, NEW CHALLENGES

Forty years later, as the second generation joined the Group, we established the values of quality, compliance and seriousness inherited from our founders, and laid out the vision of “being the most trusted engineering group in Latin America.� Though this sounded ambitious, by persevering along the chartered course, today we can feel that we have almost accomplished that dream. That is the story we want to tell you, as we now advance towards new horizons and face new challenges.


8

INTERNATIONALIZATION

2013/2003

In 2012, we completed the Pueblo Viejo mining project in the Dominican Republic for the Canadian company Barrick Gold, and started work on the enormous Minera Panamá copper project in that same country. In 2010, we acquired CAM, a Chilean company operating in Chile, Peru and Colombia. In 2011, we established, together with New Zealander partners, Stracon GyM, a company specializing in mining services, and in 2012 we acquired Vial y Vives, a Chilean construction company broadly experienced in mining projects. Today, having joined the capabilities of the two countries most committed to the mining industry in the region – Chile and Peru –, we have become the most experienced company in mining construction in Latin America.


8

INTERNATIONALIZATION

2013/2003

In 2012, we completed the Pueblo Viejo mining project in the Dominican Republic for the Canadian company Barrick Gold, and started work on the enormous Minera Panamá copper project in that same country. In 2010, we acquired CAM, a Chilean company operating in Chile, Peru and Colombia. In 2011, we established, together with New Zealander partners, Stracon GyM, a company specializing in mining services, and in 2012 we acquired Vial y Vives, a Chilean construction company broadly experienced in mining projects. Today, having joined the capabilities of the two countries most committed to the mining industry in the region – Chile and Peru –, we have become the most experienced company in mining construction in Latin America.


80 YEARS

New horizons, new challenges

10

ENTHUSIASM FOR THE FUTURE The secret to longevity is to stay young and never stop looking forward with enthusiasm. So, the Graña y Montero Group reaches its 80th anniversary ready to undertake new projects, guide the efforts and talent of its professionals to continue growing and sharing knowledge in Peru, and broaden its presence in Latin America. As the Peruvian economy has grown – particularly in the last two decades –, so has Graña y Montero by expanding and diversifying its portfolio and consolidating its role as the top engineering services group in the country. Today, it operates 24 infrastructure and engineering services companies operating in an increasing number of countries in Latin America, the region which international organizations consider will be one of the leaders of global economic growth in this century. In 2012, we set a new record as our sales increased by 30% as compared to the previous year, reaching the equivalent of US$2,051 million, and generating US$114 million in net profit. In the past 10 years, our growth has averaged more than 27% and this trend is ratified by the 49% increase in our year-end contract portfolio as compared to the previous period, thereby surpassing US$4,574 million for the first time. This allows us to forecast continuous growth in the following years.

Main office of the Graña y Montero Group in Surquillo, Lima.

INTERNATIONALIZATION


80 YEARS

New horizons, new challenges

10

ENTHUSIASM FOR THE FUTURE The secret to longevity is to stay young and never stop looking forward with enthusiasm. So, the Graña y Montero Group reaches its 80th anniversary ready to undertake new projects, guide the efforts and talent of its professionals to continue growing and sharing knowledge in Peru, and broaden its presence in Latin America. As the Peruvian economy has grown – particularly in the last two decades –, so has Graña y Montero by expanding and diversifying its portfolio and consolidating its role as the top engineering services group in the country. Today, it operates 24 infrastructure and engineering services companies operating in an increasing number of countries in Latin America, the region which international organizations consider will be one of the leaders of global economic growth in this century. In 2012, we set a new record as our sales increased by 30% as compared to the previous year, reaching the equivalent of US$2,051 million, and generating US$114 million in net profit. In the past 10 years, our growth has averaged more than 27% and this trend is ratified by the 49% increase in our year-end contract portfolio as compared to the previous period, thereby surpassing US$4,574 million for the first time. This allows us to forecast continuous growth in the following years.

Main office of the Graña y Montero Group in Surquillo, Lima.

INTERNATIONALIZATION


80 YEARS

New horizons, new challenges

2

12

“In 2012, we set a new record as our sales increased by 30% as compared to the previous year.”

1. Laying communication network cabling, CAM GyM, Peru. 2. Copper concentrating plant, Antapaccay, Espinar, Cuzco.

1

INTERNATIONALIZATION


80 YEARS

New horizons, new challenges

2

12

“In 2012, we set a new record as our sales increased by 30% as compared to the previous year.”

1. Laying communication network cabling, CAM GyM, Peru. 2. Copper concentrating plant, Antapaccay, Espinar, Cuzco.

1

INTERNATIONALIZATION


80 YEARS

New horizons, new challenges

“The Group has had more than 600 associates in its Latin American operations.”

14

EXPORTING TALENT Graña y Montero’s presence abroad is important as a demonstration of the capabilities of Peruvian engineers and workers and also for generating foreign exchange for Peru as a result of specialized service exports, including project management and large-scale infrastructure construction, particularly in the mining and hotel industries. In 2012, the Group had over 600 workers at one time in its Latin American operations. That is, Graña y Montero exports talent, while its professionals gain experience and learn to work in different environments, contributing to raising its profile and the value of their contribution to the Group. One of our corporate maxims, we should remember, is transforming knowledge into growth.

Personnel of the Las Bambas mining project in Cusco, Peru.

INTERNATIONALIZATION


80 YEARS

New horizons, new challenges

“The Group has had more than 600 associates in its Latin American operations.”

14

EXPORTING TALENT Graña y Montero’s presence abroad is important as a demonstration of the capabilities of Peruvian engineers and workers and also for generating foreign exchange for Peru as a result of specialized service exports, including project management and large-scale infrastructure construction, particularly in the mining and hotel industries. In 2012, the Group had over 600 workers at one time in its Latin American operations. That is, Graña y Montero exports talent, while its professionals gain experience and learn to work in different environments, contributing to raising its profile and the value of their contribution to the Group. One of our corporate maxims, we should remember, is transforming knowledge into growth.

Personnel of the Las Bambas mining project in Cusco, Peru.

INTERNATIONALIZATION


80 YEARS

New horizons, new challenges

16

NEW INTERNATIONAL ADDITIONS Our internationalization strategy involves performing projects abroad for recognized international clients, such as hotel chains and large mining companies, including the Four Seasons Hotel in Mexico, the Ralco Hydroelectric Plant in Chile, the San Cristobal mine in Bolivia and the Pueblo Viejo mine in the Dominican Republic. We are now moving towards acquiring companies with experience in new specialty engineering lines.

TODAY From a strategic viewpoint, we consider that the most significant events for the Group in the past two years have been the acquisition of the Chilean companies Compaùía Americana de Multiservicios Limitada (CAM), specializing in engineering services for the power industry, and Vial y Vives, specializing in the mining industry.

Pueblo Viejo Mine, Dominican Republic.

INTERNATIONALIZATION


80 YEARS

New horizons, new challenges

16

NEW INTERNATIONAL ADDITIONS Our internationalization strategy involves performing projects abroad for recognized international clients, such as hotel chains and large mining companies, including the Four Seasons Hotel in Mexico, the Ralco Hydroelectric Plant in Chile, the San Cristobal mine in Bolivia and the Pueblo Viejo mine in the Dominican Republic. We are now moving towards acquiring companies with experience in new specialty engineering lines.

TODAY From a strategic viewpoint, we consider that the most significant events for the Group in the past two years have been the acquisition of the Chilean companies Compaùía Americana de Multiservicios Limitada (CAM), specializing in engineering services for the power industry, and Vial y Vives, specializing in the mining industry.

Pueblo Viejo Mine, Dominican Republic.

INTERNATIONALIZATION


80 YEARS

New horizons, new challenges

18 “Peru and Chile are the most knowledgeable about mining engineering in Latin America.”

Vial y Vives has over 30 years of experience in civil works and electromechanical assembly and is a leader in mining construction in its country, Chile. Added to Graña y Montero’s leadership in that industry in Peru, their combined capacity has made them the most experienced group in mining project construction in Latin America. Note that, for natural reasons, Peru and Chile are the most knowledgeable about mining engineering in the region. To the capabilities and prestige of Vial y Vives, we have added the acquisition of CAM, which was already operating in Colombia, Chile and Peru. This has established our regional leadership, opening up enormous growth possibilities and bringing us closer to our vision of becoming the most trusted engineering service company in Latin America.

Jumbo working on section reinforcement at the Ralco Hydroelectric Plant in Chile.

INTERNATIONALIZATION


80 YEARS

New horizons, new challenges

18 “Peru and Chile are the most knowledgeable about mining engineering in Latin America.”

Vial y Vives has over 30 years of experience in civil works and electromechanical assembly and is a leader in mining construction in its country, Chile. Added to Graña y Montero’s leadership in that industry in Peru, their combined capacity has made them the most experienced group in mining project construction in Latin America. Note that, for natural reasons, Peru and Chile are the most knowledgeable about mining engineering in the region. To the capabilities and prestige of Vial y Vives, we have added the acquisition of CAM, which was already operating in Colombia, Chile and Peru. This has established our regional leadership, opening up enormous growth possibilities and bringing us closer to our vision of becoming the most trusted engineering service company in Latin America.

Jumbo working on section reinforcement at the Ralco Hydroelectric Plant in Chile.

INTERNATIONALIZATION


80 YEARS

New horizons, new challenges

20

THE YEAR OF CAM 2012 was a year of transformation for CAM. The initial results of the “CAM Cumple” project, started in 2011, were seen, becoming a part of its work philosophy and allowing it to improve its operational excellence by raising profitability, becoming more price-competitive and providing clients with higher quality service. CAM has significantly increased its business portfolio. In Chile, it renewed its agreements with the Enersis Group. In Peru, a business and technical operations agreement was obtained with Edelnor and, in Colombia, metering and distribution contracts were entered into with Codensa, as well as business operations contracts with Cundinamarca. In addition, CAM continued delivering innovative solutions through the Centro de Innovación Tecnológica (CIT). Technologies mostly developed with Chinese partners, with whom it has worked for over ten years, generated more than US$60 million in business. Changes implemented following the Graña y Montero corporate values will make it possible for CAM to strengthen its operating system and expand to new services specializing in the telecommunications, mining and oil industries.

Working on high-voltage lines from 60 kW to 500 kW. CAM GyM, Peru.

INTERNATIONALIZATION


80 YEARS

New horizons, new challenges

20

THE YEAR OF CAM 2012 was a year of transformation for CAM. The initial results of the “CAM Cumple” project, started in 2011, were seen, becoming a part of its work philosophy and allowing it to improve its operational excellence by raising profitability, becoming more price-competitive and providing clients with higher quality service. CAM has significantly increased its business portfolio. In Chile, it renewed its agreements with the Enersis Group. In Peru, a business and technical operations agreement was obtained with Edelnor and, in Colombia, metering and distribution contracts were entered into with Codensa, as well as business operations contracts with Cundinamarca. In addition, CAM continued delivering innovative solutions through the Centro de Innovación Tecnológica (CIT). Technologies mostly developed with Chinese partners, with whom it has worked for over ten years, generated more than US$60 million in business. Changes implemented following the Graña y Montero corporate values will make it possible for CAM to strengthen its operating system and expand to new services specializing in the telecommunications, mining and oil industries.

Working on high-voltage lines from 60 kW to 500 kW. CAM GyM, Peru.

INTERNATIONALIZATION


80 YEARS

New horizons, new challenges

INTERNATIONALIZATION

1

22 1. Harmonic filters at the Caserones Mine in Atacama, Chile. 2. Esperanza Mining Project, Chile.

VIAL Y VIVES

2

Vial y Vives Ingeniería y Construcción specializes in civil works, electromechanical assemblies and mining services. Its acquisition will create synergies that will allow Graña y Montero to boost its participation in developing large mining projects in Chile and the rest of Latin America. The professional capabilities of both companies will provide the regional market with a highly specialized service alternative and the possibility of doing business with large-scale international companies. In its 34 years of experience, Vial y Vives has participated in the most important mining plant construction and assembly projects in Chile and Peru, including Mantos Blancos, Manto Verde, El Tesoro, Ojos del Salado, La Coipa, El Abra, Cerro Colorado and Codelco Teniente in Chile, and Antamina in Peru. It has also constructed chemical plants, hydroelectric plants, aqueducts, tunnels, viaducts and industrial and building projects.

Construction of the Chile Metro. Pictured are cylindrical concrete structures.


80 YEARS

New horizons, new challenges

INTERNATIONALIZATION

1

22 1. Harmonic filters at the Caserones Mine in Atacama, Chile. 2. Esperanza Mining Project, Chile.

VIAL Y VIVES

2

Vial y Vives Ingeniería y Construcción specializes in civil works, electromechanical assemblies and mining services. Its acquisition will create synergies that will allow Graña y Montero to boost its participation in developing large mining projects in Chile and the rest of Latin America. The professional capabilities of both companies will provide the regional market with a highly specialized service alternative and the possibility of doing business with large-scale international companies. In its 34 years of experience, Vial y Vives has participated in the most important mining plant construction and assembly projects in Chile and Peru, including Mantos Blancos, Manto Verde, El Tesoro, Ojos del Salado, La Coipa, El Abra, Cerro Colorado and Codelco Teniente in Chile, and Antamina in Peru. It has also constructed chemical plants, hydroelectric plants, aqueducts, tunnels, viaducts and industrial and building projects.

Construction of the Chile Metro. Pictured are cylindrical concrete structures.


New horizons, new challenges

24

AWARDS AND ACKNOWLEDGMENTS

Graña y Montero’s leadership has been acknowledged not only for its contribution to the business sector, but also because it has extended to other areas of society as its partners Luis Hochschild Plaut Award, 2008.

and associates uphold the values instilled by the company’s founders.

FICA Social Responsibility Award, 2012.


New horizons, new challenges

24

AWARDS AND ACKNOWLEDGMENTS

Graña y Montero’s leadership has been acknowledged not only for its contribution to the business sector, but also because it has extended to other areas of society as its partners Luis Hochschild Plaut Award, 2008.

and associates uphold the values instilled by the company’s founders.

FICA Social Responsibility Award, 2012.


New horizons, new challenges

In recognition of its contribution to educational development, GyM received the “Luis Hochschild Plaut 2008 Award”, granted by the Peruvian Business Management Institute (IPAE). This acknowledgement was awarded for the program “Developing

26

Work Capabilities in Areas of Influence”, whereby the company drives knowledge management within its organization and shares this competitive advantage with the communities where it develops projects. The direct beneficiaries are the thousands of unemployed or low-income residents of marginal urban or rural areas who acquire the technical and social abilities required for their integration to the workforce. In December 2009, the National Society of Mining, Petroleum and Energy of Peru granted GMP the “2009 Sustainable Development Award” in the hydrocarbon industry for the company’s activities undertaken under the program “Rescue of Native Vegetables under Critical Risk in Bosque Seco in Talara”. In June 2010 and for the second consecutive year, the Lima Stock Exchange (BVL) gave Graña y Montero the “BVL Key” for having obtained the highest scores in the evaluation of Principles of Good Corporate Governance carried out by an external auditor. The Group has complied with the BVL’s Good Corporate Governance Index since its inception. In October 2010, Graña y Montero joined the Companies Circle of the Latin American Corporate Governance Roundtable, a group of 20 Latin American companies with high corporate governance standards, actively promoting and sharing experiences with Luis Hochschild Plaut Award, 2008.

other companies in the region. This group is driven by the Organization for Economic Cooperation and Development (OECD) and the IFC.

Mother canal of Chavimochic. Valle de Chao, La Libertad, Peru.

FICA Social Responsibility Award, 2012.


New horizons, new challenges

In recognition of its contribution to educational development, GyM received the “Luis Hochschild Plaut 2008 Award”, granted by the Peruvian Business Management Institute (IPAE). This acknowledgement was awarded for the program “Developing

26

Work Capabilities in Areas of Influence”, whereby the company drives knowledge management within its organization and shares this competitive advantage with the communities where it develops projects. The direct beneficiaries are the thousands of unemployed or low-income residents of marginal urban or rural areas who acquire the technical and social abilities required for their integration to the workforce. In December 2009, the National Society of Mining, Petroleum and Energy of Peru granted GMP the “2009 Sustainable Development Award” in the hydrocarbon industry for the company’s activities undertaken under the program “Rescue of Native Vegetables under Critical Risk in Bosque Seco in Talara”. In June 2010 and for the second consecutive year, the Lima Stock Exchange (BVL) gave Graña y Montero the “BVL Key” for having obtained the highest scores in the evaluation of Principles of Good Corporate Governance carried out by an external auditor. The Group has complied with the BVL’s Good Corporate Governance Index since its inception. In October 2010, Graña y Montero joined the Companies Circle of the Latin American Corporate Governance Roundtable, a group of 20 Latin American companies with high corporate governance standards, actively promoting and sharing experiences with Luis Hochschild Plaut Award, 2008.

other companies in the region. This group is driven by the Organization for Economic Cooperation and Development (OECD) and the IFC.

Mother canal of Chavimochic. Valle de Chao, La Libertad, Peru.

FICA Social Responsibility Award, 2012.


New horizons, new challenges

In October 2012, GyM received the “2012 Corporate Social Responsibility Latin American Award” granted by the

28

Federación Interamericana de la Industria de la Construcción (FIIC) and the CAF. Before that, in 2011, the company’s regular program “Developing Work Capabilities in Areas of Influence” received international recognition from Forum Empresa in its publication “La empresa como promotora del desarrollo económico y social: casos exitosos en América Latina” (Business as Promoter of Economic and Social Development: Successful Cases in Latin America), which was presented at the IDB’s CSR Americas 2011 Conference, held in Asunción, Paraguay. We also received the “Business Creativity Award” in three different categories from the Universidad Peruana de Ciencias Aplicadas (UPC); we were considered to be the “Exemplary Peruvian Company” by the Lima Chamber of Commerce; we were ranked 7th among the “100 Peruvian Companies with the Best Reputation”, according to the study conducted by the international consulting company Merco and KPMG; and the magazine G de Gestión, jointly with Price Waterhouse Coopers, recognized us as one of the “10 Most Admired Companies” in the country.

Luis Hochschild Plaut Award, 2008.

FICA Social Responsibility Award, 2012.


New horizons, new challenges

In October 2012, GyM received the “2012 Corporate Social Responsibility Latin American Award” granted by the

28

Federación Interamericana de la Industria de la Construcción (FIIC) and the CAF. Before that, in 2011, the company’s regular program “Developing Work Capabilities in Areas of Influence” received international recognition from Forum Empresa in its publication “La empresa como promotora del desarrollo económico y social: casos exitosos en América Latina” (Business as Promoter of Economic and Social Development: Successful Cases in Latin America), which was presented at the IDB’s CSR Americas 2011 Conference, held in Asunción, Paraguay. We also received the “Business Creativity Award” in three different categories from the Universidad Peruana de Ciencias Aplicadas (UPC); we were considered to be the “Exemplary Peruvian Company” by the Lima Chamber of Commerce; we were ranked 7th among the “100 Peruvian Companies with the Best Reputation”, according to the study conducted by the international consulting company Merco and KPMG; and the magazine G de Gestión, jointly with Price Waterhouse Coopers, recognized us as one of the “10 Most Admired Companies” in the country.

Luis Hochschild Plaut Award, 2008.

FICA Social Responsibility Award, 2012.


26

STABLE FLOWS

2003/1993

In the 1990s, we were the successful bidder in the first highway concession ever to be tendered in Peru. After two decades of experience in that field, we are currently the operators of the Lima Metro. While we were charting this course, Gra単a y Montero started trading its stock in the Lima Stock Exchange (BVL), marking one of our milestones for 1997. Today, we are the construction company with the highest stock market capitalization in Latin America.


26

STABLE FLOWS

2003/1993

In the 1990s, we were the successful bidder in the first highway concession ever to be tendered in Peru. After two decades of experience in that field, we are currently the operators of the Lima Metro. While we were charting this course, Gra単a y Montero started trading its stock in the Lima Stock Exchange (BVL), marking one of our milestones for 1997. Today, we are the construction company with the highest stock market capitalization in Latin America.


80 YEARS

New horizons, new challenges

STABLE FLOWS

WE WENT PUBLIC IN 1997, LISTING OUR SHARES IN THE STOCK EXCHANGE.

28

CONSOLIDATION Gra単a y Montero became a corporation on August 12, 1996. As a Group, we expanded our activities to investing in affiliate and subsidiary companies. In the 1990s, in order to reduce the volatility of income from our construction business, we designed and implemented a growth strategy based on diversifying into industries that generate stable flows and have clear synergies with the construction industry, such as infrastructure concessions. We went public in 1997, listing our shares in the stock exchange, making it possible to trade our shares in the BVL. This was enormously important, since it allowed us to finance our concessions and issue bonds and other debt securities which, at times, helped the Group to overcome challenging conditions when the Peruvian economy faced difficult times, as happened in 2003.

Gra単a y Montero begins listing its shares in the Lima Stock Exchange.


80 YEARS

New horizons, new challenges

STABLE FLOWS

WE WENT PUBLIC IN 1997, LISTING OUR SHARES IN THE STOCK EXCHANGE.

28

CONSOLIDATION Gra単a y Montero became a corporation on August 12, 1996. As a Group, we expanded our activities to investing in affiliate and subsidiary companies. In the 1990s, in order to reduce the volatility of income from our construction business, we designed and implemented a growth strategy based on diversifying into industries that generate stable flows and have clear synergies with the construction industry, such as infrastructure concessions. We went public in 1997, listing our shares in the stock exchange, making it possible to trade our shares in the BVL. This was enormously important, since it allowed us to finance our concessions and issue bonds and other debt securities which, at times, helped the Group to overcome challenging conditions when the Peruvian economy faced difficult times, as happened in 2003.

Gra単a y Montero begins listing its shares in the Lima Stock Exchange.


80 YEARS

New horizons, new challenges

STABLE FLOWS

30

2

“Our growth strategy was based on diversifying into industries that generate stable flows.”

1. Concession of the Ancón-Huacho-Pativilca highway, Peru.

1

2. South Inter-Oceanic Highway, Section 1, Peru.


80 YEARS

New horizons, new challenges

STABLE FLOWS

30

2

“Our growth strategy was based on diversifying into industries that generate stable flows.”

1. Concession of the Ancón-Huacho-Pativilca highway, Peru.

1

2. South Inter-Oceanic Highway, Section 1, Peru.


80 YEARS

New horizons, new challenges

“We are the engineering and construction group with the highest stock market capitalization in Latin America.”

32

THE MOST VALUABLE TODAY Stock market capitalization measures the value of a company that trades its shares on a stock exchange. According to BVL data, as of March 30, 2013, Graña y Montero had 558,284,190 outstanding shares of stock, at a par value of S/.1.00 Peruvian sol, though the quoted price at the closing of that trading day resulted in a market capitalization of S/. 6,364.4 million Peruvian soles (equal to US$ 2,458.3 million). This figure makes us the engineering and construction services group with the highest stock market capitalization in Latin America. It is worth noting that this is 30% higher than the previous year, serving as an indicator of the perception in the capital market of the Group’s good financial health and of its medium- and long-term financial outlook.

Present Board of Directors of Graña y Montero.

STABLE FLOWS


80 YEARS

New horizons, new challenges

“We are the engineering and construction group with the highest stock market capitalization in Latin America.”

32

THE MOST VALUABLE TODAY Stock market capitalization measures the value of a company that trades its shares on a stock exchange. According to BVL data, as of March 30, 2013, Graña y Montero had 558,284,190 outstanding shares of stock, at a par value of S/.1.00 Peruvian sol, though the quoted price at the closing of that trading day resulted in a market capitalization of S/. 6,364.4 million Peruvian soles (equal to US$ 2,458.3 million). This figure makes us the engineering and construction services group with the highest stock market capitalization in Latin America. It is worth noting that this is 30% higher than the previous year, serving as an indicator of the perception in the capital market of the Group’s good financial health and of its medium- and long-term financial outlook.

Present Board of Directors of Graña y Montero.

STABLE FLOWS


80 YEARS

New horizons, new challenges

34

INFRASTRUCTURE Graña y Montero was the first Peruvian company to manage a highway concession. This took place in 1994, when its subsidiary, Concar, was awarded the contract for refurbishment, operation and maintenance of the Arequipa-Matarani highway, in the department of Arequipa.

TODAY The concessions currently under the Group’s responsibility are infrastructure-related. There are six of the Group’s companies involved, three of which operate highway concessions: Norvial S.A., Survial S.A., and Concesión Canchaque S.A.C., operating more than 1,000 kilometers of overland roads. GyM Ferrovías S.A. manages Line One of the Lima Metro; Concesionaria La Chira will be in charge of construction and operation of the La Chira wastewater treatment plant; and GMP, in charge of fuel terminal concessions, will undertake the Talara gas fractioning plan and two oil blocks in northwestern Peru. Norvial was founded in 2002 and engages in administration, operation, construction and maintenance of the road infrastructure for the Ancón-Huacho-Pativilca section of the Pan-American Highway (at the exit from Lima towards the North). The concession began in January 2003 with a 25-year term of effectiveness. Survial is a consortium that, in August 2007, was awarded the concession for construction and maintenance of Section 1 of the South Inter-Oceanic Highway Corridor project. The highway has a length of 757.64 kilometers and crosses the departments of Ica, Ayacucho, Apurímac and Cuzco.

IIRSA North Highway, Section 1, Peru.

STABLE FLOWS


80 YEARS

New horizons, new challenges

34

INFRASTRUCTURE Graña y Montero was the first Peruvian company to manage a highway concession. This took place in 1994, when its subsidiary, Concar, was awarded the contract for refurbishment, operation and maintenance of the Arequipa-Matarani highway, in the department of Arequipa.

TODAY The concessions currently under the Group’s responsibility are infrastructure-related. There are six of the Group’s companies involved, three of which operate highway concessions: Norvial S.A., Survial S.A., and Concesión Canchaque S.A.C., operating more than 1,000 kilometers of overland roads. GyM Ferrovías S.A. manages Line One of the Lima Metro; Concesionaria La Chira will be in charge of construction and operation of the La Chira wastewater treatment plant; and GMP, in charge of fuel terminal concessions, will undertake the Talara gas fractioning plan and two oil blocks in northwestern Peru. Norvial was founded in 2002 and engages in administration, operation, construction and maintenance of the road infrastructure for the Ancón-Huacho-Pativilca section of the Pan-American Highway (at the exit from Lima towards the North). The concession began in January 2003 with a 25-year term of effectiveness. Survial is a consortium that, in August 2007, was awarded the concession for construction and maintenance of Section 1 of the South Inter-Oceanic Highway Corridor project. The highway has a length of 757.64 kilometers and crosses the departments of Ica, Ayacucho, Apurímac and Cuzco.

IIRSA North Highway, Section 1, Peru.

STABLE FLOWS


80 YEARS

New horizons, new challenges

STABLE FLOWS

36

Arequipa-Matarani, highway concession, Peru.

1

“Graña y Montero was the first Peruvian company to manage a highway concession.”

1. Buenos Aires-Canchaque highway concession, Badén Serrán Area, Piura, Peru. 2

2. Routine maintenance crew, IIRSA North, Peru.

Canchaque operates the concession awarded to Graña y Montero in November, 2006. With a length of 77 kilometers, the highway crosses part of the provinces of Morropón and Huancabamba, in Piura, with altitudes ranging from 127 to 1,198 meters above sea level, and passes through dry tropical forest ecosystems, some agricultural valleys and spectacular wooded ceibo and orchid groupings before entering the exuberantly vegetated last ridges of the Andean mountain range. The Group has participated in the privatization process in Peru as the local partner for the foreign companies Telefónica, Edegel and Repsol. The Graña y Montero S.A. holding company was created at the end of 1996 to ensure the organization’s healthy growth and leverage existing synergies to work in increasingly complex projects.


80 YEARS

New horizons, new challenges

STABLE FLOWS

36

Arequipa-Matarani, highway concession, Peru.

1

“Graña y Montero was the first Peruvian company to manage a highway concession.”

1. Buenos Aires-Canchaque highway concession, Badén Serrán Area, Piura, Peru. 2

2. Routine maintenance crew, IIRSA North, Peru.

Canchaque operates the concession awarded to Graña y Montero in November, 2006. With a length of 77 kilometers, the highway crosses part of the provinces of Morropón and Huancabamba, in Piura, with altitudes ranging from 127 to 1,198 meters above sea level, and passes through dry tropical forest ecosystems, some agricultural valleys and spectacular wooded ceibo and orchid groupings before entering the exuberantly vegetated last ridges of the Andean mountain range. The Group has participated in the privatization process in Peru as the local partner for the foreign companies Telefónica, Edegel and Repsol. The Graña y Montero S.A. holding company was created at the end of 1996 to ensure the organization’s healthy growth and leverage existing synergies to work in increasingly complex projects.


80 YEARS

38

New horizons, new challenges

“The Group has participated in the privatization process as the local partner for foreign companies.”

GMP was created in November 1984 and engages in hydrocarbon operations and infrastructure construction and management for that industry, focusing on oil field operation and production; oil and gas well drilling; hydrocarbon storage and transportation; multi-purpose pipelines and fuel terminal operation; and natural gas processing. Consorcio Terminales, formed by Oiltanking Perú S.A.C., an affiliate of the German company Marquard & Bahls AG, and GMP, manages fuel terminals located along the Peruvian coast, two plants in the southern Andean range and one offshore ocean terminal located in Eten (Lambayeque), Salaverry (La Libertad), Chimbote (Áncash), Supe (Lima), Pisco (Ica), Mollendo (Arequipa), Ilo (Moquegua), Cuzco, Juliaca (Puno) and the Camisea ocean platform in Punta Pejerrey (Ica).

Camisea ocean terminal Pisco, Peru.

STABLE FLOWS


80 YEARS

38

New horizons, new challenges

“The Group has participated in the privatization process as the local partner for foreign companies.”

GMP was created in November 1984 and engages in hydrocarbon operations and infrastructure construction and management for that industry, focusing on oil field operation and production; oil and gas well drilling; hydrocarbon storage and transportation; multi-purpose pipelines and fuel terminal operation; and natural gas processing. Consorcio Terminales, formed by Oiltanking Perú S.A.C., an affiliate of the German company Marquard & Bahls AG, and GMP, manages fuel terminals located along the Peruvian coast, two plants in the southern Andean range and one offshore ocean terminal located in Eten (Lambayeque), Salaverry (La Libertad), Chimbote (Áncash), Supe (Lima), Pisco (Ica), Mollendo (Arequipa), Ilo (Moquegua), Cuzco, Juliaca (Puno) and the Camisea ocean platform in Punta Pejerrey (Ica).

Camisea ocean terminal Pisco, Peru.

STABLE FLOWS


80 YEARS

New horizons, new challenges

STABLE FLOWS

40

Work crew. Lima Metro.

GyM Ferrovías is a consortium formed by Graña y Montero and Ferrovías, and is in charge of operation of Line 1 of the Lima Metro, better known as the Electric Train. The service connects Villa María del Triunfo, San Juan de Miraflores, Santiago de Surco, Surquillo, San Borja, San Luis, La Victoria and downtown Lima. The concession was awarded in February 2011 for a 30-year term. The estimated investment for development of the project is US$290 million. In January 2012, GyM Ferrovías began management of Line One and fare collection from the public started in April. Operations began with five trains and in December 2012 two more trains manufactured by the French company Alstom were received. These units are part of a total of 19 new trains to be gradually incorporated into service. In 2014, the line will be extended to the district of San Juan de Lurigancho, totaling 33 kilometers of tracks by the time the ongoing construction work for the last section is completed.

Section 1, Line One, Lima Metro.


80 YEARS

New horizons, new challenges

STABLE FLOWS

40

Work crew. Lima Metro.

GyM Ferrovías is a consortium formed by Graña y Montero and Ferrovías, and is in charge of operation of Line 1 of the Lima Metro, better known as the Electric Train. The service connects Villa María del Triunfo, San Juan de Miraflores, Santiago de Surco, Surquillo, San Borja, San Luis, La Victoria and downtown Lima. The concession was awarded in February 2011 for a 30-year term. The estimated investment for development of the project is US$290 million. In January 2012, GyM Ferrovías began management of Line One and fare collection from the public started in April. Operations began with five trains and in December 2012 two more trains manufactured by the French company Alstom were received. These units are part of a total of 19 new trains to be gradually incorporated into service. In 2014, the line will be extended to the district of San Juan de Lurigancho, totaling 33 kilometers of tracks by the time the ongoing construction work for the last section is completed.

Section 1, Line One, Lima Metro.


80 YEARS

New horizons, new challenges

42

La Chira. Wastewater treatment plant and underwater outfall in Lima.

Concesionaria La Chira is a corporation formed by Graùa y Montero and Acciona Agua, a Spanish company. In November 2010, it was awarded the concession of the La Chira wastewater treatment plan and underwater outfall. The project will require an investment of S/. 210 million Peruvian soles and operations are estimated to start in 2014. The project encompasses wastewater treatment as well as discharge into the ocean of the treated effluent through a 3.5-kilometer underwater pipeline, and will solve Lima’s main environmental liability. During 2012, Concesionaria La Chira obtained financing approval and also approval of all designs and technical studies, including the environmental and social impact studies, whereby plant construction is expected to begin in 2013.

Storage terminal in Moquegua, Peru.

STABLE FLOWS


80 YEARS

New horizons, new challenges

42

La Chira. Wastewater treatment plant and underwater outfall in Lima.

Concesionaria La Chira is a corporation formed by Graùa y Montero and Acciona Agua, a Spanish company. In November 2010, it was awarded the concession of the La Chira wastewater treatment plan and underwater outfall. The project will require an investment of S/. 210 million Peruvian soles and operations are estimated to start in 2014. The project encompasses wastewater treatment as well as discharge into the ocean of the treated effluent through a 3.5-kilometer underwater pipeline, and will solve Lima’s main environmental liability. During 2012, Concesionaria La Chira obtained financing approval and also approval of all designs and technical studies, including the environmental and social impact studies, whereby plant construction is expected to begin in 2013.

Storage terminal in Moquegua, Peru.

STABLE FLOWS


80 YEARS

New horizons, new challenges

44

CORPORATE GOVERNANCE

In 1997, we decided to list our shares in the Lima Stock Exchange, committing to the transparency and openness this implies, including Lima Stock Exchange Award, 2010.

the addition of two independent

Our associates celebrating a special date.

members to the Board.


80 YEARS

New horizons, new challenges

44

CORPORATE GOVERNANCE

In 1997, we decided to list our shares in the Lima Stock Exchange, committing to the transparency and openness this implies, including Lima Stock Exchange Award, 2010.

the addition of two independent

Our associates celebrating a special date.

members to the Board.


80 YEARS

New horizons, new challenges

Late in 2004, the Corporación Andina de Fomento (CAF) selected us as the Peruvian company that would participate in the pilot development project for inclusion of good corporate governance in the Andean Group. With the consulting assistance of a Spanish firm, we improved

46

our existing practices and incorporated new ones. These improvements included approval of the Regulations for Shareholders Meetings and the Regulations for the Board of Directors. We created the Auditing and Processes Committee, the Investment and Risk Committee, and the Human Management and Social Responsibility Committee. We identified internal members of the Board, external independent members and external non-independent members. In addition, we created the Shareholder Service Office, we established a minimum compulsory agenda for all of the Boards of Directors of the Group’s companies, and we implemented the Board of Director’s self-evaluation process. Today, the Graña y Montero Group is recognized as a leader in Good Corporate Governance. We are part of the Good Corporate Governance General Index of the Lima Stock Exchange (BVL), having been awarded the “BVL Key” for two consecutive years for obtaining the highest score, as validated by an external auditing firm and the Companies Circle, a group comprised of 17 companies with the best corporate governance practices in Latin America, sponsored by the International Finance Corporation (IFC) and the Global Corporate Governance Forum and supported by the Organization for Economic Cooperation and Development (OECD).

Lima Stock Exchange Award, 2010.

Lima Stock Exchange.

Our associates celebrating a special date.


80 YEARS

New horizons, new challenges

Late in 2004, the Corporación Andina de Fomento (CAF) selected us as the Peruvian company that would participate in the pilot development project for inclusion of good corporate governance in the Andean Group. With the consulting assistance of a Spanish firm, we improved

46

our existing practices and incorporated new ones. These improvements included approval of the Regulations for Shareholders Meetings and the Regulations for the Board of Directors. We created the Auditing and Processes Committee, the Investment and Risk Committee, and the Human Management and Social Responsibility Committee. We identified internal members of the Board, external independent members and external non-independent members. In addition, we created the Shareholder Service Office, we established a minimum compulsory agenda for all of the Boards of Directors of the Group’s companies, and we implemented the Board of Director’s self-evaluation process. Today, the Graña y Montero Group is recognized as a leader in Good Corporate Governance. We are part of the Good Corporate Governance General Index of the Lima Stock Exchange (BVL), having been awarded the “BVL Key” for two consecutive years for obtaining the highest score, as validated by an external auditing firm and the Companies Circle, a group comprised of 17 companies with the best corporate governance practices in Latin America, sponsored by the International Finance Corporation (IFC) and the Global Corporate Governance Forum and supported by the Organization for Economic Cooperation and Development (OECD).

Lima Stock Exchange Award, 2010.

Lima Stock Exchange.

Our associates celebrating a special date.


80 YEARS

New horizons, new challenges

We have a nine-member Board of Directors, seven of which are external and, of these, four are independent. There is a clear and explicit separation between the position of Chairman of the Board and that

48

of Chief Executive of the corporation. Both the Auditing and Processes Committee and the Human Management and Social Responsibility Committee are composed of independent directors. In addition, we have four operating committees, one for each of the Group’s business areas, each committee including at least one independent member. We have an approved Induction Policy for new board members and insider information management standards higher than those required by Peruvian laws. Likewise, in 2012 we approved the Code of Conduct regulating the contents of the 1985 Ethics Charter, which address the responsible and ethical conduct expected from our associates. Recently, we introduced the Ethics Channel, operated by an independent professional, through which our associates and third parties may share their concerns related to potential violations of the Ethics Charter and the Code of Conduct. Graùa y Montero believes that adopting good corporate governance standards is a process subject to continuous improvement and, as a Group of companies seeking transparency and reliability, it will continue along that path.

Lima Stock Exchange Award, 2010.

Our associates celebrating a special date.


80 YEARS

New horizons, new challenges

We have a nine-member Board of Directors, seven of which are external and, of these, four are independent. There is a clear and explicit separation between the position of Chairman of the Board and that

48

of Chief Executive of the corporation. Both the Auditing and Processes Committee and the Human Management and Social Responsibility Committee are composed of independent directors. In addition, we have four operating committees, one for each of the Group’s business areas, each committee including at least one independent member. We have an approved Induction Policy for new board members and insider information management standards higher than those required by Peruvian laws. Likewise, in 2012 we approved the Code of Conduct regulating the contents of the 1985 Ethics Charter, which address the responsible and ethical conduct expected from our associates. Recently, we introduced the Ethics Channel, operated by an independent professional, through which our associates and third parties may share their concerns related to potential violations of the Ethics Charter and the Code of Conduct. Graùa y Montero believes that adopting good corporate governance standards is a process subject to continuous improvement and, as a Group of companies seeking transparency and reliability, it will continue along that path.

Lima Stock Exchange Award, 2010.

Our associates celebrating a special date.


46

DIVERSIFICATION

1993/1983

On our 50th anniversary in 1983, we made the decision to diversify into activities that were complementary to the engineering industry, enabling us to participate in projects having greater economic and social impact. Accordingly, GMI, GMD and GMP came into being and initiated the Gra単a y Montero Group. Today we are a group of 24 engineering services companies grouped into four business areas.


46

DIVERSIFICATION

1993/1983

On our 50th anniversary in 1983, we made the decision to diversify into activities that were complementary to the engineering industry, enabling us to participate in projects having greater economic and social impact. Accordingly, GMI, GMD and GMP came into being and initiated the Gra単a y Montero Group. Today we are a group of 24 engineering services companies grouped into four business areas.


80 YEARS

New horizons, new challenges

DIVERSIFICATION

TO GROW AND DIVERSIFY BECAME THE NEW CORPORATE CHALLENGE.

48

SUBSIDIARIES COME ABOUT

As we were celebrating our Golden Anniversary in 1983, we began a diversification process that would change the organizational structure of the Group and how it operates. To grow and diversify became the new corporate challenge that would later consolidate as Corporación Graña y Montero.

GMI In August 1984, the first subsidiary was founded, GMI (Graña y Montero Ingeniería), as an independent company providing consulting services not only to GyM, but also to other companies. Today, GMI has more than 500 engineers specializing in design, geomatics supervision and the environment. Services provided by GMI include development of pre-investment studies, preliminary engineering designs, pre-feasibility and feasibility studies, final studies, executive designs, supervision, project management, construction management and specialized consulting.

Huayurí Topping Plant, Pluspetrol Peru Corporation, Peru.


80 YEARS

New horizons, new challenges

DIVERSIFICATION

TO GROW AND DIVERSIFY BECAME THE NEW CORPORATE CHALLENGE.

48

SUBSIDIARIES COME ABOUT

As we were celebrating our Golden Anniversary in 1983, we began a diversification process that would change the organizational structure of the Group and how it operates. To grow and diversify became the new corporate challenge that would later consolidate as Corporación Graña y Montero.

GMI In August 1984, the first subsidiary was founded, GMI (Graña y Montero Ingeniería), as an independent company providing consulting services not only to GyM, but also to other companies. Today, GMI has more than 500 engineers specializing in design, geomatics supervision and the environment. Services provided by GMI include development of pre-investment studies, preliminary engineering designs, pre-feasibility and feasibility studies, final studies, executive designs, supervision, project management, construction management and specialized consulting.

Huayurí Topping Plant, Pluspetrol Peru Corporation, Peru.


80 YEARS

New horizons, new challenges

DIVERSIFICATION

1

50

“GMI has more than 500 engineers specializing in design, geomatics supervision and the environment.”

1. GMI Project Management. Hotel Paradisius, Punta Cana, Dominican Republic. 2. GMI Supervision, Palomar, Mostajo, Los Incas highway interchanges. Arequipa, Peru.

2


80 YEARS

New horizons, new challenges

DIVERSIFICATION

1

50

“GMI has more than 500 engineers specializing in design, geomatics supervision and the environment.”

1. GMI Project Management. Hotel Paradisius, Punta Cana, Dominican Republic. 2. GMI Supervision, Palomar, Mostajo, Los Incas highway interchanges. Arequipa, Peru.

2


80 YEARS

New horizons, new challenges

52

“GMP operates two oil blocks in the north of Peru and 14 fuel terminals throughout Peru.”

GMP Next came GMP (Graña y Montero Petrolera), in November 1984, focusing on oil production and on well drilling and infrastructure construction and management for the hydrocarbon industry. Today, GMP operates two oil blocks in the north of Peru, it has a gas fractioning plant and operates 14 fuel terminals throughout Peru.

GMP oil well in Talara, Peru.

DIVERSIFICATION


80 YEARS

New horizons, new challenges

52

“GMP operates two oil blocks in the north of Peru and 14 fuel terminals throughout Peru.”

GMP Next came GMP (Graña y Montero Petrolera), in November 1984, focusing on oil production and on well drilling and infrastructure construction and management for the hydrocarbon industry. Today, GMP operates two oil blocks in the north of Peru, it has a gas fractioning plant and operates 14 fuel terminals throughout Peru.

GMP oil well in Talara, Peru.

DIVERSIFICATION


80 YEARS

New horizons, new challenges

DIVERSIFICATION

54

Technology Operations Center, Lima.

GMD In June 1985, GMD (Gra単a y Montero Digital) was founded to provide information technology services. Today, GMD has more than 1,400 systems engineering specialists, divided into five major groups: technology outsourcing, software factory, process outsourcing, application services outsourcing, and technology services.

GMD Main Data Center, Lima.


80 YEARS

New horizons, new challenges

DIVERSIFICATION

54

Technology Operations Center, Lima.

GMD In June 1985, GMD (Gra単a y Montero Digital) was founded to provide information technology services. Today, GMD has more than 1,400 systems engineering specialists, divided into five major groups: technology outsourcing, software factory, process outsourcing, application services outsourcing, and technology services.

GMD Main Data Center, Lima.


80 YEARS

New horizons, new challenges

DIVERSIFICATION

56

“Viva GYM, in the real estate sector, is the main social housing project developer.”

GME In January 1987, GME (Graña y Montero Edificaciones) was established to engage in real estate development and investment. In 2011, it was re-launched as VIVA GyM.

Los Parques del Agustino Residential Complex in Lima, Peru.

Today, VIVA GyM gathers all of the Group’s real estate companies, specializing in the past few years in social housing project development. VIVA GyM is developing close to 25,000 homes, in addition to office buildings and other commercial ventures.


80 YEARS

New horizons, new challenges

DIVERSIFICATION

56

“Viva GYM, in the real estate sector, is the main social housing project developer.”

GME In January 1987, GME (Graña y Montero Edificaciones) was established to engage in real estate development and investment. In 2011, it was re-launched as VIVA GyM.

Los Parques del Agustino Residential Complex in Lima, Peru.

Today, VIVA GyM gathers all of the Group’s real estate companies, specializing in the past few years in social housing project development. VIVA GyM is developing close to 25,000 homes, in addition to office buildings and other commercial ventures.


80 YEARS

New horizons, new challenges

GRAÑA Y MONTERO HAS REDEFINED ITS ORGANIZATIONAL STRUCTURE INTO FOUR BROAD BUSINESS AREAS.

58

GRAÑA Y MONTERO TODAY

In order to consolidate our competitiveness in Peru and abroad, Graña y Montero has redefined its organizational structure into four broad business areas: Engineering and Construction, Engineering Services, Infrastructure, and Real Estate. In Engineering and Construction, its subsidiaries specialize in civil works, electromechanics, buildings, mining operations and consulting services, and include Vial y Vives from Chile; Stracon GyM, for mining services; GMI for engineering consulting; and the construction company GyM. In 2012, it continued growing and reached a new sales record: US$ 1,382 million, which represented a 34% increase as compared to 2011, with profit after taxes of US$ 74 million. The Infrastructure area is comprised of six companies, three of which operate highway concessions: Norvial S.A., Survial S.A. and Concesión Canchaque S.A.C. The other three are GyM Ferrovías S.A., which operates Line One of the Lima Metro; Concesionaria La Chira, which will be responsible for construction and operation of the La Chira Wastewater Treatment Plant; and GMP, entrusted with fuel terminal concessions, the Talara gas fractioning plant and the two oil blocks in northwestern Peru. In 2012, this area invoiced US$206 million, which represented a growth of more than 37%, mainly due to the partial startup of Lima Metro’s operations.

The Lima Westin Libertador Hotel.

DIVERSIFICATION


80 YEARS

New horizons, new challenges

GRAÑA Y MONTERO HAS REDEFINED ITS ORGANIZATIONAL STRUCTURE INTO FOUR BROAD BUSINESS AREAS.

58

GRAÑA Y MONTERO TODAY

In order to consolidate our competitiveness in Peru and abroad, Graña y Montero has redefined its organizational structure into four broad business areas: Engineering and Construction, Engineering Services, Infrastructure, and Real Estate. In Engineering and Construction, its subsidiaries specialize in civil works, electromechanics, buildings, mining operations and consulting services, and include Vial y Vives from Chile; Stracon GyM, for mining services; GMI for engineering consulting; and the construction company GyM. In 2012, it continued growing and reached a new sales record: US$ 1,382 million, which represented a 34% increase as compared to 2011, with profit after taxes of US$ 74 million. The Infrastructure area is comprised of six companies, three of which operate highway concessions: Norvial S.A., Survial S.A. and Concesión Canchaque S.A.C. The other three are GyM Ferrovías S.A., which operates Line One of the Lima Metro; Concesionaria La Chira, which will be responsible for construction and operation of the La Chira Wastewater Treatment Plant; and GMP, entrusted with fuel terminal concessions, the Talara gas fractioning plant and the two oil blocks in northwestern Peru. In 2012, this area invoiced US$206 million, which represented a growth of more than 37%, mainly due to the partial startup of Lima Metro’s operations.

The Lima Westin Libertador Hotel.

DIVERSIFICATION


80 YEARS

New horizons, new challenges

DIVERSIFICATION

60

2

The Real Estate area includes the companies Viva GyM, main developer of social housing projects; Almonte S.A., owner of a property to the south of Lima with potential for construction projects; and Asociaci贸n del Proyecto Espacio in the location of the past San Martin Army Barracks, in Miraflores. In 2012, this area grew 67% resulting from US$94 million in revenues and an EBITDA of US$27 million, thereby doubling the amount obtained the preceding year.

1. Gran Teatro Nacional, Lima. 1

2. Fractioning plant, Pisco, Peru.

The Technical Services area includes three companies: Concar, specializing in highway maintenance; GMD, information technology solution provider; and CAM, which provides services to electric power companies in Chile, Colombia and Peru. This area invoiced US$425 million in 2012, which is a 17% increase as compared to the previous year.


80 YEARS

New horizons, new challenges

DIVERSIFICATION

60

2

The Real Estate area includes the companies Viva GyM, main developer of social housing projects; Almonte S.A., owner of a property to the south of Lima with potential for construction projects; and Asociaci贸n del Proyecto Espacio in the location of the past San Martin Army Barracks, in Miraflores. In 2012, this area grew 67% resulting from US$94 million in revenues and an EBITDA of US$27 million, thereby doubling the amount obtained the preceding year.

1. Gran Teatro Nacional, Lima. 1

2. Fractioning plant, Pisco, Peru.

The Technical Services area includes three companies: Concar, specializing in highway maintenance; GMD, information technology solution provider; and CAM, which provides services to electric power companies in Chile, Colombia and Peru. This area invoiced US$425 million in 2012, which is a 17% increase as compared to the previous year.


80 YEARS

62

New horizons, new challenges

BUSINESS AREAS The chart below summarizes the corporate structure of Gra単a y Montero, showing its four broad business areas and its main subsidiaries:

Main Office of the Gra単a y Montero Group in Lima, Peru.

DIVERSIFICATION


80 YEARS

62

New horizons, new challenges

BUSINESS AREAS The chart below summarizes the corporate structure of Gra単a y Montero, showing its four broad business areas and its main subsidiaries:

Main Office of the Gra単a y Montero Group in Lima, Peru.

DIVERSIFICATION


80 YEARS

New horizons, new challenges

64

LEARNING TO GROW

Since the 1980s, training our associates has been a driving force, based on our belief that the only way to grow as a company is through Corporate Learning Center

the personal and professional growth of each and every member of the organization. Values Training.


80 YEARS

New horizons, new challenges

64

LEARNING TO GROW

Since the 1980s, training our associates has been a driving force, based on our belief that the only way to grow as a company is through Corporate Learning Center

the personal and professional growth of each and every member of the organization. Values Training.


80 YEARS

New horizons, new challenges

Subsequently, the Group’s commitment to training and knowledge management became a strategic focal point. This task has been entrusted to the Corporate Learning Center (CCA, Centro Corporativo

de Aprendizaje), created in 1999 as Graña y Montero’s knowledge

66

management entity to promote maximizing the knowledge resulting from the experience gained over time, and to transmit the knowledge and lessons learnt by its professionals. The Group’s economic growth has meant a significant increase in its number of associates, reaching 28,257 associates by the close of 2012, of which 5,500 are professionals and, of those, 3,657 are engineers in various specialties. In order to support this accelerated growth and integrate new associates to the Graña y Montero culture, we have developed training programs with the participation of internal instructors and prestigious educational institutions. Standing out among these programs, is the Semana Conociendo Graña y Montero (A Week Knowing Graña y Montero) and the Professional Growth courses that are taken with the Management Training Masters Program prepared for us by Universidad de Piura. Likewise, our executives develop their management skills through personalized programs, such as the Master Express program designed and offered by the Instituto Tecnológico de Monterrey, and mentoring and coaching programs that focus on applying the knowledge acquired and strengthening leadership.

Corporate Learning Center

Work crew at the San Gabán Transmission Line, Puerto Maldonado, Peru. Values Training.


80 YEARS

New horizons, new challenges

Subsequently, the Group’s commitment to training and knowledge management became a strategic focal point. This task has been entrusted to the Corporate Learning Center (CCA, Centro Corporativo

de Aprendizaje), created in 1999 as Graña y Montero’s knowledge

66

management entity to promote maximizing the knowledge resulting from the experience gained over time, and to transmit the knowledge and lessons learnt by its professionals. The Group’s economic growth has meant a significant increase in its number of associates, reaching 28,257 associates by the close of 2012, of which 5,500 are professionals and, of those, 3,657 are engineers in various specialties. In order to support this accelerated growth and integrate new associates to the Graña y Montero culture, we have developed training programs with the participation of internal instructors and prestigious educational institutions. Standing out among these programs, is the Semana Conociendo Graña y Montero (A Week Knowing Graña y Montero) and the Professional Growth courses that are taken with the Management Training Masters Program prepared for us by Universidad de Piura. Likewise, our executives develop their management skills through personalized programs, such as the Master Express program designed and offered by the Instituto Tecnológico de Monterrey, and mentoring and coaching programs that focus on applying the knowledge acquired and strengthening leadership.

Corporate Learning Center

Work crew at the San Gabán Transmission Line, Puerto Maldonado, Peru. Values Training.


80 YEARS

New horizons, new challenges

In accordance with the new challenges, the CCA is organized as follows: Training Courses: Their purpose is to consolidate existing programs,

68

gain greater coverage and achieve excellence. Dissemination of Knowledge: The main challenge is to structure and share knowledge through tools such as portals, forums, presentations, etc. Research: Entrusted with promoting research initiatives, such as research paper competitions, the Engineering Portal and university thesis projects. Innovation Projects: Seek continuous improvement of learning and management processes and implementation of operational excellence models through development of new methods. The following projects stand out: Talent Development Model, Reliable Operating Cores and Operational Excellence. Throughout its history, Gra単a y Montero has firmly believed in the importance of human resource development and knowledge management and today, more than ever, this is a key factor in facing new challenges.

Corporate Learning Center

Values Training.


80 YEARS

New horizons, new challenges

In accordance with the new challenges, the CCA is organized as follows: Training Courses: Their purpose is to consolidate existing programs,

68

gain greater coverage and achieve excellence. Dissemination of Knowledge: The main challenge is to structure and share knowledge through tools such as portals, forums, presentations, etc. Research: Entrusted with promoting research initiatives, such as research paper competitions, the Engineering Portal and university thesis projects. Innovation Projects: Seek continuous improvement of learning and management processes and implementation of operational excellence models through development of new methods. The following projects stand out: Talent Development Model, Reliable Operating Cores and Operational Excellence. Throughout its history, Gra単a y Montero has firmly believed in the importance of human resource development and knowledge management and today, more than ever, this is a key factor in facing new challenges.

Corporate Learning Center

Values Training.


66

THE EXPERIENCE

1983/1949

The growth of Graña y Montero was founded on the prestige resulting from thousands of projects well-executed by GyM since 1949, the year in which Gramonvel merged with Morris y Montero in order to obtain the capacity necessary to build infrastructure projects such as the Cañón del Pato Hydroelectric Plant, the Cuajone Mining Project or Jorge Chávez International Airport in Lima. Today we are building in Peru four hydroelectric plants at the same time and maintain 5,000 kilometers of highways.


66

THE EXPERIENCE

1983/1949

The growth of Graña y Montero was founded on the prestige resulting from thousands of projects well-executed by GyM since 1949, the year in which Gramonvel merged with Morris y Montero in order to obtain the capacity necessary to build infrastructure projects such as the Cañón del Pato Hydroelectric Plant, the Cuajone Mining Project or Jorge Chávez International Airport in Lima. Today we are building in Peru four hydroelectric plants at the same time and maintain 5,000 kilometers of highways.


80 YEARS

GRAÑA Y MONTERO HAS PARTICIPATED IN THE CONSTRUCTION OF INFRASTRUCTURE PROJECTS THAT HAVE BEEN VITAL FOR THE COUNTRY.

New horizons, new challenges

“Graña y Montero based its philosophy on team work and respect for knowledge.”

68

THE MERGER After jointly developing several projects as partners during six years, on October 31, 1949, Gramonvel and Morris y Montero agreed to merge and form Graña y Montero S.A. The Board of Directors of the new corporation was chaired by Carlos Graña Elizalde and its members were Alejandro Graña Garland, Carlos Montero Bernales, Jorge Montero Muelle and Arthur Roy Morris. The 1950s marked a new boom for the country. The Korean War, with its demand for raw materials produced by Peru, brought large amounts of foreign currency into the country, creating an economic prosperity that lasted for an extended period of time. After the difficulties experienced during the government of José Luis Bustamante y Rivero, from 1945 to 1948, the government of General Manuel A. Odría (1948-1956) was a time when Peru enjoyed its best economic times in its contemporary history. This bonanza extended to the following decade, as reflected in the fact that during those years, the Peruvian economy grew at an equal or higher rate than other countries in Latin America.

Luis and Alejandro Graña, Lima, 1953.

THE EXPERIENCE


80 YEARS

GRAÑA Y MONTERO HAS PARTICIPATED IN THE CONSTRUCTION OF INFRASTRUCTURE PROJECTS THAT HAVE BEEN VITAL FOR THE COUNTRY.

New horizons, new challenges

“Graña y Montero based its philosophy on team work and respect for knowledge.”

68

THE MERGER After jointly developing several projects as partners during six years, on October 31, 1949, Gramonvel and Morris y Montero agreed to merge and form Graña y Montero S.A. The Board of Directors of the new corporation was chaired by Carlos Graña Elizalde and its members were Alejandro Graña Garland, Carlos Montero Bernales, Jorge Montero Muelle and Arthur Roy Morris. The 1950s marked a new boom for the country. The Korean War, with its demand for raw materials produced by Peru, brought large amounts of foreign currency into the country, creating an economic prosperity that lasted for an extended period of time. After the difficulties experienced during the government of José Luis Bustamante y Rivero, from 1945 to 1948, the government of General Manuel A. Odría (1948-1956) was a time when Peru enjoyed its best economic times in its contemporary history. This bonanza extended to the following decade, as reflected in the fact that during those years, the Peruvian economy grew at an equal or higher rate than other countries in Latin America.

Luis and Alejandro Graña, Lima, 1953.

THE EXPERIENCE


80 YEARS

New horizons, new challenges

THE EXPERIENCE

70

President Manuel A. Odría supervises construction of the Hospital del Empleado (employee social security hospital) in Jesús María, Lima.

These were years of intense activity for Graña y Montero, carrying out both public projects (including the Pan-American Highway South, the Hospital del Empleado, the Ministry of Economy and Finance, the Cañón del Pato Hydroelectric Plant, and Jorge Chávez Airport) and private projects (Northern Peru Mining Corp. Concentrating Plant, Sears stores, the Monterrico Racetrack, among others). In 1952, for construction of the Hospital del Empleado (now Hospital Edgardo Rebagliati Martins), Graña y Montero partnered with the companies Flores y Costa S.A. and Andes Constructora to establish the Consorcio de Ingenieros Contratistas. This consortium subsequently took part in important projects for the country, such as the Chimbote Iron and Steel Mill and the Cañón del Pato Hydroelectric Plant, and also expanded its presence to Argentina, Bolivia and Chile. Major projects included the El Alto Airport in La Paz, Bolivia, and the Nihuil Dam in Mendoza, Argentina.

Construction of the landing strip of Jorge Chávez Airport, Callao, Peru.


80 YEARS

New horizons, new challenges

THE EXPERIENCE

70

President Manuel A. Odría supervises construction of the Hospital del Empleado (employee social security hospital) in Jesús María, Lima.

These were years of intense activity for Graña y Montero, carrying out both public projects (including the Pan-American Highway South, the Hospital del Empleado, the Ministry of Economy and Finance, the Cañón del Pato Hydroelectric Plant, and Jorge Chávez Airport) and private projects (Northern Peru Mining Corp. Concentrating Plant, Sears stores, the Monterrico Racetrack, among others). In 1952, for construction of the Hospital del Empleado (now Hospital Edgardo Rebagliati Martins), Graña y Montero partnered with the companies Flores y Costa S.A. and Andes Constructora to establish the Consorcio de Ingenieros Contratistas. This consortium subsequently took part in important projects for the country, such as the Chimbote Iron and Steel Mill and the Cañón del Pato Hydroelectric Plant, and also expanded its presence to Argentina, Bolivia and Chile. Major projects included the El Alto Airport in La Paz, Bolivia, and the Nihuil Dam in Mendoza, Argentina.

Construction of the landing strip of Jorge Chávez Airport, Callao, Peru.


80 YEARS

New horizons, new challenges

72

THE YEARS OF WAITING Between 1956 and 1968, various sectors of the Peruvian economy continued to experience economic growth, later declining dramatically in the early 1970s. This was due to the series of property reforms undertaken by the military government of General Juan Velasco Alvarado following a coup d’état against the government of Fernando Belaúnde on October 1968. By the mid-1970’s, the Peruvian government had taken over the role previously played by foreign capital in the mining, agriculture, power generation, oil and railroad industries, and controlled a large part of the banking system and practically all of the export and fishing industry. This scenario had an impact on Graña y Montero’s business performance, particularly with the expropriation of the International Petroleum Company (IPC) and sugar plantations, which were among its main clients. At a corporate level, Graña y Montero faced some difficulties: in 1968, it decided to liquidate Consorcio de Ingenieros Contratistas. That same year, Alejandro Graña Garland had to leave the position of CEO for health reasons. José Graña Miró Quesada, his son, was in London after completing architecture studies when he received the news that he had to return to Lima and start working at Graña y Montero.

José Graña, Neil Gray and Hernán Rotalde during construction of the Lima Sheraton Hotel, 1972.

THE EXPERIENCE


80 YEARS

New horizons, new challenges

72

THE YEARS OF WAITING Between 1956 and 1968, various sectors of the Peruvian economy continued to experience economic growth, later declining dramatically in the early 1970s. This was due to the series of property reforms undertaken by the military government of General Juan Velasco Alvarado following a coup d’état against the government of Fernando Belaúnde on October 1968. By the mid-1970’s, the Peruvian government had taken over the role previously played by foreign capital in the mining, agriculture, power generation, oil and railroad industries, and controlled a large part of the banking system and practically all of the export and fishing industry. This scenario had an impact on Graña y Montero’s business performance, particularly with the expropriation of the International Petroleum Company (IPC) and sugar plantations, which were among its main clients. At a corporate level, Graña y Montero faced some difficulties: in 1968, it decided to liquidate Consorcio de Ingenieros Contratistas. That same year, Alejandro Graña Garland had to leave the position of CEO for health reasons. José Graña Miró Quesada, his son, was in London after completing architecture studies when he received the news that he had to return to Lima and start working at Graña y Montero.

José Graña, Neil Gray and Hernán Rotalde during construction of the Lima Sheraton Hotel, 1972.

THE EXPERIENCE


80 YEARS

New horizons, new challenges

74

THE CHALLENGE FOR THE SECOND GENERATION In 1972, José Graña took office as Chief Executive Officer, marking a change in our work philosophy. The leadership of the company’s founders, based on their personal capabilities, was replaced by team work and respect for knowledge. This concept was innovative in the Peruvian market, which during those years faced an economic environment of excessive government control, becoming a work guideline for Graña y Montero as it undertook the development of its senior management and focused on two core areas: management by objectives and the pursuit of excellence. This was the best way to prepare for the future. On the occasion of Graña y Montero’s 50th anniversary, José Graña wrote: “Renewing and revitalizing a company that is about to turn 50 years old is an exciting challenge, especially when attempting to replace personalities such as those of the founders of Graña y Montero. In addition, the company faces a stage of rapid growth, not to mention the responsibility of upholding a prestige gained over the course of half a century.”

Alejandro and José Graña.

THE EXPERIENCE


80 YEARS

New horizons, new challenges

74

THE CHALLENGE FOR THE SECOND GENERATION In 1972, José Graña took office as Chief Executive Officer, marking a change in our work philosophy. The leadership of the company’s founders, based on their personal capabilities, was replaced by team work and respect for knowledge. This concept was innovative in the Peruvian market, which during those years faced an economic environment of excessive government control, becoming a work guideline for Graña y Montero as it undertook the development of its senior management and focused on two core areas: management by objectives and the pursuit of excellence. This was the best way to prepare for the future. On the occasion of Graña y Montero’s 50th anniversary, José Graña wrote: “Renewing and revitalizing a company that is about to turn 50 years old is an exciting challenge, especially when attempting to replace personalities such as those of the founders of Graña y Montero. In addition, the company faces a stage of rapid growth, not to mention the responsibility of upholding a prestige gained over the course of half a century.”

Alejandro and José Graña.

THE EXPERIENCE


80 YEARS

New horizons, new challenges

THE EXPERIENCE

76

Graña y Montero’s offices in 1977.

In 1977, Graña y Montero opened its new offices in its own three-story building on the 46th block of Avenida Paseo de la República which, remodeled, updated and expanded, continues to operate as the Group’s corporate headquarters. It is worth noting that, throughout the years, as we have adapted to scientific and engineering advances and to the trends in architecture and design, we have remained faithful to our founders’ vision, as framed by the attributes of technification, seriousness and professionalism. A number of major projects were developed during those years, including the headquarters of Banco Central Hipotecario, the Cementos Lima plant, work contracts for Northern Peru at the Quiruvilca Mine, and the Lima Sheraton Hotel. Subsequently, the company obtained the contract for earthmoving, civil works and plant construction for the Cuajone Mine, owned by Southern Peru Copper Corporation, as well as for construction of the new headquarters of Banco Central de Reserva del Perú. These projects reaffirmed the company’s leadership in the Peruvian construction industry.

Open-pit mine in Cuajone, Moquegua, Peru.


80 YEARS

New horizons, new challenges

THE EXPERIENCE

76

Graña y Montero’s offices in 1977.

In 1977, Graña y Montero opened its new offices in its own three-story building on the 46th block of Avenida Paseo de la República which, remodeled, updated and expanded, continues to operate as the Group’s corporate headquarters. It is worth noting that, throughout the years, as we have adapted to scientific and engineering advances and to the trends in architecture and design, we have remained faithful to our founders’ vision, as framed by the attributes of technification, seriousness and professionalism. A number of major projects were developed during those years, including the headquarters of Banco Central Hipotecario, the Cementos Lima plant, work contracts for Northern Peru at the Quiruvilca Mine, and the Lima Sheraton Hotel. Subsequently, the company obtained the contract for earthmoving, civil works and plant construction for the Cuajone Mine, owned by Southern Peru Copper Corporation, as well as for construction of the new headquarters of Banco Central de Reserva del Perú. These projects reaffirmed the company’s leadership in the Peruvian construction industry.

Open-pit mine in Cuajone, Moquegua, Peru.


80 YEARS

New horizons, new challenges

78

AN INDELIBLE IMPRINT During its 80 years of corporate life, Graña y Montero has left an imprint throughout Peru and also on various projects abroad. Since it was founded in 1933, it has been continuously active and its engineering services have broadened and diversified. The company has taken part in the most important construction benchmarks of 20th century Peru, and in this new century it has continued to expand its presence, having also developed projects in Argentina, Bolivia, Chile, Mexico and the Dominican Republic. Just to mention some projects, Graña y Montero built the city of Talara – planning and developing the area according to international standards –, as well as six sections of the Pan-American Highway, while undertaking emblematic projects such as the Hospital del Empleado; the restoration of the Plaza de Acho, Lima’s traditional bullring; the Monterrico Racetrack; Jorge Chávez Airport; the Paseo de la República expressway; the Machu Picchu hydroelectric plant; the Chavimochic irrigation project; the Sheraton, Marriott and Westin Libertador (the tallest building in the country) hotels; various stages of the Camisea project; the Larcomar entertainment center, and the Lima electric train, to name a few. Featured among the projects carried out abroad are the El Nihuil Hydroelectric Plant (Argentina), the La Paz Airport (Bolivia), the Four Seasons and W Hotels in Mexico, four Meliá hotels in the Dominican Republic, the Ralco Hydroelectric Plant in Chile, and the Santiago de Chile Sheraton Hotel. For the mining industry, GyM took part in construction of the San Cristóbal project (Bolivia), developed the engineering for the San José Mine (Argentina), the Pueblo Viejo project (Dominican Republic), and sulfuric acid tanks in Chuquicamata (Chile).

Passenger station on Line One of the Lima Metro.

THE EXPERIENCE


80 YEARS

New horizons, new challenges

78

AN INDELIBLE IMPRINT During its 80 years of corporate life, Graña y Montero has left an imprint throughout Peru and also on various projects abroad. Since it was founded in 1933, it has been continuously active and its engineering services have broadened and diversified. The company has taken part in the most important construction benchmarks of 20th century Peru, and in this new century it has continued to expand its presence, having also developed projects in Argentina, Bolivia, Chile, Mexico and the Dominican Republic. Just to mention some projects, Graña y Montero built the city of Talara – planning and developing the area according to international standards –, as well as six sections of the Pan-American Highway, while undertaking emblematic projects such as the Hospital del Empleado; the restoration of the Plaza de Acho, Lima’s traditional bullring; the Monterrico Racetrack; Jorge Chávez Airport; the Paseo de la República expressway; the Machu Picchu hydroelectric plant; the Chavimochic irrigation project; the Sheraton, Marriott and Westin Libertador (the tallest building in the country) hotels; various stages of the Camisea project; the Larcomar entertainment center, and the Lima electric train, to name a few. Featured among the projects carried out abroad are the El Nihuil Hydroelectric Plant (Argentina), the La Paz Airport (Bolivia), the Four Seasons and W Hotels in Mexico, four Meliá hotels in the Dominican Republic, the Ralco Hydroelectric Plant in Chile, and the Santiago de Chile Sheraton Hotel. For the mining industry, GyM took part in construction of the San Cristóbal project (Bolivia), developed the engineering for the San José Mine (Argentina), the Pueblo Viejo project (Dominican Republic), and sulfuric acid tanks in Chuquicamata (Chile).

Passenger station on Line One of the Lima Metro.

THE EXPERIENCE


80 YEARS

New horizons, new challenges

THE EXPERIENCE

80

Construction work at the Paseo de la República Expressway, Lima.

“The Group has completed projects in various countries, including Argentina, Bolivia, Mexico and Venezuela.”

Construction of the Lima Sheraton Hotel in 1971.


80 YEARS

New horizons, new challenges

THE EXPERIENCE

80

Construction work at the Paseo de la República Expressway, Lima.

“The Group has completed projects in various countries, including Argentina, Bolivia, Mexico and Venezuela.”

Construction of the Lima Sheraton Hotel in 1971.


80 YEARS

New horizons, new challenges

82

MINES AND HYDROELECTRIC PLANTS TODAY GyM is deepening its participation in large mining and hydroelectric construction projects. In the mining industry, GyM has recently completed, in association with Bechtel, work for the Antapaccay project and, also with Bechtel, began works in the Las Bambas megaproject for Xstrata Copper. The company was also the successful bidder for the EPC contract to develop the Inmaculada Mine belonging to the Hochschild Group. Another EPC contract was entered into with Xstrata for construction of the new city of Fuerabamba, in Apurímac. It was also awarded construction of the primary crusher for the Caserones project in Copiapó (Chile), the Minera Lumina Copper project, and earth-moving for the copper mine in Cocle, Panama. For the power industry, GyM is currently working simultaneously on four hydroelectric plant projects in Peru: Machu Picchu (98 MW), Cerro del Águila (512 MW), Santa Teresa (90 MW) and Huanza (90 MW). In addition, in 2012 the company completed a 220-kilometer transmission line in Chile for Transelec that will carry electric power to the Caserones mining project.

Copper concentrating plant, Antapaccay, Cusco, Peru.

THE EXPERIENCE


80 YEARS

New horizons, new challenges

82

MINES AND HYDROELECTRIC PLANTS TODAY GyM is deepening its participation in large mining and hydroelectric construction projects. In the mining industry, GyM has recently completed, in association with Bechtel, work for the Antapaccay project and, also with Bechtel, began works in the Las Bambas megaproject for Xstrata Copper. The company was also the successful bidder for the EPC contract to develop the Inmaculada Mine belonging to the Hochschild Group. Another EPC contract was entered into with Xstrata for construction of the new city of Fuerabamba, in Apurímac. It was also awarded construction of the primary crusher for the Caserones project in Copiapó (Chile), the Minera Lumina Copper project, and earth-moving for the copper mine in Cocle, Panama. For the power industry, GyM is currently working simultaneously on four hydroelectric plant projects in Peru: Machu Picchu (98 MW), Cerro del Águila (512 MW), Santa Teresa (90 MW) and Huanza (90 MW). In addition, in 2012 the company completed a 220-kilometer transmission line in Chile for Transelec that will carry electric power to the Caserones mining project.

Copper concentrating plant, Antapaccay, Cusco, Peru.

THE EXPERIENCE


80 YEARS

New horizons, new challenges

THE EXPERIENCE

84

5.000 KILOMETERS

1 2

Our subsidiary CONCAR engages in highway repair and maintenance. In 2012, it entered into two major highway maintenance contracts, generating for 2013 a portfolio of contracts to be undertaken in the amount of US$200 million and, thereby, is responsible for maintaining 5,000 kilometers of highway in perfect condition.

1. Inter-Oceanic Highway, Section 1 – IIRSA Norte. 2. Line One, Lima Metro. Work crew pouring cement slab in the Lima Metro.


80 YEARS

New horizons, new challenges

THE EXPERIENCE

84

5.000 KILOMETERS

1 2

Our subsidiary CONCAR engages in highway repair and maintenance. In 2012, it entered into two major highway maintenance contracts, generating for 2013 a portfolio of contracts to be undertaken in the amount of US$200 million and, thereby, is responsible for maintaining 5,000 kilometers of highway in perfect condition.

1. Inter-Oceanic Highway, Section 1 – IIRSA Norte. 2. Line One, Lima Metro. Work crew pouring cement slab in the Lima Metro.


80 YEARS

New horizons, new challenges

Casa de la Juventud youth center, Piura, Peru.

86

GROWING AND SHARING

In the 1950s, the company undertook infrastructure projects that have been vital in the country’s history, as well as various spontaneous social support actions benefitting the communities where we operated, as part of our commitment Graùa y Montero Award for Peruvian Research in Engineering.

to ethical conduct.


80 YEARS

New horizons, new challenges

Casa de la Juventud youth center, Piura, Peru.

86

GROWING AND SHARING

In the 1950s, the company undertook infrastructure projects that have been vital in the country’s history, as well as various spontaneous social support actions benefitting the communities where we operated, as part of our commitment Graùa y Montero Award for Peruvian Research in Engineering.

to ethical conduct.


80 YEARS

New horizons, new challenges

One such example was the performance of various neighborhood projects, such as public squares, sidewalks and local churches. This support later grew to include free camps for community use as health or educational centers. Casa de la Juventud youth center, Piura, Peru.

Our increasing commitment to knowledge and its impact

88

on the growth of our associates and the company, later translated into a social responsibility policy focusing on education as the source of future well-being and growth. Therefore, drawing from our own capabilities and experience, we developed various programs, such as our successful program “Desarrollando Capacidades Laborales en la zona de influencia” (Developing Work Capabilities in Areas of Influence), which received the Luis Hochschild Plaut Award at the CADE 2008 conference. To date, this program has allowed us to train over 17,000 people across Peru, facilitating their employability and growth both as individual citizens and as a community. As the company has grown to become suppliers and infrastructure operators, such as in highway concessions, the Lima Metro, and social housing projects, we have come into contact with the customer-user, to whom we not only make service commitments, but with whom we also jointly face the challenge of turning these shared spaces into scenarios for citizen growth, prioritizing respect for others and positive leadership. In the various highways under our concession, we seek to develop a sense of ownership of the infrastructure in users and neighboring communities by recognizing the benefits it creates in terms of safe transit, tourist development, creation of local jobs and respect for the environment. This sustainable concession model enabled Graña y Montero to receive the 2012 Business Creativity Award Graña y Montero Award for Peruvian Research in Engineering.

“AYNI” social support program for integration, coexistence and respect among housing complex homeowners. Viva GyM, Lima.

in the Commitment to Society and Tourism and Recreation category.


80 YEARS

New horizons, new challenges

One such example was the performance of various neighborhood projects, such as public squares, sidewalks and local churches. This support later grew to include free camps for community use as health or educational centers. Casa de la Juventud youth center, Piura, Peru.

Our increasing commitment to knowledge and its impact

88

on the growth of our associates and the company, later translated into a social responsibility policy focusing on education as the source of future well-being and growth. Therefore, drawing from our own capabilities and experience, we developed various programs, such as our successful program “Desarrollando Capacidades Laborales en la zona de influencia” (Developing Work Capabilities in Areas of Influence), which received the Luis Hochschild Plaut Award at the CADE 2008 conference. To date, this program has allowed us to train over 17,000 people across Peru, facilitating their employability and growth both as individual citizens and as a community. As the company has grown to become suppliers and infrastructure operators, such as in highway concessions, the Lima Metro, and social housing projects, we have come into contact with the customer-user, to whom we not only make service commitments, but with whom we also jointly face the challenge of turning these shared spaces into scenarios for citizen growth, prioritizing respect for others and positive leadership. In the various highways under our concession, we seek to develop a sense of ownership of the infrastructure in users and neighboring communities by recognizing the benefits it creates in terms of safe transit, tourist development, creation of local jobs and respect for the environment. This sustainable concession model enabled Graña y Montero to receive the 2012 Business Creativity Award Graña y Montero Award for Peruvian Research in Engineering.

“AYNI” social support program for integration, coexistence and respect among housing complex homeowners. Viva GyM, Lima.

in the Commitment to Society and Tourism and Recreation category.


80 YEARS

New horizons, new challenges

In the concession of Line One of the Lima Metro, we not only provide a comprehensive transportation service to improve the lives of its users and contribute to the development of the city, but we also turn

90

the trains and stations into educational spaces, where users, as responsible citizens, can play an active role in exercising their duties and rights. As a result of this citizen education strategy, Line One obtained the 2012 Business Creativity Award in the Customer Service category. In its new social housing projects, Viva GyM develops the “Ayni” social support program through which more than 6,000 resident families have been trained to strengthen mutual respect and their leadership, coexistence and integration skills, as characterize communities committed to good citizenship. With this same “Growing and Sharing” approach, we also connect with other communities, such as the engineering community, for which we have developed the “PI Engineering Portal” that already has over 22,000 members. In addition, with the support of the Association of Engineers of Peru and the Peruvian Engineering Academy, we award the annual “Graña y Montero Award for Peruvian Research in Engineering”. In 2012, fifty-four research studies in 12 different engineering specialties were submitted for competition. These initiatives are only some examples of our social responsibility approach centered on driving the Group’s sustainable development and promoting a more inclusive and equitable society.

Graña y Montero Award for Peruvian Research in Engineering.

Casa de la Juventud youth center, Piura, Peru.


80 YEARS

New horizons, new challenges

In the concession of Line One of the Lima Metro, we not only provide a comprehensive transportation service to improve the lives of its users and contribute to the development of the city, but we also turn

90

the trains and stations into educational spaces, where users, as responsible citizens, can play an active role in exercising their duties and rights. As a result of this citizen education strategy, Line One obtained the 2012 Business Creativity Award in the Customer Service category. In its new social housing projects, Viva GyM develops the “Ayni” social support program through which more than 6,000 resident families have been trained to strengthen mutual respect and their leadership, coexistence and integration skills, as characterize communities committed to good citizenship. With this same “Growing and Sharing” approach, we also connect with other communities, such as the engineering community, for which we have developed the “PI Engineering Portal” that already has over 22,000 members. In addition, with the support of the Association of Engineers of Peru and the Peruvian Engineering Academy, we award the annual “Graña y Montero Award for Peruvian Research in Engineering”. In 2012, fifty-four research studies in 12 different engineering specialties were submitted for competition. These initiatives are only some examples of our social responsibility approach centered on driving the Group’s sustainable development and promoting a more inclusive and equitable society.

Graña y Montero Award for Peruvian Research in Engineering.

Casa de la Juventud youth center, Piura, Peru.


88

VALUES

1949/1933

In the 1930s, under the name Gramonvel, we started with small buildings, such as the Municipality of Miraflores. Ten years later, we had already completed large projects, including construction of the city of Talara and 400 kilometers of the Pan-American Highway. Since then, we have undertaken every project upholding the values of quality, compliance and seriousness instilled by our founders. Today, the three Peruvian engineers who founded Gra単a y Montero have turned into a team of more than 5,000 professionals with capacities for designing, building and operating the most sophisticated specialized engineering service and infrastructure projects in compliance with international standards. We are proud of the countless projects we have completed, from hospitals and hydroelectric plants to thousands of miles of highways, and now our new goal is to make all Peruvians proud of the great team of engineers we have established, who today are demonstrating their capabilities beyond our borders.


88

VALUES

1949/1933

In the 1930s, under the name Gramonvel, we started with small buildings, such as the Municipality of Miraflores. Ten years later, we had already completed large projects, including construction of the city of Talara and 400 kilometers of the Pan-American Highway. Since then, we have undertaken every project upholding the values of quality, compliance and seriousness instilled by our founders. Today, the three Peruvian engineers who founded Gra単a y Montero have turned into a team of more than 5,000 professionals with capacities for designing, building and operating the most sophisticated specialized engineering service and infrastructure projects in compliance with international standards. We are proud of the countless projects we have completed, from hospitals and hydroelectric plants to thousands of miles of highways, and now our new goal is to make all Peruvians proud of the great team of engineers we have established, who today are demonstrating their capabilities beyond our borders.


80 YEARS

New horizons, new challenges

VALUES

GRAMONVEL STARTED WITH AN INITIAL CAPITAL OF 3,000 SOLES AND SET UP ITS OFFICES IN HISTORIC DOWNTOWN LIMA.

90

GRAMONVEL On June 22, 1933, three young Peruvian engineers, Carlos Graña Elizalde, Alejandro Graña Garland and Carlos Montero Bernales, with the enthusiasm characteristic of their age, agreed to form, in their own words: “a technical partnership with the purpose of uniting our efforts to perform any project”. 1

2

The architect Héctor Velarde Bergman joined them at an early stage, so the company took the name Gramonvel for Graña, Montero and Velarde. After a few years, Mr. Velarde left the company, wishing to dedicate himself fully to architecture. 1933 was a year of crisis and turmoil in Peru. After heading a coup d’état, Sánchez Cerro was assassinated in April and General Oscar R. Benavides was named president. There were also border problems. At the time, arrangements were being made to sign a treaty with Colombia in order to solve a border conflict that had caused armed skirmishes between our country and its neighbor to the north. 1. Carlos Graña Elizalde.

Lima was a city with around half a million inhabitants at the time, and at its core was Historic Downtown Lima, where the recently founded Gramonvel was established with an initial capital of 3,000 soles. Its first headquarters were located on the sixth floor of the Wiese Building in Jirón Carabaya.

2. Alejandro Graña Garland. 3

3. Carlos Montero Bernales.


80 YEARS

New horizons, new challenges

VALUES

GRAMONVEL STARTED WITH AN INITIAL CAPITAL OF 3,000 SOLES AND SET UP ITS OFFICES IN HISTORIC DOWNTOWN LIMA.

90

GRAMONVEL On June 22, 1933, three young Peruvian engineers, Carlos Graña Elizalde, Alejandro Graña Garland and Carlos Montero Bernales, with the enthusiasm characteristic of their age, agreed to form, in their own words: “a technical partnership with the purpose of uniting our efforts to perform any project”. 1

2

The architect Héctor Velarde Bergman joined them at an early stage, so the company took the name Gramonvel for Graña, Montero and Velarde. After a few years, Mr. Velarde left the company, wishing to dedicate himself fully to architecture. 1933 was a year of crisis and turmoil in Peru. After heading a coup d’état, Sánchez Cerro was assassinated in April and General Oscar R. Benavides was named president. There were also border problems. At the time, arrangements were being made to sign a treaty with Colombia in order to solve a border conflict that had caused armed skirmishes between our country and its neighbor to the north. 1. Carlos Graña Elizalde.

Lima was a city with around half a million inhabitants at the time, and at its core was Historic Downtown Lima, where the recently founded Gramonvel was established with an initial capital of 3,000 soles. Its first headquarters were located on the sixth floor of the Wiese Building in Jirón Carabaya.

2. Alejandro Graña Garland. 3

3. Carlos Montero Bernales.


80 YEARS

New horizons, new challenges

1

VALUES

2

92

1. Town Council of Miraflores, 1940, Lima. 2. Ulloa residence, one of the first works of Gramonvel. La Punta, Callao.

“In 1937, the company started to undertake more ambitious projects, such as the Miraflores Baths.”

Carlos Graña was not only the first president, but also the creator of the long-term concept that has characterized the company. He was very forward-thinking for his time and had a great ability for developing new business approaches. That is precisely why he is recognized as one of the creators of the construction business in Peru. Carlos Montero contributed his talent and financial culture, while Alejandro Graña stood out for his technical and management capabilities, especially in difficult times and critical situations. The first project carried out by Gramonvel was the home of Dr. Manuel Irigoyen y Puente. From this initial stage, Gramonvel went on to building projects that allowed the company to develop new capacities and take on new challenges, such as the piers for Corporación Guanera. In 1937, the company started to undertake more ambitious projects, like the Miraflores Baths, with facilities for up to 500 people. The magazine El Arquitecto Peruano referred to the innovative project in the following terms: “This establishment is totally supported by reinforced cement pile foundations, jacked with all the necessary precision, with piles perfectly aligned both lengthwise and crosswise.”


80 YEARS

New horizons, new challenges

1

VALUES

2

92

1. Town Council of Miraflores, 1940, Lima. 2. Ulloa residence, one of the first works of Gramonvel. La Punta, Callao.

“In 1937, the company started to undertake more ambitious projects, such as the Miraflores Baths.”

Carlos Graña was not only the first president, but also the creator of the long-term concept that has characterized the company. He was very forward-thinking for his time and had a great ability for developing new business approaches. That is precisely why he is recognized as one of the creators of the construction business in Peru. Carlos Montero contributed his talent and financial culture, while Alejandro Graña stood out for his technical and management capabilities, especially in difficult times and critical situations. The first project carried out by Gramonvel was the home of Dr. Manuel Irigoyen y Puente. From this initial stage, Gramonvel went on to building projects that allowed the company to develop new capacities and take on new challenges, such as the piers for Corporación Guanera. In 1937, the company started to undertake more ambitious projects, like the Miraflores Baths, with facilities for up to 500 people. The magazine El Arquitecto Peruano referred to the innovative project in the following terms: “This establishment is totally supported by reinforced cement pile foundations, jacked with all the necessary precision, with piles perfectly aligned both lengthwise and crosswise.”


80 YEARS

New horizons, new challenges

“In 1942, Gramonvel built its first project abroad, the Nestlé plant in Venezuela.”

94

The prestigious estimator engineer Teodoro E. Harmsen joined the company in 1941, excelling as technical and administrative manager and later becoming General Managing Director and Chairman of the Board of GyM. He was also professor for five decades at the Pontificia Universidad Católica del Perú, specializing in reinforced concrete. In 1942, Luis Graña, who had been working in the construction works at the Panama Canal, joined Gramonvel. He was Project Manager and Director of GyM and became, because of his technical and human qualities, a living example for the engineers who had the opportunity of working with him. In 1942, Gramonvel went abroad for the first time to carry out construction work at the Nestlé plant in Venezuela. That same year, the company obtained the contract for the El Pato Base in Talara for the United States government, during the Second World War. Alejandro Graña recalled the beginning of that project: “During the Second World War, the United States government decided to build an air base in the Talara area to prevent a Japanese attack on the Pacific coast and, particularly, on the oil fields under concession to the International Petroleum Company. The project depended on the United States Army Southern Command headquartered in Panama. Luis Graña, since he had worked in the Canal, was entrusted with contacting the Command, and joined Gramonvel. Once the contract for the project was signed, all of those involved traveled to Talara in view of its urgency. When the US commander arrived and saw our old roller at the site, he asked if they were nuts, if they thought they could build an airport ‘With that’. He almost turned right around to leave.”

Wiese Building in downtown Lima, where Gramonvel’s first offices were located.

VALUES


80 YEARS

New horizons, new challenges

“In 1942, Gramonvel built its first project abroad, the Nestlé plant in Venezuela.”

94

The prestigious estimator engineer Teodoro E. Harmsen joined the company in 1941, excelling as technical and administrative manager and later becoming General Managing Director and Chairman of the Board of GyM. He was also professor for five decades at the Pontificia Universidad Católica del Perú, specializing in reinforced concrete. In 1942, Luis Graña, who had been working in the construction works at the Panama Canal, joined Gramonvel. He was Project Manager and Director of GyM and became, because of his technical and human qualities, a living example for the engineers who had the opportunity of working with him. In 1942, Gramonvel went abroad for the first time to carry out construction work at the Nestlé plant in Venezuela. That same year, the company obtained the contract for the El Pato Base in Talara for the United States government, during the Second World War. Alejandro Graña recalled the beginning of that project: “During the Second World War, the United States government decided to build an air base in the Talara area to prevent a Japanese attack on the Pacific coast and, particularly, on the oil fields under concession to the International Petroleum Company. The project depended on the United States Army Southern Command headquartered in Panama. Luis Graña, since he had worked in the Canal, was entrusted with contacting the Command, and joined Gramonvel. Once the contract for the project was signed, all of those involved traveled to Talara in view of its urgency. When the US commander arrived and saw our old roller at the site, he asked if they were nuts, if they thought they could build an airport ‘With that’. He almost turned right around to leave.”

Wiese Building in downtown Lima, where Gramonvel’s first offices were located.

VALUES


80 YEARS

New horizons, new challenges

VALUES

1

2

96

1. Copsa Plant, Callao. 1948, Peru. 2. Pan-American Highway South, Lurín-Cañete section. 1950, Peru.

“From the very first day we chartered the course towards technification.”


80 YEARS

New horizons, new challenges

VALUES

1

2

96

1. Copsa Plant, Callao. 1948, Peru. 2. Pan-American Highway South, Lurín-Cañete section. 1950, Peru.

“From the very first day we chartered the course towards technification.”


80 YEARS

New horizons, new challenges

VALUES

98

“We assured them that we would be receiving more equipment and that we would be able to meet our deadline. The commander accepted and left, not without first warning us of a possible Japanese attack if we did not finish within on time.” To satisfy this commitment, it was necessary to take to Talara not only all of Gramonvel’s equipment, but also equipment belonging to Morris y Montero, a company owned by a cousin, Jorge Montero Muelle. The project was shared with Morris y Montero, leading to a successful partnership. The company not only met its deadline, preventing any Japanese attack, but also, as a result of its good performance, it continued to work in the area, where ultimately, in 1945, it obtained the contract for construction of the whole city of Talara in association with Roque Vargas Prada y Cía. There we built, for the IPC, more than 2,000 homes, offices, schools, markets, churches, a shopping area, another airport and, of course, the refinery.

Construction of the city of Talara in Piura, Peru.

In 1945, Carlos Montero was named Minister of Finance of Peru by President José Luis Bustamante y Rivero, and was elected as first president of the Association of Contracting Engineers. Finally, in 1949, the Gramonvel partners decided to merge with Morris y Montero, creating Graña y Montero S.A.


80 YEARS

New horizons, new challenges

VALUES

98

“We assured them that we would be receiving more equipment and that we would be able to meet our deadline. The commander accepted and left, not without first warning us of a possible Japanese attack if we did not finish within on time.” To satisfy this commitment, it was necessary to take to Talara not only all of Gramonvel’s equipment, but also equipment belonging to Morris y Montero, a company owned by a cousin, Jorge Montero Muelle. The project was shared with Morris y Montero, leading to a successful partnership. The company not only met its deadline, preventing any Japanese attack, but also, as a result of its good performance, it continued to work in the area, where ultimately, in 1945, it obtained the contract for construction of the whole city of Talara in association with Roque Vargas Prada y Cía. There we built, for the IPC, more than 2,000 homes, offices, schools, markets, churches, a shopping area, another airport and, of course, the refinery.

Construction of the city of Talara in Piura, Peru.

In 1945, Carlos Montero was named Minister of Finance of Peru by President José Luis Bustamante y Rivero, and was elected as first president of the Association of Contracting Engineers. Finally, in 1949, the Gramonvel partners decided to merge with Morris y Montero, creating Graña y Montero S.A.


80 YEARS

100

New horizons, new challenges

“In 1949, Gramonvel merged with Morris y Montero, creating Graña y Montero S.A.”

In 1983, Graña y Montero turned 50 years old and celebrated with a ceremony attended by the President of the Republic, Fernando Belaúnde. On this landmark occasion, Alejandro Graña wrote: “There are days when decisions are made, when determinations are made, and these then become transcendent. From one of those days, what was and continues to be our company came about... From the very first day we chartered the course towards technification, and we believe that our success is largely due to our continuous preoccupation with technological development. The results bear out our belief that this is the best guarantee for continuity.” At that time, José Graña wrote: “Renewing and revitalizing the management of a company that is about to turn 50 years old is an exciting challenge, especially when attempting to replace personalities such as those of the founders of Graña y Montero. In addition, the company faces a stage of rapid growth, not to mention the responsibility of upholding a prestige gained over the course of half a century.”

Aerial view of the former Miraflores Baths, Lima.

VALUES


80 YEARS

100

New horizons, new challenges

“In 1949, Gramonvel merged with Morris y Montero, creating Graña y Montero S.A.”

In 1983, Graña y Montero turned 50 years old and celebrated with a ceremony attended by the President of the Republic, Fernando Belaúnde. On this landmark occasion, Alejandro Graña wrote: “There are days when decisions are made, when determinations are made, and these then become transcendent. From one of those days, what was and continues to be our company came about... From the very first day we chartered the course towards technification, and we believe that our success is largely due to our continuous preoccupation with technological development. The results bear out our belief that this is the best guarantee for continuity.” At that time, José Graña wrote: “Renewing and revitalizing the management of a company that is about to turn 50 years old is an exciting challenge, especially when attempting to replace personalities such as those of the founders of Graña y Montero. In addition, the company faces a stage of rapid growth, not to mention the responsibility of upholding a prestige gained over the course of half a century.”

Aerial view of the former Miraflores Baths, Lima.

VALUES


80 YEARS

New horizons, new challenges

102

THE GRAÑA Y MONTERO STYLE

In the company’s Charter, executed in 1933, the course towards technification and professionalism was established, a course that has been crucial for us to get to where we are today. Through the projects completed by Gramonvel, it established Larcomar shopping and entertainment center, Miraflores, Lima.

a reputation for quality that was highly recognized by the community and was closely safeguarded by the company’s founding executives.

Westin Libertador Hotel, San Isidro, Lima.


80 YEARS

New horizons, new challenges

102

THE GRAÑA Y MONTERO STYLE

In the company’s Charter, executed in 1933, the course towards technification and professionalism was established, a course that has been crucial for us to get to where we are today. Through the projects completed by Gramonvel, it established Larcomar shopping and entertainment center, Miraflores, Lima.

a reputation for quality that was highly recognized by the community and was closely safeguarded by the company’s founding executives.

Westin Libertador Hotel, San Isidro, Lima.


80 YEARS

New horizons, new challenges

In the 1970s, when the generational change occurred in the company’s top management, we surveyed clients, suppliers and associates to learn about their perception of our track record. We translated this feedback and defined it in a commitment to continue honoring the values of

104

Quality, Compliance and Seriousness, which had allowed us to achieve our success and were to guide us towards the future. Years later we set out to raise efficiency to the level of our core values, based on the professional practice and commitment of our associates. This accelerated the process for improvement in efficiency and competitiveness in all of our business areas. In order to ensure full observance of our four Corporate Values in our performance, we have developed a special policy for each one of them. For example, for the Compliance value we have established the “Before Deadline” Policy, which involves making a continuous effort to complete all of our projects before the contractually agreed deadline and submitting a year-end report prepared by an independent auditing firm. The 2012 report was made by Price Waterhouse Coopers.

Larcomar shopping and entertainment center, Miraflores, Lima.

GMI team entrusted with supervising the Yanacancha permanent camp for Compañía Minera Antamina, Pasco, Peru. Westin Libertador Hotel, San Isidro, Lima.


80 YEARS

New horizons, new challenges

In the 1970s, when the generational change occurred in the company’s top management, we surveyed clients, suppliers and associates to learn about their perception of our track record. We translated this feedback and defined it in a commitment to continue honoring the values of

104

Quality, Compliance and Seriousness, which had allowed us to achieve our success and were to guide us towards the future. Years later we set out to raise efficiency to the level of our core values, based on the professional practice and commitment of our associates. This accelerated the process for improvement in efficiency and competitiveness in all of our business areas. In order to ensure full observance of our four Corporate Values in our performance, we have developed a special policy for each one of them. For example, for the Compliance value we have established the “Before Deadline” Policy, which involves making a continuous effort to complete all of our projects before the contractually agreed deadline and submitting a year-end report prepared by an independent auditing firm. The 2012 report was made by Price Waterhouse Coopers.

Larcomar shopping and entertainment center, Miraflores, Lima.

GMI team entrusted with supervising the Yanacancha permanent camp for Compañía Minera Antamina, Pasco, Peru. Westin Libertador Hotel, San Isidro, Lima.


80 YEARS

New horizons, new challenges

This “Before Deadline” policy integrates with and is complemented by others, such as our 1985 Ethics Charter and our Code of Conduct, Environmental Policy, Accident Risk Prevention Policy and Social

106

Responsibility Policy. This set of guidelines sustains and expresses the way we think and act at Graña y Montero, within a culture that identifies us and motivates us to continue growing and achieving our vision of “being recognized as the most reliable engineering service group in Latin America.” Today, those three founding engineers who set the course of our history as a company and inspired us to continue growing with professionalism and integrity, have turned into an organization receiving the contributions of more than 3,800 engineers capable of designing, building and operating highly sophisticated infrastructure projects in Peru and several other countries in Latin America, inspired and guided by the Graña y Montero style.

Larcomar shopping and entertainment center, Miraflores, Lima.

Westin Libertador Hotel, San Isidro, Lima.


80 YEARS

New horizons, new challenges

This “Before Deadline” policy integrates with and is complemented by others, such as our 1985 Ethics Charter and our Code of Conduct, Environmental Policy, Accident Risk Prevention Policy and Social

106

Responsibility Policy. This set of guidelines sustains and expresses the way we think and act at Graña y Montero, within a culture that identifies us and motivates us to continue growing and achieving our vision of “being recognized as the most reliable engineering service group in Latin America.” Today, those three founding engineers who set the course of our history as a company and inspired us to continue growing with professionalism and integrity, have turned into an organization receiving the contributions of more than 3,800 engineers capable of designing, building and operating highly sophisticated infrastructure projects in Peru and several other countries in Latin America, inspired and guided by the Graña y Montero style.

Larcomar shopping and entertainment center, Miraflores, Lima.

Westin Libertador Hotel, San Isidro, Lima.


Nuevos horizontes, nuevos retos

TIME LINE

INTERNATIONALIZATION OF GMI. MELIÁ BÁVARO HOTEL, PUNTA CANA, DOMINICAN REPUBLIC

CONSTRUCTION OF THE CITY OF TALARA

GMD FIRST TECHNOLOGY OUTSOURCING CONTRACT IN PERU

THREE FOUNDERS Carlos Graña Alejandro Graña Carlos Montero

CUAJONE MINE

1991

GMD First implementation of systems and server sales.

1933

1937

1945

1952

1957

“We hereby agree to form a technical partnership that we will call GRAMONVEL with the purpose of bringing together our knowledge to perform any project or work.”

1972

1983

1988

1990

50 YEARS OF DIVERSIFICATION

Charter, June 22, 1933.

EMPLOYEE SOCIAL SECURITY HOSPITAL

MIRAFLORES BATHS

GMP STARTS OIL PRODUCTION OPERATIONS IN LOT I – TALARA

SHERATON HOTEL

1991


Nuevos horizontes, nuevos retos

TIME LINE

INTERNATIONALIZATION OF GMI. MELIÁ BÁVARO HOTEL, PUNTA CANA, DOMINICAN REPUBLIC

CONSTRUCTION OF THE CITY OF TALARA

GMD FIRST TECHNOLOGY OUTSOURCING CONTRACT IN PERU

THREE FOUNDERS Carlos Graña Alejandro Graña Carlos Montero

CUAJONE MINE

1991

GMD First implementation of systems and server sales.

1933

1937

1945

1952

1957

“We hereby agree to form a technical partnership that we will call GRAMONVEL with the purpose of bringing together our knowledge to perform any project or work.”

1972

1983

1988

1990

50 YEARS OF DIVERSIFICATION

Charter, June 22, 1933.

EMPLOYEE SOCIAL SECURITY HOSPITAL

MIRAFLORES BATHS

GMP STARTS OIL PRODUCTION OPERATIONS IN LOT I – TALARA

SHERATON HOTEL

1991


PARQUE DEL AGUSTINO

TIME LINE STOCK TRADED AT THE LIMA STOCK EXCHANGE GMP GAS PLANT

1998

partners with Oiltanking to create Consorcio Terminales

GMI acquires ECOTEC S.A.

1994

1999

2010

Creation of CCA

GSD Purchase

2001

Westin Libertador Hotel

GMP in partnership with Oiltanking starts Pisco-Camisea Ocean Platform

1997

1998

2003

2007

2009

2010

2001

GyM Camisea

2007 2005

VIVA GyM Golf Millenium Building

GMD Software Plant, CMMI*3, first in Peru

CAM PURCHASE PERU-CHILE-COLOMBIA

2009 HIGHWAY CONCESSIONS

2011

JW MARRIOTT HOTEL AND LARCOMAR

Help Desk Outsourcing with coverage for 6,000 users nationwide

2011

2012

CHILE


PARQUE DEL AGUSTINO

TIME LINE STOCK TRADED AT THE LIMA STOCK EXCHANGE GMP GAS PLANT

1998

partners with Oiltanking to create Consorcio Terminales

GMI acquires ECOTEC S.A.

1994

1999

2010

Creation of CCA

GSD Purchase

2001

Westin Libertador Hotel

GMP in partnership with Oiltanking starts Pisco-Camisea Ocean Platform

1997

1998

2003

2007

2009

2010

2001

GyM Camisea

2007 2005

VIVA GyM Golf Millenium Building

GMD Software Plant, CMMI*3, first in Peru

CAM PURCHASE PERU-CHILE-COLOMBIA

2009 HIGHWAY CONCESSIONS

2011

JW MARRIOTT HOTEL AND LARCOMAR

Help Desk Outsourcing with coverage for 6,000 users nationwide

2011

2012

CHILE


80 YEARS

MAIN WORKS IN WHICH WE HAVE PARTICIPATED

2013/1933


80 YEARS

MAIN WORKS IN WHICH WE HAVE PARTICIPATED

2013/1933


New horizons, new challenges

Engineering and Construction

111

BUILDINGS CIUDAD NUEVA FUERABAMBA (NEW CITY OF FUERABAMBA)

Construction of 441.200 m² and 250 m² single-family housing units and public buildings at 3.800 meters above sea level; in addition to installation of utilities such as electric power, water and sewage. Apurímac - Cotabambas 2011 - 2013 SHAMROCK EL RANCHO

Multifamily housing consisting of 106 town houses, 4 stories and rooftop, over a total area of 47.700 m². Lima - Miraflores 2012 - 2013

LOS PARQUES DE EL AGUSTINO – 1ST. STAGE - LIMA LOS PARQUES DE VILLA

PEZET 961

EL SALVADOR

Luxury 15-story building and 4.5 underground levels. Lima - San Isidro 2012 - 2013

Urban development and construction of 33 multifamily buildings (660 apartments of 62 m² in average), common areas and parking. Lima - Villa El Salvador 2011 - 2013

TORRE REAL OCHO

Office building, 16 stories and 5 underground parking and storage areas. Total area is 31.060 m². Lima - San Isidro 2012 - 2014 ROOSEVELT SCHOOL THEATER

Performing arts center, administrative office and outdoor areas of the Franklin Delano Roosevelt School. Lima - La Molina 2011 - 2012 LOS PARQUES DE SAN MARTÍN DE

CLÍNICA SAN FELIPE

17.158 m² building. Lima - Jesús María 2010 - 2012 WESTIN LIBERTADOR LIMA HOTEL

CIPRESES

133 apartments in two 15-story towers and one 5-story tower) and 4 underground levels. Lima - San Isidro 2011 - 2013

Five-star 301-room hotel on a total area of 71.000 m², 4 underground levels and 30 floors. Lima - San Isidro 2008 - 2011 GRAÑA Y MONTERO BUILDING,

NEO 10

PETIT THOUARS OFFICES

Residential building, with 4 parking levels and 3 towers with 17 apartment floors. Lima - Miraflores 2011- 2012

Seven-story building with 4 underground levels and rooftop, on a total built-up area of 17.200 m². Lima – Miraflores 2012 - 2013

PORRES

Eighteen buildings with apartments from 46.3 m² to 65.13 m² and 364 parking spaces. Over 7.400 m² of parks and green areas. Lima - San Martín de Porres 2011 - 2013

GRAN TEATRO NACIONAL

LINK TOWER

Seven-story building, 4 underground levels. Includes auditorium, stage, box seating, technical area, parking, service and administration area. Lima - San Borja 2010 - 2011

Seventeen-story office building, 4 underground levels, 7 parking levels and 104 offices on a built-up area of 35.324 m². Lima - Surco 2010 - 2012

PARDO Y ALIAGA

Seven-story office building and 6 underground parking levels. Lima - San Isidro 2010 - 2011 LOS PARQUES DE EL AGUSTINO STAGE II

Residential compound of 640 apartments in 11 8- and 10-story buildings. Lima - El Agustino 2010 - 2012 CENTRO COMERCIAL PARQUE AGUSTINO

Shopping center and boulevard of the Parques del Agustino Project. Lima - El Agustino. 2010 - 2011 PARQUE DE CARABAYLLO

Residential compound of 1,200 apartments in 50 3-story buildings. Lima - Puente Piedra 2010 - 2013


New horizons, new challenges

Engineering and Construction

111

BUILDINGS CIUDAD NUEVA FUERABAMBA (NEW CITY OF FUERABAMBA)

Construction of 441.200 m² and 250 m² single-family housing units and public buildings at 3.800 meters above sea level; in addition to installation of utilities such as electric power, water and sewage. Apurímac - Cotabambas 2011 - 2013 SHAMROCK EL RANCHO

Multifamily housing consisting of 106 town houses, 4 stories and rooftop, over a total area of 47.700 m². Lima - Miraflores 2012 - 2013

LOS PARQUES DE EL AGUSTINO – 1ST. STAGE - LIMA LOS PARQUES DE VILLA

PEZET 961

EL SALVADOR

Luxury 15-story building and 4.5 underground levels. Lima - San Isidro 2012 - 2013

Urban development and construction of 33 multifamily buildings (660 apartments of 62 m² in average), common areas and parking. Lima - Villa El Salvador 2011 - 2013

TORRE REAL OCHO

Office building, 16 stories and 5 underground parking and storage areas. Total area is 31.060 m². Lima - San Isidro 2012 - 2014 ROOSEVELT SCHOOL THEATER

Performing arts center, administrative office and outdoor areas of the Franklin Delano Roosevelt School. Lima - La Molina 2011 - 2012 LOS PARQUES DE SAN MARTÍN DE

CLÍNICA SAN FELIPE

17.158 m² building. Lima - Jesús María 2010 - 2012 WESTIN LIBERTADOR LIMA HOTEL

CIPRESES

133 apartments in two 15-story towers and one 5-story tower) and 4 underground levels. Lima - San Isidro 2011 - 2013

Five-star 301-room hotel on a total area of 71.000 m², 4 underground levels and 30 floors. Lima - San Isidro 2008 - 2011 GRAÑA Y MONTERO BUILDING,

NEO 10

PETIT THOUARS OFFICES

Residential building, with 4 parking levels and 3 towers with 17 apartment floors. Lima - Miraflores 2011- 2012

Seven-story building with 4 underground levels and rooftop, on a total built-up area of 17.200 m². Lima – Miraflores 2012 - 2013

PORRES

Eighteen buildings with apartments from 46.3 m² to 65.13 m² and 364 parking spaces. Over 7.400 m² of parks and green areas. Lima - San Martín de Porres 2011 - 2013

GRAN TEATRO NACIONAL

LINK TOWER

Seven-story building, 4 underground levels. Includes auditorium, stage, box seating, technical area, parking, service and administration area. Lima - San Borja 2010 - 2011

Seventeen-story office building, 4 underground levels, 7 parking levels and 104 offices on a built-up area of 35.324 m². Lima - Surco 2010 - 2012

PARDO Y ALIAGA

Seven-story office building and 6 underground parking levels. Lima - San Isidro 2010 - 2011 LOS PARQUES DE EL AGUSTINO STAGE II

Residential compound of 640 apartments in 11 8- and 10-story buildings. Lima - El Agustino 2010 - 2012 CENTRO COMERCIAL PARQUE AGUSTINO

Shopping center and boulevard of the Parques del Agustino Project. Lima - El Agustino. 2010 - 2011 PARQUE DE CARABAYLLO

Residential compound of 1,200 apartments in 50 3-story buildings. Lima - Puente Piedra 2010 - 2013


112

80 YEARS

New horizons, new challenges

PARQUE GAREZON

QUBO BUILDING

BALTA 1070

Golf Millenium

Real estate Project of 17 buildings, 175 parking spaces, roads, green areas, sidewalks and entertainment area. Consists of 476 affordable 62 - 75 m² apartments, with buildings of 7 stories each. Lima 2010 – 2011

Twelve-story building on a 1.800 m² plant area. Lima - Surco 2009 – 2010

Seventeen-story residential building, 4 underground levels and a total area of 10.800m². Lima - Miraflores 2007 - 2008

Exclusive apartments overlooking the golf course. Four towers with 1 building of 18 and 28 floors and 2 buildings of 24 floors. 1.700m² of green areas. Lima - San Isidro 2007 – 2009

SHAMROCK EL POLO

Multifamily housing project of 164 apartments, 10 apartment towers over an area of 30.800 m². Lima - Surco 2010 - 2012 BCP COMPUTER CENTER CHORRILLOS

New computer center of Banco de Crédito del Perú (BCP) on a total area of 46.463 m². Lima - Chorrillos 2009 – 2011 AMÉRICA MÓVIL PERÚ CORPORATE BUILDING

Six-story office building on 16.726 m² built-up area, 5.549 m² of parking spaces and green areas. Lima La Victoria 2010 - 2011 UNIVERSIDAD UCAL

Universidad de Ciencias y Artes de America Latina (UCAL) with a total built-up area of 11.386 m². Lima - La Molina 2010 – 2011 UNIVERSIDAD DEL PACIFICO

Five-story building with 6 underground levels on a total built-up area of 17.626 m². Lima - Jesús María 2010-2011 PARQUE CENTRAL CLUB RESIDENCIAL

Urban development of land and construction of 22 12-story residential buildings. Lima - Cercado de Lima 2009 – 2014

IBIS LIMA HOTEL

Fourteen-story building with 3 underground parking levels. Area of 1.279 m² de area, 11.950 m² built-up area, 2.973 m² underground area and 8.977 m² tower area. Lima - Miraflores 2009 – 2010

MINERA ARES BUILDING REMODELING

Remodeling of 3 floors of offices, 3.000 m² built-up area. Lima - San Isidro 2007 - 2008 UPDATING OF GMI OFFICES

CAPITAL BUILDING

Office building with 6 underground levels, 23 floors, 31.000 m² built-up area. Lima - San Isidro 2008 – 2009

Fitting of offices in floors 7, 8, 9 and 10, Tower III, Graña y Montero Building. Lima - Surquillo 2007 - 2008 FERREYROS NEW HEADQUARTERS

ÁBACO TOWER

Office building with 4 underground parking levels and 12 floors, 12.500 m² total area. Lima - San Isidro 2008

Four-story building and 1 underground parking. Total area: 10.800 m². Lima - Surco 2007 EXPANSION OF BLOCK III OF GRAÑA

LOS PARQUES DE EL AGUSTINO – 1ST

Y MONTERO HEADQUARTERS

STAGE

Expansion of 4 floors in Block III, Graña y Montero Building. Lima - Surquillo 2007

Urban development of 227.046 m² of land and construction of 133 5-story buildings, with 4 2-floor apartments. Lima - El Agustino 2007 - 2010 GOLF LOS INKAS

Two blocks of multifamily buildings on a total area of 11.000 m². Lima - Surco 2007 – 2008

IGLESIA Y CENTRO PASTORAL

CLÍNICA RICARDO PALMA MEDICAL OFFICES

Five underground parking levels and 12 floors of medical offices. Area 14.000 m². Lima - San Isidro 2007 - 2008

Real estate project of 4 towers (one of 18, two of 24 and one of 28 floors) and 5 underground parking levels with a total area of 52.000 m². Lima - San Isidro 2007 – 2008 MALECÓN CISNEROS

Residential building of 22 apartments and 17 floors. Lima - Miraflores 2007 - 2008

School of 2 building units and 2 bankfill levels. Lima - San Juan de Miraflores 2007 GOLF LOS INKAS BUILDING

Exclusive building overlooking the golf club and the building private park. Two towers with flat, duplex and penthouse apartments. Lima - Surco 2007 - 2008

UNIVERSIDAD CATOLICA SCHOOL

LAS TERRAZAS DE SAN FELIPE

WONG SHELL

METRO BARRANCO

OF ARCHITECTURE

Three 18-story residential towers and 1 parking tower. Lima - Jesús María 2006 – 2007

Adaptation of existing premises to a Wong store format. Lima - Miraflores 2005

Remodeling and updating of existing premises. Lima - Barranco 2005

Three-story face concrete building. Lima - San Miguel 2002 - 2003 UNIVERSIDAD SAN MARTÍN DE

ECO SAN JUAN DE MIRAFLORES

METRO INDUMIL

UNIVERSIDAD ANDINA DEL CUSCO

PORRES MEDICAL SCHOOL

Construction of eco store. Total area of 3.350 m². Lima - San Juan de Miraflores 2005

Engineering and construction of a metal structure. Lima - Lima 2005

Two 4- and 5-story buildings, 13. 900 m² built-up area. Cusco - Cusco 2005

PLAZA 3

METRO FURUKAWA

BALTAMAR BUILDING

Twenty-three-story building with 5 underground levels. Lima - San Isidro 2005 – 2007

Double height 2.000 m² metal structure bay. Lima – La Victoria 2005

Nineteen-story apartment building with 2 underground levels. Lima - Miraflores 2005 LAS LADERAS DE MELGAREJO

Expansion of the administrative building of Universidad San Martín. Lima - La Molina 2002 HOCHSCHILD BUILDING EXPANSION

Expansion of 2 floors of offices. Lima - Santiago de Surco 2006 - 2007 LARCOMAR FASHION CENTER

WONG DOS DE MAYO EXPANSION

ECO NORTE

Construction of 3 new levels of shopping center and 2 parking levels. Lima - Miraflores 2006 - 2007

1.000 m² store expansion. Lima - San Isidro 2005

Construction of eco store. Total area of 1.950 m². Lima – Comas 2005

TOTTUS STORE AT TORRE REAL 10

Construction of a 1.368 m² built-up area store Lima – Rímac 2005

BALTA 1070 BUILDING

Flats of 208 m² and 212 m², all of them overlooking the ocean and with a terrace. Lima - Miraflores 2007 – 2008

ECO RÍMAC

Seven-story office building, rooftop, 4 underground levels. Lima - San Isidro 2006 - 2007

NOVOTEL HOTEL

ECO COMAS EXPANSION

210 rooms, 8 floors, 2 underground parking levels and 1 service level. Area: 14.400 m². Lima - San Isidro 2007 – 2008

One-story supermarket expansion. Lima - Comas 2006

DOUBLETREE PARACAS HOTEL GUEST SUITES

Two-story hotel on a wet structure level. Built-up area of 9.860 m². Ica - Paracas 2007 – 2008

COLEGIO FE Y ALEGRÍA GOLF MILLENIUM

113

SANTO TORIBIO BUILDING

Seven-story building with 4 underground levels. Area: 21.600 m². Lima - San Isidro 2007 – 2008

(CHURCH AND PASTORAL CENTER)

Chapel with light dome (2.500 m²), 8 floors of church and parking spaces. Total area 21.000 m². Lima - Santiago de Surco 2007 - 2008

Engineering and Construction

CINEMARK PLAZA SUR

Construction of 7 movie houses. Lima - Chorrillos 2006 ECO ÓVALO BALTA

Construction of store. Lima - Barranco 2006

UNIVERSIDAD DE PIURA – GRADUATE SCHOOL

ECO ANGÉLICA GAMARRA

Graduate school campus and various buildings of Universidad de Piura. Lima – Surco 2006 - 2007

One-story supermarket. Callao - Callao 2006

UNIVERSIDAD ANDINA DEL CUSCO

Three buildings, 55 apartments and 2 underground parking levels. Total area of 6.800 m². Lima - Miraflores 2006 – 2007

BOLOGNESI 364 CONDOMINIUM

Two 4- and 5 story buildings, 13.900 m² built-up area. Cusco 2005

LIMA PLAZA SUR SHOPPING CENTER

BUILDING

Real estate project of 33 buildings with a total of 252 apartments, 76 m² each. Lima - La Molina 2004 - 2006

Shopping center built on 11.000 m². Lima - Chorrillos 2005

GRAN TEATRO NACIONAL - LIMA


112

80 YEARS

New horizons, new challenges

PARQUE GAREZON

QUBO BUILDING

BALTA 1070

Golf Millenium

Real estate Project of 17 buildings, 175 parking spaces, roads, green areas, sidewalks and entertainment area. Consists of 476 affordable 62 - 75 m² apartments, with buildings of 7 stories each. Lima 2010 – 2011

Twelve-story building on a 1.800 m² plant area. Lima - Surco 2009 – 2010

Seventeen-story residential building, 4 underground levels and a total area of 10.800m². Lima - Miraflores 2007 - 2008

Exclusive apartments overlooking the golf course. Four towers with 1 building of 18 and 28 floors and 2 buildings of 24 floors. 1.700m² of green areas. Lima - San Isidro 2007 – 2009

SHAMROCK EL POLO

Multifamily housing project of 164 apartments, 10 apartment towers over an area of 30.800 m². Lima - Surco 2010 - 2012 BCP COMPUTER CENTER CHORRILLOS

New computer center of Banco de Crédito del Perú (BCP) on a total area of 46.463 m². Lima - Chorrillos 2009 – 2011 AMÉRICA MÓVIL PERÚ CORPORATE BUILDING

Six-story office building on 16.726 m² built-up area, 5.549 m² of parking spaces and green areas. Lima La Victoria 2010 - 2011 UNIVERSIDAD UCAL

Universidad de Ciencias y Artes de America Latina (UCAL) with a total built-up area of 11.386 m². Lima - La Molina 2010 – 2011 UNIVERSIDAD DEL PACIFICO

Five-story building with 6 underground levels on a total built-up area of 17.626 m². Lima - Jesús María 2010-2011 PARQUE CENTRAL CLUB RESIDENCIAL

Urban development of land and construction of 22 12-story residential buildings. Lima - Cercado de Lima 2009 – 2014

IBIS LIMA HOTEL

Fourteen-story building with 3 underground parking levels. Area of 1.279 m² de area, 11.950 m² built-up area, 2.973 m² underground area and 8.977 m² tower area. Lima - Miraflores 2009 – 2010

MINERA ARES BUILDING REMODELING

Remodeling of 3 floors of offices, 3.000 m² built-up area. Lima - San Isidro 2007 - 2008 UPDATING OF GMI OFFICES

CAPITAL BUILDING

Office building with 6 underground levels, 23 floors, 31.000 m² built-up area. Lima - San Isidro 2008 – 2009

Fitting of offices in floors 7, 8, 9 and 10, Tower III, Graña y Montero Building. Lima - Surquillo 2007 - 2008 FERREYROS NEW HEADQUARTERS

ÁBACO TOWER

Office building with 4 underground parking levels and 12 floors, 12.500 m² total area. Lima - San Isidro 2008

Four-story building and 1 underground parking. Total area: 10.800 m². Lima - Surco 2007 EXPANSION OF BLOCK III OF GRAÑA

LOS PARQUES DE EL AGUSTINO – 1ST

Y MONTERO HEADQUARTERS

STAGE

Expansion of 4 floors in Block III, Graña y Montero Building. Lima - Surquillo 2007

Urban development of 227.046 m² of land and construction of 133 5-story buildings, with 4 2-floor apartments. Lima - El Agustino 2007 - 2010 GOLF LOS INKAS

Two blocks of multifamily buildings on a total area of 11.000 m². Lima - Surco 2007 – 2008

IGLESIA Y CENTRO PASTORAL

CLÍNICA RICARDO PALMA MEDICAL OFFICES

Five underground parking levels and 12 floors of medical offices. Area 14.000 m². Lima - San Isidro 2007 - 2008

Real estate project of 4 towers (one of 18, two of 24 and one of 28 floors) and 5 underground parking levels with a total area of 52.000 m². Lima - San Isidro 2007 – 2008 MALECÓN CISNEROS

Residential building of 22 apartments and 17 floors. Lima - Miraflores 2007 - 2008

School of 2 building units and 2 bankfill levels. Lima - San Juan de Miraflores 2007 GOLF LOS INKAS BUILDING

Exclusive building overlooking the golf club and the building private park. Two towers with flat, duplex and penthouse apartments. Lima - Surco 2007 - 2008

UNIVERSIDAD CATOLICA SCHOOL

LAS TERRAZAS DE SAN FELIPE

WONG SHELL

METRO BARRANCO

OF ARCHITECTURE

Three 18-story residential towers and 1 parking tower. Lima - Jesús María 2006 – 2007

Adaptation of existing premises to a Wong store format. Lima - Miraflores 2005

Remodeling and updating of existing premises. Lima - Barranco 2005

Three-story face concrete building. Lima - San Miguel 2002 - 2003 UNIVERSIDAD SAN MARTÍN DE

ECO SAN JUAN DE MIRAFLORES

METRO INDUMIL

UNIVERSIDAD ANDINA DEL CUSCO

PORRES MEDICAL SCHOOL

Construction of eco store. Total area of 3.350 m². Lima - San Juan de Miraflores 2005

Engineering and construction of a metal structure. Lima - Lima 2005

Two 4- and 5-story buildings, 13. 900 m² built-up area. Cusco - Cusco 2005

PLAZA 3

METRO FURUKAWA

BALTAMAR BUILDING

Twenty-three-story building with 5 underground levels. Lima - San Isidro 2005 – 2007

Double height 2.000 m² metal structure bay. Lima – La Victoria 2005

Nineteen-story apartment building with 2 underground levels. Lima - Miraflores 2005 LAS LADERAS DE MELGAREJO

Expansion of the administrative building of Universidad San Martín. Lima - La Molina 2002 HOCHSCHILD BUILDING EXPANSION

Expansion of 2 floors of offices. Lima - Santiago de Surco 2006 - 2007 LARCOMAR FASHION CENTER

WONG DOS DE MAYO EXPANSION

ECO NORTE

Construction of 3 new levels of shopping center and 2 parking levels. Lima - Miraflores 2006 - 2007

1.000 m² store expansion. Lima - San Isidro 2005

Construction of eco store. Total area of 1.950 m². Lima – Comas 2005

TOTTUS STORE AT TORRE REAL 10

Construction of a 1.368 m² built-up area store Lima – Rímac 2005

BALTA 1070 BUILDING

Flats of 208 m² and 212 m², all of them overlooking the ocean and with a terrace. Lima - Miraflores 2007 – 2008

ECO RÍMAC

Seven-story office building, rooftop, 4 underground levels. Lima - San Isidro 2006 - 2007

NOVOTEL HOTEL

ECO COMAS EXPANSION

210 rooms, 8 floors, 2 underground parking levels and 1 service level. Area: 14.400 m². Lima - San Isidro 2007 – 2008

One-story supermarket expansion. Lima - Comas 2006

DOUBLETREE PARACAS HOTEL GUEST SUITES

Two-story hotel on a wet structure level. Built-up area of 9.860 m². Ica - Paracas 2007 – 2008

COLEGIO FE Y ALEGRÍA GOLF MILLENIUM

113

SANTO TORIBIO BUILDING

Seven-story building with 4 underground levels. Area: 21.600 m². Lima - San Isidro 2007 – 2008

(CHURCH AND PASTORAL CENTER)

Chapel with light dome (2.500 m²), 8 floors of church and parking spaces. Total area 21.000 m². Lima - Santiago de Surco 2007 - 2008

Engineering and Construction

CINEMARK PLAZA SUR

Construction of 7 movie houses. Lima - Chorrillos 2006 ECO ÓVALO BALTA

Construction of store. Lima - Barranco 2006

UNIVERSIDAD DE PIURA – GRADUATE SCHOOL

ECO ANGÉLICA GAMARRA

Graduate school campus and various buildings of Universidad de Piura. Lima – Surco 2006 - 2007

One-story supermarket. Callao - Callao 2006

UNIVERSIDAD ANDINA DEL CUSCO

Three buildings, 55 apartments and 2 underground parking levels. Total area of 6.800 m². Lima - Miraflores 2006 – 2007

BOLOGNESI 364 CONDOMINIUM

Two 4- and 5 story buildings, 13.900 m² built-up area. Cusco 2005

LIMA PLAZA SUR SHOPPING CENTER

BUILDING

Real estate project of 33 buildings with a total of 252 apartments, 76 m² each. Lima - La Molina 2004 - 2006

Shopping center built on 11.000 m². Lima - Chorrillos 2005

GRAN TEATRO NACIONAL - LIMA


114

80 YEARS

New horizons, new challenges

DUKE ENERGY OFFICES

PARAÍSO CULTURAL CENTER

CENTRO CULTURAL

BLAS CERDEÑA BUILDING

TAXCOP CULTURAL CENTER

TORRE REAL TRES

Construction and full interior implementation of the Paraíso Cultural Center. Mexico - Ixtapalapa 1999 – 2000

TEHUACÁN

Seven-story building with 5 370 m² flats and one duplex penthouse. Lima - San Isidro 1998

Mexico - Guerrero 1997 – 1998

Fifteen-story, 18.151 m² building, 4 underground levels and 149 parking spaces. Lima - San Isidro 1997 – 1998

Construction of shell, 24.800 m² built-up area, 3 underground parking levels. Lima - Miraflores 2001 BRITISH EMBASSY HEADQUARTERS

New headquarters, implementation of office in floors 22 and 23 of Torre Parque Mar. Lima - Miraflores 2001

CAMPO DE MARTE

CENTRO RECREACIONAL

USAID BUILDING

Two towers of 52 and 51 apartments. Lima - Jesús María 2004 – 2005

MAGISTERIAL (TEACHERS

Office building for the United States Embassy AID Lima - Santiago de Surco 2000 – 2002

CIURLIZZA BUILDING

Fifteen-story building, 22 luxury apartments and 3 underground levels with a total area of 20.000 m². Lima - San Isidro 2004 - 2005 DALMACIA BUILDING

Courts, 6-room lodgings per building, 50-room hotel. Area: 7.000 m². Cusco - Cusco 2003 - 2005 USAID SAFE

Safety shelter to be used in the event of an attack. Lima - Santiago de Surco 2002 - 2003

Eight-story apartment building. Lima - Miraflores 2004 - 2005

PUCP SCHOOL OF ARCHITECTURE

ERNST & YOUNG BUILDING

Three-story concrete building. Lima - San Miguel 2002 - 2003

Seven-story building, 4 underground levels. Area: 12.200 m². Lima - San Isidro 2004

WORKSHOPS

CIUDAD JUÁREZ TEMPLE

Temple of 3.568.47 m². Mexico - Ciudad Juárez 1999 - 2000 RESIDENCIAL LA PORTADA DE CERES

153 houses of up to 88 m². Lima - Santa Anita 1999 – 2000

Twenty-three story office building. Area: 19.000 m². Lima - Miraflores 2000 - 2001 SOCIAL SECURITY HOSPITAL - SANTA ANITA

720 m² expansion of metal structure. Lima - Miraflores 2002 - 2003

Four blocks of the Social Security hospital, 5.420 m² built-up area. Lima - Ate 1999 – 2000

UNIVERSIDAD SAN MARTÍN DE

SAGITARIO CULTURAL CENTER

PORRES MEDICAL SCHOOL

Construction and full interior implementation of the Sagitario Cultural Center. CULTURAL CENTER 1999 - 2000

ÓVALO GUTIÉRREZ EXPANSION

Administrative building expansion. Lima - La Molina 2002

PASEO DE LA REPÚBLICA CONDOMINIUM

MCDONALD’S

NEXAPA CULTURAL CENTER

Seven residential towers, 149 apartments, 21 parking spaces. Lima - Surquillo 2003 – 2004

Construction of new establishment. Lima - San Miguel 2001 – 2001

Construction and full interior implementation of the Nexapa Cultural Center. Mexico - Mexico D.F. 1999 - 2000

Expansion, remodeling and full interior implementation of the Cocoyoc Cultural Center. Mexico - Morelos - Cuatla 1998 - 1999

NICOLÁS DE RIVERA BUILDING

Seven-story building, 11 3- and 4-bedroom apartments. Lima - San Isidro 1999 – 2000

Construction of Ripley department store. Lima - San Isidro 1998 - 2000 MARRIOTT HOTEL & STELLARIS CASINO

ESTACIÓN CULTURAL CENTER

Expansion, remodeling and full interior implementation. Mexico - Morelos - Cuatla 1998 - 1999

Five-star, 24-story hotel, 300 rooms. Total area 28.800m². Lima - Miraflores 1998 - 2000 NEW COLD IMPORT CORPORATE

HIDALGO CULTURAL CENTER

HEADQUARTERS

Expansion, remodeling and full interior implementation of the Hidalgo Cultural Center. Mexico - Morelos - Cuatla 1998 – 1999

Commercial and office building for third parties – 3.700 m² built-up area. Lima - Miraflores 1998 - 1999

COAHUIXTLA CULTURAL CENTER

Cultural center. Mexico - Torreon 1997

KPMG TOWER

Fourteen floors - 4 underground levels. Lima - San Isidro 1997 – 1998 CONSTRUCTION OF GRAÑA Y MONTERO BLOCK III

Construction of 6 floors of Block III. Lima - Surquillo 1997 – 1998 MAURICIO HOCHSCHILD & CIA OFFICE BUILDING

TORRE REAL SEIS

Seven stories and 3 underground levels, 208 parking spaces. Lima - San Isidro 1997 - 1998 TORRE SIGLO XXI

Twenty-one stories, 31.000 m² builtup area, 350 parking spaces. Lima – San Isidro 1997 - 1998

Built-up area 6.644 m² - lobby, 107 offices, meeting rooms. Lima - Santiago de Surco 1997

JUÁREZ CULTURAL CENTER

Expansion, remodeling and full interior implementation of the Coahuixtla Cultural Center. Mexico - Morelos - Cuatla 1998 - 1999

TORRE REAL SIETE

Two-story building, one semibasement and one underground level. Lima - San Isidro 1999 – 2000

RIPLEY SAN ISIDRO DEPARTMENT STORE

CENTRO CULTURAL COCOYOC

TORRE REAL UNO

Fourteen floors of offices, 144 parking spaces, 26 storage areas in 4 underground levels. Lima - San Isidro 1999 – 2000

TORRE PARQUE MAR

CAMPO DE MARTE BUILDING

Two towers of 52 and 51 apartments, 14 stories each, Lima - Jesús María 2004 – 2005

Chapel remodeling. Mexico - Guerrero - Chilpancingo 1999

MULTICINES ALCÁZAR

Eight movie houses with 1,800 seats and 40 parking spaces. Area: 8.400 m². Lima - San Isidro 2000 - 2001

Expansion, remodeling and full interior implementation of the Tehuacán Cultural Center. Mexico - Puebla - Tehuacán 1998 – 1999

HERMOSILLO TEMPLE

Temple of 4.796.48 m². Mexico - Hermosillo 1999 - 2000 CHILPANCINGO PROJECT

RECREATION CENTER)

115

Implementation of 1.200 m² of offices in 3 floors. Lima - San Isidro 2001 RIPLEY DE MIRAFLORES

MULTICINES ALCÁZAR

Engineering and Construction

CUMBRES DE FIGUEROA CULTURAL CENTER

Expansion, remodeling and full interior implementation of the cultural center. Mexico - Guerrero - Acapulco 1998

ANAHUAC CULTURAL CENTER

Construction of the Anahuac Cultural Center. Mexico - Sinaloa 1997 - 1998 VOLTA PROJECT

Economical housing project. Mexico - Mexico D.F. 1997 - 1998

IXTAPALUCA CULTURAL CENTER

LOMBARDIA PROJECT

Cultural center. Mexico - Mexico D.F. 1998

Economical housing project. Mexico - Mexico D.F. 1997 - 1998

RINCÓN DEL BOSQUE BUILDING

Twenty-one apartments, 1 penthouse, 2 parking levels, 10.857.84 m² built-up area. Mexico - Mexico D.F. 1998 – 2000

LATINO BUILDING

PROYECTO SANTA CRUZ IV PROJECT

Building construction. Lima - San Isidro 1998 - 2000

Economical housing project – Work in partnership. Mexico - Mexico D.F. 1997 - 1998

BOULEVARD DERTEANO SANTA TERESA

Six hundred and sixty economical housing apartments, 5 stories each, 37.304.85 m² built-up area. Mexico - Mexico D.F. 1998 - 1999

Boulevard and underground parking. Built-up area of 14.300 m². Lima - San Isidro 1998

JUAN ESCUTIA PROJECT

Temple. Mexico - Mexico D.F. 1997 MARRIOTT HOTEL & STELLARIS CASINO


114

80 YEARS

New horizons, new challenges

DUKE ENERGY OFFICES

PARAÍSO CULTURAL CENTER

CENTRO CULTURAL

BLAS CERDEÑA BUILDING

TAXCOP CULTURAL CENTER

TORRE REAL TRES

Construction and full interior implementation of the Paraíso Cultural Center. Mexico - Ixtapalapa 1999 – 2000

TEHUACÁN

Seven-story building with 5 370 m² flats and one duplex penthouse. Lima - San Isidro 1998

Mexico - Guerrero 1997 – 1998

Fifteen-story, 18.151 m² building, 4 underground levels and 149 parking spaces. Lima - San Isidro 1997 – 1998

Construction of shell, 24.800 m² built-up area, 3 underground parking levels. Lima - Miraflores 2001 BRITISH EMBASSY HEADQUARTERS

New headquarters, implementation of office in floors 22 and 23 of Torre Parque Mar. Lima - Miraflores 2001

CAMPO DE MARTE

CENTRO RECREACIONAL

USAID BUILDING

Two towers of 52 and 51 apartments. Lima - Jesús María 2004 – 2005

MAGISTERIAL (TEACHERS

Office building for the United States Embassy AID Lima - Santiago de Surco 2000 – 2002

CIURLIZZA BUILDING

Fifteen-story building, 22 luxury apartments and 3 underground levels with a total area of 20.000 m². Lima - San Isidro 2004 - 2005 DALMACIA BUILDING

Courts, 6-room lodgings per building, 50-room hotel. Area: 7.000 m². Cusco - Cusco 2003 - 2005 USAID SAFE

Safety shelter to be used in the event of an attack. Lima - Santiago de Surco 2002 - 2003

Eight-story apartment building. Lima - Miraflores 2004 - 2005

PUCP SCHOOL OF ARCHITECTURE

ERNST & YOUNG BUILDING

Three-story concrete building. Lima - San Miguel 2002 - 2003

Seven-story building, 4 underground levels. Area: 12.200 m². Lima - San Isidro 2004

WORKSHOPS

CIUDAD JUÁREZ TEMPLE

Temple of 3.568.47 m². Mexico - Ciudad Juárez 1999 - 2000 RESIDENCIAL LA PORTADA DE CERES

153 houses of up to 88 m². Lima - Santa Anita 1999 – 2000

Twenty-three story office building. Area: 19.000 m². Lima - Miraflores 2000 - 2001 SOCIAL SECURITY HOSPITAL - SANTA ANITA

720 m² expansion of metal structure. Lima - Miraflores 2002 - 2003

Four blocks of the Social Security hospital, 5.420 m² built-up area. Lima - Ate 1999 – 2000

UNIVERSIDAD SAN MARTÍN DE

SAGITARIO CULTURAL CENTER

PORRES MEDICAL SCHOOL

Construction and full interior implementation of the Sagitario Cultural Center. CULTURAL CENTER 1999 - 2000

ÓVALO GUTIÉRREZ EXPANSION

Administrative building expansion. Lima - La Molina 2002

PASEO DE LA REPÚBLICA CONDOMINIUM

MCDONALD’S

NEXAPA CULTURAL CENTER

Seven residential towers, 149 apartments, 21 parking spaces. Lima - Surquillo 2003 – 2004

Construction of new establishment. Lima - San Miguel 2001 – 2001

Construction and full interior implementation of the Nexapa Cultural Center. Mexico - Mexico D.F. 1999 - 2000

Expansion, remodeling and full interior implementation of the Cocoyoc Cultural Center. Mexico - Morelos - Cuatla 1998 - 1999

NICOLÁS DE RIVERA BUILDING

Seven-story building, 11 3- and 4-bedroom apartments. Lima - San Isidro 1999 – 2000

Construction of Ripley department store. Lima - San Isidro 1998 - 2000 MARRIOTT HOTEL & STELLARIS CASINO

ESTACIÓN CULTURAL CENTER

Expansion, remodeling and full interior implementation. Mexico - Morelos - Cuatla 1998 - 1999

Five-star, 24-story hotel, 300 rooms. Total area 28.800m². Lima - Miraflores 1998 - 2000 NEW COLD IMPORT CORPORATE

HIDALGO CULTURAL CENTER

HEADQUARTERS

Expansion, remodeling and full interior implementation of the Hidalgo Cultural Center. Mexico - Morelos - Cuatla 1998 – 1999

Commercial and office building for third parties – 3.700 m² built-up area. Lima - Miraflores 1998 - 1999

COAHUIXTLA CULTURAL CENTER

Cultural center. Mexico - Torreon 1997

KPMG TOWER

Fourteen floors - 4 underground levels. Lima - San Isidro 1997 – 1998 CONSTRUCTION OF GRAÑA Y MONTERO BLOCK III

Construction of 6 floors of Block III. Lima - Surquillo 1997 – 1998 MAURICIO HOCHSCHILD & CIA OFFICE BUILDING

TORRE REAL SEIS

Seven stories and 3 underground levels, 208 parking spaces. Lima - San Isidro 1997 - 1998 TORRE SIGLO XXI

Twenty-one stories, 31.000 m² builtup area, 350 parking spaces. Lima – San Isidro 1997 - 1998

Built-up area 6.644 m² - lobby, 107 offices, meeting rooms. Lima - Santiago de Surco 1997

JUÁREZ CULTURAL CENTER

Expansion, remodeling and full interior implementation of the Coahuixtla Cultural Center. Mexico - Morelos - Cuatla 1998 - 1999

TORRE REAL SIETE

Two-story building, one semibasement and one underground level. Lima - San Isidro 1999 – 2000

RIPLEY SAN ISIDRO DEPARTMENT STORE

CENTRO CULTURAL COCOYOC

TORRE REAL UNO

Fourteen floors of offices, 144 parking spaces, 26 storage areas in 4 underground levels. Lima - San Isidro 1999 – 2000

TORRE PARQUE MAR

CAMPO DE MARTE BUILDING

Two towers of 52 and 51 apartments, 14 stories each, Lima - Jesús María 2004 – 2005

Chapel remodeling. Mexico - Guerrero - Chilpancingo 1999

MULTICINES ALCÁZAR

Eight movie houses with 1,800 seats and 40 parking spaces. Area: 8.400 m². Lima - San Isidro 2000 - 2001

Expansion, remodeling and full interior implementation of the Tehuacán Cultural Center. Mexico - Puebla - Tehuacán 1998 – 1999

HERMOSILLO TEMPLE

Temple of 4.796.48 m². Mexico - Hermosillo 1999 - 2000 CHILPANCINGO PROJECT

RECREATION CENTER)

115

Implementation of 1.200 m² of offices in 3 floors. Lima - San Isidro 2001 RIPLEY DE MIRAFLORES

MULTICINES ALCÁZAR

Engineering and Construction

CUMBRES DE FIGUEROA CULTURAL CENTER

Expansion, remodeling and full interior implementation of the cultural center. Mexico - Guerrero - Acapulco 1998

ANAHUAC CULTURAL CENTER

Construction of the Anahuac Cultural Center. Mexico - Sinaloa 1997 - 1998 VOLTA PROJECT

Economical housing project. Mexico - Mexico D.F. 1997 - 1998

IXTAPALUCA CULTURAL CENTER

LOMBARDIA PROJECT

Cultural center. Mexico - Mexico D.F. 1998

Economical housing project. Mexico - Mexico D.F. 1997 - 1998

RINCÓN DEL BOSQUE BUILDING

Twenty-one apartments, 1 penthouse, 2 parking levels, 10.857.84 m² built-up area. Mexico - Mexico D.F. 1998 – 2000

LATINO BUILDING

PROYECTO SANTA CRUZ IV PROJECT

Building construction. Lima - San Isidro 1998 - 2000

Economical housing project – Work in partnership. Mexico - Mexico D.F. 1997 - 1998

BOULEVARD DERTEANO SANTA TERESA

Six hundred and sixty economical housing apartments, 5 stories each, 37.304.85 m² built-up area. Mexico - Mexico D.F. 1998 - 1999

Boulevard and underground parking. Built-up area of 14.300 m². Lima - San Isidro 1998

JUAN ESCUTIA PROJECT

Temple. Mexico - Mexico D.F. 1997 MARRIOTT HOTEL & STELLARIS CASINO


116

80 YEARS

LARCOMAR SHOPPING AND

New horizons, new challenges

Engineering and Construction

OFFICES OF SHELL PROSPECTING

EL PARDO HOTEL

BARRANCO I BUILDING

FRANKLIN D. ROOSEVELT SCHOOL

BANCO CENTRAL DE RESERVA

ENTERTAINMENT CENTER

DEL PERÚ

Residential building facing the ocean, consisting of 2 buildings of 15 apartments. Lima - Barranco 1994

(CENTRAL RESERVE BANK)

Implementation of offices. Lima - San Isidro 1996 – 1997

Expansion of the hotel by 600 m². Lima - Miraflores 1995 - 1996

LIBRARY

44.675 m² of entertainment and culture establishments with parking. Lima - Miraflores 1997 – 1998

Library, classrooms, labs, warehouses, etc. on 2.675 m². Lima - La Molina 1984 – 1985

Remodeling. Lima - Lima 1980

NEW HEADQUARTERS OF THE CHAMPAGNAT MARISTAS PRIMARY

PERUVIAN MINING ENGINEERS

BARRANCO III BUILDING

SCHOOL

INSTITUTE

PLAZA SANTA FE PROJECT

TEMPLO IGLESIA DE JESUCRISTO

Two 5-story buildings, 22 apartments, flats and duplex. Lima-Barranco 1997

Building on a built-up area of 7.200 m², 3 levels, one semibasement. Lima - Miraflores 1996 – 1997

Two buildings on an area of 1.398 m², one the auditorium and the other the offices building. Lima - La Molina 1995 – 1996

Forty-six apartments in 3 residential buildings, 2 penthouses on an area of 18.713 m². Mexico - Mexico D.F 1993 – 1995

Main temple and ancillary building. Lima - La Molina 1983 - 1985

Prefabricated structures of 716 houses. Venezuela - Puerto Ordaz 1978

CIUDAD DE TINTAYA CAMP

ALIDE BUILDING

SHERATON SAN CRISTÓBAL

PASAJE SANTA FE PROJECT

HOTEL SANTIAGO

Apartment buildings on an area of 32.800 m². Mexico - Mexico D.F. 1993 – 1994

Urban development and concurrent construction of 45 buildings and urban equipment facilities Cusco - Tintaya 1983

Finishings for 4.300 m². Lima - San Isidro 1978

RURAL HOSPITALS AND HEALTH

New corporate headquarters and shopping center of 66.000 m² and work in partnership. Lima - San Isidro 1978 – 1980

VALLE VERDE PROJECT

LOS BOSQUES DE LA PLANICIE

Housing compound. Mexico - Torreón 1996 - 1997

A condominium of 43.000 m² consisting of 42 houses of 270 m² and 320 m², with common areas. Lima - La Molina 1995 – 1996

CIVAC CULTURAL CENTER

Land area, 2.420 m², built-up area 1.473.64 m². Mexico – Mexico City 1996 REFORMA 2503 BUILDING

Five-story residential building, 1 apartment per floor, 6 parking spaces and 1 storage area. 2.460 m². Mexico – Mexico City 1996 - 1997

TELEFÓNICA BUILDING

TORRE REAL ONCE

BLOCK II

Construction of 3-story building. Lima - Surquillo 1993 FOUR SEASONS HOTEL

AZTECA CULTURAL CENTER

EL PARQUE DE MONTERRICO

Land area, 3.171 m². Land area, 2.420 m², built-up area 1.851.50 m². Mexico - Mexico D.F. 1995 - 1996

CONDOMINIUM

CANELOS BUILDING

Total built-up area 2.475.65 m², land area 657.26 m². Mexico - Mexico D.F. 1996

LUZ DEL SUR BUILDING

Construction of warehouses. Lima - Santiago de Surco 1995 – 1996

Two building blocks with a total of 39 apartments and parking spaces. Lima - San Isidro 1996 – 1997 LUZ DEL SUR

Excavation and footings for the future building. Lima - San Isidro 1996

Four hospitals in Jaén, La Merced, Puerto Bermúdez and Pichanaki; and 92 health centers. Cajamarca - Junín - Pasco 1983

COMPOUND

US EMBASSY WAREHOUSE AND

PUERTA DEL GOLF BUILDING

SERVICES – PROJECT MANAGEMENT

Economical housing project of 5-story buildings, 660 houses. Mexico - Mexico D.F 1994 – 1995

Eight 5-story buildings, 60 apartments overlooking a 2.000 m² private park. Lima - Santiago de Surco 1994 – 1995 ORO VERDE HOTEL (SWISSOTEL)

Five-star hotel, 244 rooms, restaurants and services. Lima - San Isidro 1994 – 1995

SHOP FACILITIES

TORRE REAL CUATRO

Eight-story office building and 3 underground levels. Lima - San Isidro 1995 – 1996 SAGA SAN ISIDRO

Remodeling of the first floor. Lima - San Isidro 1995

247 rooms on 33.500 m². Mexico - Mexico D.F. 1992 – 1994

LIMA SHERATON HOTEL AND CASINO

Remodeling of Las Palmeras restaurant and services on an area of 350 m². Lima 1994

Eight-story building overlooking the ocean, 4.026 m² built-up area. 12 luxury apartments. Lima - Barranco 1994 – 1995

BLOCK I EXPANSION

SANTIAGO DE CHILE SHERATON HOTEL

One additional floor. Lima - Surquillo 1982

OF THE UNITED STATES OF AMERICA EMBASSY

CHAVIMOCHIC SPECIAL PROJECT

NUEVO CENTRO POBLADO “CRUCE

Built-up area of 15.000 m², parking area, roads and sidewalks, 15.820 m², work in partnership. Lima - Santiago de Surco 1992 - 1995

HEADQUARTERS

DE CAJAMARCA” (“CRUCE DE

PORRAS–BEATA IMELDA

Headquarters at industrial park. La Libertad - Trujillo 1988 - 1989

CAJAMARCA” NEW SETTLEMENT)

Construction of headquarters. Lima – San Juan de Lurigancho 1982

JACINTO LARA BUILDING

Eight-apartment building, the back opening to a park. Lima - San Isidro 1989-1990

Ten-apartment building, the back opening to a park. Lima - San Isidro 1988

Assessment of original windows and improvement alternative. Lima - San Isidro 1992 CHAN CHAN SITE MUSEUM

Construction of the building and assembly of the exhibition. La Libertad - Trujillo 1989 – 1990

Urban development and concurrent construction of 320 housing units and urban equipment facilities. La Libertad - Pacasmayo 1987 CONJUNTO HABITACIONAL HILARIO MENDIVIL (HILARIO MENDIVIL

CENECAPE SAN MARTÍN DE

COMPAÑÍA DE SEGUROS LA

Four-story and 5-apartment building with top quality finishings. Building of 1.922.75 m². Lima - San Isidro 1987

Urban development and construction of 114 apartments and preparation of commercial plots. Cusco 1987

Office building of 3.225 m². Lima - La Molina 1981

(SUBMARINE SCHOOL)

Three underground levels, 3 floors of 5.642 m². Lima - Miraflores 1987 – 1988

Callao navy base. Callao - Callao 1987

UNIVERSIDAD CATÓLICA DE CUENCA

Project and supervision of 33.000 m². Ecuador - Cuenca 1977 - 1978 GRAÑA Y MONTERO BUILDING BLOCK I

Three-story building. Lima - Surquillo 1976 - 1977 TORRES DE VALLE BUILDINGS

Multifamily buildings on 4000 m². Ecuador - Quito 1976 - 1977

INSTITUTO DE INVESTIGACIÓN NUTRICIONAL (NUTRITION

HOTEL INTERNACIONAL PICOAGA

RESEARCH INSTITUTE)

CUSCO

Building of 2.118 m². Lima - La Molina 1981 - 1982

Four-star hotel with 75 rooms and services. Cusco - Cusco 1976 - 1977

ESCUELA DE SUBMARINOS BANCO CONTINENTAL MIRAFLORES

CUSCO REGIONAL HOSPITAL

Building of 46.000 m² 500 beds. Cusco - Cusco 1978 - 1986

NACIONAL

RESIDENTIAL COMPOUND) LOS NOGALES BUILDING

REPAIR OF PETROPERÚ BUILDING WINDOWS

BARRANCO II BUILDING

GRAÑA Y MONTERO BUILDING

NEW HEADQUARTERS

ALFREDO SALAZAR BUILDING

BANCO CONTINENTAL AND SHOPPING CENTER

GRAÑA Y MONTERO BUILDING

REMODELING

Parking building. Lima - San Isidro 1996

Twenty-two story and 4 underground area building on an area of 30.000 m². Lima - San Isidro 1996 – 1997

SANTA TERESA RESIDENTIAL

ECONOMICAL HOUSING

Implementation of works of the right sector of the building. Lima - Lima 1996

SAGA JOCKEY PLAZA

Full interior implementation. Lima - Santiago de Surco 1996 – 1997

Expansion of 157 rooms. Chile - Santiago de Chile 1995 – 1997

117

SAN RICARDO EL GOLF LIMA BUILDING

Multifamily building of 21.022.65 m². Lima - San Isidro 1980

PLAZA SAN MIGUEL LIMA SHOPPING CENTER

Building of 18.000 m². Lima - San Miguel 1975 – 1976


116

80 YEARS

LARCOMAR SHOPPING AND

New horizons, new challenges

Engineering and Construction

OFFICES OF SHELL PROSPECTING

EL PARDO HOTEL

BARRANCO I BUILDING

FRANKLIN D. ROOSEVELT SCHOOL

BANCO CENTRAL DE RESERVA

ENTERTAINMENT CENTER

DEL PERÚ

Residential building facing the ocean, consisting of 2 buildings of 15 apartments. Lima - Barranco 1994

(CENTRAL RESERVE BANK)

Implementation of offices. Lima - San Isidro 1996 – 1997

Expansion of the hotel by 600 m². Lima - Miraflores 1995 - 1996

LIBRARY

44.675 m² of entertainment and culture establishments with parking. Lima - Miraflores 1997 – 1998

Library, classrooms, labs, warehouses, etc. on 2.675 m². Lima - La Molina 1984 – 1985

Remodeling. Lima - Lima 1980

NEW HEADQUARTERS OF THE CHAMPAGNAT MARISTAS PRIMARY

PERUVIAN MINING ENGINEERS

BARRANCO III BUILDING

SCHOOL

INSTITUTE

PLAZA SANTA FE PROJECT

TEMPLO IGLESIA DE JESUCRISTO

Two 5-story buildings, 22 apartments, flats and duplex. Lima-Barranco 1997

Building on a built-up area of 7.200 m², 3 levels, one semibasement. Lima - Miraflores 1996 – 1997

Two buildings on an area of 1.398 m², one the auditorium and the other the offices building. Lima - La Molina 1995 – 1996

Forty-six apartments in 3 residential buildings, 2 penthouses on an area of 18.713 m². Mexico - Mexico D.F 1993 – 1995

Main temple and ancillary building. Lima - La Molina 1983 - 1985

Prefabricated structures of 716 houses. Venezuela - Puerto Ordaz 1978

CIUDAD DE TINTAYA CAMP

ALIDE BUILDING

SHERATON SAN CRISTÓBAL

PASAJE SANTA FE PROJECT

HOTEL SANTIAGO

Apartment buildings on an area of 32.800 m². Mexico - Mexico D.F. 1993 – 1994

Urban development and concurrent construction of 45 buildings and urban equipment facilities Cusco - Tintaya 1983

Finishings for 4.300 m². Lima - San Isidro 1978

RURAL HOSPITALS AND HEALTH

New corporate headquarters and shopping center of 66.000 m² and work in partnership. Lima - San Isidro 1978 – 1980

VALLE VERDE PROJECT

LOS BOSQUES DE LA PLANICIE

Housing compound. Mexico - Torreón 1996 - 1997

A condominium of 43.000 m² consisting of 42 houses of 270 m² and 320 m², with common areas. Lima - La Molina 1995 – 1996

CIVAC CULTURAL CENTER

Land area, 2.420 m², built-up area 1.473.64 m². Mexico – Mexico City 1996 REFORMA 2503 BUILDING

Five-story residential building, 1 apartment per floor, 6 parking spaces and 1 storage area. 2.460 m². Mexico – Mexico City 1996 - 1997

TELEFÓNICA BUILDING

TORRE REAL ONCE

BLOCK II

Construction of 3-story building. Lima - Surquillo 1993 FOUR SEASONS HOTEL

AZTECA CULTURAL CENTER

EL PARQUE DE MONTERRICO

Land area, 3.171 m². Land area, 2.420 m², built-up area 1.851.50 m². Mexico - Mexico D.F. 1995 - 1996

CONDOMINIUM

CANELOS BUILDING

Total built-up area 2.475.65 m², land area 657.26 m². Mexico - Mexico D.F. 1996

LUZ DEL SUR BUILDING

Construction of warehouses. Lima - Santiago de Surco 1995 – 1996

Two building blocks with a total of 39 apartments and parking spaces. Lima - San Isidro 1996 – 1997 LUZ DEL SUR

Excavation and footings for the future building. Lima - San Isidro 1996

Four hospitals in Jaén, La Merced, Puerto Bermúdez and Pichanaki; and 92 health centers. Cajamarca - Junín - Pasco 1983

COMPOUND

US EMBASSY WAREHOUSE AND

PUERTA DEL GOLF BUILDING

SERVICES – PROJECT MANAGEMENT

Economical housing project of 5-story buildings, 660 houses. Mexico - Mexico D.F 1994 – 1995

Eight 5-story buildings, 60 apartments overlooking a 2.000 m² private park. Lima - Santiago de Surco 1994 – 1995 ORO VERDE HOTEL (SWISSOTEL)

Five-star hotel, 244 rooms, restaurants and services. Lima - San Isidro 1994 – 1995

SHOP FACILITIES

TORRE REAL CUATRO

Eight-story office building and 3 underground levels. Lima - San Isidro 1995 – 1996 SAGA SAN ISIDRO

Remodeling of the first floor. Lima - San Isidro 1995

247 rooms on 33.500 m². Mexico - Mexico D.F. 1992 – 1994

LIMA SHERATON HOTEL AND CASINO

Remodeling of Las Palmeras restaurant and services on an area of 350 m². Lima 1994

Eight-story building overlooking the ocean, 4.026 m² built-up area. 12 luxury apartments. Lima - Barranco 1994 – 1995

BLOCK I EXPANSION

SANTIAGO DE CHILE SHERATON HOTEL

One additional floor. Lima - Surquillo 1982

OF THE UNITED STATES OF AMERICA EMBASSY

CHAVIMOCHIC SPECIAL PROJECT

NUEVO CENTRO POBLADO “CRUCE

Built-up area of 15.000 m², parking area, roads and sidewalks, 15.820 m², work in partnership. Lima - Santiago de Surco 1992 - 1995

HEADQUARTERS

DE CAJAMARCA” (“CRUCE DE

PORRAS–BEATA IMELDA

Headquarters at industrial park. La Libertad - Trujillo 1988 - 1989

CAJAMARCA” NEW SETTLEMENT)

Construction of headquarters. Lima – San Juan de Lurigancho 1982

JACINTO LARA BUILDING

Eight-apartment building, the back opening to a park. Lima - San Isidro 1989-1990

Ten-apartment building, the back opening to a park. Lima - San Isidro 1988

Assessment of original windows and improvement alternative. Lima - San Isidro 1992 CHAN CHAN SITE MUSEUM

Construction of the building and assembly of the exhibition. La Libertad - Trujillo 1989 – 1990

Urban development and concurrent construction of 320 housing units and urban equipment facilities. La Libertad - Pacasmayo 1987 CONJUNTO HABITACIONAL HILARIO MENDIVIL (HILARIO MENDIVIL

CENECAPE SAN MARTÍN DE

COMPAÑÍA DE SEGUROS LA

Four-story and 5-apartment building with top quality finishings. Building of 1.922.75 m². Lima - San Isidro 1987

Urban development and construction of 114 apartments and preparation of commercial plots. Cusco 1987

Office building of 3.225 m². Lima - La Molina 1981

(SUBMARINE SCHOOL)

Three underground levels, 3 floors of 5.642 m². Lima - Miraflores 1987 – 1988

Callao navy base. Callao - Callao 1987

UNIVERSIDAD CATÓLICA DE CUENCA

Project and supervision of 33.000 m². Ecuador - Cuenca 1977 - 1978 GRAÑA Y MONTERO BUILDING BLOCK I

Three-story building. Lima - Surquillo 1976 - 1977 TORRES DE VALLE BUILDINGS

Multifamily buildings on 4000 m². Ecuador - Quito 1976 - 1977

INSTITUTO DE INVESTIGACIÓN NUTRICIONAL (NUTRITION

HOTEL INTERNACIONAL PICOAGA

RESEARCH INSTITUTE)

CUSCO

Building of 2.118 m². Lima - La Molina 1981 - 1982

Four-star hotel with 75 rooms and services. Cusco - Cusco 1976 - 1977

ESCUELA DE SUBMARINOS BANCO CONTINENTAL MIRAFLORES

CUSCO REGIONAL HOSPITAL

Building of 46.000 m² 500 beds. Cusco - Cusco 1978 - 1986

NACIONAL

RESIDENTIAL COMPOUND) LOS NOGALES BUILDING

REPAIR OF PETROPERÚ BUILDING WINDOWS

BARRANCO II BUILDING

GRAÑA Y MONTERO BUILDING

NEW HEADQUARTERS

ALFREDO SALAZAR BUILDING

BANCO CONTINENTAL AND SHOPPING CENTER

GRAÑA Y MONTERO BUILDING

REMODELING

Parking building. Lima - San Isidro 1996

Twenty-two story and 4 underground area building on an area of 30.000 m². Lima - San Isidro 1996 – 1997

SANTA TERESA RESIDENTIAL

ECONOMICAL HOUSING

Implementation of works of the right sector of the building. Lima - Lima 1996

SAGA JOCKEY PLAZA

Full interior implementation. Lima - Santiago de Surco 1996 – 1997

Expansion of 157 rooms. Chile - Santiago de Chile 1995 – 1997

117

SAN RICARDO EL GOLF LIMA BUILDING

Multifamily building of 21.022.65 m². Lima - San Isidro 1980

PLAZA SAN MIGUEL LIMA SHOPPING CENTER

Building of 18.000 m². Lima - San Miguel 1975 – 1976


118

80 YEARS

New horizons, new challenges

Engineering and Construction

INSTITUTO HIJAS DE MARÍA

CITY OF TALARA

BELÉN SCHOOL

Building of 5.000 m². Lima - Lima 1975 - 1976

Reconstruction. Piura - Talara 1971

Educational complex of 16.000 m². Lima - San Isidro 1963

HOLIDAY INN HOTEL

TÚPAC AMARU BCH ECONOMICAL

EDIFICIO INMOBILIARIO

125 rooms. Iquitos 1975 - 1976

HOUSING

NAZARENAS S.A.

BANCO POPULAR TACNA

158 houses. Lima 1971

Six floors - 11.000 m². Lima - Lima 1963

Banking services on 1.300 m². Tacna 1958

SAN IGNACIO DE LOYOLA PIURA

MINISTERIO DE TRABAJO Y

CASAS ASISTENCIA SOCIAL

SCHOOL

ASUNTOS INDÍGENAS (LABOR AND

MAGDALENA (MAGDALENA SOCIAL

Building of 2.500 m². Piura 1959

INDIGENOUS AFFAIRS MINISTRY)

AID HOUSES)

Twelve floors - 38.000 m². Lima - Jesús María 1956 – 1957

36 houses. Lima - Magdalena del Mar 1953

CLÍNICA DOCTOR ESCALANTE

MINISTRY OF ECONOMY AND

Construction of hospital. Piura - Talara 1955

FINANCE

LIBERTADOR MARRIOTT HOTEL

131 rooms. Cusco 1975 - 1976

PENSIONADO SAN JOSÉ DE TARBES

ALCEDO CONCERT HALL

NUESTRA SEÑORA DE LOURDES

(LOURDES) (SAN JOSÉ DE TARBES

SCHOOL

BANCO WIESE MIRAFLORES

SPCC ILO HOSPITAL

Building of 1.800 m². La Libertad - Trujillo 1971

Building of 1.000 m², 315 seats. Lima 1963

Building on 3.000 m². Piura 1958

Banking services, 800 m². Lima - Miraflores 1955

Expansion of 1.400 m². Moquegua - Ilo 1974 – 1976

(LOURDES) BOARDING HOUSE)

LA PASCANA LIMA MARKET

Building of 2.700 m². Lima - Comas 1963

HOUSING FOR NORTHERN PERÚ MINING CORPORATION WORKERS

BANCO POPULAR DEL PERÚ

Savings section Lima – building of 7.500 m². Lima 1974 TORRE CENTRO CÍVICO LIMA

Thirty-four floors, with 32.800 m² of offices. Lima - Lima 1974 – 1977 BEATA IMELDA SCHOOL CHAPEL

Chapel and related services. Lima - Chosica 1974 BANCO CENTRAL DE RESERVA

138 houses. La Libertad - Shorey and Quiruvilca 1971

Building of 5.600 m². Lima 1970

CÍRCULO MILITAR DEL PERÚ

CUGLIEVAN PIURA BUILDING

Social facilities and services. Lima - Jesús María 1967 - 1968

Construction of office and commercial building. Piura 1965

UNIVERSIDAD DE PIURA

First state of 1.500 m². Piura 1969

CLÍNICA ANGLO AMERICANA

Expansion of 600 m². Lima - San Isidro 1966

BANCO CENTRAL HIPOTECARIO

Building of 4.400 m². Callao 1969

LIMA SHERATON HOTEL

Five-star hotel, 22 floors, 495 rooms and 40.000 m². Lima 1972 – 1974

SEMINARIO MENOR CHOSICA

INRESA FACTORY OFFICES

Construction of offices. Lima 1970 – 1971

GALAX SUPERMARKET

COMPAÑÍA DE SEGUROS LA VITALICIA

COMPAÑÍA DE SEGUROS

Building of 3.800 m². Lima - San Isidro 1966

ÍTALO–PERUANA

Building of 3.000 m². Lima - Lima 1965

Building of 3.000 m². Lima - Santiago de Surco 1968

ECONOMICAL HOUSING AT LA URBANIZACIÓN LATINA

BEATA IMELDA CHOSICA SCHOOL

Twenty-two economical houses. Lambayeque - Chiclayo 1966

Building of 8.000 m². Currently the Beata Imelda Peruvian – German School Lima - Chosica 1964

SHOREY OFFICES AND HOUSES

COLEGIO SANTA MARÍA PIURA

Expansion. La Libertad 1972

Building of 3.700 m². Piura 1967

SAMMNE NORTHERN OFFICES

LAS MERCEDES BASILICA

Construction of building. Cajamarca 1972

Church and related services. Piura - Paita 1967 – 1968

FIRST NATIONAL CITY BANK OF NEW YORK

Banking services on 400 m². Callao 1966

Building of 2.600 m². Piura - Piura 1963

Private entity offices on 10.500 m². Lima 1955

48 houses. Lima 1958 - 1958

HOSPITAL SEGURO SOCIAL DEL FIRST NATIONAL CITY BANK OF NEW

EMPLEADO CHICLAYO

YORK

Social Security hospital in Chiclayo. Lambayeque - Chiclayo 1955

Banking services on 6.200 m². Lima 1958 COLEGIO NACIONAL NASCA (NASCA

LICEO EDUCACIONAL SAN ANTONIO

Building on 1.560 m². Ica - Nasca 1958

Building of 4.400 m². Chile - San Antonio 1961

SEARS ROEBUCK DEL PERÚ STATE SCHOOL)

CLUB ESMERALDA SANTA MARÍA DEL MAR

Restoration, 823 seats. Lima 1960

Social facilities with services and pool, 4.000 m². Lima - Santa María del Mar 1957

OREZZOLI ANCÓN STORES AND

SEMINARIO DE SANTO DOMINGO

GARAGES

Building of 4.000 m². Lima 1956

TEATRO SEGURA (SEGURA THEATER)

Building of 1.200 m². Lima - Ancón 1960

CAMANÁ APARTMENT BUILDING GRAU TALARA MOVIE HOUSE

Building of 2.000 m². Piura - Talara 1959

Building of 1.100 m². Lima 1956 SEMINARIO SANTO TORIBIO

TALARA MOVIE HOUSE SALESIANO PIURA SCHOOL

WIESE BUILDING

WORKERS

Building of 7.000 m². Lima - Chosica 1962

COLEGIO SALESIANO LIMA

Construction of school. Lima 1965

HOUSES FOR OSTOLAZA S.A.

CORAZÓN

Building of 1.400 m². Lima - Chosica 1963

SUDAMÉRICA OFFICE BUILDING

(CENTRAL RESERVE BANK)

Building of 28.500 m². Lima 1973 – 1975

PRE SEMINARIO DEL SAGRADO

MINISTRY OF EDUCATION

Building of 2.600 m². Piura - Talara 1959

119

Building of 4.000 m². Lima 1956

Department store - 18.000 m². Lima - San Isidro 1954 – 1955

Twelve floors - 42.000 m². Lima 1953 - 1954 BENEFICENCIA PÚBLICA DE LIMA HOUSING

50 houses. Lima 1953 TALARA CIVIC CENTER

Public commercial buildings and plaza. Piura - Talara 1952 HOSPITAL DEL SEGURO SOCIAL DEL EMPLEADO LIMA

Social Security hospital with 1.250 beds - 130.000 m². Lima 1952 - 1954 CIUDAD OBRERA NORTHERN PERÚ

EL SOL BUILDING

Construction of office building. Lima 1954 MINISTRY OF EDUCATION

Twenty-two floors - 46.000 m². Lima 1954 - 1956 UNIDAD ESCOLAR SAN RAMÓN

CHILETE (NORTHERN PERÚ CHILETE COMPANY TOWN)

Development and construction of 125 houses. Cajamarca - Chilete 1952 GRAN HOTEL TACNA

75 rooms and services - 4.250 m². Tacna 1951

(SAN RAMÓN PUBLIC SCHOOL)

Building of 1 and 2 stories. Area: 7.000 m². Junín - Tarma 1954 IGLESIA MATRIZ TARMA

Church and related services. Junín - Tarma 1953 COUNTRY CLUB LIMA HOTEL

Five-star hotel - 2.000 m². Lima - San Isidro 1953

MERCADO FRIGORÍFICO DE TALARA (TALARA COLD STORAGE MARKET)

Sale stands and cold storage chambers on 9.800 m². Piura - Talara 1951 CLUB TALARA

Swimming pool and services for members. Area: 2.250 m². Piura - Talara 1951


118

80 YEARS

New horizons, new challenges

Engineering and Construction

INSTITUTO HIJAS DE MARÍA

CITY OF TALARA

BELÉN SCHOOL

Building of 5.000 m². Lima - Lima 1975 - 1976

Reconstruction. Piura - Talara 1971

Educational complex of 16.000 m². Lima - San Isidro 1963

HOLIDAY INN HOTEL

TÚPAC AMARU BCH ECONOMICAL

EDIFICIO INMOBILIARIO

125 rooms. Iquitos 1975 - 1976

HOUSING

NAZARENAS S.A.

BANCO POPULAR TACNA

158 houses. Lima 1971

Six floors - 11.000 m². Lima - Lima 1963

Banking services on 1.300 m². Tacna 1958

SAN IGNACIO DE LOYOLA PIURA

MINISTERIO DE TRABAJO Y

CASAS ASISTENCIA SOCIAL

SCHOOL

ASUNTOS INDÍGENAS (LABOR AND

MAGDALENA (MAGDALENA SOCIAL

Building of 2.500 m². Piura 1959

INDIGENOUS AFFAIRS MINISTRY)

AID HOUSES)

Twelve floors - 38.000 m². Lima - Jesús María 1956 – 1957

36 houses. Lima - Magdalena del Mar 1953

CLÍNICA DOCTOR ESCALANTE

MINISTRY OF ECONOMY AND

Construction of hospital. Piura - Talara 1955

FINANCE

LIBERTADOR MARRIOTT HOTEL

131 rooms. Cusco 1975 - 1976

PENSIONADO SAN JOSÉ DE TARBES

ALCEDO CONCERT HALL

NUESTRA SEÑORA DE LOURDES

(LOURDES) (SAN JOSÉ DE TARBES

SCHOOL

BANCO WIESE MIRAFLORES

SPCC ILO HOSPITAL

Building of 1.800 m². La Libertad - Trujillo 1971

Building of 1.000 m², 315 seats. Lima 1963

Building on 3.000 m². Piura 1958

Banking services, 800 m². Lima - Miraflores 1955

Expansion of 1.400 m². Moquegua - Ilo 1974 – 1976

(LOURDES) BOARDING HOUSE)

LA PASCANA LIMA MARKET

Building of 2.700 m². Lima - Comas 1963

HOUSING FOR NORTHERN PERÚ MINING CORPORATION WORKERS

BANCO POPULAR DEL PERÚ

Savings section Lima – building of 7.500 m². Lima 1974 TORRE CENTRO CÍVICO LIMA

Thirty-four floors, with 32.800 m² of offices. Lima - Lima 1974 – 1977 BEATA IMELDA SCHOOL CHAPEL

Chapel and related services. Lima - Chosica 1974 BANCO CENTRAL DE RESERVA

138 houses. La Libertad - Shorey and Quiruvilca 1971

Building of 5.600 m². Lima 1970

CÍRCULO MILITAR DEL PERÚ

CUGLIEVAN PIURA BUILDING

Social facilities and services. Lima - Jesús María 1967 - 1968

Construction of office and commercial building. Piura 1965

UNIVERSIDAD DE PIURA

First state of 1.500 m². Piura 1969

CLÍNICA ANGLO AMERICANA

Expansion of 600 m². Lima - San Isidro 1966

BANCO CENTRAL HIPOTECARIO

Building of 4.400 m². Callao 1969

LIMA SHERATON HOTEL

Five-star hotel, 22 floors, 495 rooms and 40.000 m². Lima 1972 – 1974

SEMINARIO MENOR CHOSICA

INRESA FACTORY OFFICES

Construction of offices. Lima 1970 – 1971

GALAX SUPERMARKET

COMPAÑÍA DE SEGUROS LA VITALICIA

COMPAÑÍA DE SEGUROS

Building of 3.800 m². Lima - San Isidro 1966

ÍTALO–PERUANA

Building of 3.000 m². Lima - Lima 1965

Building of 3.000 m². Lima - Santiago de Surco 1968

ECONOMICAL HOUSING AT LA URBANIZACIÓN LATINA

BEATA IMELDA CHOSICA SCHOOL

Twenty-two economical houses. Lambayeque - Chiclayo 1966

Building of 8.000 m². Currently the Beata Imelda Peruvian – German School Lima - Chosica 1964

SHOREY OFFICES AND HOUSES

COLEGIO SANTA MARÍA PIURA

Expansion. La Libertad 1972

Building of 3.700 m². Piura 1967

SAMMNE NORTHERN OFFICES

LAS MERCEDES BASILICA

Construction of building. Cajamarca 1972

Church and related services. Piura - Paita 1967 – 1968

FIRST NATIONAL CITY BANK OF NEW YORK

Banking services on 400 m². Callao 1966

Building of 2.600 m². Piura - Piura 1963

Private entity offices on 10.500 m². Lima 1955

48 houses. Lima 1958 - 1958

HOSPITAL SEGURO SOCIAL DEL FIRST NATIONAL CITY BANK OF NEW

EMPLEADO CHICLAYO

YORK

Social Security hospital in Chiclayo. Lambayeque - Chiclayo 1955

Banking services on 6.200 m². Lima 1958 COLEGIO NACIONAL NASCA (NASCA

LICEO EDUCACIONAL SAN ANTONIO

Building on 1.560 m². Ica - Nasca 1958

Building of 4.400 m². Chile - San Antonio 1961

SEARS ROEBUCK DEL PERÚ STATE SCHOOL)

CLUB ESMERALDA SANTA MARÍA DEL MAR

Restoration, 823 seats. Lima 1960

Social facilities with services and pool, 4.000 m². Lima - Santa María del Mar 1957

OREZZOLI ANCÓN STORES AND

SEMINARIO DE SANTO DOMINGO

GARAGES

Building of 4.000 m². Lima 1956

TEATRO SEGURA (SEGURA THEATER)

Building of 1.200 m². Lima - Ancón 1960

CAMANÁ APARTMENT BUILDING GRAU TALARA MOVIE HOUSE

Building of 2.000 m². Piura - Talara 1959

Building of 1.100 m². Lima 1956 SEMINARIO SANTO TORIBIO

TALARA MOVIE HOUSE SALESIANO PIURA SCHOOL

WIESE BUILDING

WORKERS

Building of 7.000 m². Lima - Chosica 1962

COLEGIO SALESIANO LIMA

Construction of school. Lima 1965

HOUSES FOR OSTOLAZA S.A.

CORAZÓN

Building of 1.400 m². Lima - Chosica 1963

SUDAMÉRICA OFFICE BUILDING

(CENTRAL RESERVE BANK)

Building of 28.500 m². Lima 1973 – 1975

PRE SEMINARIO DEL SAGRADO

MINISTRY OF EDUCATION

Building of 2.600 m². Piura - Talara 1959

119

Building of 4.000 m². Lima 1956

Department store - 18.000 m². Lima - San Isidro 1954 – 1955

Twelve floors - 42.000 m². Lima 1953 - 1954 BENEFICENCIA PÚBLICA DE LIMA HOUSING

50 houses. Lima 1953 TALARA CIVIC CENTER

Public commercial buildings and plaza. Piura - Talara 1952 HOSPITAL DEL SEGURO SOCIAL DEL EMPLEADO LIMA

Social Security hospital with 1.250 beds - 130.000 m². Lima 1952 - 1954 CIUDAD OBRERA NORTHERN PERÚ

EL SOL BUILDING

Construction of office building. Lima 1954 MINISTRY OF EDUCATION

Twenty-two floors - 46.000 m². Lima 1954 - 1956 UNIDAD ESCOLAR SAN RAMÓN

CHILETE (NORTHERN PERÚ CHILETE COMPANY TOWN)

Development and construction of 125 houses. Cajamarca - Chilete 1952 GRAN HOTEL TACNA

75 rooms and services - 4.250 m². Tacna 1951

(SAN RAMÓN PUBLIC SCHOOL)

Building of 1 and 2 stories. Area: 7.000 m². Junín - Tarma 1954 IGLESIA MATRIZ TARMA

Church and related services. Junín - Tarma 1953 COUNTRY CLUB LIMA HOTEL

Five-star hotel - 2.000 m². Lima - San Isidro 1953

MERCADO FRIGORÍFICO DE TALARA (TALARA COLD STORAGE MARKET)

Sale stands and cold storage chambers on 9.800 m². Piura - Talara 1951 CLUB TALARA

Swimming pool and services for members. Area: 2.250 m². Piura - Talara 1951


120

80 YEARS

TARMA MARKET

Building of 9.500 m². Junín - Tarma 1951

INTERNATIONAL PETROLEUM

REISER Y CURIONI S.A. OFFICES

COMPANY PRIVATE SCHOOL

Commercial building. Lima 1942

Building of 700 m². Piura - Talara 1947

BANCO POPULAR DEL PERÚ

Banking services on 6.400 m². Arequipa 1951

Church and related services. Lima - San Isidro 1947 INMOBILIARIA SAN MARTÍN S.A.

Construction of 2.500 m². Piura - Talara 1949

BUILDING

Private entity offices, 4.320 m². Lima 1947

IGNACIO MERINO TALARA SCHOOL SAN FELIPE APÓSTOL CHURCH

Church and related services. Lima - San Isidro 1946

SANTA CLARA PSYCHIATRIC HOSPITAL

CITY OF TALARA

Building of 2.000 m². Lima 1949

Development and construction of 4.322 houses. Piura - Talara 1945 – 1957

COMPAÑÍA DE SEGUROS LA NACIONAL RESIDENTIAL BUILDING

TACNA LAS NAZARENAS - LUIS

Multifamily building, 18.000 m². Lima 1949

GUILLERMO OSTOLAZA S.A.

TALARA SHOPPING CENTER

Commercial buildings on 16.000 m². Piura - Talara 1948 - 1950 EL ROSARIO RESIDENTIAL BUILDING

Multifamily building, 4.000 m². Lima 1948

Public entity offices. Lima - Miraflores 1940

Private entity offices, 4.100 m². Lima 1945 PLAZA DE ACHO

Restoration and expansion, 14.000 spectators. Lima - Rímac 1944

Engineering and Construction

URBANIZACIÓN LAS VEGAS

URBANIZACIÓN VILLA LOS ÁNGELES

14 ha Lima 1964

RESIDENCE

PUENTE DE PIEDRA

Single family, 2-floor house. Lima 1938

Lima 1972 URBANIZACIÓN TÚPAC AMARU

URBANIZACIÓN VALLE HERMOSO

COMPAÑÍA ADMINISTRADORA

5 ha Lima 1971

50 ha Lima 1964

DEL GUANO WORKERS HOUSE

Dormitory for workers, with capacity for 432 men in 3 floors. Ica - Islas Chincha Norte 1938 BAÑOS DE MIRAFLORES (MIRAFLORES SHORE BATHS)

URBANIZACIÓN CHACARILLA DEL ESTANQUE

LA MOLINA

Lima 1957 URBANIZACIÓN SANTA MARÍA

URBANIZACIÓN LAS CASUARINAS -

DEL MAR

MONTERRICO

200 ha Lima 1956

URBANIZACIÓN SAN BERNARDO

30 ha Piura 1963

URBANIZACIÓN HUERTO URBANIZACIÓN SAN ROQUE SURCO

SAN ANTONIO

50 ha Lima 1959

45 ha Lima - Monterrico 1954

Commercial and residential. Lima 1940

Restaurant, services, capacity for 500, all on poles. Lima - Miraflores 1937 – 1938

10 ha Lima 1969

MOTHER AND CHILD HOSPITAL

WIESE – MONTERO FAMILY

URBANIZACIÓN LA TINA CHICLAYO

Current service number 6 - 3.000 m². Lima 1940

RESIDENCE

Single family house, 2 floors. Lima - Chosica 1937

33 ha Lambayeque 1968

URBANIZACIÓN LOMAS DE MONTERRICO

URBANIZACIÓN CHACRA RIOS

URBANIZACIÓN LAS LAGUNAS DE LA UNIVERSIDAD SAN AGUSTÍN

ULLOA RESIDENCE

MOLINA

15 ha Lima 1960

50 ha Lima 1959

School of Liberal Arts. Arequipa 1940

Single family house, 2 floors. Callao - La Punta 1936 – 1937

20 ha Lima - La Molina 1968

URBANIZACIÓN MIRAFLORES PIURA

URBANIZACIÓN RINCONADA

ANTENOR RIZO PATRÓN BUILDING

URBANIZACIÓN CUEVA

HOTEL DE TURISTAS DE AREQUIPA

MANUEL IRIGOYEN RESIDENCE

URBANIZACIÓN PANAMERICANA

(CURRENTLY HOTEL LIBERTADOR)

Single family house, 2 floors. Lima - Miraflores 1933

NORTE

88 rooms and services - 2.600 m². Arequipa 1940

30 ha Lima 1968

URBANIZACIÓN VILLA FAP LA JOYA TEATRO MUNICIPAL AREQUIPA

Construction of 2.000 m². Arequipa 1940

BANCO WIESE LIMITADO

Implementation of the project, includes: design, development, specifications and blueprints. Arequipa 1980

AND BUILDINGS OF THE BANCO

CÍA. ADMINISTRADORA DEL GUANO

WIESE UNION

Three buildings, 36.000 m². Lima 1944

Services and water reservoir facility. Kitchen, canteen, bakery, toilets. Ica - Islas Chincha Norte 1939

29 ha Lima 1976

BENEFICENCIA PÚBLICA DE LIMA

COMPAÑÍA ADMINISTRADORA

URBANIZACIÓN CAMACHO

20 ha Lima 1973

URBANIZACIÓN CAMACHO

20 ha Lima 1967 - 1973 URBANIZACIÓN CARABAYLLO

URBANIZACIÓN PANDO

14 ha Lima 1966 URBANIZACIÓN HUAQUILLAY

IGLESIA MATRIZ DE TALARA

BUILDING

DEL GUANO HOSPITAL

Church and related services. Piura - Talara 1947

Public entity offices, 11.900 m². Lima 1944

Health facility with capacity for 34 patients. Ica - Islas Chincha Norte 1939

50 ha Lima 1964 URBANIZACIÓN LA TRINIDAD

URBANIZACIÓN MIRAFLORES PIURA

60 ha Piura 1960 - 1969 - 1973

12 ha Lima 1964

URBANIZACIÓN LA PRADERA

160 ha Lima 1959 y 1968

28 ha Lima 1959

URBANIZACIÓN LA ESTANCIA

7 ha Lima 1970

BUILDING

BUILDING

Three buildings, 31.000 m². Lima 1949

Five-story building, 4.000 m² built up. 1942 - 1943 MIRAFLORES MUNICIPALITY

LABORATORIES

COMPAÑÍA DE SEGUROS RÍMAC

ARCHITECT HECTOR VELARDE

CASINO NÁUTICO DE ANCÓN SANTA ÚRSULA CHURCH

GENERAL HOSPITAL AND

Building of 1 plant - 1.050 m². Piura - Talara 1949

New horizons, new challenges

URBANIZACIÓN CÓRPAC (CONSORTIUM)

URBANIZACIÓN SANTA TERESA DE

URBANIZACIÓN RISSO

100 ha Lima 1962

MONTERRICO

Lima - Lince 1949

25 ha Lima 1959

URBANIZACIÓN SAN BERNARDO

20 ha Lima 1949 URBANIZACIÓN LIMA POLO & HUNT CLUB

Piura 1960 - 1969

LA MOLINA

Lima 1958

PLAZA DE ACHO, LIMA

126 ha Lima - Monterrico 1948

121


120

80 YEARS

TARMA MARKET

Building of 9.500 m². Junín - Tarma 1951

INTERNATIONAL PETROLEUM

REISER Y CURIONI S.A. OFFICES

COMPANY PRIVATE SCHOOL

Commercial building. Lima 1942

Building of 700 m². Piura - Talara 1947

BANCO POPULAR DEL PERÚ

Banking services on 6.400 m². Arequipa 1951

Church and related services. Lima - San Isidro 1947 INMOBILIARIA SAN MARTÍN S.A.

Construction of 2.500 m². Piura - Talara 1949

BUILDING

Private entity offices, 4.320 m². Lima 1947

IGNACIO MERINO TALARA SCHOOL SAN FELIPE APÓSTOL CHURCH

Church and related services. Lima - San Isidro 1946

SANTA CLARA PSYCHIATRIC HOSPITAL

CITY OF TALARA

Building of 2.000 m². Lima 1949

Development and construction of 4.322 houses. Piura - Talara 1945 – 1957

COMPAÑÍA DE SEGUROS LA NACIONAL RESIDENTIAL BUILDING

TACNA LAS NAZARENAS - LUIS

Multifamily building, 18.000 m². Lima 1949

GUILLERMO OSTOLAZA S.A.

TALARA SHOPPING CENTER

Commercial buildings on 16.000 m². Piura - Talara 1948 - 1950 EL ROSARIO RESIDENTIAL BUILDING

Multifamily building, 4.000 m². Lima 1948

Public entity offices. Lima - Miraflores 1940

Private entity offices, 4.100 m². Lima 1945 PLAZA DE ACHO

Restoration and expansion, 14.000 spectators. Lima - Rímac 1944

Engineering and Construction

URBANIZACIÓN LAS VEGAS

URBANIZACIÓN VILLA LOS ÁNGELES

14 ha Lima 1964

RESIDENCE

PUENTE DE PIEDRA

Single family, 2-floor house. Lima 1938

Lima 1972 URBANIZACIÓN TÚPAC AMARU

URBANIZACIÓN VALLE HERMOSO

COMPAÑÍA ADMINISTRADORA

5 ha Lima 1971

50 ha Lima 1964

DEL GUANO WORKERS HOUSE

Dormitory for workers, with capacity for 432 men in 3 floors. Ica - Islas Chincha Norte 1938 BAÑOS DE MIRAFLORES (MIRAFLORES SHORE BATHS)

URBANIZACIÓN CHACARILLA DEL ESTANQUE

LA MOLINA

Lima 1957 URBANIZACIÓN SANTA MARÍA

URBANIZACIÓN LAS CASUARINAS -

DEL MAR

MONTERRICO

200 ha Lima 1956

URBANIZACIÓN SAN BERNARDO

30 ha Piura 1963

URBANIZACIÓN HUERTO URBANIZACIÓN SAN ROQUE SURCO

SAN ANTONIO

50 ha Lima 1959

45 ha Lima - Monterrico 1954

Commercial and residential. Lima 1940

Restaurant, services, capacity for 500, all on poles. Lima - Miraflores 1937 – 1938

10 ha Lima 1969

MOTHER AND CHILD HOSPITAL

WIESE – MONTERO FAMILY

URBANIZACIÓN LA TINA CHICLAYO

Current service number 6 - 3.000 m². Lima 1940

RESIDENCE

Single family house, 2 floors. Lima - Chosica 1937

33 ha Lambayeque 1968

URBANIZACIÓN LOMAS DE MONTERRICO

URBANIZACIÓN CHACRA RIOS

URBANIZACIÓN LAS LAGUNAS DE LA UNIVERSIDAD SAN AGUSTÍN

ULLOA RESIDENCE

MOLINA

15 ha Lima 1960

50 ha Lima 1959

School of Liberal Arts. Arequipa 1940

Single family house, 2 floors. Callao - La Punta 1936 – 1937

20 ha Lima - La Molina 1968

URBANIZACIÓN MIRAFLORES PIURA

URBANIZACIÓN RINCONADA

ANTENOR RIZO PATRÓN BUILDING

URBANIZACIÓN CUEVA

HOTEL DE TURISTAS DE AREQUIPA

MANUEL IRIGOYEN RESIDENCE

URBANIZACIÓN PANAMERICANA

(CURRENTLY HOTEL LIBERTADOR)

Single family house, 2 floors. Lima - Miraflores 1933

NORTE

88 rooms and services - 2.600 m². Arequipa 1940

30 ha Lima 1968

URBANIZACIÓN VILLA FAP LA JOYA TEATRO MUNICIPAL AREQUIPA

Construction of 2.000 m². Arequipa 1940

BANCO WIESE LIMITADO

Implementation of the project, includes: design, development, specifications and blueprints. Arequipa 1980

AND BUILDINGS OF THE BANCO

CÍA. ADMINISTRADORA DEL GUANO

WIESE UNION

Three buildings, 36.000 m². Lima 1944

Services and water reservoir facility. Kitchen, canteen, bakery, toilets. Ica - Islas Chincha Norte 1939

29 ha Lima 1976

BENEFICENCIA PÚBLICA DE LIMA

COMPAÑÍA ADMINISTRADORA

URBANIZACIÓN CAMACHO

20 ha Lima 1973

URBANIZACIÓN CAMACHO

20 ha Lima 1967 - 1973 URBANIZACIÓN CARABAYLLO

URBANIZACIÓN PANDO

14 ha Lima 1966 URBANIZACIÓN HUAQUILLAY

IGLESIA MATRIZ DE TALARA

BUILDING

DEL GUANO HOSPITAL

Church and related services. Piura - Talara 1947

Public entity offices, 11.900 m². Lima 1944

Health facility with capacity for 34 patients. Ica - Islas Chincha Norte 1939

50 ha Lima 1964 URBANIZACIÓN LA TRINIDAD

URBANIZACIÓN MIRAFLORES PIURA

60 ha Piura 1960 - 1969 - 1973

12 ha Lima 1964

URBANIZACIÓN LA PRADERA

160 ha Lima 1959 y 1968

28 ha Lima 1959

URBANIZACIÓN LA ESTANCIA

7 ha Lima 1970

BUILDING

BUILDING

Three buildings, 31.000 m². Lima 1949

Five-story building, 4.000 m² built up. 1942 - 1943 MIRAFLORES MUNICIPALITY

LABORATORIES

COMPAÑÍA DE SEGUROS RÍMAC

ARCHITECT HECTOR VELARDE

CASINO NÁUTICO DE ANCÓN SANTA ÚRSULA CHURCH

GENERAL HOSPITAL AND

Building of 1 plant - 1.050 m². Piura - Talara 1949

New horizons, new challenges

URBANIZACIÓN CÓRPAC (CONSORTIUM)

URBANIZACIÓN SANTA TERESA DE

URBANIZACIÓN RISSO

100 ha Lima 1962

MONTERRICO

Lima - Lince 1949

25 ha Lima 1959

URBANIZACIÓN SAN BERNARDO

20 ha Lima 1949 URBANIZACIÓN LIMA POLO & HUNT CLUB

Piura 1960 - 1969

LA MOLINA

Lima 1958

PLAZA DE ACHO, LIMA

126 ha Lima - Monterrico 1948

121


122

80 YEARS

New horizons, new challenges

Engineering and Construction

123

URBANIZACIÓN LA MODA ELEGANTE

SAN LORENZO CERAMICS PLANT

GREASE PLANT FOR TEXACO

COPSA EXPANSION

PEPESCA FISHERY COMPOUND

Lima 1948

Shop and administrative offices module of the ceramics processing plant. Mechanical facilities, scale, generator set, substation. Lima - Lurín 1998 - 1999

Civil works, electrical facilities, electromechanical assembly of the grease plant. Callao 1990

Construction of floors 3 and 4, 540 m², for industrial facilities. Wardrobe expansion, construction of reservoir, foundations for cooling tower Nº8. Callao 1982

Cold storage, cannery and fish meal plant, 24.000 m². Piura - Paita 1973 - 1974

URBANIZACIÓN LA MODA ELEGANTE

Lima 1948

SIDERPERU SMELTER

URBANIZACIÓN BALCONCILLO LIMA

GLORIA PLANT

PLANT

CENTRO PAPELERO DE LIMA

127 ha Lima 1948

Civil works of the industrial plant for food products processing plant. Lima 1998 - 1999

20,000 t/year Chavimochic project. La Libertad - Chao 1989

PAPER MILL

Ancash - Chimbote 6.200 m². 1972

Lima 1982

SILOS OF NORTHERN PERU MINING

TOMATO PASTE AGROINDUSTRIAL

URBANIZACIÓN GOLF

CORPORATION PACOCHA OILS AND SOAP MILL

HUACHO SOAP MILL

CLUB LOS INCAS

EL COMERCIO

EXPANSION

100 ha Lima 1948

New plant for printing press, 2.605 m² built-up area, 750 m² outer areas. Lima 1996

Maintenance and miscellaneous works. Lima - Huacho 1988 - 1990

Continuous saponification, subchlorine treatment, glycerin evaporation, glycerin distillation, soap drying, cutting and packaging plant, offices, warehouses and laboratories. Lima 1981

URBANIZACIÓN CIUDAD Y CAMPO

42 ha Lima 1947

PLASTIC OMNIUM AUTOMOVILE

PALMA DEL ESPINO S.A. OIL MILL

PROJECT

Industrial plant and housing at Palmas del Espino. Foundation for 590 poles and reinforced concrete slabs. Uchiza, San Martín 1987

Mexico - Mexico DF 1996 - 1997

URBANIZACIÓN LUREN

Ica 1947

LAIVE MEAT PRODUCTS PLANT

Baños de Miraflores ca. 1940

URBANIZACIÓN SAN GERMAN

20 ha Lima 1947

URBANIZACIÓN SANTA INÉS

Lima - Chaclacayo 1940

URBANIZACIÓN AMÉRICA

URBANIZACIÓN SELVA ALEGRE

15 ha Lima 1946

25 ha Arequipa 1940

URBANIZACIÓN LA FLORIDA

URBANIZACIÓN SAN ISIDRO

30 ha Lima - Rímac 1946

COUNTRY CLUB

Lima 1939

URBANIZACIÓN GUARDIA CHALACA

Callao 1940

INDUSTRY

to manufacture non-woven fabric, with an area of 11.266 m². Lima 2011 – 2012 TEXTIL SAN JACINTO INDUSTRIAL PLANT

Tejidos San Jacinto indigo mill. Area 10.476 m². Lima - Ate 2011

60 ha Callao - La Perla 1940

Sales, repair shop and technical service building. Two underground parking levels. Total area 8.066 m². Lima 2012 – 2013

URBANIZACIÓN ORRANTIA DEL MAR

25 ha Lima 1940

FITESA INDUSTRIAL PLANT

Implementation of first stage (production line 1) of plant intended

BACKUS STEEL TANK ASSEMBLY RANSA WAREHOUSES

Construction of warehouse. San Agustín -Callao 2004

KOMATSU MITSUI HEADQUARTERS

New Mitsui headquarters. Includes office building of the operations area. Lima 2010

EUROMOTORS URBANIZACIÓN LA PERLA

PISCO BAG PLANT STAGES I AND II

Remodeling, expansion and reinforcement of structure damaged by earthquake and expansion of the industrial bay. Ica - Pisco 2007 – 2008

NASA UNIQUE DISTRIBUTION CENTER

Two office buildings of 3.000 m² and an 8.800 m² metal bay. Lurín 2008 - 2009

Production plant, outer platforms, office areas, laboratory, electrical and plumbing facilities, general finishings. Outer works include maneuvering yard and access road, treatment settling tank. Area: 4.450 m². Lima - Ate 1995 - 1996

Assembly of 3 10.000 hl stainless steel tanks and their respective insulation. Lima 1994

SAN LORENZO CERAMICS PLANT

First expansion: raw materials reception area, main bay (mill area, enamel preparation area, kiln area and finished product area). Lima - Lurín 2000

CACER INDUSTRIAL BAY EXPANSION

Production bay 940 m². Callao 1992 ALMACENES SERLIPSA CARGO CENTER

MESSER OXYGEN PLANT

Expansion of oxygen plant for Siderperú. Civil works and electromechanical assembly. Ancash 1999

Construction of a perimeter fence and Block 1.Area: 5.300 m². Callao 1991 - 1992

Three silos for 5.000 tons. La Libertad - Shorey 1972 QUÍMICA DEL PACIFICO SALT REFINERY

3.000 m². Callao 1971 - 1972

HUARANGAL NUCLEAR ENERGY

SEARS ROEBUCK WAREHOUSE

CENTER SUPERVISION

Lima 1981

15.000 m². Lima 1968

TRANSERVI S.A. WAREHOUSES

TEXTIL PIURA YARN FACTORY

PIRELLI CABLE PLANT

Callao - Bocanegra and Lima Chorrillos 1987

Construction and expansion of Piura yarn factory, with a built-up area of 42.000 m². Piura 1979

14.000 m². Lima 1968

HILOS CADENA LLAVE S.A. THREAD FACTORY

Expansion. Lima 1985 COMPAÑÍA CERVECERA DEL SUR

CEMENTOS LIMA HISCHMAN SECONDARY CRUSHER

Crusher and conveyor belt assembly. Lima - Villa María del Triunfo 1978

DEL PERÚ S.A.

Administrative complex 4,200 m². Arequipa 1984 - 1985 COMPAÑÍA CERVECERA DEL SUR

PARAMONGA PULP PLANT

EMPRESA EDITORA EL COMERCIO S.A.

New printing plant of 18.323 m². Lima 1982 - 1984

CASA GRANDE SUGAR SILO

10.000 tons. La Libertad 1968

EXPANSION

Assembly of equipment and piping. Lima - Paramonga 1978

DEL PERÚ S.A.

Water plant expansion, fermentation block. Arequipa 1983

CARTAVIO PAPER MILL

14.000 m². La Libertad - Trujillo 1968

INDUPERÚ NEWSPRINT PAPER MILL

25.000 m², 34.000 m3 of concrete, 3.200 tons of concrete. La Libertad - Santiago de Cao 1976 - 1977

SAN JACINTO COTTON GIN

Piura 1967


122

80 YEARS

New horizons, new challenges

Engineering and Construction

123

URBANIZACIÓN LA MODA ELEGANTE

SAN LORENZO CERAMICS PLANT

GREASE PLANT FOR TEXACO

COPSA EXPANSION

PEPESCA FISHERY COMPOUND

Lima 1948

Shop and administrative offices module of the ceramics processing plant. Mechanical facilities, scale, generator set, substation. Lima - Lurín 1998 - 1999

Civil works, electrical facilities, electromechanical assembly of the grease plant. Callao 1990

Construction of floors 3 and 4, 540 m², for industrial facilities. Wardrobe expansion, construction of reservoir, foundations for cooling tower Nº8. Callao 1982

Cold storage, cannery and fish meal plant, 24.000 m². Piura - Paita 1973 - 1974

URBANIZACIÓN LA MODA ELEGANTE

Lima 1948

SIDERPERU SMELTER

URBANIZACIÓN BALCONCILLO LIMA

GLORIA PLANT

PLANT

CENTRO PAPELERO DE LIMA

127 ha Lima 1948

Civil works of the industrial plant for food products processing plant. Lima 1998 - 1999

20,000 t/year Chavimochic project. La Libertad - Chao 1989

PAPER MILL

Ancash - Chimbote 6.200 m². 1972

Lima 1982

SILOS OF NORTHERN PERU MINING

TOMATO PASTE AGROINDUSTRIAL

URBANIZACIÓN GOLF

CORPORATION PACOCHA OILS AND SOAP MILL

HUACHO SOAP MILL

CLUB LOS INCAS

EL COMERCIO

EXPANSION

100 ha Lima 1948

New plant for printing press, 2.605 m² built-up area, 750 m² outer areas. Lima 1996

Maintenance and miscellaneous works. Lima - Huacho 1988 - 1990

Continuous saponification, subchlorine treatment, glycerin evaporation, glycerin distillation, soap drying, cutting and packaging plant, offices, warehouses and laboratories. Lima 1981

URBANIZACIÓN CIUDAD Y CAMPO

42 ha Lima 1947

PLASTIC OMNIUM AUTOMOVILE

PALMA DEL ESPINO S.A. OIL MILL

PROJECT

Industrial plant and housing at Palmas del Espino. Foundation for 590 poles and reinforced concrete slabs. Uchiza, San Martín 1987

Mexico - Mexico DF 1996 - 1997

URBANIZACIÓN LUREN

Ica 1947

LAIVE MEAT PRODUCTS PLANT

Baños de Miraflores ca. 1940

URBANIZACIÓN SAN GERMAN

20 ha Lima 1947

URBANIZACIÓN SANTA INÉS

Lima - Chaclacayo 1940

URBANIZACIÓN AMÉRICA

URBANIZACIÓN SELVA ALEGRE

15 ha Lima 1946

25 ha Arequipa 1940

URBANIZACIÓN LA FLORIDA

URBANIZACIÓN SAN ISIDRO

30 ha Lima - Rímac 1946

COUNTRY CLUB

Lima 1939

URBANIZACIÓN GUARDIA CHALACA

Callao 1940

INDUSTRY

to manufacture non-woven fabric, with an area of 11.266 m². Lima 2011 – 2012 TEXTIL SAN JACINTO INDUSTRIAL PLANT

Tejidos San Jacinto indigo mill. Area 10.476 m². Lima - Ate 2011

60 ha Callao - La Perla 1940

Sales, repair shop and technical service building. Two underground parking levels. Total area 8.066 m². Lima 2012 – 2013

URBANIZACIÓN ORRANTIA DEL MAR

25 ha Lima 1940

FITESA INDUSTRIAL PLANT

Implementation of first stage (production line 1) of plant intended

BACKUS STEEL TANK ASSEMBLY RANSA WAREHOUSES

Construction of warehouse. San Agustín -Callao 2004

KOMATSU MITSUI HEADQUARTERS

New Mitsui headquarters. Includes office building of the operations area. Lima 2010

EUROMOTORS URBANIZACIÓN LA PERLA

PISCO BAG PLANT STAGES I AND II

Remodeling, expansion and reinforcement of structure damaged by earthquake and expansion of the industrial bay. Ica - Pisco 2007 – 2008

NASA UNIQUE DISTRIBUTION CENTER

Two office buildings of 3.000 m² and an 8.800 m² metal bay. Lurín 2008 - 2009

Production plant, outer platforms, office areas, laboratory, electrical and plumbing facilities, general finishings. Outer works include maneuvering yard and access road, treatment settling tank. Area: 4.450 m². Lima - Ate 1995 - 1996

Assembly of 3 10.000 hl stainless steel tanks and their respective insulation. Lima 1994

SAN LORENZO CERAMICS PLANT

First expansion: raw materials reception area, main bay (mill area, enamel preparation area, kiln area and finished product area). Lima - Lurín 2000

CACER INDUSTRIAL BAY EXPANSION

Production bay 940 m². Callao 1992 ALMACENES SERLIPSA CARGO CENTER

MESSER OXYGEN PLANT

Expansion of oxygen plant for Siderperú. Civil works and electromechanical assembly. Ancash 1999

Construction of a perimeter fence and Block 1.Area: 5.300 m². Callao 1991 - 1992

Three silos for 5.000 tons. La Libertad - Shorey 1972 QUÍMICA DEL PACIFICO SALT REFINERY

3.000 m². Callao 1971 - 1972

HUARANGAL NUCLEAR ENERGY

SEARS ROEBUCK WAREHOUSE

CENTER SUPERVISION

Lima 1981

15.000 m². Lima 1968

TRANSERVI S.A. WAREHOUSES

TEXTIL PIURA YARN FACTORY

PIRELLI CABLE PLANT

Callao - Bocanegra and Lima Chorrillos 1987

Construction and expansion of Piura yarn factory, with a built-up area of 42.000 m². Piura 1979

14.000 m². Lima 1968

HILOS CADENA LLAVE S.A. THREAD FACTORY

Expansion. Lima 1985 COMPAÑÍA CERVECERA DEL SUR

CEMENTOS LIMA HISCHMAN SECONDARY CRUSHER

Crusher and conveyor belt assembly. Lima - Villa María del Triunfo 1978

DEL PERÚ S.A.

Administrative complex 4,200 m². Arequipa 1984 - 1985 COMPAÑÍA CERVECERA DEL SUR

PARAMONGA PULP PLANT

EMPRESA EDITORA EL COMERCIO S.A.

New printing plant of 18.323 m². Lima 1982 - 1984

CASA GRANDE SUGAR SILO

10.000 tons. La Libertad 1968

EXPANSION

Assembly of equipment and piping. Lima - Paramonga 1978

DEL PERÚ S.A.

Water plant expansion, fermentation block. Arequipa 1983

CARTAVIO PAPER MILL

14.000 m². La Libertad - Trujillo 1968

INDUPERÚ NEWSPRINT PAPER MILL

25.000 m², 34.000 m3 of concrete, 3.200 tons of concrete. La Libertad - Santiago de Cao 1976 - 1977

SAN JACINTO COTTON GIN

Piura 1967


124

80 YEARS

New horizons, new challenges

VOLKSWAGEN DEALERS AND SHOPS

FERTISA PLANT

COPSA OIL AND FATS FACTORY

Piura 1967

Fertilizer plant. Callao 1960 - 1961

20.700 m². Callao 1948 and 1962

Lima 1966

Callao 1964

HUANZA HYDROELECTRIC PLANT

Orange crating. Lima - Huando 1943

Civil works of the 90 MW plant. Include dam, water intake, conduction tunnel, chimney, pressure conduit, diversion dam, surface engine room and accesses. Lima 2009 - 2013

Piura 1958 SIDNEY ROSS CHEMICAL

ETERNIT PIPES AND SHEETING PLANT

LABORATORIES

Lima 1964

5.300 m². Lima 1957

METALÚRGICA PERUANA METALWORKS

SEARS ROEBUCK DEL PERÚ STORES

2.000 m². Lima 1964

Lima 1955

CACHIMAYO FERTILIZERS

Iron plant for 70.000 ton steelwork and sheeting plant of 26.400 m². Ancash - Chimbote 1954 - 1957

SIDERPERÚ STEELWORKS

Cusco 1964 - 1965

Civil works and pressure pipe for Compañía Minera SIMSA. Junín 1997 - 1998

A & F. GRAÑA ELIZALDE S.A.

SAN MIGUEL BREWERY PILSEN CALLAO BEER WAREHOUSES

PLANT

44m-high concrete dam, 9km tunnel and 50.000 kW powerhouse. Ancash - Huallanca 1954 - 1957

TEXTILE COTTON MILL

ACE DETERGENT FACTORY

NESTLÉ DAIRY PRODUCTS PLANT

ETERNIT PLANT

10.500 m². Lima 1941- 1949 - 1965

PLATANAL HYDROELECTRIC PLANT

Includes the North Dam and South Dam, spillway, assembly of the steel armor of the vertical shaft of the pressure conduit and sections of the adduction tunnel. Lima - Yauyos 2008 - 2009

NESTLÉ DAIRY PRODUCTS PLANT

4.500 m². Lambayeque - Chiclayo 1941 - 1942

RALCO HYDROELECTRIC PLANT IN CHILE

ELECTRIC POWER

7 km-long and 66 m²-section tunnel. Engine cave for 540 MW hydro plant. Chile - Ralco 2000 - 2004

SANTA TERESITA COTTON GIN

HYDROELECTRIC PLANTS

CAÑÓN DEL PATO – EGENOR

Piura 1953

CERRO DEL ÁGUILA HYDROELECTRIC

Civil works and assembly of six generators 40 MW each. Ancash 1998 – 1999

SIDERPERÚ

High furnace of 300.000 tons. Ancash - Chimbote 1963 - 1964

HYDROELECTRIC PLANT PLANT

INDESA

CORPORACIÓN DEL GUANO

Detergent factory. Lima 1963

TREATMENT PLANT

Callao 1952

LEVER PACOCHA

INTERNATIONAL PETROLEUM

Lima 1963 ETERNIT

Warehouse expansion. Lima 1962

OECHSLE STORES

Lima 1950

COPSA PLANT

Oil and fats factory. Lima 1958 – 1962

EPC of the 510 MW HP that includes access roads, bridges, pontoons, inlet and silt removers, dam, tunnels, surge tank, cave engine room. Huancavelica 2012 – 2015

COMPANY MECHANIC SHOP

4.000 m². Piura - Talara 1951

COPRELSA METALWORKS

3.000 m². Lima 1950

REPOWERING OF THE MONOBAMBA HYDROELECTRIC PLANT

9.800 m². Venezuela - Santa Bárbara 1942 - 1943

SANTA TERESA HYDROELECTRIC

Civil work and underground installations of the 520 MW Fénix Power Thermal Plant. Lima - Chilca 2010 - 2012

PLANT EXPANSION FROM 40 MW TO

9.000 m². Lima 1944

Lima 1959 y 1964

FÉNIX POWER THERMAL PLANT

100 MW

CHAVIMOCHIC PROJECT MICROPOWER PLANTS

Tanguche and Desarenador 320 kW plants. La Libertad 1995 - 1996 CALLAHUANCA PROJECT

Three Jeumont Schneider generators, three Neypric turbines of 25 MW each, 501 m of pressure conduit, silt remover, adduction tunnel, pressure pipe, discharge tunnel, vertical shaft and set assembly. Cusco 1982 - 1985 SOUTHERN PERÚ COPPER

CHARCANI V HYDROELECTRIC

LAS FLORES THERMAL PLANT

CORPORATION POWER PLANT

Detail engineering, earthmoving, equipment supply, civil works and construction of gas station. Lima - Chilca 2009

1,200 kW. Cajamarca - Chilete 1950

PLANTS

THERMAL POWER PLANTS

Construction of two 4.000 kW plants. Moquegua - Cuajone 1975 - 1976

GAS STATION AND SERVICE

CAÑÓN DEL PATO PLANT

Expansion of the plant by 50.000 kW. Ancash - Huallanca 1967

MICROPOWER PLANTS

Maintenance of 1.116 m pressure pipe Nº 4 Lima 1994

NORTHERN PERÚ MINING

CORPORATION HYDROELECRIC

HYDROELECTRIC SETS FOR THE

125

CAÑÓN DEL PATO HYDROELECRIC

PLANT

SALT CRYSTALLIZATION PONDS

PLANT

MACHU PICCHU HYDROELECRIC

Construction of intake and other water collection works, conduction tunnel and pressure pipe for Edegel. Junín 1997 – 1999

Lima - Huacho 1959

EXPANSION OF FORD ASSEMBLY

YANANGO 40 MW HYDROELECTRIC

PLANT

Expansion of the HP by 98 MW. Includes civil works, intake, silt remover, adduction tunnel, load and excess chamber, pressure conduit, engine room, discharge system, outer works. Cusco 2009 - 2013

CHRYSLER ASSEMBLY PLANT

11.300 m². Lima 1966

MACHU PICCHU HYDROELECTRIC

Engineering and Construction

CONNECTION FOR FÉNIX POWER

Development of detail engineering, supply, construction and OC facilities, mechanical equipment, electrical installations and instrumentation of the Chilca City Gate. Lima - Chilca 2012 - 2013

EL NIHUIL HYDROELECRIC PLANT

Dike, tunnel, engine building and spillway. Argentina - Mendoza 1960 - 1962

PLANT

Assembly of four Alsthom Atlantique generators of 45 MW each, three Neypric Pelton turbines of 45 MW each, 135 m of 2.6 m diameter pipe, pressure conduit and Neypric sealing devices. Arequipa 1984 - 1985 MANTARO HYDROELECTRIC PLANT STABILIZATION

Consolidation, abutment, rewiring and four substations. Huancavelica 1982 – 1984

PLANT

Santa Teresa 96 MW HP. Includes loading chamber and tunnel, compensation chamber, bypass tunnel, ancillary tunnels, conduction tunnel, cave engine room, tunnel, vertical shaft, surge tank. Cusco 2012 – 2015

MACHU PICCHU HYDROELECTRIC PLANT


124

80 YEARS

New horizons, new challenges

VOLKSWAGEN DEALERS AND SHOPS

FERTISA PLANT

COPSA OIL AND FATS FACTORY

Piura 1967

Fertilizer plant. Callao 1960 - 1961

20.700 m². Callao 1948 and 1962

Lima 1966

Callao 1964

HUANZA HYDROELECTRIC PLANT

Orange crating. Lima - Huando 1943

Civil works of the 90 MW plant. Include dam, water intake, conduction tunnel, chimney, pressure conduit, diversion dam, surface engine room and accesses. Lima 2009 - 2013

Piura 1958 SIDNEY ROSS CHEMICAL

ETERNIT PIPES AND SHEETING PLANT

LABORATORIES

Lima 1964

5.300 m². Lima 1957

METALÚRGICA PERUANA METALWORKS

SEARS ROEBUCK DEL PERÚ STORES

2.000 m². Lima 1964

Lima 1955

CACHIMAYO FERTILIZERS

Iron plant for 70.000 ton steelwork and sheeting plant of 26.400 m². Ancash - Chimbote 1954 - 1957

SIDERPERÚ STEELWORKS

Cusco 1964 - 1965

Civil works and pressure pipe for Compañía Minera SIMSA. Junín 1997 - 1998

A & F. GRAÑA ELIZALDE S.A.

SAN MIGUEL BREWERY PILSEN CALLAO BEER WAREHOUSES

PLANT

44m-high concrete dam, 9km tunnel and 50.000 kW powerhouse. Ancash - Huallanca 1954 - 1957

TEXTILE COTTON MILL

ACE DETERGENT FACTORY

NESTLÉ DAIRY PRODUCTS PLANT

ETERNIT PLANT

10.500 m². Lima 1941- 1949 - 1965

PLATANAL HYDROELECTRIC PLANT

Includes the North Dam and South Dam, spillway, assembly of the steel armor of the vertical shaft of the pressure conduit and sections of the adduction tunnel. Lima - Yauyos 2008 - 2009

NESTLÉ DAIRY PRODUCTS PLANT

4.500 m². Lambayeque - Chiclayo 1941 - 1942

RALCO HYDROELECTRIC PLANT IN CHILE

ELECTRIC POWER

7 km-long and 66 m²-section tunnel. Engine cave for 540 MW hydro plant. Chile - Ralco 2000 - 2004

SANTA TERESITA COTTON GIN

HYDROELECTRIC PLANTS

CAÑÓN DEL PATO – EGENOR

Piura 1953

CERRO DEL ÁGUILA HYDROELECTRIC

Civil works and assembly of six generators 40 MW each. Ancash 1998 – 1999

SIDERPERÚ

High furnace of 300.000 tons. Ancash - Chimbote 1963 - 1964

HYDROELECTRIC PLANT PLANT

INDESA

CORPORACIÓN DEL GUANO

Detergent factory. Lima 1963

TREATMENT PLANT

Callao 1952

LEVER PACOCHA

INTERNATIONAL PETROLEUM

Lima 1963 ETERNIT

Warehouse expansion. Lima 1962

OECHSLE STORES

Lima 1950

COPSA PLANT

Oil and fats factory. Lima 1958 – 1962

EPC of the 510 MW HP that includes access roads, bridges, pontoons, inlet and silt removers, dam, tunnels, surge tank, cave engine room. Huancavelica 2012 – 2015

COMPANY MECHANIC SHOP

4.000 m². Piura - Talara 1951

COPRELSA METALWORKS

3.000 m². Lima 1950

REPOWERING OF THE MONOBAMBA HYDROELECTRIC PLANT

9.800 m². Venezuela - Santa Bárbara 1942 - 1943

SANTA TERESA HYDROELECTRIC

Civil work and underground installations of the 520 MW Fénix Power Thermal Plant. Lima - Chilca 2010 - 2012

PLANT EXPANSION FROM 40 MW TO

9.000 m². Lima 1944

Lima 1959 y 1964

FÉNIX POWER THERMAL PLANT

100 MW

CHAVIMOCHIC PROJECT MICROPOWER PLANTS

Tanguche and Desarenador 320 kW plants. La Libertad 1995 - 1996 CALLAHUANCA PROJECT

Three Jeumont Schneider generators, three Neypric turbines of 25 MW each, 501 m of pressure conduit, silt remover, adduction tunnel, pressure pipe, discharge tunnel, vertical shaft and set assembly. Cusco 1982 - 1985 SOUTHERN PERÚ COPPER

CHARCANI V HYDROELECTRIC

LAS FLORES THERMAL PLANT

CORPORATION POWER PLANT

Detail engineering, earthmoving, equipment supply, civil works and construction of gas station. Lima - Chilca 2009

1,200 kW. Cajamarca - Chilete 1950

PLANTS

THERMAL POWER PLANTS

Construction of two 4.000 kW plants. Moquegua - Cuajone 1975 - 1976

GAS STATION AND SERVICE

CAÑÓN DEL PATO PLANT

Expansion of the plant by 50.000 kW. Ancash - Huallanca 1967

MICROPOWER PLANTS

Maintenance of 1.116 m pressure pipe Nº 4 Lima 1994

NORTHERN PERÚ MINING

CORPORATION HYDROELECRIC

HYDROELECTRIC SETS FOR THE

125

CAÑÓN DEL PATO HYDROELECRIC

PLANT

SALT CRYSTALLIZATION PONDS

PLANT

MACHU PICCHU HYDROELECRIC

Construction of intake and other water collection works, conduction tunnel and pressure pipe for Edegel. Junín 1997 – 1999

Lima - Huacho 1959

EXPANSION OF FORD ASSEMBLY

YANANGO 40 MW HYDROELECTRIC

PLANT

Expansion of the HP by 98 MW. Includes civil works, intake, silt remover, adduction tunnel, load and excess chamber, pressure conduit, engine room, discharge system, outer works. Cusco 2009 - 2013

CHRYSLER ASSEMBLY PLANT

11.300 m². Lima 1966

MACHU PICCHU HYDROELECTRIC

Engineering and Construction

CONNECTION FOR FÉNIX POWER

Development of detail engineering, supply, construction and OC facilities, mechanical equipment, electrical installations and instrumentation of the Chilca City Gate. Lima - Chilca 2012 - 2013

EL NIHUIL HYDROELECRIC PLANT

Dike, tunnel, engine building and spillway. Argentina - Mendoza 1960 - 1962

PLANT

Assembly of four Alsthom Atlantique generators of 45 MW each, three Neypric Pelton turbines of 45 MW each, 135 m of 2.6 m diameter pipe, pressure conduit and Neypric sealing devices. Arequipa 1984 - 1985 MANTARO HYDROELECTRIC PLANT STABILIZATION

Consolidation, abutment, rewiring and four substations. Huancavelica 1982 – 1984

PLANT

Santa Teresa 96 MW HP. Includes loading chamber and tunnel, compensation chamber, bypass tunnel, ancillary tunnels, conduction tunnel, cave engine room, tunnel, vertical shaft, surge tank. Cusco 2012 – 2015

MACHU PICCHU HYDROELECTRIC PLANT


126

80 YEARS

New horizons, new challenges

Engineering and Construction

127

REDUCTION STATION OF

220/500 KV CENTRO

REHABILITATION OF 60 KV

66 KV TRANSMISSION LINE AND

220 KV MANTARO - SOCABAYA

THE ENERSUR THERMAL PLANT

LA PLANICIE – CARABAYLLO

TRANSMISSION LINE IN CHOSICA

DIVERSION SUBSTATIONS FROM

TRANSMISSION LINE

Installation of the pressure reduction skid and connection to the second unit of the Chilca Thermal Plant. Lima - Chilca 2006 - 2007

TRANSMISSION LINE PROJECT

PARA EDEGEL

THE PORT FOR MINERA ANTAMINA

FOR HYDRO-QUÉBEC CONSORTIUM

Civil work, assembly and laying of 40 km of Planicie - Carabayllo 220 kV lines and Planicie - Carabayllo 500 kV lines. Lima 2010.

Dismantling and assembly of conductors, painting of towers, change of tower sections and branches, guard cable installation, 64 km of lines. Lima 2004 - 2005

Detail engineering, supply, civil work, electromechanical assembly, tests and commissioning. Huarmey 2000

CONVERSION TO COMBINED CYCLE

220 KV CONOCOCHA-KIMAN AYLLU

LESSER ELECTRICAL SYSTEMS IN

Engineering, supply, civil works and electromechanical assembly of 604 km of 220 kV double circuit and double bundle conductor Mantaro - Cotaruse – Socabaya transmission line and 3 220 kV substations. Arequipa - Junín 1998 – 2000

Civil works for expansion of the Etevensa TP. Lima - Ventanilla 2005 - 2006

TRANSMISSION LINE

LIMA, PIURA, HUANUCO,

REHABILITATION

Civil work and electromechanical assembly of 172 km of 220 kV double circuit line including double guard cable. Ancash 2009 - 2010

JUNÍN, PUNO AND TACNA

Civil works, electromechanical assembly, testing and commissioning of various lesser electrical systems in several departments of Peru. Piura 2001 – 2005

Detail engineering, supply, civil work, electromechanical assembly, tests and commissioning of 167 km. of TL in en Mala, Ancón, Huarmey, Chimbote, Chiclayo, Piura. Ica - Piura 2000 – 2001

TRANSMISSION LINE

ALTO MARCAVALLE TRANSMISSION

220 KV TRUJILLO – CAJAMARCA

TRANSMISSION LINE

EPC contract for the 138 kV San Gabán - Mazuko Puerto Maldonado TL. Puerto Maldonado 2007 - 2009

LINE AND LA OROYA 50 KV MEDIUM

TRANSMISSION LINE

AND LOW VOLTAGE GRIDS

Construction of 50/10 kV substation and remodeling of power grids. La Oroya - Junín 2003 – 2004

Substations, communication system and Cajamarca - Pajuela 60 kV transmission line. La Libertad - Cajamarca 2000 – 2001

Supply, electromechanical assembly and civil works. Junín 1998 – 1999

220 KV LA OROYA - VIZCARRRA

60 KV TRANSMISSION LINE

TRANSMISSION LINE AND 138 KV

AND LESSER ELECTRICAL

VENTANILLA THERMAL PLANT

220 KV TRANSMISSION

EMPRESA ELÉCTRICA DE PIURA MALACAS THERMAL STATION

Civil works and electromechanical assembly of the 2 x 80 MW thermal power plant. Piura 199 7 - 1998 AGUAYTÍA THERMAL PLANT

Civil works and electromechanical assembly of the 2 x 80 MW thermal power plant. Aguaytía 1997 - 1998

138 KV SAN GABÁN - MAZUKO

VENTANILLA THERMAL STATION

LIMA 100 MW THERMAL PLANT

PUCALLPA POWER STATION

STAGE II

Skoda Export sets for Electroperú. Pucallpa 1982 - 1983

Electromechanical assembly and civil works, additional works, two generator sets, 100 MW each. Lima 1993 - 1994

SANTA ROSA THERMAL PLANT (140 MW)

Electromechanical assembly and civil works. Expansion by 140 MW, turbine and generator installation. Installation of 125 MW Westinghouse turbine for Edegel. Callao - Ventanilla 1996

CORRIENTES – TROMPETEROS POWER PLANT

Installation of 2.800 kV - 13.8 generator set. Loreto 1993 - 1994 LIMA EMERGENCY THERMAL PLANT

Civil works, supply and electromechanical assembly of three units, 6.5 MW each. Tacna 1995

Includes two tanks of 4,500 m3 each, one of 400 m3 for fuel, assembly of 3.5 km of piping and two Westinghouse 10 MW turbines. Lima 1992 - 1993

TUMBES THERMAL PLANT

VENTANILLA THERMAL STATION

Two Skoda 2.35 MW sets electromechanical assembly and civil works. Tumbes 1994

Civil works and erection of two Westinghouse sets, 100 MW each, for Electroperú. Lima 1992 - 1993

CALANA THERMAL PLANT

LINE – SHORELINE – ETECEN

THERMAL PLANT FOR THE ILO SMELTER

66.000 kW. Moquegua - Ilo 1973 - 1975

CENTRO DE INVESTIGACIÓN NUCLEAR DEL PERÚ

PIURA THERMAL PLANT

Supervision of 10 MW reactor, laboratories, and radioisotope production plant. Lima 1982 - 1983

5.000 kW. Piura 1958

IQUITOS POWER PLANT

Skoda Export sets for Electroperú. Loreto - Iquitos 1981 - 1982 STEAM THERMAL POWER PLANT

2 X 10 MW, civil works. Loreto - Iquitos 1979 - 1981 PUCALLPA THERMOELECTRIC PLANT

Technical assistance, thermoelectric assembly and civil works. Equipment. Ucayali 1979 - 1984

TARMA THERMAL PLANT

2.000 kW. Junín - Tarma 1954 - 1955

TRANSMISSION LINES AND SUBSTATIONS

220 KV SAN JUAN - CHILCA EN 220 KV

220 KV MAITENCILLO – CASERONES TRANSMISSION LINE

138 KV TRUJILLO NORTE - ALTO

196 km of double circuit configuration 220 kV TL from the Maitencillo substation to the Caserones substation. Chile - Copiapó 2011 - 2012

CHICAMA TRANSMISSION LINE

Expansion of the Trujillo Norte substation, EPC for the 138 kV TL until testing and commissioning. Includes expansion of the Trujillo Norte substation and erection of the Alto Chicama substation gantry. La Libertad 2004 - 2005

60 KV GALLITO CIEGO – CAJAMARCA TRANSMISSION LINE

AGUAYTÍA – PUCALLPA TL

SYSTEMS GROUP 5

Detail engineering, civil work, electromechanical assembly, testing and commissioning of 242 km. and 131 km. La Oroya - Aguaytía 2001 - 2002

Electromechanical assembly and civil works. Cachimayo, Pisac and Paucartambo Cusco 2000 – 2001

TRANSMISSION LINE

220 Kv TL. Civil and electromechanical works in 36 towers and nine poles; and laying of 18.1 km. Double circuit line and double conductor bundle. Lima 2007

TRANSMISSION LINE

Electromechanical assembly and civil works. Ancash 1998 – 2000 220 KV CHINANGO

220 KV EDEGEL TRANSMISSION LINE

Rehabilitation and hot replacement of conductors of the 2001 and 2002 circuits. Change of 25 km of conductors and guard cable, change of damaged tower sections. Lima, Huinco 2007 – 2008

23 KV ANTAMINA

Supply, electromechanical assembly and civil works. Cajamarca 1998 23 KV LINE PROJECT FOR ANTAMINA

Electromechanical assembly and civil works of 23 kV Ancash – Huari line. 1998 - 2000

220 KV ANCASH – HUARI 220 KV TRUJILLO - CAJAMARCA

TRANSMISSION LINE

66 KV CAJAMARCA – YANACOCHA

- LA PAJUELA TRANSMISSION LINE

Supply and installation of 220 kV and 52 km Huallanca substation TL. Huallanca. Ancash - Huari 1999

Supply, electromechanical assembly and civil works. Cajamarca 1997

EPC contract for the new Trujillo - Cajamarca - La Pajuela TL (136,9 km 220 kV and 10,6 km 50 kV), Cajamarca Norte SS, expansion of the Trujillo Norte SS and telecommunication system. Cajamarca - La Libertad 2000 - 2001

TRANSMISSION LINE

220 KV ANTAMINA PROJECT

PARAMONGA SUBSTATION

TRANSMISSION LINE

Electromechanical assembly and civil works. Lima - Paramonga 1997

EPC contract for 220 kV TL from Vizcarra substation to Antamina substation, 52km-long, erection of the Vizcarra (Huallanca) substation. Ancash 1999 - 2000


126

80 YEARS

New horizons, new challenges

Engineering and Construction

127

REDUCTION STATION OF

220/500 KV CENTRO

REHABILITATION OF 60 KV

66 KV TRANSMISSION LINE AND

220 KV MANTARO - SOCABAYA

THE ENERSUR THERMAL PLANT

LA PLANICIE – CARABAYLLO

TRANSMISSION LINE IN CHOSICA

DIVERSION SUBSTATIONS FROM

TRANSMISSION LINE

Installation of the pressure reduction skid and connection to the second unit of the Chilca Thermal Plant. Lima - Chilca 2006 - 2007

TRANSMISSION LINE PROJECT

PARA EDEGEL

THE PORT FOR MINERA ANTAMINA

FOR HYDRO-QUÉBEC CONSORTIUM

Civil work, assembly and laying of 40 km of Planicie - Carabayllo 220 kV lines and Planicie - Carabayllo 500 kV lines. Lima 2010.

Dismantling and assembly of conductors, painting of towers, change of tower sections and branches, guard cable installation, 64 km of lines. Lima 2004 - 2005

Detail engineering, supply, civil work, electromechanical assembly, tests and commissioning. Huarmey 2000

CONVERSION TO COMBINED CYCLE

220 KV CONOCOCHA-KIMAN AYLLU

LESSER ELECTRICAL SYSTEMS IN

Engineering, supply, civil works and electromechanical assembly of 604 km of 220 kV double circuit and double bundle conductor Mantaro - Cotaruse – Socabaya transmission line and 3 220 kV substations. Arequipa - Junín 1998 – 2000

Civil works for expansion of the Etevensa TP. Lima - Ventanilla 2005 - 2006

TRANSMISSION LINE

LIMA, PIURA, HUANUCO,

REHABILITATION

Civil work and electromechanical assembly of 172 km of 220 kV double circuit line including double guard cable. Ancash 2009 - 2010

JUNÍN, PUNO AND TACNA

Civil works, electromechanical assembly, testing and commissioning of various lesser electrical systems in several departments of Peru. Piura 2001 – 2005

Detail engineering, supply, civil work, electromechanical assembly, tests and commissioning of 167 km. of TL in en Mala, Ancón, Huarmey, Chimbote, Chiclayo, Piura. Ica - Piura 2000 – 2001

TRANSMISSION LINE

ALTO MARCAVALLE TRANSMISSION

220 KV TRUJILLO – CAJAMARCA

TRANSMISSION LINE

EPC contract for the 138 kV San Gabán - Mazuko Puerto Maldonado TL. Puerto Maldonado 2007 - 2009

LINE AND LA OROYA 50 KV MEDIUM

TRANSMISSION LINE

AND LOW VOLTAGE GRIDS

Construction of 50/10 kV substation and remodeling of power grids. La Oroya - Junín 2003 – 2004

Substations, communication system and Cajamarca - Pajuela 60 kV transmission line. La Libertad - Cajamarca 2000 – 2001

Supply, electromechanical assembly and civil works. Junín 1998 – 1999

220 KV LA OROYA - VIZCARRRA

60 KV TRANSMISSION LINE

TRANSMISSION LINE AND 138 KV

AND LESSER ELECTRICAL

VENTANILLA THERMAL PLANT

220 KV TRANSMISSION

EMPRESA ELÉCTRICA DE PIURA MALACAS THERMAL STATION

Civil works and electromechanical assembly of the 2 x 80 MW thermal power plant. Piura 199 7 - 1998 AGUAYTÍA THERMAL PLANT

Civil works and electromechanical assembly of the 2 x 80 MW thermal power plant. Aguaytía 1997 - 1998

138 KV SAN GABÁN - MAZUKO

VENTANILLA THERMAL STATION

LIMA 100 MW THERMAL PLANT

PUCALLPA POWER STATION

STAGE II

Skoda Export sets for Electroperú. Pucallpa 1982 - 1983

Electromechanical assembly and civil works, additional works, two generator sets, 100 MW each. Lima 1993 - 1994

SANTA ROSA THERMAL PLANT (140 MW)

Electromechanical assembly and civil works. Expansion by 140 MW, turbine and generator installation. Installation of 125 MW Westinghouse turbine for Edegel. Callao - Ventanilla 1996

CORRIENTES – TROMPETEROS POWER PLANT

Installation of 2.800 kV - 13.8 generator set. Loreto 1993 - 1994 LIMA EMERGENCY THERMAL PLANT

Civil works, supply and electromechanical assembly of three units, 6.5 MW each. Tacna 1995

Includes two tanks of 4,500 m3 each, one of 400 m3 for fuel, assembly of 3.5 km of piping and two Westinghouse 10 MW turbines. Lima 1992 - 1993

TUMBES THERMAL PLANT

VENTANILLA THERMAL STATION

Two Skoda 2.35 MW sets electromechanical assembly and civil works. Tumbes 1994

Civil works and erection of two Westinghouse sets, 100 MW each, for Electroperú. Lima 1992 - 1993

CALANA THERMAL PLANT

LINE – SHORELINE – ETECEN

THERMAL PLANT FOR THE ILO SMELTER

66.000 kW. Moquegua - Ilo 1973 - 1975

CENTRO DE INVESTIGACIÓN NUCLEAR DEL PERÚ

PIURA THERMAL PLANT

Supervision of 10 MW reactor, laboratories, and radioisotope production plant. Lima 1982 - 1983

5.000 kW. Piura 1958

IQUITOS POWER PLANT

Skoda Export sets for Electroperú. Loreto - Iquitos 1981 - 1982 STEAM THERMAL POWER PLANT

2 X 10 MW, civil works. Loreto - Iquitos 1979 - 1981 PUCALLPA THERMOELECTRIC PLANT

Technical assistance, thermoelectric assembly and civil works. Equipment. Ucayali 1979 - 1984

TARMA THERMAL PLANT

2.000 kW. Junín - Tarma 1954 - 1955

TRANSMISSION LINES AND SUBSTATIONS

220 KV SAN JUAN - CHILCA EN 220 KV

220 KV MAITENCILLO – CASERONES TRANSMISSION LINE

138 KV TRUJILLO NORTE - ALTO

196 km of double circuit configuration 220 kV TL from the Maitencillo substation to the Caserones substation. Chile - Copiapó 2011 - 2012

CHICAMA TRANSMISSION LINE

Expansion of the Trujillo Norte substation, EPC for the 138 kV TL until testing and commissioning. Includes expansion of the Trujillo Norte substation and erection of the Alto Chicama substation gantry. La Libertad 2004 - 2005

60 KV GALLITO CIEGO – CAJAMARCA TRANSMISSION LINE

AGUAYTÍA – PUCALLPA TL

SYSTEMS GROUP 5

Detail engineering, civil work, electromechanical assembly, testing and commissioning of 242 km. and 131 km. La Oroya - Aguaytía 2001 - 2002

Electromechanical assembly and civil works. Cachimayo, Pisac and Paucartambo Cusco 2000 – 2001

TRANSMISSION LINE

220 Kv TL. Civil and electromechanical works in 36 towers and nine poles; and laying of 18.1 km. Double circuit line and double conductor bundle. Lima 2007

TRANSMISSION LINE

Electromechanical assembly and civil works. Ancash 1998 – 2000 220 KV CHINANGO

220 KV EDEGEL TRANSMISSION LINE

Rehabilitation and hot replacement of conductors of the 2001 and 2002 circuits. Change of 25 km of conductors and guard cable, change of damaged tower sections. Lima, Huinco 2007 – 2008

23 KV ANTAMINA

Supply, electromechanical assembly and civil works. Cajamarca 1998 23 KV LINE PROJECT FOR ANTAMINA

Electromechanical assembly and civil works of 23 kV Ancash – Huari line. 1998 - 2000

220 KV ANCASH – HUARI 220 KV TRUJILLO - CAJAMARCA

TRANSMISSION LINE

66 KV CAJAMARCA – YANACOCHA

- LA PAJUELA TRANSMISSION LINE

Supply and installation of 220 kV and 52 km Huallanca substation TL. Huallanca. Ancash - Huari 1999

Supply, electromechanical assembly and civil works. Cajamarca 1997

EPC contract for the new Trujillo - Cajamarca - La Pajuela TL (136,9 km 220 kV and 10,6 km 50 kV), Cajamarca Norte SS, expansion of the Trujillo Norte SS and telecommunication system. Cajamarca - La Libertad 2000 - 2001

TRANSMISSION LINE

220 KV ANTAMINA PROJECT

PARAMONGA SUBSTATION

TRANSMISSION LINE

Electromechanical assembly and civil works. Lima - Paramonga 1997

EPC contract for 220 kV TL from Vizcarra substation to Antamina substation, 52km-long, erection of the Vizcarra (Huallanca) substation. Ancash 1999 - 2000


128

80 YEARS

New horizons, new challenges

Engineering and Construction

129

AGUAYTÍA AND TINGO MARÍA

CHILETE SUBSTATION

CUSCO REGIONAL ELECTRICITY

COMPAÑÍA MINERA ANTAMINA

SAN CRISTÓBAL - AP EX SILVER

CUAJONE - SOUTHERN CORP.

SUBSTATIONS

Electromechanical assembly and civil works 60 / 22.9 / 10 kV. Cajamarca 1995 - 1996

SYSTEM ERECTION WORKS

Erection of 138 kV substations. Cusco 1982 - 1985

REHABILITATION OF EDEGEL

138 KV QUENCORO AND

Concentrating plant for expansion from 90.000 to 130.000 t/day. Includes a SAG mill and a ball mill, floatation, remilling, concentrate thickener, bismuth plant, reagents and concentrate facilities. Work in partnership. Ancash - Yanacancha 2010 - 2011

40,000 t/day concentrating plant. Includes, without limitation, civil works, erection of structures, equipment and piping, primary crusher, 1 SAG mill, 2 ball mills. Bolivia - Potosí 2005 - 2006

60.000 t/day copper concentrator, crushers, mills, thickeners, floatation cells, conveyor belts and ore deposit, 110.000 m3 of concrete, 13.000 tons of steel. Moquegua - Cuajone 1972 - 1976

Electromechanical assembly and civil works Ucayali - Pucallpa 1997 CENTER – NORTH INTERCONNECTED

TOWERS

DOLORESPATA SUBSTATION

SYSTEM SUBSTATIONS

Erection and production of 18 220 kV and 60 kV towers. Lima 1994

Cusco 1982 - 1985

Electromechanical assembly and civil works. Lima 1996

SECTOR ELECTRIFICATION OF 261 SHAFTS

Electromechanical assembly and civil works, 1.5 MVA, 33/13.2 kV substation. Piura - Talara 1995 - 1996 AREQUIPA - CERRO VERDE

101 oil wells. Piura Talara 1993 - 1994

Cusco 1980

220 KV CHICLAYO – PIURA TRANSMISSION LINE

MINING

Electromechanical assembly and civil works. Lambayeque - Piura 1991

CONCENTRATING PLANTS LAS BAMBAS - XSTRATA COPPER

140.000 t/day copper concentrating plant. Includes 2 ball mills, 2 SAG mills, , 119.000 m3 of concrete and erection of over 16.000 structures. Apurímac - Cotabambas 2012 – 2014

MANTARO – POMACOCHA 220 KV TRANSMISSION LINE

Construction of 93 towers. Junín - Huancayo 1990 - 1992 MANTARO – LIMA 220 KV

REHABILITATION OF

TRANSMISSION LINE

MOYOPAMPA - SANTA ROSA

Laying of 140 km. Junín - Lima 1988

TRANSMISSION LINE

Rehabilitation and repowering, erection of 26 towers. Lima 1996 138 KV YAUPI - OXAPAMPA – VILLARRICA

66 KV CORONGO – PALLASCA

138 KV CERRO DE PASCO - TINGO MARÍA TRANSMISSION LINE

Electromechanical assembly and civil works. Pasco - Huánuco 1986 – 1988

TRANSMISSION LINE

Electromechanical assembly and civil works, 58.9 km. Ancash 1995 – 1996

LA PLANICIE - CARABAYLLO 220/500 KV TRANSMISSION LINE

TRANSMISSION LINE

Substation laying of 55 km of lines. Huánuco - Pasco 1987 - 1988

TINTAYA SUBSTATION

Cusco - Tintaya 1984

BAYÓVAR - VALE

10.700 t/day phosphate concentrating plant. Includes engineering, equipment supply, materials, civil works, electromechanical assembly, commissioning, start-up of the system and assisted operation. Piura - Bayóvar 2009 - 2010

QUIRUVILCA - NORTHERN PERU

1.250 t/day ore concentrating plant. La Libertad - Santiago de Chuco 1966 CHILETE - NORTHERN PERU

500 t/day ore concentrating plant. Cajamarca - Chilete 1952

ARES - HOCHSCHILD

Construction of the 1,500 t/day ore processing plant. Includes civil works, metal structures and electromechanical assembly. Arequipa 1997 – 1998

EARTHMOVING AND DAMS CIUDAD NUEVA FUERABAMBA

Earthmoving for construction of Nueva Fuerabamba for Las Bambas. 7.000,000 m3 cut and fill volume. Apurímac 2013

CERRO CORONA - GOLD FIELDS LA CIMA

HUÁNUCO - PASCO - TINGO MARÍA

TRANSMISSION LINE

28 km. (Yaupi - Oxapampa) and 22.9 km. (Oxapampa - Villarrica). Junín - Pasco 1995 - 1996

Earthmoving, civil works, mechanical erection of ore crushing and milling areas, and construction of five 19 m-high and 21 m-diameter Stebbings acid storage tanks. Dominican Republic - Pueblo Viejo 2009 - 2011

SACRED VALLEY SUBSTATION

ELECTRICITY SYSTEM

Erection of three substations: two from the Charcani V Hydroelectric Plant to Socabaya, 60 MVA each, 138 kV and one 60 MVA, at Cerro Verde. Arequipa 1982 - 1984

PUEBLO VIEJO - BARRICK

AND SUBSTATION

Lima - Huacho 1981 - 1982

OIL WELL ELECTRIFICATION SECTOR TAIMAN - PEÑA NEGRA

PACOCHA – HUACHO POWERHOUSE

CUAJONE - SOUTHERN CORP

Expansion of the Cuajone concentrating plant from 64,000 t/ day to 96,000 t/day. Includes camps, civil works and electromechanical assembly (2 ball mills). Moquegua - Cuajone 1997 - 1998

ElECTROPERÚ CACHIMAYO

CUSCO REGIONAL ELECTRICITY

SUBSTATION

SYSTEM TRANSMISSION LINE

Construction and erection of 33 kV substation. Cusco 1983

300 km for 138 kV and 7 substations. Cusco - Tintaya 1982 - 1983 138 KV

CUSCO REGIONAL ELECTRICITY

MACHU PICCHU - TINTAYA – CUSCO

SYSTEM

TRANSMISSION LINE

138 kV and 33 kV substation. Cusco 1982 – 1985

Cusco 1982 - 1984 TRANSMANTARO PROJECT BINNIE & PARTNERS

Junín 1982

TOROMOCHO - CHINALCO

Erection of metal structures, mechanical equipment and pipes for the wet area of the concentrator plant. Includes erection of 2 ball mills and 1 SAG mills. Work in partnership. Junín 2012 - 2013

17.000 t/day copper and gold concentrating plant. Includes civil works, from manufacturing and erection of structures, assembly of equipment, manufacturing and erection of 21 tanks, piping erection (500 t) to mechanical completion. Cajamarca - Hualgayoc 2007 - 2008

ANTAPACCAY - XSTRATA COPPER

CERRO VERDE - PHELPS DODGE

70,000 t/day copper concentrating plant. Includes 3 million m3 earthmoving/day, 119.000 m3 of concrete and erection of over 11.500 tons of structures. Cusco - Espinar 2010 - 2012

108,000 t/day concentrating plant, accesses, excavation platforms, tailings distribution system, primary, secondary and tertiary crushing, thickeners, and milling, among others. Civil works, structure erection and piping installation. Arequipa - Cerro Verde 2005 – 2006

PROYECTO MINERO LAS BAMBAS.


128

80 YEARS

New horizons, new challenges

Engineering and Construction

129

AGUAYTÍA AND TINGO MARÍA

CHILETE SUBSTATION

CUSCO REGIONAL ELECTRICITY

COMPAÑÍA MINERA ANTAMINA

SAN CRISTÓBAL - AP EX SILVER

CUAJONE - SOUTHERN CORP.

SUBSTATIONS

Electromechanical assembly and civil works 60 / 22.9 / 10 kV. Cajamarca 1995 - 1996

SYSTEM ERECTION WORKS

Erection of 138 kV substations. Cusco 1982 - 1985

REHABILITATION OF EDEGEL

138 KV QUENCORO AND

Concentrating plant for expansion from 90.000 to 130.000 t/day. Includes a SAG mill and a ball mill, floatation, remilling, concentrate thickener, bismuth plant, reagents and concentrate facilities. Work in partnership. Ancash - Yanacancha 2010 - 2011

40,000 t/day concentrating plant. Includes, without limitation, civil works, erection of structures, equipment and piping, primary crusher, 1 SAG mill, 2 ball mills. Bolivia - Potosí 2005 - 2006

60.000 t/day copper concentrator, crushers, mills, thickeners, floatation cells, conveyor belts and ore deposit, 110.000 m3 of concrete, 13.000 tons of steel. Moquegua - Cuajone 1972 - 1976

Electromechanical assembly and civil works Ucayali - Pucallpa 1997 CENTER – NORTH INTERCONNECTED

TOWERS

DOLORESPATA SUBSTATION

SYSTEM SUBSTATIONS

Erection and production of 18 220 kV and 60 kV towers. Lima 1994

Cusco 1982 - 1985

Electromechanical assembly and civil works. Lima 1996

SECTOR ELECTRIFICATION OF 261 SHAFTS

Electromechanical assembly and civil works, 1.5 MVA, 33/13.2 kV substation. Piura - Talara 1995 - 1996 AREQUIPA - CERRO VERDE

101 oil wells. Piura Talara 1993 - 1994

Cusco 1980

220 KV CHICLAYO – PIURA TRANSMISSION LINE

MINING

Electromechanical assembly and civil works. Lambayeque - Piura 1991

CONCENTRATING PLANTS LAS BAMBAS - XSTRATA COPPER

140.000 t/day copper concentrating plant. Includes 2 ball mills, 2 SAG mills, , 119.000 m3 of concrete and erection of over 16.000 structures. Apurímac - Cotabambas 2012 – 2014

MANTARO – POMACOCHA 220 KV TRANSMISSION LINE

Construction of 93 towers. Junín - Huancayo 1990 - 1992 MANTARO – LIMA 220 KV

REHABILITATION OF

TRANSMISSION LINE

MOYOPAMPA - SANTA ROSA

Laying of 140 km. Junín - Lima 1988

TRANSMISSION LINE

Rehabilitation and repowering, erection of 26 towers. Lima 1996 138 KV YAUPI - OXAPAMPA – VILLARRICA

66 KV CORONGO – PALLASCA

138 KV CERRO DE PASCO - TINGO MARÍA TRANSMISSION LINE

Electromechanical assembly and civil works. Pasco - Huánuco 1986 – 1988

TRANSMISSION LINE

Electromechanical assembly and civil works, 58.9 km. Ancash 1995 – 1996

LA PLANICIE - CARABAYLLO 220/500 KV TRANSMISSION LINE

TRANSMISSION LINE

Substation laying of 55 km of lines. Huánuco - Pasco 1987 - 1988

TINTAYA SUBSTATION

Cusco - Tintaya 1984

BAYÓVAR - VALE

10.700 t/day phosphate concentrating plant. Includes engineering, equipment supply, materials, civil works, electromechanical assembly, commissioning, start-up of the system and assisted operation. Piura - Bayóvar 2009 - 2010

QUIRUVILCA - NORTHERN PERU

1.250 t/day ore concentrating plant. La Libertad - Santiago de Chuco 1966 CHILETE - NORTHERN PERU

500 t/day ore concentrating plant. Cajamarca - Chilete 1952

ARES - HOCHSCHILD

Construction of the 1,500 t/day ore processing plant. Includes civil works, metal structures and electromechanical assembly. Arequipa 1997 – 1998

EARTHMOVING AND DAMS CIUDAD NUEVA FUERABAMBA

Earthmoving for construction of Nueva Fuerabamba for Las Bambas. 7.000,000 m3 cut and fill volume. Apurímac 2013

CERRO CORONA - GOLD FIELDS LA CIMA

HUÁNUCO - PASCO - TINGO MARÍA

TRANSMISSION LINE

28 km. (Yaupi - Oxapampa) and 22.9 km. (Oxapampa - Villarrica). Junín - Pasco 1995 - 1996

Earthmoving, civil works, mechanical erection of ore crushing and milling areas, and construction of five 19 m-high and 21 m-diameter Stebbings acid storage tanks. Dominican Republic - Pueblo Viejo 2009 - 2011

SACRED VALLEY SUBSTATION

ELECTRICITY SYSTEM

Erection of three substations: two from the Charcani V Hydroelectric Plant to Socabaya, 60 MVA each, 138 kV and one 60 MVA, at Cerro Verde. Arequipa 1982 - 1984

PUEBLO VIEJO - BARRICK

AND SUBSTATION

Lima - Huacho 1981 - 1982

OIL WELL ELECTRIFICATION SECTOR TAIMAN - PEÑA NEGRA

PACOCHA – HUACHO POWERHOUSE

CUAJONE - SOUTHERN CORP

Expansion of the Cuajone concentrating plant from 64,000 t/ day to 96,000 t/day. Includes camps, civil works and electromechanical assembly (2 ball mills). Moquegua - Cuajone 1997 - 1998

ElECTROPERÚ CACHIMAYO

CUSCO REGIONAL ELECTRICITY

SUBSTATION

SYSTEM TRANSMISSION LINE

Construction and erection of 33 kV substation. Cusco 1983

300 km for 138 kV and 7 substations. Cusco - Tintaya 1982 - 1983 138 KV

CUSCO REGIONAL ELECTRICITY

MACHU PICCHU - TINTAYA – CUSCO

SYSTEM

TRANSMISSION LINE

138 kV and 33 kV substation. Cusco 1982 – 1985

Cusco 1982 - 1984 TRANSMANTARO PROJECT BINNIE & PARTNERS

Junín 1982

TOROMOCHO - CHINALCO

Erection of metal structures, mechanical equipment and pipes for the wet area of the concentrator plant. Includes erection of 2 ball mills and 1 SAG mills. Work in partnership. Junín 2012 - 2013

17.000 t/day copper and gold concentrating plant. Includes civil works, from manufacturing and erection of structures, assembly of equipment, manufacturing and erection of 21 tanks, piping erection (500 t) to mechanical completion. Cajamarca - Hualgayoc 2007 - 2008

ANTAPACCAY - XSTRATA COPPER

CERRO VERDE - PHELPS DODGE

70,000 t/day copper concentrating plant. Includes 3 million m3 earthmoving/day, 119.000 m3 of concrete and erection of over 11.500 tons of structures. Cusco - Espinar 2010 - 2012

108,000 t/day concentrating plant, accesses, excavation platforms, tailings distribution system, primary, secondary and tertiary crushing, thickeners, and milling, among others. Civil works, structure erection and piping installation. Arequipa - Cerro Verde 2005 – 2006

PROYECTO MINERO LAS BAMBAS.


130

80 YEARS

CONGA - ACCESS ROADS AND

New horizons, new challenges

ALTO CHICAMA MINING PROJECT

CAMP PLATFORMS

FOR MINERA BARRICK

Massive earthmoving and platforms (1,300.000 m3) for the Conga mining project. Cajamarca 2010 - 2011

Platforms, excavation and concrete work for crushers, conveyor, processing plant and storage. Over 1,500.000 m3 earthmoving. La Libertad - Alto Chicama 2004 - 2005

ANTAPACCAY - ACCESS ROADS AND CAMP PLATFORMS

PIERINA MINING PROJECT FOR

Construction of access roads and platforms for over 2,200.000 m3 concentrating plant. Cusco - Espinar 2011

MINERA BARRICK

Earthmoving (1,000.000 de m3) associated with construction of the collection and purification dams. Ancash - Huaraz 1997 - 1999

MINERA MILPO EL PORVENIR DAM

Heightening of dam with projecting material, 354.000 m3 earthmoving volume. Pasco - Cerro de Pasco 2007 - 2008 MINA EL BROCAL TAILINGS

PADS AND PONDS YANACOCHA LA QUINUA PAD 8

885.640 m² leaching pad, 300.000 m3 operation pond, minor event pond, diversion and solution channels, roads, among others. In the aggregate, over 7,300.000 m3 earthmoving. Cajamarca 2011 – 2013 LA ARENA PHASE 1 PAD 1

Pad of 14 hectares for La Zanja project. 720.000 m3 earthmoving La Libertad 2010

MINERA ARCATA TAILINGS DAM

Construction of dam with borrowed fill, 25 m. maximum height, earthmoving 21.150 m3 , with concrete screen on slope. Arequipa 1984 - 1985

DEPOSITS

Construction the new number 6 and 7 tailings deposits and 1 settling pond. Pasco - Colquijirca 2006 – 2007

YANACOCHA PAD 6

YANACOCHA PAD 3

CAJAMARQUILLA REFINERY

Pad 6, about 500.000 m², a 250.000 m3 capacity pond and a 1.7 km-long channel. Earthmoving and geomembrane installation works. Cajamarca - Yanacocha 2003 - 2004

Leaching pad, operation pond and secondary recovery pond, solution channel, piping channel, rainwater diversion channels. Cajamarca 1993

INDIUM PLANT

OF THE ILO –SOUTHERN SMELTER

SYSTEMS

Project for expansion of the Cajamarquilla refinery to 160 km. Lima 2007 – 2008

Design and construction of civil works and electromechanical assembly of the 1.045 t/day Ilo oxygen plant. Moquegua - Ilo 2005 – 2006

Construction of the tailings distribution system. Ancash - Huari 2000 - 2001

YANACOCHA PAD 5

Land preparation, geomembrane installation and construction of leaching Pad 5. A total of 2,950.000 m3 earthmoving. Cajamarca 2002 - 2003 CUAJONE PAD

YANACOCHA LA QUINUA PAD STAGE 6

1,110.000 m² leaching pad. Includes installation of geomembrane, HDPV pipes and protective liner. Cajamarca - La Quinua 2005 – 2006

Leaching pads at the Cuajone mine, with an area of 131.500 m² and 54.400 m3 earthmoving. Moquegua - Cuajone 2001 - 2002 PIERINA PAD AND POND

Pad and pond for the Pierina project. Includes earthmoving and geomembrane installation. Ancash 2001

CERRO LINDO MILPO TAILINGS DAM

26 m-high and 443.000 m3 tailings dam. Includes grout curtain on the upstream slope of the dam. Ica - Chavín 2006 - 2007

Engineering and Construction

CAJAMARQUILLA REFINERY

MISCELLANEOUS MINING WORKS CASERONES CRUSHER

Electromechanical assembly of a total of 2.900 tons of structures and equipment for 144.230 tpd crusher. Atacama Region III Chile 2012 - 2014

CELL HOUSE

Cell house civil works. Lima - Huachipa 2008 ROASTING AND ACID PLANT – OUTOTEC

Expansion of the Cajamarquilla refinery to 320 km. Lima - Huachipa 2008 - 2009.

TUNNELS AND GALLERIES FOR BUENAVENTURA ORCOPAMPA MINE

EXPANSION OF

Construction of over 40 km of ramps, galleries and stacks of 3.20 m x 3.20 m and 4 m x 3.5 m sections. Arequipa - Orcopampa 2013

THE CAJAMARQUILLA ZINC

TUNNELS AND GALLERIES

REFINERY TO 320K

Construction of roasting and sulfuric acid plant, cell house building, indium refinery, tanks and Stebbins thickeners, among other works. Lima - Huachipa 2007 - 2009

FOR BUENAVENTURA PORACOTA MINE

YANACOCHA GOLD MILL

Underground excavation of over 10 km of tunnels and galleries, (3.70 x 3.50 m average section). Arequipa - Poracota 2013

Concrete works for the foundations of the structures of the new Gold Mill processes plant, ductbank and piping. Cajamarca - Yanacocha 2006 - 2007

ANTAMINA CAMPS

Camps and facilities for the Yanacancha mine. Excavation, civil work, sanitary and electrical installations of the new camp. Ancash - Huari 2008 - 2009

CERRO VERDE – ACCESS ROADS AND PLATFORMS

Platforms and access roads to the Cerro Verde project. Earthmoving of 690.000 m3 . Arequipa - Cerro Verde 2006

YANACOCHA FUEL STATION

Diesel storage and dispatch station for the mine. Cajamarca - La Quinua 2005 – 2006 ILO SOUTHERN SMELTER

LA GRANJA MINING PROJECT EARTHMOVING FOR THE ANTAMINA

EXPLORATION TUNNEL

MINING PROJECT

Exploration tunnel of 800 m and 4.0 m by 4.5 m section for Minera Río Tinto. Cajamarca - La Granja 2007 – 2008

Over 3,000.000 m3 cut and fill earthmoving. Ancash – Huari 1999 - 2001

CERRO VERDE

OXYGEN PLANT No. 2

Upgrading of four PS converters, electrostatic filter assembly, ducts, assembly of the anode furnace and casting wheel. Installation of all electrical equipment for power supply and distribution to the project. Moquegua - Ilo 2005 - 2006

SULFURIC ACID PLANT No. 2 OF THE ILO –SOUTHERN SMELTER

3.760 t/day sulfuric acid plant to industrialize smelting process residue. Moquegua - Ilo 2005 – 2006 CERRO VERDE WATER IMPULSE LINE

6.5 km-long and 24, 16 and 12 inch-diameter carbon steel and polyethylene water impulse line, from the Chili River intake to the Cerro Verde mine. 2004 - 2005 PATÓN - UCHUCCHACUA MINE DRAINAGE TUNNEL

4.5 km tunnel for drainage of underground water from the mine. Lima - Oyón 2002 – 2004 YANACOCHA ACID WATER TREATMENT PLANT

Expansion and upgrading of La Quinua acid water treatment plant for ore treatment. Cajamarca 2004 - 2005 CHUQUICAMATA ACID STORAGE TANKS

H2SO4 acid storage tanks with Stebbins technology. Chile - Antofagasta 2002 - 2003 LABORATORY OF THE ANTAMINA CONCENTRATOR

Finishings of the mine laboratory building. Ancash - Huari 2000 – 2001

131

ANTAMINA TAILINGS DISTRIBUTION

ANTAMINA PRIMARY CRUSHER

Primary crusher graders, civil works and assembly, laboratories and tailings system. Ancash - Huari 1999 - 2002 MESSER OXYGEN PLANT

Construction and erection of 480 t/day oxygen plant, civil works and electromechanical assembly Ancash - Chimbote 1999 - 2000 DEEPENING OF EL PORVENIR MINE

Deepening of the mine from 530 to 850, excavation, 38.327 m3 ramp, 25 m3 shaft. Electromechanical assembly included. Pasco - Cerro de Pasco 1996 - 1998 CAJAMARQUILLA ZINC REFINERY EXPANSION

Concrete and electrical works, tanks for expansion to 120 km. Lima - Cajamarquilla 1997 CERRO VERDE ELECTRODEPOSITION AND EXTRACTION PLANT

Includes concrete works, structures, piping, installation and instrumentation. Arequipa - Cerro Verde 1996 SULFURIC ACID PLANT No. 1 OF THE ILO –SOUTHERN CORP. SMELTER

Civil works and electromechanical assembly for sulfuric acid plant (3.760 t/day), water treatment plant and port facilities, 4 sulfuric acid tanks of 1,000.000 gl and 2 water tanks of 110.000 gl. Moquegua - Ilo 1994 - 1995


130

80 YEARS

CONGA - ACCESS ROADS AND

New horizons, new challenges

ALTO CHICAMA MINING PROJECT

CAMP PLATFORMS

FOR MINERA BARRICK

Massive earthmoving and platforms (1,300.000 m3) for the Conga mining project. Cajamarca 2010 - 2011

Platforms, excavation and concrete work for crushers, conveyor, processing plant and storage. Over 1,500.000 m3 earthmoving. La Libertad - Alto Chicama 2004 - 2005

ANTAPACCAY - ACCESS ROADS AND CAMP PLATFORMS

PIERINA MINING PROJECT FOR

Construction of access roads and platforms for over 2,200.000 m3 concentrating plant. Cusco - Espinar 2011

MINERA BARRICK

Earthmoving (1,000.000 de m3) associated with construction of the collection and purification dams. Ancash - Huaraz 1997 - 1999

MINERA MILPO EL PORVENIR DAM

Heightening of dam with projecting material, 354.000 m3 earthmoving volume. Pasco - Cerro de Pasco 2007 - 2008 MINA EL BROCAL TAILINGS

PADS AND PONDS YANACOCHA LA QUINUA PAD 8

885.640 m² leaching pad, 300.000 m3 operation pond, minor event pond, diversion and solution channels, roads, among others. In the aggregate, over 7,300.000 m3 earthmoving. Cajamarca 2011 – 2013 LA ARENA PHASE 1 PAD 1

Pad of 14 hectares for La Zanja project. 720.000 m3 earthmoving La Libertad 2010

MINERA ARCATA TAILINGS DAM

Construction of dam with borrowed fill, 25 m. maximum height, earthmoving 21.150 m3 , with concrete screen on slope. Arequipa 1984 - 1985

DEPOSITS

Construction the new number 6 and 7 tailings deposits and 1 settling pond. Pasco - Colquijirca 2006 – 2007

YANACOCHA PAD 6

YANACOCHA PAD 3

CAJAMARQUILLA REFINERY

Pad 6, about 500.000 m², a 250.000 m3 capacity pond and a 1.7 km-long channel. Earthmoving and geomembrane installation works. Cajamarca - Yanacocha 2003 - 2004

Leaching pad, operation pond and secondary recovery pond, solution channel, piping channel, rainwater diversion channels. Cajamarca 1993

INDIUM PLANT

OF THE ILO –SOUTHERN SMELTER

SYSTEMS

Project for expansion of the Cajamarquilla refinery to 160 km. Lima 2007 – 2008

Design and construction of civil works and electromechanical assembly of the 1.045 t/day Ilo oxygen plant. Moquegua - Ilo 2005 – 2006

Construction of the tailings distribution system. Ancash - Huari 2000 - 2001

YANACOCHA PAD 5

Land preparation, geomembrane installation and construction of leaching Pad 5. A total of 2,950.000 m3 earthmoving. Cajamarca 2002 - 2003 CUAJONE PAD

YANACOCHA LA QUINUA PAD STAGE 6

1,110.000 m² leaching pad. Includes installation of geomembrane, HDPV pipes and protective liner. Cajamarca - La Quinua 2005 – 2006

Leaching pads at the Cuajone mine, with an area of 131.500 m² and 54.400 m3 earthmoving. Moquegua - Cuajone 2001 - 2002 PIERINA PAD AND POND

Pad and pond for the Pierina project. Includes earthmoving and geomembrane installation. Ancash 2001

CERRO LINDO MILPO TAILINGS DAM

26 m-high and 443.000 m3 tailings dam. Includes grout curtain on the upstream slope of the dam. Ica - Chavín 2006 - 2007

Engineering and Construction

CAJAMARQUILLA REFINERY

MISCELLANEOUS MINING WORKS CASERONES CRUSHER

Electromechanical assembly of a total of 2.900 tons of structures and equipment for 144.230 tpd crusher. Atacama Region III Chile 2012 - 2014

CELL HOUSE

Cell house civil works. Lima - Huachipa 2008 ROASTING AND ACID PLANT – OUTOTEC

Expansion of the Cajamarquilla refinery to 320 km. Lima - Huachipa 2008 - 2009.

TUNNELS AND GALLERIES FOR BUENAVENTURA ORCOPAMPA MINE

EXPANSION OF

Construction of over 40 km of ramps, galleries and stacks of 3.20 m x 3.20 m and 4 m x 3.5 m sections. Arequipa - Orcopampa 2013

THE CAJAMARQUILLA ZINC

TUNNELS AND GALLERIES

REFINERY TO 320K

Construction of roasting and sulfuric acid plant, cell house building, indium refinery, tanks and Stebbins thickeners, among other works. Lima - Huachipa 2007 - 2009

FOR BUENAVENTURA PORACOTA MINE

YANACOCHA GOLD MILL

Underground excavation of over 10 km of tunnels and galleries, (3.70 x 3.50 m average section). Arequipa - Poracota 2013

Concrete works for the foundations of the structures of the new Gold Mill processes plant, ductbank and piping. Cajamarca - Yanacocha 2006 - 2007

ANTAMINA CAMPS

Camps and facilities for the Yanacancha mine. Excavation, civil work, sanitary and electrical installations of the new camp. Ancash - Huari 2008 - 2009

CERRO VERDE – ACCESS ROADS AND PLATFORMS

Platforms and access roads to the Cerro Verde project. Earthmoving of 690.000 m3 . Arequipa - Cerro Verde 2006

YANACOCHA FUEL STATION

Diesel storage and dispatch station for the mine. Cajamarca - La Quinua 2005 – 2006 ILO SOUTHERN SMELTER

LA GRANJA MINING PROJECT EARTHMOVING FOR THE ANTAMINA

EXPLORATION TUNNEL

MINING PROJECT

Exploration tunnel of 800 m and 4.0 m by 4.5 m section for Minera Río Tinto. Cajamarca - La Granja 2007 – 2008

Over 3,000.000 m3 cut and fill earthmoving. Ancash – Huari 1999 - 2001

CERRO VERDE

OXYGEN PLANT No. 2

Upgrading of four PS converters, electrostatic filter assembly, ducts, assembly of the anode furnace and casting wheel. Installation of all electrical equipment for power supply and distribution to the project. Moquegua - Ilo 2005 - 2006

SULFURIC ACID PLANT No. 2 OF THE ILO –SOUTHERN SMELTER

3.760 t/day sulfuric acid plant to industrialize smelting process residue. Moquegua - Ilo 2005 – 2006 CERRO VERDE WATER IMPULSE LINE

6.5 km-long and 24, 16 and 12 inch-diameter carbon steel and polyethylene water impulse line, from the Chili River intake to the Cerro Verde mine. 2004 - 2005 PATÓN - UCHUCCHACUA MINE DRAINAGE TUNNEL

4.5 km tunnel for drainage of underground water from the mine. Lima - Oyón 2002 – 2004 YANACOCHA ACID WATER TREATMENT PLANT

Expansion and upgrading of La Quinua acid water treatment plant for ore treatment. Cajamarca 2004 - 2005 CHUQUICAMATA ACID STORAGE TANKS

H2SO4 acid storage tanks with Stebbins technology. Chile - Antofagasta 2002 - 2003 LABORATORY OF THE ANTAMINA CONCENTRATOR

Finishings of the mine laboratory building. Ancash - Huari 2000 – 2001

131

ANTAMINA TAILINGS DISTRIBUTION

ANTAMINA PRIMARY CRUSHER

Primary crusher graders, civil works and assembly, laboratories and tailings system. Ancash - Huari 1999 - 2002 MESSER OXYGEN PLANT

Construction and erection of 480 t/day oxygen plant, civil works and electromechanical assembly Ancash - Chimbote 1999 - 2000 DEEPENING OF EL PORVENIR MINE

Deepening of the mine from 530 to 850, excavation, 38.327 m3 ramp, 25 m3 shaft. Electromechanical assembly included. Pasco - Cerro de Pasco 1996 - 1998 CAJAMARQUILLA ZINC REFINERY EXPANSION

Concrete and electrical works, tanks for expansion to 120 km. Lima - Cajamarquilla 1997 CERRO VERDE ELECTRODEPOSITION AND EXTRACTION PLANT

Includes concrete works, structures, piping, installation and instrumentation. Arequipa - Cerro Verde 1996 SULFURIC ACID PLANT No. 1 OF THE ILO –SOUTHERN CORP. SMELTER

Civil works and electromechanical assembly for sulfuric acid plant (3.760 t/day), water treatment plant and port facilities, 4 sulfuric acid tanks of 1,000.000 gl and 2 water tanks of 110.000 gl. Moquegua - Ilo 1994 - 1995


132

80 YEARS

New horizons, new challenges

CERRO VERDE CRUSHING PLANT

CUAJONE – SOUTHERN PROJECT

ILO - SOUTHERN CORP. COPPER

CHILETE CONCENTRATING PLANT

CEMENTOS LIMA PLANT

800 t/h crushing plant, 700 t/h agglomeration plant and conveyor belt. Arequipa - Cerro Verde 1994 - 1995

TAILINGS PIPE

SMELTER

(STAGE I and II)

Civil works and facilities of the tailings disposal pipe (42” diameter and 34 km long) Moquegua - Cuajone 1977 - 1978

Expansion of 120.000 tons of blister per year. Moquegua - Ilo 1973 - 1976

500 t/day of ore. Cajamarca - Chilete 1952 – 1952

OXYGEN PLANT No. 1 OF

CEMENT PLANTS NORTHERN ACID WATER PLANT

THE ILO –SOUTHERN CORP. SMELTER

CENTROMIN MINE WATER

EXPANSION

CEMENTOS LIMA PLANT EXPANSION

Civil works of oxygen plant for the Ilo smelter, 300 t/day capacity. Moquegua - Ilo 1993 - 1994

TREATMENT PLANT

Civil works for foundations, ponds, slabs, bridge cranes and metal structures, office building in Samme. La Libertad - Quiruvilca 1972 - 1973

Includes fabrication, mechanical assembly, dismantling, changes, testing and commissioning of raw milling, clinkerization and cement grinding systems. Work in partnership. Lima - Villa María del Triunfo 2011 - 2012

CENTROMIN OXYGEN PLANT

Electromechanical installation for 300 t/day oxygen plant. Junín - La Oroya 1992 - 1993 TIN SMELTING PLANT

Civil works and erection of Anomelt Ica - Pisco 1995 - 1996

Cerro de Pasco detail engineering and works inspection Solvent extraction and electrodisposition plant. Pasco - Cerro de Pasco 1977 - 1980

PERUANA PLANT POWER HOUSE EXPANSION – SOUTHERN

Expansion by 66,000 kW. Moquegua - Ilo 1974 - 1976 SOUTHERN SUCHE CUAJONE WATER PIPE

RELOCATION OF MARCONA CONVEYOR BELT

Assembly of a 1.3 km-long conveyor belt. Ica - Marcona 1989 - 1990 ARCATA TAILINGS DAM 5

Dam with borrowed fill, 35 m. maximum height, earthmoving 21.150 m3, with concrete screen on slope. Arequipa 1984 - 1985

FUNDICIÓN METALÚRGICA

53 km of 36” fiberglass pipe manufactured on site. Moquegua - Cuajone 1974 - 1977

2,000 m². Lima 1964 SIDERPERÚ HIGH FURNACE

Smelter 300.000 ton-high furnace Ancash - Chimbote 1963 - 1964 BAYÓVAR SULFATE PONDS

Construction of ponds. Piura - Bayovar 1962

CEMENTOS YURA PLANT

]TGP Ayacucho City Gate

SALT CRYSTALLIZATION PONDS

SOBOCE

Construction of ponds. Lima - Huacho 1960

Expansion of the Cemento Viacha plant, metal manufacturing and electromechanical assembly, supply of materials, fabrication, preassembly, sanding and painting for clinker production plant. Bolivia - La Paz 1997 - 1999

Construction of the Huayuri Topping Unit Crude. Loreto - Huayuri 2008

Expansion and upgrading of natural plant (separation and fractioning plant), including project management. Piura - Talara 2007 - 2008

Renovation of offices (987 m²), construction of new shops (980m²). Perimeter fence, 4 concrete towers. Ayacucho 2004

SOUTHERN CONCENTRATOR PLATFORMS

512.000 m3 Moquegua - Toquepala 1957

NORTHERN PRECIPITATES PLANT AND ACID WATER NEUTRALIZATION

SIDERPERÚ WATER PIPE

PLANT EXPANSION

10 km of laying of 10 steel water pipe. Work in partnership. Ancash - Chimbote 1955 – 1956

TRANSPORTATION – CENTROMIN

CEMENTOS LIMA PLANT

Construction of six reinforced concrete, 15 m-diameter and 47 m-high large silos for 30.000 tons. Construction of pre-heating building with one 75 m-tower, construction of the crushing plant building. Lima - Villa María del Triunfo 1969 - 1970

AND UPGRADING

AGGLOMERATION PLANT

New reinforced concrete building. Pumping station Nº2. Junín - La Oroya 1980 – 1981

AND EXPANSION

Manufacturing and mechanical assembly of mills, exchanger tower, kiln and silos. Electromechanical works for expansion of kiln No. 3 in the year 1995. La Libertad - Pacasmayo 1976 - 1977 – 1995

PARIÑAS PLANT EXPANSION

Relocation of filter, electrothermal plant, dismantling and demolition. Junín - La Oroya 1980 – 1983 ZINC CALCINE

CEMENTO PACASMAYO PLANT

HUAYURI TOPPING PLANT

ILO – SOUTHERN MECHANIC SHOP

Execution of civil works: foundations, ponds, slabs, bridge cranes and metal structures. La Libertad - Santiago de Chuco 1972 - 1973

Milling and pyro-processes plant as part of expansion of the plant. Includes metal fabrication (4.400 t), civil works (35.000 m3), mechanical assembly, piping and structures (7.800 t) and vacuum testing. Work in partnership. Arequipa - Yura 2009 – 2011

Expansion of the 107 m-high heat exchanger building , clinker and raw meal milling building, covered channel and clinker tower, five silos. Milling building, substation expansion. Lima - Villa María del Triunfo 1996 - 1997

(BLOCK 1AB)

Shop construction. Moquegua - Ilo 1973 - 1975

CENTROMIN NEW LEAD

PYRO-PROCESSES PLANT

133

VIACHA CEMENT PLANT FOR

NORTHERN SHOREY TAILINGS PIPE

8 kilometers in 3” steel of 2,000 lb/foot2. La Libertad - Santiago de Chuco 1974

CEMENTOS YURA MILLING AND

Engineering and Construction

SIDERPERÚ STEELWORKS

Iron plant for 70.000 ton steelwork and sheeting plant of 26.400 m². Ancash - Chimbote 1954 - 1957

GA S AND OIL CHIQUINTIRCA GAS COMPRESSION STATION

Engineering, supply and construction of the Chiquintirca compression plant of 1.090 MMPCD capacity. Work in partnership. Ayacucho 2008 - 2010 PAMPA MELCHORITA NATURAL GAS LIQUEFACTION PLANT

CORRIENTES TOPPING PLANT BLOCK 8 MAINTENANCE8

GAS GRIDS

Corrientes topping unit crude in Block 8. EPC project that includes engineering, procurement, civil works, mechanical works, erection, electricity and instrumentation. Loreto - Trompeteros 2008

Multiple service and works contracts, industrial maintenance, construction of tanks and oil pipelines. Loreto 2007 – 2008

Lima 2004

FOR PERÚ LNG

Temporary and permanent camps, tank foundations, underground installations, civil works of the plant, mechanical assembly. Lima - Cañete 2007 – 2010

INDUSTRIAL AND RESIDENTIAL

(BLOCK 8)

CASHIRIARI 1

Temporary works (camps, roads), platforms (120.000 m3 in cut and fill, excavation, concrete works and electrical services. Cusco - La Convención 2007 – 2008

TGP OPERATIONS CENTER - LURÍN, CITY GATE LURÍN AND TERMINAL STATION

PAGORENI - MALVINAS

Construction of the civil works for gas locations in Pagoreni A and B. Cusco 2005 – 2007

Camisea project, construction of administrative area, warehouse, shops, canteen, museum (City Gate) Lima - Lurín 2003 - 2004


132

80 YEARS

New horizons, new challenges

CERRO VERDE CRUSHING PLANT

CUAJONE – SOUTHERN PROJECT

ILO - SOUTHERN CORP. COPPER

CHILETE CONCENTRATING PLANT

CEMENTOS LIMA PLANT

800 t/h crushing plant, 700 t/h agglomeration plant and conveyor belt. Arequipa - Cerro Verde 1994 - 1995

TAILINGS PIPE

SMELTER

(STAGE I and II)

Civil works and facilities of the tailings disposal pipe (42” diameter and 34 km long) Moquegua - Cuajone 1977 - 1978

Expansion of 120.000 tons of blister per year. Moquegua - Ilo 1973 - 1976

500 t/day of ore. Cajamarca - Chilete 1952 – 1952

OXYGEN PLANT No. 1 OF

CEMENT PLANTS NORTHERN ACID WATER PLANT

THE ILO –SOUTHERN CORP. SMELTER

CENTROMIN MINE WATER

EXPANSION

CEMENTOS LIMA PLANT EXPANSION

Civil works of oxygen plant for the Ilo smelter, 300 t/day capacity. Moquegua - Ilo 1993 - 1994

TREATMENT PLANT

Civil works for foundations, ponds, slabs, bridge cranes and metal structures, office building in Samme. La Libertad - Quiruvilca 1972 - 1973

Includes fabrication, mechanical assembly, dismantling, changes, testing and commissioning of raw milling, clinkerization and cement grinding systems. Work in partnership. Lima - Villa María del Triunfo 2011 - 2012

CENTROMIN OXYGEN PLANT

Electromechanical installation for 300 t/day oxygen plant. Junín - La Oroya 1992 - 1993 TIN SMELTING PLANT

Civil works and erection of Anomelt Ica - Pisco 1995 - 1996

Cerro de Pasco detail engineering and works inspection Solvent extraction and electrodisposition plant. Pasco - Cerro de Pasco 1977 - 1980

PERUANA PLANT POWER HOUSE EXPANSION – SOUTHERN

Expansion by 66,000 kW. Moquegua - Ilo 1974 - 1976 SOUTHERN SUCHE CUAJONE WATER PIPE

RELOCATION OF MARCONA CONVEYOR BELT

Assembly of a 1.3 km-long conveyor belt. Ica - Marcona 1989 - 1990 ARCATA TAILINGS DAM 5

Dam with borrowed fill, 35 m. maximum height, earthmoving 21.150 m3, with concrete screen on slope. Arequipa 1984 - 1985

FUNDICIÓN METALÚRGICA

53 km of 36” fiberglass pipe manufactured on site. Moquegua - Cuajone 1974 - 1977

2,000 m². Lima 1964 SIDERPERÚ HIGH FURNACE

Smelter 300.000 ton-high furnace Ancash - Chimbote 1963 - 1964 BAYÓVAR SULFATE PONDS

Construction of ponds. Piura - Bayovar 1962

CEMENTOS YURA PLANT

]TGP Ayacucho City Gate

SALT CRYSTALLIZATION PONDS

SOBOCE

Construction of ponds. Lima - Huacho 1960

Expansion of the Cemento Viacha plant, metal manufacturing and electromechanical assembly, supply of materials, fabrication, preassembly, sanding and painting for clinker production plant. Bolivia - La Paz 1997 - 1999

Construction of the Huayuri Topping Unit Crude. Loreto - Huayuri 2008

Expansion and upgrading of natural plant (separation and fractioning plant), including project management. Piura - Talara 2007 - 2008

Renovation of offices (987 m²), construction of new shops (980m²). Perimeter fence, 4 concrete towers. Ayacucho 2004

SOUTHERN CONCENTRATOR PLATFORMS

512.000 m3 Moquegua - Toquepala 1957

NORTHERN PRECIPITATES PLANT AND ACID WATER NEUTRALIZATION

SIDERPERÚ WATER PIPE

PLANT EXPANSION

10 km of laying of 10 steel water pipe. Work in partnership. Ancash - Chimbote 1955 – 1956

TRANSPORTATION – CENTROMIN

CEMENTOS LIMA PLANT

Construction of six reinforced concrete, 15 m-diameter and 47 m-high large silos for 30.000 tons. Construction of pre-heating building with one 75 m-tower, construction of the crushing plant building. Lima - Villa María del Triunfo 1969 - 1970

AND UPGRADING

AGGLOMERATION PLANT

New reinforced concrete building. Pumping station Nº2. Junín - La Oroya 1980 – 1981

AND EXPANSION

Manufacturing and mechanical assembly of mills, exchanger tower, kiln and silos. Electromechanical works for expansion of kiln No. 3 in the year 1995. La Libertad - Pacasmayo 1976 - 1977 – 1995

PARIÑAS PLANT EXPANSION

Relocation of filter, electrothermal plant, dismantling and demolition. Junín - La Oroya 1980 – 1983 ZINC CALCINE

CEMENTO PACASMAYO PLANT

HUAYURI TOPPING PLANT

ILO – SOUTHERN MECHANIC SHOP

Execution of civil works: foundations, ponds, slabs, bridge cranes and metal structures. La Libertad - Santiago de Chuco 1972 - 1973

Milling and pyro-processes plant as part of expansion of the plant. Includes metal fabrication (4.400 t), civil works (35.000 m3), mechanical assembly, piping and structures (7.800 t) and vacuum testing. Work in partnership. Arequipa - Yura 2009 – 2011

Expansion of the 107 m-high heat exchanger building , clinker and raw meal milling building, covered channel and clinker tower, five silos. Milling building, substation expansion. Lima - Villa María del Triunfo 1996 - 1997

(BLOCK 1AB)

Shop construction. Moquegua - Ilo 1973 - 1975

CENTROMIN NEW LEAD

PYRO-PROCESSES PLANT

133

VIACHA CEMENT PLANT FOR

NORTHERN SHOREY TAILINGS PIPE

8 kilometers in 3” steel of 2,000 lb/foot2. La Libertad - Santiago de Chuco 1974

CEMENTOS YURA MILLING AND

Engineering and Construction

SIDERPERÚ STEELWORKS

Iron plant for 70.000 ton steelwork and sheeting plant of 26.400 m². Ancash - Chimbote 1954 - 1957

GA S AND OIL CHIQUINTIRCA GAS COMPRESSION STATION

Engineering, supply and construction of the Chiquintirca compression plant of 1.090 MMPCD capacity. Work in partnership. Ayacucho 2008 - 2010 PAMPA MELCHORITA NATURAL GAS LIQUEFACTION PLANT

CORRIENTES TOPPING PLANT BLOCK 8 MAINTENANCE8

GAS GRIDS

Corrientes topping unit crude in Block 8. EPC project that includes engineering, procurement, civil works, mechanical works, erection, electricity and instrumentation. Loreto - Trompeteros 2008

Multiple service and works contracts, industrial maintenance, construction of tanks and oil pipelines. Loreto 2007 – 2008

Lima 2004

FOR PERÚ LNG

Temporary and permanent camps, tank foundations, underground installations, civil works of the plant, mechanical assembly. Lima - Cañete 2007 – 2010

INDUSTRIAL AND RESIDENTIAL

(BLOCK 8)

CASHIRIARI 1

Temporary works (camps, roads), platforms (120.000 m3 in cut and fill, excavation, concrete works and electrical services. Cusco - La Convención 2007 – 2008

TGP OPERATIONS CENTER - LURÍN, CITY GATE LURÍN AND TERMINAL STATION

PAGORENI - MALVINAS

Construction of the civil works for gas locations in Pagoreni A and B. Cusco 2005 – 2007

Camisea project, construction of administrative area, warehouse, shops, canteen, museum (City Gate) Lima - Lurín 2003 - 2004


134

80 YEARS

CAMISEA GAS PLANT EXPANSION

New horizons, new challenges

Engineering and Construction

CAMISEA FRACTIONING PLANT

REPSOL – ASPHALT PLANT

OXI BLOCK 1 AB ANDOAS

TAIMAN PEÑA NEGRA ADDITIONAL

EL MILAGRO, PETROPERÚ REFINERY

LAGUNA ZAPOTAL WELL DRILLING

(EPC 11)

FOR PLUSPETROL

Engineering, supply, construction and erection of propane, butane, naphtha and diesel plant. 15.000 m3 of concrete and 4.000 tons of equipment and pipes. Ica - Pisco 2002 - 2003

Engineering and construction of asphalt plant, storage tanks and dispatch center. Callao - Ventanilla 2000 – 2001

Multiple service and works contracts. Road maintenance, industrial maintenance, construction of tanks and oil pipelines, environmental remediation. Loreto - Andoas 1997

WORKS

Expansion of the Malvinas gas separation plant. Civil works (3.000 m3 of concrete). Cusco - La Convención 2006 – 2008

Civil works and electromechanical assembly of a transformation substation, control and protection cells. Piura 1996

Manufacturing and mechanical assembly of 11 vertical tanks and erection of connection pipes for new El Milagro refinery. Amazonas - Bagua 1994 – 1995

Drilling of 40 oil wells at the Laguna Zapotal oil field, 4.000 - 8.050 feet deep, with 3 drilling equipment. Piura 1986

CORRIENTES STATION AT

Works implemented at Pucani base and Shell platform. 1984

PUMPING STATIONS OF THE CAMISEA GAS PIPELINE

Manufacture, installation and testing of the entire piping system for 7 pumping stations along the Camisea project gas pipeline. Ayacucho - Ica - Lima 2003 – 2004

CAMISEA PROCESSING PLANT FOR PLUSPETROL

Earthmoving, foundations, port and airport, 1,100.000 m3 earthmoving and 13.000 m3 of concrete Cusco - La Convención 2001 - 2002

BLOCK 8 MAINTENANCE8

Multiple service and works contracts, industrial maintenance, construction of tanks and oil pipelines. Loreto 2003 CAMISEA GAS DISTRIBUTION GRID

LA PAMPILLA REFINERY

Cogeneration. Construction of cogeneration units, amine units, industrial services and interconnections. Callao - Ventanilla 2001 - 2002

IN LIMA

Lima 2003

MESSER – OXYGEN PLANT EXPANSION

Civil works and electromechanical assembly. Main contractor. Ancash - Chimbote 1999 - 2000 AGUAYTÍA GAS PLANT

PRAXAIR OXYGEN PLANT

Construction of plant, buildings, tank foundations and equipment. Ica - Pisco 1997 - 1998

LA PAMPILLA REFINERY

Expansion of the refining capacity of the new tank unit. Callao - Ventanilla 2000 – 2002

EXPANSION OF THE MOBIL OIL

AGUAYTÍA ABB GAS PLANT

TROMPETEROS

VALLEJO PLANT (STAGE I)

Mobil Oil de Mexico S.A. de C.V. Plant expansion and remodeling. Mexico - Mexico D.F. 1996 - 1997

Civil works and electromechanical assembly of 1 gas plant, 1 fractioning plant and 1 distribution plant in the Peruvian Amazon region. 1996 – 1997

Addition and installation of 2800 kV - 13.8 kV generator set. Loreto - Trompeteros 1993

CONSTRUCTION AND REMODELING

AGUAYTÍA LUMMUS GLOBAL GAS

PRIMARY DISTILLATION PLANT

OF CORPETROL SERVICE STATIONS

PROJECT

Construction and remodeling of service stations and supermarkets throughout Greater Lima. Lima 1996

Construction of camps and general civil works for the Aguaytía gas project. 1996 - 1997

Civil and electromechanical 3.000 m piping. Loreto 1992 – 1993

AND FRACTIONING PLANT

Civil works and erection of 55 Mmcufpd fractioning plant. Ucayali - Pucallpa 1997 - 1998

LA PAMPILLA REFINERY

Civil and mechanical works of the sales plant loader of the refinery. Callao 1997 – 1998

SHELL PUCANI BASE

OCCIDENTAL PETROLEUM COMPANY

PIPELINE

Supply of personnel, tools, equipment and materials for erection and assembly of equipment, accessories and pipes in the laying of pipelines of 6” x 11.500 m-long for battery interconnection. Piura - Talara 1984 - 1986

ANDOAS TOPPING PLANT BAYÓVAR PETROPERÚ TERMINAL

SARAMIRIZA QUINTANA MINERALS

STATION

BLOCK 50

Repair of tanks at the Bayóvar Terminal. Piura - Bayóvar 1995 - 1996

Exploration and construction of locations in Block 50 in the Amazon region. Loreto - Amazonas 1996

LAGUNA ZAPOTAL TALARA OIL

ELECTRIFICATION OF TALARA WELLS

Electrification of 101 oil wells. Piura - Talara 1995 NORTH PERUVIAN OIL PIPELINE MAINTENANCE

Loreto 1995 CIVIL WORKS FRO LIMONYACU WELLS PROSPECTING

Execution of works for unloading and storage of materials and equipment, cleaning and leveling of 24.000 m². Amazonas – Limonyacu

Mobilizing, installation of mechanical process equipment, installation and manufacture. Loreto - Andoas 1992 – 1993

SYSTEM

New system of fresh load injection and skid valve control of the fractioning unit. Piura - Talara 1995

MALVINAS GAS PLANT

MALDONADILLO BASE

Four helipads with appurtenant facilities, one berth with platform for 40 ton crane, warehouses, stores, camps, road, sidewalks and ditches. Ucayali - Maldonadillo 1982 - 1983 TETRAETHYL LEAD PLANT FOR ETHYL CORP. DEL PERÚ

Lead storage plant, manufacture, erection of structure and piping. Callao - Callao 1981 – 1982 OCCIDENTAL PERUANA INC. SECONDARY RECOVERY PROJECT

250,000 feet pipe of 12, 8”, 6” and 2” erection and start-up of 14 oil batteries. Piura - Talara 1979 - 1983

OCCIDENTAL NORTHERN AMAZON PROSPECTING

OIL STORAGE SYSTEM

Loreto 1983

Loreto - Andoas 1979

OCCIDENTAL BLOCK 1A–1B CIVIL

WATER SYSTEM, TANKS, GRIDS

MOBILE PROSPECTING BLOCK 30

WORKS

AND ASSEMBLY

Construction, expansion and maintenance of well locations and access roads. Laying of pipelines, construction of new locations, safety dam. Loreto 1983 – 1988

Piura - Talara 1979

TEXACO GREASE PLANT

BATTERIES FOR OCCIDENTAL

ANCHOR INSTALLATION AND WELL

PERUANA INC. SUCURSAL DEL PERÚ

Three reservoir batteries for crude of 87.000 gl, concrete works 650 m3 , erection of 670.000 kg of metal structure. Loreto - Northern Amazon 1983 – 1984

SERVICING, NORTHEAST TALARA REFINERY INJECTION

SHELL EXPLORADORA

Construction of Nueva Unión – Ponasillo (55 km compacted earth road), road rehabilitation Yurimaguas - Tarapoto - Nueva Unión. San Martín 1991

Texas Petroleum Company del Perú. Grease mixing tower, storage tank support structure, hoist. Callao 1989 – 1990

Piura 1987 BLOCK 36 SERVICES

Construction of 59 km of roads and 140 km of dirt road for heavy vehicles. Construction of bridges over the Sheshea and Nohaya Rivers. Ucayali 1987

ANDOAS WORK OVER

Loreto - Andoas 1983

135

LA PAMPILLA – PETROPERÚ REFINERY EXPANSION

Construction of pipeline, manufacturing of tanks and civil works. Callao - Ventanilla 1976 - 1977


134

80 YEARS

CAMISEA GAS PLANT EXPANSION

New horizons, new challenges

Engineering and Construction

CAMISEA FRACTIONING PLANT

REPSOL – ASPHALT PLANT

OXI BLOCK 1 AB ANDOAS

TAIMAN PEÑA NEGRA ADDITIONAL

EL MILAGRO, PETROPERÚ REFINERY

LAGUNA ZAPOTAL WELL DRILLING

(EPC 11)

FOR PLUSPETROL

Engineering, supply, construction and erection of propane, butane, naphtha and diesel plant. 15.000 m3 of concrete and 4.000 tons of equipment and pipes. Ica - Pisco 2002 - 2003

Engineering and construction of asphalt plant, storage tanks and dispatch center. Callao - Ventanilla 2000 – 2001

Multiple service and works contracts. Road maintenance, industrial maintenance, construction of tanks and oil pipelines, environmental remediation. Loreto - Andoas 1997

WORKS

Expansion of the Malvinas gas separation plant. Civil works (3.000 m3 of concrete). Cusco - La Convención 2006 – 2008

Civil works and electromechanical assembly of a transformation substation, control and protection cells. Piura 1996

Manufacturing and mechanical assembly of 11 vertical tanks and erection of connection pipes for new El Milagro refinery. Amazonas - Bagua 1994 – 1995

Drilling of 40 oil wells at the Laguna Zapotal oil field, 4.000 - 8.050 feet deep, with 3 drilling equipment. Piura 1986

CORRIENTES STATION AT

Works implemented at Pucani base and Shell platform. 1984

PUMPING STATIONS OF THE CAMISEA GAS PIPELINE

Manufacture, installation and testing of the entire piping system for 7 pumping stations along the Camisea project gas pipeline. Ayacucho - Ica - Lima 2003 – 2004

CAMISEA PROCESSING PLANT FOR PLUSPETROL

Earthmoving, foundations, port and airport, 1,100.000 m3 earthmoving and 13.000 m3 of concrete Cusco - La Convención 2001 - 2002

BLOCK 8 MAINTENANCE8

Multiple service and works contracts, industrial maintenance, construction of tanks and oil pipelines. Loreto 2003 CAMISEA GAS DISTRIBUTION GRID

LA PAMPILLA REFINERY

Cogeneration. Construction of cogeneration units, amine units, industrial services and interconnections. Callao - Ventanilla 2001 - 2002

IN LIMA

Lima 2003

MESSER – OXYGEN PLANT EXPANSION

Civil works and electromechanical assembly. Main contractor. Ancash - Chimbote 1999 - 2000 AGUAYTÍA GAS PLANT

PRAXAIR OXYGEN PLANT

Construction of plant, buildings, tank foundations and equipment. Ica - Pisco 1997 - 1998

LA PAMPILLA REFINERY

Expansion of the refining capacity of the new tank unit. Callao - Ventanilla 2000 – 2002

EXPANSION OF THE MOBIL OIL

AGUAYTÍA ABB GAS PLANT

TROMPETEROS

VALLEJO PLANT (STAGE I)

Mobil Oil de Mexico S.A. de C.V. Plant expansion and remodeling. Mexico - Mexico D.F. 1996 - 1997

Civil works and electromechanical assembly of 1 gas plant, 1 fractioning plant and 1 distribution plant in the Peruvian Amazon region. 1996 – 1997

Addition and installation of 2800 kV - 13.8 kV generator set. Loreto - Trompeteros 1993

CONSTRUCTION AND REMODELING

AGUAYTÍA LUMMUS GLOBAL GAS

PRIMARY DISTILLATION PLANT

OF CORPETROL SERVICE STATIONS

PROJECT

Construction and remodeling of service stations and supermarkets throughout Greater Lima. Lima 1996

Construction of camps and general civil works for the Aguaytía gas project. 1996 - 1997

Civil and electromechanical 3.000 m piping. Loreto 1992 – 1993

AND FRACTIONING PLANT

Civil works and erection of 55 Mmcufpd fractioning plant. Ucayali - Pucallpa 1997 - 1998

LA PAMPILLA REFINERY

Civil and mechanical works of the sales plant loader of the refinery. Callao 1997 – 1998

SHELL PUCANI BASE

OCCIDENTAL PETROLEUM COMPANY

PIPELINE

Supply of personnel, tools, equipment and materials for erection and assembly of equipment, accessories and pipes in the laying of pipelines of 6” x 11.500 m-long for battery interconnection. Piura - Talara 1984 - 1986

ANDOAS TOPPING PLANT BAYÓVAR PETROPERÚ TERMINAL

SARAMIRIZA QUINTANA MINERALS

STATION

BLOCK 50

Repair of tanks at the Bayóvar Terminal. Piura - Bayóvar 1995 - 1996

Exploration and construction of locations in Block 50 in the Amazon region. Loreto - Amazonas 1996

LAGUNA ZAPOTAL TALARA OIL

ELECTRIFICATION OF TALARA WELLS

Electrification of 101 oil wells. Piura - Talara 1995 NORTH PERUVIAN OIL PIPELINE MAINTENANCE

Loreto 1995 CIVIL WORKS FRO LIMONYACU WELLS PROSPECTING

Execution of works for unloading and storage of materials and equipment, cleaning and leveling of 24.000 m². Amazonas – Limonyacu

Mobilizing, installation of mechanical process equipment, installation and manufacture. Loreto - Andoas 1992 – 1993

SYSTEM

New system of fresh load injection and skid valve control of the fractioning unit. Piura - Talara 1995

MALVINAS GAS PLANT

MALDONADILLO BASE

Four helipads with appurtenant facilities, one berth with platform for 40 ton crane, warehouses, stores, camps, road, sidewalks and ditches. Ucayali - Maldonadillo 1982 - 1983 TETRAETHYL LEAD PLANT FOR ETHYL CORP. DEL PERÚ

Lead storage plant, manufacture, erection of structure and piping. Callao - Callao 1981 – 1982 OCCIDENTAL PERUANA INC. SECONDARY RECOVERY PROJECT

250,000 feet pipe of 12, 8”, 6” and 2” erection and start-up of 14 oil batteries. Piura - Talara 1979 - 1983

OCCIDENTAL NORTHERN AMAZON PROSPECTING

OIL STORAGE SYSTEM

Loreto 1983

Loreto - Andoas 1979

OCCIDENTAL BLOCK 1A–1B CIVIL

WATER SYSTEM, TANKS, GRIDS

MOBILE PROSPECTING BLOCK 30

WORKS

AND ASSEMBLY

Construction, expansion and maintenance of well locations and access roads. Laying of pipelines, construction of new locations, safety dam. Loreto 1983 – 1988

Piura - Talara 1979

TEXACO GREASE PLANT

BATTERIES FOR OCCIDENTAL

ANCHOR INSTALLATION AND WELL

PERUANA INC. SUCURSAL DEL PERÚ

Three reservoir batteries for crude of 87.000 gl, concrete works 650 m3 , erection of 670.000 kg of metal structure. Loreto - Northern Amazon 1983 – 1984

SERVICING, NORTHEAST TALARA REFINERY INJECTION

SHELL EXPLORADORA

Construction of Nueva Unión – Ponasillo (55 km compacted earth road), road rehabilitation Yurimaguas - Tarapoto - Nueva Unión. San Martín 1991

Texas Petroleum Company del Perú. Grease mixing tower, storage tank support structure, hoist. Callao 1989 – 1990

Piura 1987 BLOCK 36 SERVICES

Construction of 59 km of roads and 140 km of dirt road for heavy vehicles. Construction of bridges over the Sheshea and Nohaya Rivers. Ucayali 1987

ANDOAS WORK OVER

Loreto - Andoas 1983

135

LA PAMPILLA – PETROPERÚ REFINERY EXPANSION

Construction of pipeline, manufacturing of tanks and civil works. Callao - Ventanilla 1976 - 1977


136

80 YEARS

New horizons, new challenges

STATIONS NO. 8 AND 9

SEDAPAL BLOCK 10

SEDAPAL SERVICES

SEDAPAL SERVICES

DRILLING OF 4 TUBULAR WELLS

OF PETROPERÚ NORTH PERUVIAN

Drinking water and sewage secondary works. Lima - Puente Piedra 2007

Rehabilitation of drinking water and sewage systems in Pueblo Libre. Lima - Pueblo Libre 1999 – 2000

Maintenance of 50% of the drinking water and sewage system of Metropolitan Lima. Lima 1996 - 1997

Four 100 meter-deep tubular wells, with flows between 20 and 55 l/s. Lima – Chillón Valley - Carabayllo 1995 – 1996

PIPELINE

Civil works, pipeline support bases. Bridge of 60 m over the Huancabamba River. Cajamarca - Huancabamba 1976 - 1977 IPC MECHANICAL SHOP

Piura - Talara 1951 EXPANSION OF TALARA REFINERY

SEDAPAL BLOCK 6

SEDAPAL ATARJEA

General drinking water and sewage works for the districts of San Juan de Lurigancho, Independencia, Comas and Puente Piedra. Lima 2006 - 2007

Reinforcement of the primary drinking water supply system. Lima - Villa El Salvador 1999 - 2000

FOR INTERNATIONAL PETROLEUM COMPANY

SEDAPAL BLOCK 7

Tanks and civil works. Piura - Talara 1949 – 1953

Drinking water and sewage secondary works. Lima - Puente Piedra 2006 - 2007

IPC OIL AND GAS PIPELINES

Piura - Talara 1949

SEWAGE LA CHIRA WATER TREATMENT PLANT

Sewage treatment plant, 11.3 m³/s capacity. Includes installation of 3.5 km submarine emitter and new 800 m feeding tunnel. Work in partnership. Lima - Chorillos 2010 - 2012

SEDAPAL R–67 CHAMBER

Construction, supply, installation and putting into operation of pumping station CR 67. Lima - San Juan de Lurigancho 2001 - 2002 SEDAPAL 5

Rehabilitation of drinking water and sewage systems. Callao 2001 – 2003 SEDAPAL 4

PARIACHI - SEDAPAL

Expansion and upgrading of drinking water and sewage systems for Pariachi, La Gloria, San Juan, Horacio and annexes for Sedapal. Work in partnership. Lima - Ate 2009 - 2011

Miscellaneous services. Lima 2001 - 2003

SEDAPAL MAINTENANCE 2

Provision of services for maintenance of the North services system. Callao - Bellavista 1999 - 2001 SEDAPAL SERVICES

Rehabilitation of drinking water and sewage systems in Ate Vitarte. Lima - Ate Vitarte 1998 – 2000

Maintenance of drinking water and sewage systems. Lima - Lima Norte 1999 - 2002

TREATMENT PLANT

SEDAPAL SERVICES

Procurement and construction, expansion and upgrading of the drinking water system. Includes intake at the Chili River, silt remover, 11 km of conduction line and construction of the treatment plant. Work in partnership. Arequipa 2009 – 2011

Reinforcement of the primary drinking water supply system. Lima 1999 - 2000

DRILLING OF SEDAPAL TUBULAR

Tanks, electrodes, peripheral detectors and injectors, drinking water main grid of P.J. San Antonio. Loreto - Iquitos 1986

SAN ANTONIO IQUITOS DRINKING WATER GRID

WELLS

Drilling of four 80 meter-deep tubular wells, with flows between 13 and 20 l/s. Lima - Comas 1996 - 1996

LA ATARJEA No. 2 WATER

SEDAPAL METERS

Comprehensive water plan. Sector I and II and population centers (AAHH) of the District of Ate Vitarte. Lima - Ate 1998 – 1999

Installation of meters Lima 1996 – 2000

Water intake works, settling tanks and filters, water and distribution grids. Lima 1981 – 1982 WATER TREATMENT PLANT FOR PAITA AND TALARA

Laying of pipes and engineering. Callao 1997 - 1999 REHABILITATION OF

Connection box rehabilitation works and installation of 95.000 residential meters. Lima 1996 – 1997 REINFORCEMENT OF THE ATARJEA PRIMARY DRINKING WATER SYSTEM

5.529 m of 900 mm pipes. Lima - Villa El Salvador 1996 - 1997

DESARENADOR PROYECTO CHAVIMOCHIC

TREATMENT PLANT

SEDAPAL ATE

CONNECTION BOXES

AREQUIPA DRINKING WATER

Supply and installation of the fire fighting system. Callao - Ventanilla 1994

Primavera – Chorrillos section, 5.804 m of 900 mm-diameter piping. Lima - Chorrillos 1998

SEDAPAL 2 SEDAPAL MAINTENANCE - NORTH

FIGHTING SYSTEM

Provision of services for operation and maintenance of Central and Northern Callao zonal drinking water and sewage systems. Lima 1996 - 1997

Provision of services for operation and maintenance of the distribution management drinking water and sewage. Lima – Northern Lima 1996 - 1997

DRINKING WATER SYSTEM.

137

VENTANILLA THERMAL PLANT FIRE SEDAPAL SERVICES

SEDAPAL SERVICES REINFORCEMENT OF THE PRIMARY

Engineering and Construction

SEDAPAL WELL DRILLING

Four 180 meter-deep tubular wells, with flows between 13 and 20 l/s. Lima - San Miguel - Ate Vitarte 1995 – 1996

Construction of civil works of the Paita – Talara water system. Piura - Sullana 1977 – 1979 IQUITOS DRINKING WATER EXPANSION AND UPGRADING

Control building, filters, pipe galleries, pumping stations. Loreto - Iquitos 1977 – 1978

TRUJILLO DRINKING WATER

Capacity of 1.000 l/sec. La Libertad - Trujillo 1995 - 1996

WATER PIPING FOR SOUTHERN PERÚ

WATER RESERVOIR FOR LA UNIÓN

COPPER CORPORATION

1.000 m3 . Arequipa - La Unión 1963 - 1964

53 km of 36” fiberglass pipe manufactured on site. Moquegua - Cuajone - Suche 1974 – 1977

PIURA AND CASTILLA WATER RESERVOIRS

URBANIZACIÓN LA ESTANCIA WATER RESERVOIR

500 m3 reservoir. Lima 1970

2.000 m3 . Piura - Castilla 1963 CHACARILLA DEL ESTANQUE WATER RESERVOIR

VALLE HERMOSO WATER RESERVOIR

600 m3 at 42 m-height. Lima 1964

1.200 m3 . Lima - Santiago de Surco 1959 IQUITOS METAL WATER RESERVOIR

PAITA – TALARA WATER SYSTEM PIPING

URBANIZACIÓN HUAQUILLAY

54 km of 60 m-diameter steel piping. Piura - Paita - Talara 1977 - 1978

800 m3 reservoir. Lima 1964

URBANIZACIÓN MIRAFLORES PIURA

WATER RESERVOIR FOR SECHURA

WATER RESERVOIR

1.000 m3 reservoir. Piura - Sechura 1963

WATER RESERVOIR

1.000 m3 of steel. Iquitos 1948

SALVADOR

Reinforcement of the primary water supply system. Atarjea - Villa El Salvador. Lima 1999 - 2000 ATE VITARTE SEDAPAL SERVICES

Rehabilitation of drinking water and sewage systems. Lima - Ate Vitarte 1998 - 2000 SEDAPAL 2

Installation of drinking water pipes and works engineering Lima - Callao 1997 – 1999 REINFORCEMENT OF THE PRIMARY WATER SUPPLY SYSTEM.

SEDAPAL MAINTENANCE SERVICES FOR LIMA CENTRO

600 m3 at 42 m-height. Piura 1973

SEDAPAL ATARJEA - VILLA EL

Rehabilitation of drinking water and sewage systems in the districts of Cercado and Pueblo Libre. Lima 1999 – 2000

Lima - Chorrillos 1998


136

80 YEARS

New horizons, new challenges

STATIONS NO. 8 AND 9

SEDAPAL BLOCK 10

SEDAPAL SERVICES

SEDAPAL SERVICES

DRILLING OF 4 TUBULAR WELLS

OF PETROPERÚ NORTH PERUVIAN

Drinking water and sewage secondary works. Lima - Puente Piedra 2007

Rehabilitation of drinking water and sewage systems in Pueblo Libre. Lima - Pueblo Libre 1999 – 2000

Maintenance of 50% of the drinking water and sewage system of Metropolitan Lima. Lima 1996 - 1997

Four 100 meter-deep tubular wells, with flows between 20 and 55 l/s. Lima – Chillón Valley - Carabayllo 1995 – 1996

PIPELINE

Civil works, pipeline support bases. Bridge of 60 m over the Huancabamba River. Cajamarca - Huancabamba 1976 - 1977 IPC MECHANICAL SHOP

Piura - Talara 1951 EXPANSION OF TALARA REFINERY

SEDAPAL BLOCK 6

SEDAPAL ATARJEA

General drinking water and sewage works for the districts of San Juan de Lurigancho, Independencia, Comas and Puente Piedra. Lima 2006 - 2007

Reinforcement of the primary drinking water supply system. Lima - Villa El Salvador 1999 - 2000

FOR INTERNATIONAL PETROLEUM COMPANY

SEDAPAL BLOCK 7

Tanks and civil works. Piura - Talara 1949 – 1953

Drinking water and sewage secondary works. Lima - Puente Piedra 2006 - 2007

IPC OIL AND GAS PIPELINES

Piura - Talara 1949

SEWAGE LA CHIRA WATER TREATMENT PLANT

Sewage treatment plant, 11.3 m³/s capacity. Includes installation of 3.5 km submarine emitter and new 800 m feeding tunnel. Work in partnership. Lima - Chorillos 2010 - 2012

SEDAPAL R–67 CHAMBER

Construction, supply, installation and putting into operation of pumping station CR 67. Lima - San Juan de Lurigancho 2001 - 2002 SEDAPAL 5

Rehabilitation of drinking water and sewage systems. Callao 2001 – 2003 SEDAPAL 4

PARIACHI - SEDAPAL

Expansion and upgrading of drinking water and sewage systems for Pariachi, La Gloria, San Juan, Horacio and annexes for Sedapal. Work in partnership. Lima - Ate 2009 - 2011

Miscellaneous services. Lima 2001 - 2003

SEDAPAL MAINTENANCE 2

Provision of services for maintenance of the North services system. Callao - Bellavista 1999 - 2001 SEDAPAL SERVICES

Rehabilitation of drinking water and sewage systems in Ate Vitarte. Lima - Ate Vitarte 1998 – 2000

Maintenance of drinking water and sewage systems. Lima - Lima Norte 1999 - 2002

TREATMENT PLANT

SEDAPAL SERVICES

Procurement and construction, expansion and upgrading of the drinking water system. Includes intake at the Chili River, silt remover, 11 km of conduction line and construction of the treatment plant. Work in partnership. Arequipa 2009 – 2011

Reinforcement of the primary drinking water supply system. Lima 1999 - 2000

DRILLING OF SEDAPAL TUBULAR

Tanks, electrodes, peripheral detectors and injectors, drinking water main grid of P.J. San Antonio. Loreto - Iquitos 1986

SAN ANTONIO IQUITOS DRINKING WATER GRID

WELLS

Drilling of four 80 meter-deep tubular wells, with flows between 13 and 20 l/s. Lima - Comas 1996 - 1996

LA ATARJEA No. 2 WATER

SEDAPAL METERS

Comprehensive water plan. Sector I and II and population centers (AAHH) of the District of Ate Vitarte. Lima - Ate 1998 – 1999

Installation of meters Lima 1996 – 2000

Water intake works, settling tanks and filters, water and distribution grids. Lima 1981 – 1982 WATER TREATMENT PLANT FOR PAITA AND TALARA

Laying of pipes and engineering. Callao 1997 - 1999 REHABILITATION OF

Connection box rehabilitation works and installation of 95.000 residential meters. Lima 1996 – 1997 REINFORCEMENT OF THE ATARJEA PRIMARY DRINKING WATER SYSTEM

5.529 m of 900 mm pipes. Lima - Villa El Salvador 1996 - 1997

DESARENADOR PROYECTO CHAVIMOCHIC

TREATMENT PLANT

SEDAPAL ATE

CONNECTION BOXES

AREQUIPA DRINKING WATER

Supply and installation of the fire fighting system. Callao - Ventanilla 1994

Primavera – Chorrillos section, 5.804 m of 900 mm-diameter piping. Lima - Chorrillos 1998

SEDAPAL 2 SEDAPAL MAINTENANCE - NORTH

FIGHTING SYSTEM

Provision of services for operation and maintenance of Central and Northern Callao zonal drinking water and sewage systems. Lima 1996 - 1997

Provision of services for operation and maintenance of the distribution management drinking water and sewage. Lima – Northern Lima 1996 - 1997

DRINKING WATER SYSTEM.

137

VENTANILLA THERMAL PLANT FIRE SEDAPAL SERVICES

SEDAPAL SERVICES REINFORCEMENT OF THE PRIMARY

Engineering and Construction

SEDAPAL WELL DRILLING

Four 180 meter-deep tubular wells, with flows between 13 and 20 l/s. Lima - San Miguel - Ate Vitarte 1995 – 1996

Construction of civil works of the Paita – Talara water system. Piura - Sullana 1977 – 1979 IQUITOS DRINKING WATER EXPANSION AND UPGRADING

Control building, filters, pipe galleries, pumping stations. Loreto - Iquitos 1977 – 1978

TRUJILLO DRINKING WATER

Capacity of 1.000 l/sec. La Libertad - Trujillo 1995 - 1996

WATER PIPING FOR SOUTHERN PERÚ

WATER RESERVOIR FOR LA UNIÓN

COPPER CORPORATION

1.000 m3 . Arequipa - La Unión 1963 - 1964

53 km of 36” fiberglass pipe manufactured on site. Moquegua - Cuajone - Suche 1974 – 1977

PIURA AND CASTILLA WATER RESERVOIRS

URBANIZACIÓN LA ESTANCIA WATER RESERVOIR

500 m3 reservoir. Lima 1970

2.000 m3 . Piura - Castilla 1963 CHACARILLA DEL ESTANQUE WATER RESERVOIR

VALLE HERMOSO WATER RESERVOIR

600 m3 at 42 m-height. Lima 1964

1.200 m3 . Lima - Santiago de Surco 1959 IQUITOS METAL WATER RESERVOIR

PAITA – TALARA WATER SYSTEM PIPING

URBANIZACIÓN HUAQUILLAY

54 km of 60 m-diameter steel piping. Piura - Paita - Talara 1977 - 1978

800 m3 reservoir. Lima 1964

URBANIZACIÓN MIRAFLORES PIURA

WATER RESERVOIR FOR SECHURA

WATER RESERVOIR

1.000 m3 reservoir. Piura - Sechura 1963

WATER RESERVOIR

1.000 m3 of steel. Iquitos 1948

SALVADOR

Reinforcement of the primary water supply system. Atarjea - Villa El Salvador. Lima 1999 - 2000 ATE VITARTE SEDAPAL SERVICES

Rehabilitation of drinking water and sewage systems. Lima - Ate Vitarte 1998 - 2000 SEDAPAL 2

Installation of drinking water pipes and works engineering Lima - Callao 1997 – 1999 REINFORCEMENT OF THE PRIMARY WATER SUPPLY SYSTEM.

SEDAPAL MAINTENANCE SERVICES FOR LIMA CENTRO

600 m3 at 42 m-height. Piura 1973

SEDAPAL ATARJEA - VILLA EL

Rehabilitation of drinking water and sewage systems in the districts of Cercado and Pueblo Libre. Lima 1999 – 2000

Lima - Chorrillos 1998


138

IRRIGATION SOUTHERN PERU TORATA IRRIGATION TUNNEL

Digging of a 4.5 km-long and 3.1 m-diameter tunnel, 104 m shaft, valve chamber and 18 km of access roads. Moquegua 1999 - 2000 CHINECAS PROJECT

Irrigation channel of 134 km of channels and 9 km of tunnels, Chimbote, Nepeña and Casma. Ancash 1995 - 1998

80 YEARS

New horizons, new challenges

QUINUA - SAN FRANCISCO HIGHWAY

SOUTH INTER-OCEANIC HIGHWAY

TORATA PROJECT

REHABILITATION AND

CABO BLANCO ARTISANAL WHARF

ANDOAS AIRPORT ASPHALT PAVING

PACKAGE “B”

Construction of the Quinua - San Francisco Highway (Section 2) from km 78+540 to km 173+270, located in the Eastern Andes. Ayacucho 2012 - 2014

(SECTION 3)

Digging of a 4.5 km tunnel, valve chamber and access roads. Moquegua 1999 - 2006

MAINTENANCE AREQUIPA–

Construction of wharf. Reception and dispatch yard, administrative area, refrigeration facilities. Piura - Cabo Blanco 1992 - 1993

Priming of 89.950 m², 2.480 m3 of concrete, asphalt leveling layer of ½”, 4.000 m² of drainage cleaning, 8.000 m of joint and crack repair. Loreto - Andoas 1988

Detail engineering and construction of tunnel works and canals for diversion from the Santa River to the Chao Valley. La Libertad - Trujillo 1988 – 1993 LIMONYACU IRRIGATION

Platform, channel and works, 16.4 km tunnel 595 m intake, 3.2 m3/s water collection. Work in partnership. Amazonas - Cajamarca 1987 – 1988

(Line One - Section 1) Engineering, construction and electromechanical equipment of Line One of the Lima Metro. Upgrading of 9.2 km of viaduct and 7 existing stations. 7.4 km of new viaducts, 9 stations and power substation. Work in partnership. Lima 2008 - 2011

CROSSING SIPHON

Construction of 66 km main channel for 50 m3/s package “b”. Work in partnership. La Libertad - Trujillo 1994 - 1995

Construction of transverse dike to the Chira River to protect eventual works. 8.000 m3 borrowed dill and material used and 6.000 m3 removed. Piura - Talara 1984 – 1985

(SECTION 1) Rehabilitation of 50 km of highway to hot asphalt carpet level. Ayacucho - Huamanga 2010 - 2011

ACARÍ – BELLA UNIÓN (LOWER

SOUTH INTER-OCEANIC HIGHWAY

ZONE) SUB-PROJECT

(SECTION 1)

Water intake works, main channel with silt remover, side and siphon. Work in partnership. Acarí - Arequipa 1982 - 1985

Construction, rehabilitation and maintenance of 750 km of the Peru – Brazil South Inter-Oceanic Highway. Section 1: San Juan de Marcona - Nazca - Puquio - Chalhuanca Abancay - Cusco - Urcos. Ica, Ayacucho, Apurímac, Cusco, 2008 – 2010

KOVIRE TRANSANDEAN TUNNEL TAMBO VALLEY DRAINAGE SYSTEM

Arequipa 1984 - 1986

INFRASTRUCTURE CHAVIMOCHIC INTAKE

Execution of a water intake of 95 m3/s. La Libertad - Trujillo 1990 - 1993 CHAVIMOCHIC TRUJILLO PROJECT PACKAGE “A”

Detail engineering and construction of tunnel works (17.5 km) and canals for diversion from the Santa River to the Chao Valley. La Libertad - Trujillo 1998 – 1990

LIMA METRO

(Line One - Section 2) Design, construction, supplies, erection, electromechanical assembly, preliminary testing and commissioning of the overhead viaduct for the electric train. Lima 2012 - 2013

EPC ROAD NETWORK N°5 NORTH PAN-AMERICAN HIGHWAY, ANCÓN – PATIVILCA SECTION

Reinstatement of 57 km of the North Pan-American Highway, Ancón - Huacho - Pativilca section, and construction of 2 improved traffic flow roads (vías de evitamiento), interchanges, and 2 bridges. Lima - Huacho - Pativilca 2005 - 2007

AYACUCHO – ABANCAY HIGHWAY

SIPHON)

8.5 km-long, trunk-type section of 5.86 m². Carries over 13 m3/s of water. Tacna 1991 - 1995

Construction, rehabilitation and maintenance of 403 km of the Peru – Brazil South Inter-Oceanic Highway. Section 3: Inambari - Iñapari. Madre de Dios 2005 – 2008

LIMA METRO

CHIRA RIVER – ALTO PIURA PROJECT

Execution of miscellaneous work for a design flow of 16.67 m3/s. Construction of a steel siphon, package “b”. La Libertad - Trujillo 1993 – 1995

139

CHAVIMOCHIC TRUJILLO PROJECT

VIRÚ – MOCHE MAIN CANAL

VIRÚ RIVER CROSSING (VIRÚ

Engineering and Construction

TRUJILLO–LIMA FIBER OPTIC FIBER OPTIC INSTALLATION

INSTALLATION

NUEVO CENTRO POBLADO CRUCE DE

Preliminary works, conduits, ditches and fiber laying for Telefónica. Lima - Arequipa 1994 – 1995

Installation and commissioning, transmission equipment, machinery and spare parts supply. La Libertad - Lima 1991 - 1994

Urban development, construction of houses and equipment facilities. La Libertad - Pacasmayo 1987 – 1988

NATIONAL POLICE COLISEUM

ENAPU WALLS – IQUITOS PORT

EXPANSION

Rehabilitation river terminal, reinforcement, containment wall and drainage. Installation of geotextiles. Loreto - Iquitos 1994 - 1995

Construction and expansion. Lima 1997

AREQUIPA–MATARANI HIGHWAY

PARKING

PERIODIC MAINTENANCE

2 underground levels. Lima - San Isidro 1997

Treatment with emulsions, micropavement and pothole asphalt carpet solution and curbs along the 104 km of the highway. Arequipa 2004 – 2005 IMPERIAL – IZCUCHACA HIGHWAY

Reinstatement, reconstruction and upgrading of the Imperial – Izcuchaca Highway. Huancavelica 2003 NORTH PERUVIAN OIL PIPELINE SUSPENSION BRIDGE

NAVALES DE LIMA

Suspension bridge to support 36”-diameter oil pipeline. Amazonas 2001 – 2002 IMPSAT OPTICAL RING

52 km, construction of ring, conduits and equipment. Lima 2000 - 2001

SOUTH INTER-OCEANIC HIGHWAY

VIZCARRA – ANTAMINA ROAD

(SECTION 2)

Road improvement, construction and repair. Ancash - Huaraz 2000 - 2001

Construction, rehabilitation and maintenance of 246 km of the Peru – Brazil South Inter-Oceanic Highway. Section 2: Urcos - Inambari. Cusco - Madre de Dios 2005 – 2008

HIGHWAY

Rehabilitation and upgrading of Nasca–Abancay–Cusco highway. Section 2: Pampachiri – Chalhuanca. Nasca–Abancay–Cusco 1998 - 1999

ÓVALO GUTIÉRREZ UNDERGROUND

ESTACIÓN CENTRAL HÉROES

Development of final studies, technical file preparation and construction of commercial area underground level, boarding areas and equipment of Estación Central de Buses de Lima (the Lima Central Bus Station) Lima - Cercado 2006 - 2008

NASCA - ABANCAY – CUSCO

MATARANI HIGHWAY

Section 1 of 39.325 km. Section 2 of 57.93 km, 6.60 wide. Arequipa 1994 - 1995

EXTERNAL TELEPHONE PLANT

Conduits, cameras, posts, wiring and coupling throughout Lima. Lima 1997

CAJAMARCA

ELECTRIC TRAIN SHOPYARD

BLOCK 36 CONSTRUCTION SERVICE

Earthmoving, cutting and filling. 28.274 m² platform, general warehouse building. Lima 1991 - 1992

Construction of 59 km of roads and 140 km of dirt road, construction of Nohaya River bridge, construction of 60.96 km-long bridge over the Sheshed River. Ucayali 1987 - 1990

IQUITOS PORT PIER SUPPORT STRUCTURE

BLOCK 30 PROSPECTING WORKS

Additional civil works for pier support, relocation of 70 m of pier. Loreto - Iquitos 1994

Nueva Unión - Ponasillo 55 km-long compacted earth road and 10 m roadway. 568.000 m3 cut volume. San Martín - Loreto 1991

REHABILITATION OF ILO - DESAGÜADERO HIGHWAY SECTION 1

Construction and asphalt upgrading of Ilo – Desagüadero highway. Section 1: km 0+000 to km 52+346.28. Moquegua - Puno 1997 - 1998 HUÁNUCO - TINGO MARÍA HIGHWAY

Construction and rehabilitation of Huánuco –Tingo María highway. 1996 TALARA – CANCAS HIGHWAY

101.968 km of rehabilitation, construction and concrete, 2” asphalt carpet. Piura - Tumbes 1994 – 1995

CHAVIMOCHIC PROJECT INTAKE


138

IRRIGATION SOUTHERN PERU TORATA IRRIGATION TUNNEL

Digging of a 4.5 km-long and 3.1 m-diameter tunnel, 104 m shaft, valve chamber and 18 km of access roads. Moquegua 1999 - 2000 CHINECAS PROJECT

Irrigation channel of 134 km of channels and 9 km of tunnels, Chimbote, Nepeña and Casma. Ancash 1995 - 1998

80 YEARS

New horizons, new challenges

QUINUA - SAN FRANCISCO HIGHWAY

SOUTH INTER-OCEANIC HIGHWAY

TORATA PROJECT

REHABILITATION AND

CABO BLANCO ARTISANAL WHARF

ANDOAS AIRPORT ASPHALT PAVING

PACKAGE “B”

Construction of the Quinua - San Francisco Highway (Section 2) from km 78+540 to km 173+270, located in the Eastern Andes. Ayacucho 2012 - 2014

(SECTION 3)

Digging of a 4.5 km tunnel, valve chamber and access roads. Moquegua 1999 - 2006

MAINTENANCE AREQUIPA–

Construction of wharf. Reception and dispatch yard, administrative area, refrigeration facilities. Piura - Cabo Blanco 1992 - 1993

Priming of 89.950 m², 2.480 m3 of concrete, asphalt leveling layer of ½”, 4.000 m² of drainage cleaning, 8.000 m of joint and crack repair. Loreto - Andoas 1988

Detail engineering and construction of tunnel works and canals for diversion from the Santa River to the Chao Valley. La Libertad - Trujillo 1988 – 1993 LIMONYACU IRRIGATION

Platform, channel and works, 16.4 km tunnel 595 m intake, 3.2 m3/s water collection. Work in partnership. Amazonas - Cajamarca 1987 – 1988

(Line One - Section 1) Engineering, construction and electromechanical equipment of Line One of the Lima Metro. Upgrading of 9.2 km of viaduct and 7 existing stations. 7.4 km of new viaducts, 9 stations and power substation. Work in partnership. Lima 2008 - 2011

CROSSING SIPHON

Construction of 66 km main channel for 50 m3/s package “b”. Work in partnership. La Libertad - Trujillo 1994 - 1995

Construction of transverse dike to the Chira River to protect eventual works. 8.000 m3 borrowed dill and material used and 6.000 m3 removed. Piura - Talara 1984 – 1985

(SECTION 1) Rehabilitation of 50 km of highway to hot asphalt carpet level. Ayacucho - Huamanga 2010 - 2011

ACARÍ – BELLA UNIÓN (LOWER

SOUTH INTER-OCEANIC HIGHWAY

ZONE) SUB-PROJECT

(SECTION 1)

Water intake works, main channel with silt remover, side and siphon. Work in partnership. Acarí - Arequipa 1982 - 1985

Construction, rehabilitation and maintenance of 750 km of the Peru – Brazil South Inter-Oceanic Highway. Section 1: San Juan de Marcona - Nazca - Puquio - Chalhuanca Abancay - Cusco - Urcos. Ica, Ayacucho, Apurímac, Cusco, 2008 – 2010

KOVIRE TRANSANDEAN TUNNEL TAMBO VALLEY DRAINAGE SYSTEM

Arequipa 1984 - 1986

INFRASTRUCTURE CHAVIMOCHIC INTAKE

Execution of a water intake of 95 m3/s. La Libertad - Trujillo 1990 - 1993 CHAVIMOCHIC TRUJILLO PROJECT PACKAGE “A”

Detail engineering and construction of tunnel works (17.5 km) and canals for diversion from the Santa River to the Chao Valley. La Libertad - Trujillo 1998 – 1990

LIMA METRO

(Line One - Section 2) Design, construction, supplies, erection, electromechanical assembly, preliminary testing and commissioning of the overhead viaduct for the electric train. Lima 2012 - 2013

EPC ROAD NETWORK N°5 NORTH PAN-AMERICAN HIGHWAY, ANCÓN – PATIVILCA SECTION

Reinstatement of 57 km of the North Pan-American Highway, Ancón - Huacho - Pativilca section, and construction of 2 improved traffic flow roads (vías de evitamiento), interchanges, and 2 bridges. Lima - Huacho - Pativilca 2005 - 2007

AYACUCHO – ABANCAY HIGHWAY

SIPHON)

8.5 km-long, trunk-type section of 5.86 m². Carries over 13 m3/s of water. Tacna 1991 - 1995

Construction, rehabilitation and maintenance of 403 km of the Peru – Brazil South Inter-Oceanic Highway. Section 3: Inambari - Iñapari. Madre de Dios 2005 – 2008

LIMA METRO

CHIRA RIVER – ALTO PIURA PROJECT

Execution of miscellaneous work for a design flow of 16.67 m3/s. Construction of a steel siphon, package “b”. La Libertad - Trujillo 1993 – 1995

139

CHAVIMOCHIC TRUJILLO PROJECT

VIRÚ – MOCHE MAIN CANAL

VIRÚ RIVER CROSSING (VIRÚ

Engineering and Construction

TRUJILLO–LIMA FIBER OPTIC FIBER OPTIC INSTALLATION

INSTALLATION

NUEVO CENTRO POBLADO CRUCE DE

Preliminary works, conduits, ditches and fiber laying for Telefónica. Lima - Arequipa 1994 – 1995

Installation and commissioning, transmission equipment, machinery and spare parts supply. La Libertad - Lima 1991 - 1994

Urban development, construction of houses and equipment facilities. La Libertad - Pacasmayo 1987 – 1988

NATIONAL POLICE COLISEUM

ENAPU WALLS – IQUITOS PORT

EXPANSION

Rehabilitation river terminal, reinforcement, containment wall and drainage. Installation of geotextiles. Loreto - Iquitos 1994 - 1995

Construction and expansion. Lima 1997

AREQUIPA–MATARANI HIGHWAY

PARKING

PERIODIC MAINTENANCE

2 underground levels. Lima - San Isidro 1997

Treatment with emulsions, micropavement and pothole asphalt carpet solution and curbs along the 104 km of the highway. Arequipa 2004 – 2005 IMPERIAL – IZCUCHACA HIGHWAY

Reinstatement, reconstruction and upgrading of the Imperial – Izcuchaca Highway. Huancavelica 2003 NORTH PERUVIAN OIL PIPELINE SUSPENSION BRIDGE

NAVALES DE LIMA

Suspension bridge to support 36”-diameter oil pipeline. Amazonas 2001 – 2002 IMPSAT OPTICAL RING

52 km, construction of ring, conduits and equipment. Lima 2000 - 2001

SOUTH INTER-OCEANIC HIGHWAY

VIZCARRA – ANTAMINA ROAD

(SECTION 2)

Road improvement, construction and repair. Ancash - Huaraz 2000 - 2001

Construction, rehabilitation and maintenance of 246 km of the Peru – Brazil South Inter-Oceanic Highway. Section 2: Urcos - Inambari. Cusco - Madre de Dios 2005 – 2008

HIGHWAY

Rehabilitation and upgrading of Nasca–Abancay–Cusco highway. Section 2: Pampachiri – Chalhuanca. Nasca–Abancay–Cusco 1998 - 1999

ÓVALO GUTIÉRREZ UNDERGROUND

ESTACIÓN CENTRAL HÉROES

Development of final studies, technical file preparation and construction of commercial area underground level, boarding areas and equipment of Estación Central de Buses de Lima (the Lima Central Bus Station) Lima - Cercado 2006 - 2008

NASCA - ABANCAY – CUSCO

MATARANI HIGHWAY

Section 1 of 39.325 km. Section 2 of 57.93 km, 6.60 wide. Arequipa 1994 - 1995

EXTERNAL TELEPHONE PLANT

Conduits, cameras, posts, wiring and coupling throughout Lima. Lima 1997

CAJAMARCA

ELECTRIC TRAIN SHOPYARD

BLOCK 36 CONSTRUCTION SERVICE

Earthmoving, cutting and filling. 28.274 m² platform, general warehouse building. Lima 1991 - 1992

Construction of 59 km of roads and 140 km of dirt road, construction of Nohaya River bridge, construction of 60.96 km-long bridge over the Sheshed River. Ucayali 1987 - 1990

IQUITOS PORT PIER SUPPORT STRUCTURE

BLOCK 30 PROSPECTING WORKS

Additional civil works for pier support, relocation of 70 m of pier. Loreto - Iquitos 1994

Nueva Unión - Ponasillo 55 km-long compacted earth road and 10 m roadway. 568.000 m3 cut volume. San Martín - Loreto 1991

REHABILITATION OF ILO - DESAGÜADERO HIGHWAY SECTION 1

Construction and asphalt upgrading of Ilo – Desagüadero highway. Section 1: km 0+000 to km 52+346.28. Moquegua - Puno 1997 - 1998 HUÁNUCO - TINGO MARÍA HIGHWAY

Construction and rehabilitation of Huánuco –Tingo María highway. 1996 TALARA – CANCAS HIGHWAY

101.968 km of rehabilitation, construction and concrete, 2” asphalt carpet. Piura - Tumbes 1994 – 1995

CHAVIMOCHIC PROJECT INTAKE


140

80 YEARS

New horizons, new challenges

Engineering and Construction

LA JOYA PERUVIAN AIR FORCE

CONCHÁN PIER

CAMAL BELLAVISTA HIGHWAY

56 m-long x 6.50 m-wide access ramp, 20 cm-thick slab, metal protection walkway for access to pier. Lima - Playa Conchán 1987 - 1989

IQUITOS

HIGHWAY

AIRPORT

TRACK (Consortium)

Two-way road, 2 km each lane. 6” thick asphalt carpet. Loreto - Iquitos 1980 – 1982

70 km. Moquegua - Tacna 1955

Paving. Arequipa 1969 – 1972

For 25.000 spectators. Lima 1954 – 1957

CIRCUNVALACIÓN LIMA HIGHWAY

LAS PALMAS AIR FORCE BASE

CRANE BRIDGE FOR ETERNIT

ILO – DESAGUADERO HIGHWAY

12 km. Lima 1954

Repaving. Lima 1966 - 1968

Civil work construction of the crane bridge expansion. Lima 1980

Construction and upgrading of 65.47 km. Puno 1979 – 1982

PAVING OF PAITA MARITIME TERMINAL

12,000 m², construction of drainage grids and reinforced concrete conduits. Piura - Paita 1987

MICHIQUILLAY – CALAMARCA HIGHWAY

8 Km. Cajamarca 1970

LA ISLILLA WHARF

Construction of 140 m-long breakwater, construction of 55 m-long reinforced concrete marginal wharf , 1.800 m² landfill, installation of 2 tanks of 4.500 gallons each. Piura 1986 - 1990

CASA GRANDE – CARTAVIO

La Libertad 1977 SURVIAL

Stage I. Lima 1967

TRANSPORTATION AND HIGHWAY MAINTENANCE FOR SHELL

PAVING OF RODRÍGUEZ DE MENDOZA AIRPORT

Includes landing strip, taxing runway, road access platform, airplane and automobile parking. Amazonas 1986 - 1988 REPAVING OF IQUITOS STREETS

18 km of streets, sewage piping, water grid. Installation of residential connections. Loreto - Iquitos 1986 - 1987

REHABILITATION OF PIURA TRUNK

STABILIZATION OF TABLACHACA

AV. ELÍAS AGUIRRE PAVING

ROADS

DAM LANDSLIDE

Paving of North Pan-American Highway and calle San Ramón, 4.7 km final length and 6.60 m road Piura 1984 - 1985

Huancavelica 1982

18 km of the main streets of Iquitos. Residential connections. Loreto - Iquitos 1980

BLOCK 1 AB MISCELLANEOUS WORKS

Rehabilitation and maintenance of roads. Loreto - Andoas 1983 - 1995 YURIMAGUAS AIRPORT ASPHALT PAVING

Airport paving, 1.800 m long. Loreto 1983 – 1984

VILLA MARÍA DEL TRIUNFO REPAVING

6.600 m² of asphalt paving. Lima 1986 TABLACHACA DAM

Huancavelica 1986

LPC WELLS ACCESS ROADS

EL ANCLA SHIPYARD

Talara Piura 1954

Ship repairs, construction of 100 m x 35 m artificial cement island. Callao 1963 - 1964

SOUTH PAN-AMERICAN HIGHWAY

430 km. Lima - Ica - Arequipa 1953

HIGHWAY

PASEO DE LA REPÚBLICA

Cashiari, Segakaito and Amihuari platforms. Cusco 1986 - 1987

PAN-AMERICAN ILO – TACNA

141

CIUDAD SATÉLITE SANTA ROSA

MARGINAL DE LA SELVA HIGHWAY

SEC 3 Y 4

NAPO PUTUMAYO HIGHWAY

Building, water and sewage grids, construction of 944 apartments. Callao - Carmen de la Legua 1981 - 1984

Construction of highway. Putumayo River – Algon River, 24.400 km. Loreto 1984 – 1985

VILLA BASE FAP LA JOYA PROJECT

Urban development of 16 blocks, distributed and divided in lots, preliminary works, installation of water and sewage grids, electromechanical installations. Arequipa 1980 – 1981

CIUDAD SATÉLITE SANTA ROSA SECTORS 5 AND 6

PHILLIPS SATELLITE ANTENNA BASES

Buildings, water and sewage grids, 768 3-bedroom apartments, 56 single-family housing and 2 levels of 280 stores. Callao - Carmen de la Legua 1982 - 1984

Civil work for satellite antenna bases in Chachapoyas, Contamana and Caballococha. Amazonas 1980

BATÁN GRANDE HIGHWAY

Lambayeque 1967

PIURA PAITA HIGHWAY SECTION 2

Piura 1984 - 1985

120 km de Tarapoto a Río Nieva. San Martín 1968 HACIENDA CASA GRANDE HIGHWAY

67 km. La Libertad 1968

La Libertad 1968

CONSTANCIA NORTHERN DAM

30.000 m3 . Cajamarca 1963

Lima 1954 CHILETE BRIDGE

Cajamarca 1952

PAN-AMERICANA HIGHWAY

EL ALTO AIRPORT

30 km. Ica 1953

Paving. Bolivia - La Paz 1962

NORTHERN CHILETE HIGHWAY

CHEZ VÍCTOR (AIRPORT)

Cajamarca 1952

INDUSTRIAL KITCHEN

RÍO CHICO BRIDGE

Callao 1962

Lima - Ica 1952

MATAGENTE BRIDGE

Lima - Ica 1952

COLISEO CERRADO DEL CUSCO

For 14.000 spectators. Cusco 1977 – 1978

FERTISA CALLAO PIER

CHILLÓN RIVER CHANNELING

Callao 1961

Lima - Puente Piedra 1948

SPCC INDUSTRIAL RAILROAD

JORGE CHÁVEZ AIRPORT

CAPITÁN MONTES BASE

CUAJONE

CALLAO (CONSORTIUM)

Moquegua 1974

Paving. Callao 1960

Runway and buildings. Piura - Talara 1944

COMPLEJO PESQUERO PEPESCA

Lambayeque 1963 TUMÁN HIGHWAYS

MOCHE RIVER LEVEES

Lambayeque 1963

PLAZAPAMPA NORTHERN

BASE LAS PALMAS PIURA MUNICIPAL STADIUM

Piura 1958

Building of 4 hangars. Lima 1944

CHICLAYO AIR FORCE BASE

AEROPUERTO DE PIURA

Lambayeque 1955

Piura 1943 - 1955 – 1968

La Libertad 1972

PISCO AIR FORCE BASE

U.S. GOVERNMENT EL PATO BASE

SANTA CATALINA DAM

Ica 1955

Runway and camps. Piura 1942

PAN-AMERICAN CASMA – HUARMEY – CHIMBOTE

CASA GRANDE VICTORIA BRIDGE

TRÉBOL EL PINO BRIDGES

MARCONA - SAN JUAN–

220 m dock, cold storages, factories, offices and housing, 24.000 m². Piura - Paita 1973 – 1974

POMALCA – PUCALÁ HIGHWAY

HIPÓDROMO MONTERRICO RACE

HIGHWAY

NORTHERN PERÚ

60 km. Ancash 1957 - 1958

50.000 m3 . La Libertad 1971


140

80 YEARS

New horizons, new challenges

Engineering and Construction

LA JOYA PERUVIAN AIR FORCE

CONCHÁN PIER

CAMAL BELLAVISTA HIGHWAY

56 m-long x 6.50 m-wide access ramp, 20 cm-thick slab, metal protection walkway for access to pier. Lima - Playa Conchán 1987 - 1989

IQUITOS

HIGHWAY

AIRPORT

TRACK (Consortium)

Two-way road, 2 km each lane. 6” thick asphalt carpet. Loreto - Iquitos 1980 – 1982

70 km. Moquegua - Tacna 1955

Paving. Arequipa 1969 – 1972

For 25.000 spectators. Lima 1954 – 1957

CIRCUNVALACIÓN LIMA HIGHWAY

LAS PALMAS AIR FORCE BASE

CRANE BRIDGE FOR ETERNIT

ILO – DESAGUADERO HIGHWAY

12 km. Lima 1954

Repaving. Lima 1966 - 1968

Civil work construction of the crane bridge expansion. Lima 1980

Construction and upgrading of 65.47 km. Puno 1979 – 1982

PAVING OF PAITA MARITIME TERMINAL

12,000 m², construction of drainage grids and reinforced concrete conduits. Piura - Paita 1987

MICHIQUILLAY – CALAMARCA HIGHWAY

8 Km. Cajamarca 1970

LA ISLILLA WHARF

Construction of 140 m-long breakwater, construction of 55 m-long reinforced concrete marginal wharf , 1.800 m² landfill, installation of 2 tanks of 4.500 gallons each. Piura 1986 - 1990

CASA GRANDE – CARTAVIO

La Libertad 1977 SURVIAL

Stage I. Lima 1967

TRANSPORTATION AND HIGHWAY MAINTENANCE FOR SHELL

PAVING OF RODRÍGUEZ DE MENDOZA AIRPORT

Includes landing strip, taxing runway, road access platform, airplane and automobile parking. Amazonas 1986 - 1988 REPAVING OF IQUITOS STREETS

18 km of streets, sewage piping, water grid. Installation of residential connections. Loreto - Iquitos 1986 - 1987

REHABILITATION OF PIURA TRUNK

STABILIZATION OF TABLACHACA

AV. ELÍAS AGUIRRE PAVING

ROADS

DAM LANDSLIDE

Paving of North Pan-American Highway and calle San Ramón, 4.7 km final length and 6.60 m road Piura 1984 - 1985

Huancavelica 1982

18 km of the main streets of Iquitos. Residential connections. Loreto - Iquitos 1980

BLOCK 1 AB MISCELLANEOUS WORKS

Rehabilitation and maintenance of roads. Loreto - Andoas 1983 - 1995 YURIMAGUAS AIRPORT ASPHALT PAVING

Airport paving, 1.800 m long. Loreto 1983 – 1984

VILLA MARÍA DEL TRIUNFO REPAVING

6.600 m² of asphalt paving. Lima 1986 TABLACHACA DAM

Huancavelica 1986

LPC WELLS ACCESS ROADS

EL ANCLA SHIPYARD

Talara Piura 1954

Ship repairs, construction of 100 m x 35 m artificial cement island. Callao 1963 - 1964

SOUTH PAN-AMERICAN HIGHWAY

430 km. Lima - Ica - Arequipa 1953

HIGHWAY

PASEO DE LA REPÚBLICA

Cashiari, Segakaito and Amihuari platforms. Cusco 1986 - 1987

PAN-AMERICAN ILO – TACNA

141

CIUDAD SATÉLITE SANTA ROSA

MARGINAL DE LA SELVA HIGHWAY

SEC 3 Y 4

NAPO PUTUMAYO HIGHWAY

Building, water and sewage grids, construction of 944 apartments. Callao - Carmen de la Legua 1981 - 1984

Construction of highway. Putumayo River – Algon River, 24.400 km. Loreto 1984 – 1985

VILLA BASE FAP LA JOYA PROJECT

Urban development of 16 blocks, distributed and divided in lots, preliminary works, installation of water and sewage grids, electromechanical installations. Arequipa 1980 – 1981

CIUDAD SATÉLITE SANTA ROSA SECTORS 5 AND 6

PHILLIPS SATELLITE ANTENNA BASES

Buildings, water and sewage grids, 768 3-bedroom apartments, 56 single-family housing and 2 levels of 280 stores. Callao - Carmen de la Legua 1982 - 1984

Civil work for satellite antenna bases in Chachapoyas, Contamana and Caballococha. Amazonas 1980

BATÁN GRANDE HIGHWAY

Lambayeque 1967

PIURA PAITA HIGHWAY SECTION 2

Piura 1984 - 1985

120 km de Tarapoto a Río Nieva. San Martín 1968 HACIENDA CASA GRANDE HIGHWAY

67 km. La Libertad 1968

La Libertad 1968

CONSTANCIA NORTHERN DAM

30.000 m3 . Cajamarca 1963

Lima 1954 CHILETE BRIDGE

Cajamarca 1952

PAN-AMERICANA HIGHWAY

EL ALTO AIRPORT

30 km. Ica 1953

Paving. Bolivia - La Paz 1962

NORTHERN CHILETE HIGHWAY

CHEZ VÍCTOR (AIRPORT)

Cajamarca 1952

INDUSTRIAL KITCHEN

RÍO CHICO BRIDGE

Callao 1962

Lima - Ica 1952

MATAGENTE BRIDGE

Lima - Ica 1952

COLISEO CERRADO DEL CUSCO

For 14.000 spectators. Cusco 1977 – 1978

FERTISA CALLAO PIER

CHILLÓN RIVER CHANNELING

Callao 1961

Lima - Puente Piedra 1948

SPCC INDUSTRIAL RAILROAD

JORGE CHÁVEZ AIRPORT

CAPITÁN MONTES BASE

CUAJONE

CALLAO (CONSORTIUM)

Moquegua 1974

Paving. Callao 1960

Runway and buildings. Piura - Talara 1944

COMPLEJO PESQUERO PEPESCA

Lambayeque 1963 TUMÁN HIGHWAYS

MOCHE RIVER LEVEES

Lambayeque 1963

PLAZAPAMPA NORTHERN

BASE LAS PALMAS PIURA MUNICIPAL STADIUM

Piura 1958

Building of 4 hangars. Lima 1944

CHICLAYO AIR FORCE BASE

AEROPUERTO DE PIURA

Lambayeque 1955

Piura 1943 - 1955 – 1968

La Libertad 1972

PISCO AIR FORCE BASE

U.S. GOVERNMENT EL PATO BASE

SANTA CATALINA DAM

Ica 1955

Runway and camps. Piura 1942

PAN-AMERICAN CASMA – HUARMEY – CHIMBOTE

CASA GRANDE VICTORIA BRIDGE

TRÉBOL EL PINO BRIDGES

MARCONA - SAN JUAN–

220 m dock, cold storages, factories, offices and housing, 24.000 m². Piura - Paita 1973 – 1974

POMALCA – PUCALÁ HIGHWAY

HIPÓDROMO MONTERRICO RACE

HIGHWAY

NORTHERN PERÚ

60 km. Ancash 1957 - 1958

50.000 m3 . La Libertad 1971


142

80 YEARS

New horizons, new challenges

Engineering and Construction

Club Lawn Tenis Pool

PUNTA LOBOS PROJECT

OGP-1 ESCONDIDA MINE EXPANSION

EL MANZANO MINI HYDROELECTRIC

ESCONDIDA MINE SX PLANT

Lima 1939

Mining and operation of plant for salt processing in the Tarapacá Salar Grande salt mine. Mineral loading and transportation, operation of grinders, and transportation of product to stockpiles. Volume: 9.6 million t/year Iquique Chile 2011 to 2012

Design, engineering, procurement, construction and other technical and administrative services related to the stockpile, ore transportation, and thickener areas. Antofagasta Region II Chile 2011 to date

PLANT

Run-of-the-river hydroelectric plant that collects water from the El Manzano River through a concrete water intake, conducting it by adduction. Chile 2007-2008

NEW PRIMARY CRUSHER

EXPANSION OF THE LITHIUM

Civil works and electromechanical erection of the SX plant for the Escondida Mine leaching project. Execution of approximately 9,000 m3 of concrete, 820 tons of metal structures and 5,000 meters of pipes. Antofagasta Region II Chile 2005 – 2006

AND BELTS - ROSARIO

CARBONATE PLANT TO 40,000 TPY

Civil works and erection of the new primary crushing building, transfer tower, and tunnels for the ore transportation system. Tarapacá Region I Chile 2009 – 2011

Civil works, mechanical and structural erection, pipes, electrical installations and instrumentation. Antofagasta Region II Chile 2007 – 2008

Chancay River Channeling

Lima - Huaral 1938 Corporación Guanera Docks

Ica 1934

LA ZANJA PROJECT

COBRE PANAMA MINE PROJECT

Tailings dam for Minera Panama’s Cobre Panama Mine Project. 5.5 million m3 of excavations, 9.3 million m3 of landfills, and installation of 300,000 m2 of geotextiles. Donoso - Colón Panama 2012 to date TOROMOCHO PROJECT

Construction of tailings dam and related structures, including 7.5 million m3 of earthmoving, construction of roads, channels, dams, settling ponds, installation of geomembrane and concrete. Yauli - Junín Peru 2012 to date CONSTANCIA PROJECT

Construction of roads, platforms, tailings dam and ponds, including massive earthmoving and earthworks, and open pit operation. Chumbivilcas - Cusco Peru 2011 to date LA ARENA PROJECT

Development and construction of the copper and gold mine from zero. Mine planning, drilling, blasting, loading and transportation of ore and sterile material. Volume: 25 million t/year Huamachuco – La Libertad Peru 2011 to date

Development and operation of open pit mine for production of 100,000 ounces of gold per year. Planning, drilling, blasting, loading and transportation of ore and sterile material. Cajamarca Peru 2010 to date MARCONA PROJECT

Open pit iron mine development services. Drilling, blasting, loading and transportation of sterile material and ore. Marcona – Ica Peru 2008 – 2012 ORCOPAMPA – PORACOTA PROJECT

Construction services for ramps, galleries, crossings, shelters, shafts and supports. Drilling, controlled blasting and loading. Arequipa Peru 2003 to date EL BROCAL PROJECT

Drilling, blasting, loading and transportation of waste and polymetal ore from the open pit to the processing plant or dumps. Volume: 30 million t/year Colquijirca – Pasco Peru 1998 to date

ANTUCOYA ORE CRUSHING AND TRANSPORTATION

Design, engineering and construction of civil works, electromechanical erection, electrical installations, instrumentation for a primary, secondary and tertiary crusher. Includes conveyor belts. Antofagasta Region II Chile 2012 to date VISTA AUXILIARY BUILDING EXTENSION

Vista telescope expansion project for the European Organisation for Astronomical Research in the Southern Hemisphere. Antofagasta Region II Chile 2012 to date

Civil works and electromechanical erection for the wet and dry areas of a copper concentration plant. Chile 2009 – 2010

CASERONES TRUCK SHOP

ALMA BUILDING

Design, engineering and construction of the truck shop building with 4 repair areas, 2 multipurpose areas, washing and welding stations, warehouses, access area, substation. Atacama Region III Chile 2011-2013

Construction of the general management building for the ALMA Project (acronym for Atacama Large Millimiter Array). It included civil works, equipment assembly, finishes and landscaping. Metropolitan Region Chile 2009 – 2010

CASERONES CONCENTRATOR

CONCENTRATION

Construction, structural and mechanical erection, piping, electrical work and instrumentation for the concentration plant with a capacity of 144,230 t/day. Includes erection of 2 ball mills and 1 SAG mill. Atacama Region III Chile 2011 to date

IMPROVEMENT - ROMERAL

MAIN SUBSTATION AND CASERONES LOOP

Construction, erection and support for start-up of the mine’s loop and main electrical substation. Atacama Region III Chile 2011-2013

EUROPEAN ORGANISATION FOR ESPERANZA PROJECT

CRUSHING PLANT

Construction of foundations, equipment assembly and structural erection, electrical installations and modification of building structures, cobber magnetic pulleys, tripper transporter, product and reject feeders. Coquimbo Region IV Chile 2008 GAS TURBINE BUILDING REPAIR (UMB)

Valparaíso Region V Chile 2008

ASTRONOMICAL RESEARCH IN THE SOUTHERN HEMISPHERE (ESO)

Civil works, paving, construction and assembly of technical buildings and metal structures, electrical, sanitary, fire protection and air conditioning installations, equipment assembly and architecture. Antofagasta Region II Chile 2006 – 2008 POTASSIUM CHLORIDE PLANT AND

ESCONDIDA NORTE PROJECT CRUSHING PLANT AND CONVEYOR BELTS

Erection of metal building structures, conveyor belts and galleries, erection of primary crusher, conveyor belts, belt feeders, electromagnetic chutes, feeder chutes in areas 100, 200, and 300. Antofagasta Region II Chile 2004 – 2005

sifters and metal fabrication. Client: Compañía Minera del Pacífico Chile 2004 – 2005 TRANSITION PROJECT

143

and start-up, involving all related specialties: civil works, electric power, instrumentation and control. Tarapacá Region I Chile 2003

UJINA – ROSARIO

Civil works for two existing process water ponds, from which existing sediments and the HDPE layer were removed, in order to build concrete walls, slabs and access ramps. Tarapacá Region I Chile 2004 ESCONDIDA NORTE PROJECT

ASSEMBLY, CONSTRUCTION, COMMISSIONING AND START-UP OF SEMI-MOBILE PRIMARY CRUSHING PLANT

Civil works and structural and mechanical erection of a fully automated building for crushing ore. Tarapacá Region I Chile 2003

CIVIL WORKS IN AREAS 100, 200, AND 300

CONCRETE FOR ORE CRUSHING

Civil works and erection of belt structures in the primary crusher area, transfer silos and ore belts. Antofagasta Region II Chile 2004 – 2005

Civil works for ore crushing and transportation areas. Tarapacá Region I Chile 2003

LOW GRADE ORE PROCESSING PROJECT AT ROMERAL PLANT

MISCELLANEOUS

Civil works and metal structure erection (1,400 tons) for roller mill, ball mill, flotation and filtering buildings. Assembly of conveyor belts, magnetic separators, tailings thickener, flotation cells, pumps,

ELECTROMECHANICAL CONSTRUCTION FOR CRUSHING AND BELT SYSTEM

Electromechanical equipment for several areas, supplying equipment, assembly, testing, commissioning

INTERMEDIATE PRODUCT PADS

Construction, structural and mechanical erection, pipes, electrical installations, instrumentation and testing for the belt filter project – KCL, supply and production of posttensioned slab 3,600 m2. Concrete production and pouring. Antofagasta Region II Chile 2006 – 2007 LOS PELAMBRES MINE UPGRADE

Civil works and concrete construction work, structural excavation, structural landfill, concrete base, framework, forming and concrete for the mine upgrade project. Coquimbo Region IV Chile 2006 – 2007

LA ESPERANZA MINE, CHILE.

AND TRANSPORTATION AREAS


142

80 YEARS

New horizons, new challenges

Engineering and Construction

Club Lawn Tenis Pool

PUNTA LOBOS PROJECT

OGP-1 ESCONDIDA MINE EXPANSION

EL MANZANO MINI HYDROELECTRIC

ESCONDIDA MINE SX PLANT

Lima 1939

Mining and operation of plant for salt processing in the Tarapacá Salar Grande salt mine. Mineral loading and transportation, operation of grinders, and transportation of product to stockpiles. Volume: 9.6 million t/year Iquique Chile 2011 to 2012

Design, engineering, procurement, construction and other technical and administrative services related to the stockpile, ore transportation, and thickener areas. Antofagasta Region II Chile 2011 to date

PLANT

Run-of-the-river hydroelectric plant that collects water from the El Manzano River through a concrete water intake, conducting it by adduction. Chile 2007-2008

NEW PRIMARY CRUSHER

EXPANSION OF THE LITHIUM

Civil works and electromechanical erection of the SX plant for the Escondida Mine leaching project. Execution of approximately 9,000 m3 of concrete, 820 tons of metal structures and 5,000 meters of pipes. Antofagasta Region II Chile 2005 – 2006

AND BELTS - ROSARIO

CARBONATE PLANT TO 40,000 TPY

Civil works and erection of the new primary crushing building, transfer tower, and tunnels for the ore transportation system. Tarapacá Region I Chile 2009 – 2011

Civil works, mechanical and structural erection, pipes, electrical installations and instrumentation. Antofagasta Region II Chile 2007 – 2008

Chancay River Channeling

Lima - Huaral 1938 Corporación Guanera Docks

Ica 1934

LA ZANJA PROJECT

COBRE PANAMA MINE PROJECT

Tailings dam for Minera Panama’s Cobre Panama Mine Project. 5.5 million m3 of excavations, 9.3 million m3 of landfills, and installation of 300,000 m2 of geotextiles. Donoso - Colón Panama 2012 to date TOROMOCHO PROJECT

Construction of tailings dam and related structures, including 7.5 million m3 of earthmoving, construction of roads, channels, dams, settling ponds, installation of geomembrane and concrete. Yauli - Junín Peru 2012 to date CONSTANCIA PROJECT

Construction of roads, platforms, tailings dam and ponds, including massive earthmoving and earthworks, and open pit operation. Chumbivilcas - Cusco Peru 2011 to date LA ARENA PROJECT

Development and construction of the copper and gold mine from zero. Mine planning, drilling, blasting, loading and transportation of ore and sterile material. Volume: 25 million t/year Huamachuco – La Libertad Peru 2011 to date

Development and operation of open pit mine for production of 100,000 ounces of gold per year. Planning, drilling, blasting, loading and transportation of ore and sterile material. Cajamarca Peru 2010 to date MARCONA PROJECT

Open pit iron mine development services. Drilling, blasting, loading and transportation of sterile material and ore. Marcona – Ica Peru 2008 – 2012 ORCOPAMPA – PORACOTA PROJECT

Construction services for ramps, galleries, crossings, shelters, shafts and supports. Drilling, controlled blasting and loading. Arequipa Peru 2003 to date EL BROCAL PROJECT

Drilling, blasting, loading and transportation of waste and polymetal ore from the open pit to the processing plant or dumps. Volume: 30 million t/year Colquijirca – Pasco Peru 1998 to date

ANTUCOYA ORE CRUSHING AND TRANSPORTATION

Design, engineering and construction of civil works, electromechanical erection, electrical installations, instrumentation for a primary, secondary and tertiary crusher. Includes conveyor belts. Antofagasta Region II Chile 2012 to date VISTA AUXILIARY BUILDING EXTENSION

Vista telescope expansion project for the European Organisation for Astronomical Research in the Southern Hemisphere. Antofagasta Region II Chile 2012 to date

Civil works and electromechanical erection for the wet and dry areas of a copper concentration plant. Chile 2009 – 2010

CASERONES TRUCK SHOP

ALMA BUILDING

Design, engineering and construction of the truck shop building with 4 repair areas, 2 multipurpose areas, washing and welding stations, warehouses, access area, substation. Atacama Region III Chile 2011-2013

Construction of the general management building for the ALMA Project (acronym for Atacama Large Millimiter Array). It included civil works, equipment assembly, finishes and landscaping. Metropolitan Region Chile 2009 – 2010

CASERONES CONCENTRATOR

CONCENTRATION

Construction, structural and mechanical erection, piping, electrical work and instrumentation for the concentration plant with a capacity of 144,230 t/day. Includes erection of 2 ball mills and 1 SAG mill. Atacama Region III Chile 2011 to date

IMPROVEMENT - ROMERAL

MAIN SUBSTATION AND CASERONES LOOP

Construction, erection and support for start-up of the mine’s loop and main electrical substation. Atacama Region III Chile 2011-2013

EUROPEAN ORGANISATION FOR ESPERANZA PROJECT

CRUSHING PLANT

Construction of foundations, equipment assembly and structural erection, electrical installations and modification of building structures, cobber magnetic pulleys, tripper transporter, product and reject feeders. Coquimbo Region IV Chile 2008 GAS TURBINE BUILDING REPAIR (UMB)

Valparaíso Region V Chile 2008

ASTRONOMICAL RESEARCH IN THE SOUTHERN HEMISPHERE (ESO)

Civil works, paving, construction and assembly of technical buildings and metal structures, electrical, sanitary, fire protection and air conditioning installations, equipment assembly and architecture. Antofagasta Region II Chile 2006 – 2008 POTASSIUM CHLORIDE PLANT AND

ESCONDIDA NORTE PROJECT CRUSHING PLANT AND CONVEYOR BELTS

Erection of metal building structures, conveyor belts and galleries, erection of primary crusher, conveyor belts, belt feeders, electromagnetic chutes, feeder chutes in areas 100, 200, and 300. Antofagasta Region II Chile 2004 – 2005

sifters and metal fabrication. Client: Compañía Minera del Pacífico Chile 2004 – 2005 TRANSITION PROJECT

143

and start-up, involving all related specialties: civil works, electric power, instrumentation and control. Tarapacá Region I Chile 2003

UJINA – ROSARIO

Civil works for two existing process water ponds, from which existing sediments and the HDPE layer were removed, in order to build concrete walls, slabs and access ramps. Tarapacá Region I Chile 2004 ESCONDIDA NORTE PROJECT

ASSEMBLY, CONSTRUCTION, COMMISSIONING AND START-UP OF SEMI-MOBILE PRIMARY CRUSHING PLANT

Civil works and structural and mechanical erection of a fully automated building for crushing ore. Tarapacá Region I Chile 2003

CIVIL WORKS IN AREAS 100, 200, AND 300

CONCRETE FOR ORE CRUSHING

Civil works and erection of belt structures in the primary crusher area, transfer silos and ore belts. Antofagasta Region II Chile 2004 – 2005

Civil works for ore crushing and transportation areas. Tarapacá Region I Chile 2003

LOW GRADE ORE PROCESSING PROJECT AT ROMERAL PLANT

MISCELLANEOUS

Civil works and metal structure erection (1,400 tons) for roller mill, ball mill, flotation and filtering buildings. Assembly of conveyor belts, magnetic separators, tailings thickener, flotation cells, pumps,

ELECTROMECHANICAL CONSTRUCTION FOR CRUSHING AND BELT SYSTEM

Electromechanical equipment for several areas, supplying equipment, assembly, testing, commissioning

INTERMEDIATE PRODUCT PADS

Construction, structural and mechanical erection, pipes, electrical installations, instrumentation and testing for the belt filter project – KCL, supply and production of posttensioned slab 3,600 m2. Concrete production and pouring. Antofagasta Region II Chile 2006 – 2007 LOS PELAMBRES MINE UPGRADE

Civil works and concrete construction work, structural excavation, structural landfill, concrete base, framework, forming and concrete for the mine upgrade project. Coquimbo Region IV Chile 2006 – 2007

LA ESPERANZA MINE, CHILE.

AND TRANSPORTATION AREAS


144

80 YEARS

LINE 4 PROJECT 1, VICUÑA

ORE PROCESSING CAPACITY

New horizons, new challenges

EL ABRA ROM LEACH

EL TESORO PROJECT

Electromechanical erection of the wet area at the El Tesoro Project. Architecture, structural, mechanical and piping erection, and plant equipment assembly services. In addition to electrical and instrumentation assembly services. Antofagasta Region II Chile 2000 – 2001

MACKENNA ORIENTE SECTOR A

EXPANSION PROJECT PHASE I

PROJECT – MISCELLANEOUS WORK

VESPUCIO TRINIDAD

Electromechanical erection of equipment, piping, metal structures, wiring and electrical cabling and instrumentation in the mill, flotation, lime and reagents plant, recovered water, coarse ore transportation, and concentrate transportation. Libertador O’Higgins Region VI Chile 2002 – 2004

Earthmoving and excavations for pumping tank platform, foundations for electrical rooms, transfers, pumps, tanks, refining pump lines, mechanical pump assembly, electrical room and transfer, manifold discharge and suction pipes to connect to the main. Antofagasta Region II Chile 2001

Service modification and surface replacement, modification work on sewer, electric power, potable water, traffic light, and instrumentation services and systems affected by the Santiago Metro. Metropolitan Region Chile 2003

MECHANICAL ERECTION OF PIPING

LINE 4 PROJECT 1, SECTION D METRO STATION PUENTE ALTO PLAZA

Construction of the Puente Alto Metro Station. Includes 2 km of bypass tunnel. Metropolitan Region Chile 2003 - 2005

Construction of galleries and access tunnels, Gerónimo de Alderete and Rodríguez Velasco. Line 4 of the Santiago Metro. Similar description to the Section 128 Project. Metropolitan Region Chile 2002 – 2003

LINE 4 PROJECT 1

HARD CONSTRUCTION OF

CONSTRUCTION OF CIVIL WORKS

CONNECTION TUNNEL - PASEO

FOR THE VICUÑA MACKENNA -

BOMBERO OSSA BUILDING

PUENTE ALTO VIADUCT

Construction of a tunnel to connect the Paseo Bombero Ossa Building (Banco Santiago) with Banco Santander. Metropolitan Region Chile 2002 - 2003

Works for erection of the viaduct, comprising a prefab concrete erection system (voussoirs), with a system of post-tensioning and launch beams. Metropolitan Region Chile 2003 – 2004

AND MILL AND BELT ARCHITECTURE

Earthmoving, concrete, reinforcement steel works, and others for the construction of the immense ESO Paranal VLT Telescope for the client, the European Southern Observatory. Antofagasta Region II Chile 2001

Main mechanical erection: SAG mill, 3 ball mills, conveyor belt, tunnel from primary crusher to stacker, radial stacker, 6 chain feeders and mill feeder belt, pumps, compressors, regrind mill, and auxiliary concentrator equipment. Ancash - Peru 2000 – 2001

KCL EXPANSION PROJECT

PROJECT

PLANT ERECTION PROJECT

Construction and electromechanical erection of the solvent extraction and electro-winning plant with quality assurance. Metropolitan Region Chile 2000 – 2002

Recovery tunnel, mill, flotation and main substation. Mechanical erection, piping, electrical, control and instrumentation, structure and architecture works related to the mill system (2 SAG mills, 4 ball mills, 4 horizontal pumps and 3 vertical mills). Coquimbo Region IV Chile 1998 – 1999

Expansion of a functioning plant; construction and expansion of office buildings and laboratories. Antofagasta Region II Chile 1997 – 1998

ESO PARANAL PROJECT

Finishing of civil works and miscellaneous work in the auxiliary telescopes area, roads and stations in the vast ESO Paranal VLT Telescope Project for the client, the European Southern Observatory. Antofagasta Region II Chile 2000 – 2001 ESO PARANAL PROJECT

Earthmoving, concrete, structures, electrical and mechanical installations (Phase 1) for offices, housing and power supply for the ESO Paranal VLT Project facilities for the client, the European Southern Observatory. Antofagasta Region II Chile 1999 - 2000 ANTAMINA PROJECT CONCENTRATOR

AND POTASSIUM CHLORIDE PLANT,

Project located north of Lima at 4,300 meters over sea level. All concrete for the concentrator plant was executed in severe climate conditions (low temperatures and rain). Ancash - Peru 1999 - 2000

KCL SUPPORT PROJECT 650 MTPA

Civil works for Santiago Metro Line 4 workshops and depots. Metropolitan Region Chile 2003 - 2004

Erection of a magnesium and potassium chloride plant in the Atacama salt mine. Includes civil works. Antofagasta Region II Chile 2002 - 2003

TALAGANTE WATER COLLECTOR

ESO PARANAL PROJECT

LOS PELAMBRES CONCENTRATOR

CONSTRUCTION OF MAGNESIUM

LINE 4 PROJECT 4 PUENTE ALTO

Construction of a 5,600 meter long, 900, 1,000 and 1,200 mm diameter HDP wastewater collector. Metropolitan Region Chile 2003 - 2004

ANTAMINA PROJECT

LOW GRADE ORE COPPER RECOVERY

MINSAL PROJECT

Electromechanical erection of the KCL drying and compacting plant, civil works, structural, electromechanical and electrical erection and instrumentation for the following areas: feeders, drying, compacting building, storage and general area. Antofagasta Region II Chile 1998 - 1999

LOS BRONCES EXPANSION PHASE I

Construction and electromechanical erection for expansion of the Los Bronces Mine, building and erection of the necessary facilities to increase the mill plant’s ore treatment capacity from 42 KPTD to 54 KPTD. Metropolitan Region Chile 2001 – 2002 COLLAHUASI MINE, CHILE.

Engineering and Construction

LOS PELAMBRES PROJECT

Civil works in the mine area, including the following buildings: primary crusher, recovery tunnel, false tunnel, power station, electrical rooms, wastewater treatment plant, water intake, stair tower building and tanks. Coquimbo Region IV Chile 1998 - 1999

COLLAHUASI PROJECT

Erection of deep well pumps, reinforcement pumps, pumping station and related piping. Tarapacá Region I Chile 1997 - 1998 COLLAHUASI CONCRETE

Supply and installation of reinforced concrete at Collahuasi, at 4,200 meters above sea level. Tarapacá Region I Chile 1997 - 1998 MINSAL POTASSIUM SULFATE AND BORIC ACID PLANT PROJECT

LOS PELAMBRES PROJECT CIVIL WORKS CONSTRUCTION – CHANCAY AREA

Concentrator civil works: coarse ore stockpile buildings, recovery and mill tunnels, including foundations for 2 SAG mills and 4 ball mills, flotation building, molybdenum plant, concentrate storage tank. Coquimbo Region IV Chile 1998 - 1999 CODOS PROJECT

Civil works and electromechanical erection of the CO2 plant. Metropolitan Region Chile 1998 PARQUE LOS DOMINICOS BUILDING

9-story building plus underground. Total area 9,115 m2. Metropolitan Region Chile 1997 – 1998

Civil works and electromechanical erection of potassium sulfate and boric acid plant in the Atacama salt mine. Antofagasta Region II Chile 1997 - 1998 LAGUNAS PROJECT

Civil works and electromechanical erection of the Nueva Victoria iodine plant; design and construction of auxiliary buildings and camp. Tarapacá Region I Chile 1997 SUPERNITROS PROJECT

Civil works and electromechanical erection of plant for production of supernitro reinforced concrete, erection of structures, instrumentation and electrical assembly and architecture. Antofagasta Region II Chile 1996 - 1997

145

BALLAST LEACHING PROJECT LOS VV PHASE I

Civil works and electromechanical erection of leaching plant in Los Bronces, located at 3,500 meters above sea level. Metropolitan Region Chile 1996 – 1998 RADOMIRO TOMIC PROJECT

Supply and installation of 55,000 m3 of reinforced concrete. Ore processing plant including a primary and secondary crusher, stock pile, belts, electro winning, tank farm, and electrical substation. Antofagasta Region II Chile 1996 – 1997 STAGE I CONSTRUCTION PROJECT

Civil works, architecture and structural erection, Quilicura Plant No.2. Metropolitan Region Chile 1996 TOCONAO CAMP CONSTRUCTION

Project development and construction of camp for plant operation (for 120 people). 1,250 m2 Antofagasta Region II Chile 1996 LITHIUM CARBONATE PLANT - SALAR DEL CARMEN (SALT MINE)

Plant perimeter enclosure, platform and installation. 1,100 m2 of architecture work for the carbonate plant: civil work, electromechanical erection and piping. Antofagasta Region II Chile 1996 – 1997


144

80 YEARS

LINE 4 PROJECT 1, VICUÑA

ORE PROCESSING CAPACITY

New horizons, new challenges

EL ABRA ROM LEACH

EL TESORO PROJECT

Electromechanical erection of the wet area at the El Tesoro Project. Architecture, structural, mechanical and piping erection, and plant equipment assembly services. In addition to electrical and instrumentation assembly services. Antofagasta Region II Chile 2000 – 2001

MACKENNA ORIENTE SECTOR A

EXPANSION PROJECT PHASE I

PROJECT – MISCELLANEOUS WORK

VESPUCIO TRINIDAD

Electromechanical erection of equipment, piping, metal structures, wiring and electrical cabling and instrumentation in the mill, flotation, lime and reagents plant, recovered water, coarse ore transportation, and concentrate transportation. Libertador O’Higgins Region VI Chile 2002 – 2004

Earthmoving and excavations for pumping tank platform, foundations for electrical rooms, transfers, pumps, tanks, refining pump lines, mechanical pump assembly, electrical room and transfer, manifold discharge and suction pipes to connect to the main. Antofagasta Region II Chile 2001

Service modification and surface replacement, modification work on sewer, electric power, potable water, traffic light, and instrumentation services and systems affected by the Santiago Metro. Metropolitan Region Chile 2003

MECHANICAL ERECTION OF PIPING

LINE 4 PROJECT 1, SECTION D METRO STATION PUENTE ALTO PLAZA

Construction of the Puente Alto Metro Station. Includes 2 km of bypass tunnel. Metropolitan Region Chile 2003 - 2005

Construction of galleries and access tunnels, Gerónimo de Alderete and Rodríguez Velasco. Line 4 of the Santiago Metro. Similar description to the Section 128 Project. Metropolitan Region Chile 2002 – 2003

LINE 4 PROJECT 1

HARD CONSTRUCTION OF

CONSTRUCTION OF CIVIL WORKS

CONNECTION TUNNEL - PASEO

FOR THE VICUÑA MACKENNA -

BOMBERO OSSA BUILDING

PUENTE ALTO VIADUCT

Construction of a tunnel to connect the Paseo Bombero Ossa Building (Banco Santiago) with Banco Santander. Metropolitan Region Chile 2002 - 2003

Works for erection of the viaduct, comprising a prefab concrete erection system (voussoirs), with a system of post-tensioning and launch beams. Metropolitan Region Chile 2003 – 2004

AND MILL AND BELT ARCHITECTURE

Earthmoving, concrete, reinforcement steel works, and others for the construction of the immense ESO Paranal VLT Telescope for the client, the European Southern Observatory. Antofagasta Region II Chile 2001

Main mechanical erection: SAG mill, 3 ball mills, conveyor belt, tunnel from primary crusher to stacker, radial stacker, 6 chain feeders and mill feeder belt, pumps, compressors, regrind mill, and auxiliary concentrator equipment. Ancash - Peru 2000 – 2001

KCL EXPANSION PROJECT

PROJECT

PLANT ERECTION PROJECT

Construction and electromechanical erection of the solvent extraction and electro-winning plant with quality assurance. Metropolitan Region Chile 2000 – 2002

Recovery tunnel, mill, flotation and main substation. Mechanical erection, piping, electrical, control and instrumentation, structure and architecture works related to the mill system (2 SAG mills, 4 ball mills, 4 horizontal pumps and 3 vertical mills). Coquimbo Region IV Chile 1998 – 1999

Expansion of a functioning plant; construction and expansion of office buildings and laboratories. Antofagasta Region II Chile 1997 – 1998

ESO PARANAL PROJECT

Finishing of civil works and miscellaneous work in the auxiliary telescopes area, roads and stations in the vast ESO Paranal VLT Telescope Project for the client, the European Southern Observatory. Antofagasta Region II Chile 2000 – 2001 ESO PARANAL PROJECT

Earthmoving, concrete, structures, electrical and mechanical installations (Phase 1) for offices, housing and power supply for the ESO Paranal VLT Project facilities for the client, the European Southern Observatory. Antofagasta Region II Chile 1999 - 2000 ANTAMINA PROJECT CONCENTRATOR

AND POTASSIUM CHLORIDE PLANT,

Project located north of Lima at 4,300 meters over sea level. All concrete for the concentrator plant was executed in severe climate conditions (low temperatures and rain). Ancash - Peru 1999 - 2000

KCL SUPPORT PROJECT 650 MTPA

Civil works for Santiago Metro Line 4 workshops and depots. Metropolitan Region Chile 2003 - 2004

Erection of a magnesium and potassium chloride plant in the Atacama salt mine. Includes civil works. Antofagasta Region II Chile 2002 - 2003

TALAGANTE WATER COLLECTOR

ESO PARANAL PROJECT

LOS PELAMBRES CONCENTRATOR

CONSTRUCTION OF MAGNESIUM

LINE 4 PROJECT 4 PUENTE ALTO

Construction of a 5,600 meter long, 900, 1,000 and 1,200 mm diameter HDP wastewater collector. Metropolitan Region Chile 2003 - 2004

ANTAMINA PROJECT

LOW GRADE ORE COPPER RECOVERY

MINSAL PROJECT

Electromechanical erection of the KCL drying and compacting plant, civil works, structural, electromechanical and electrical erection and instrumentation for the following areas: feeders, drying, compacting building, storage and general area. Antofagasta Region II Chile 1998 - 1999

LOS BRONCES EXPANSION PHASE I

Construction and electromechanical erection for expansion of the Los Bronces Mine, building and erection of the necessary facilities to increase the mill plant’s ore treatment capacity from 42 KPTD to 54 KPTD. Metropolitan Region Chile 2001 – 2002 COLLAHUASI MINE, CHILE.

Engineering and Construction

LOS PELAMBRES PROJECT

Civil works in the mine area, including the following buildings: primary crusher, recovery tunnel, false tunnel, power station, electrical rooms, wastewater treatment plant, water intake, stair tower building and tanks. Coquimbo Region IV Chile 1998 - 1999

COLLAHUASI PROJECT

Erection of deep well pumps, reinforcement pumps, pumping station and related piping. Tarapacá Region I Chile 1997 - 1998 COLLAHUASI CONCRETE

Supply and installation of reinforced concrete at Collahuasi, at 4,200 meters above sea level. Tarapacá Region I Chile 1997 - 1998 MINSAL POTASSIUM SULFATE AND BORIC ACID PLANT PROJECT

LOS PELAMBRES PROJECT CIVIL WORKS CONSTRUCTION – CHANCAY AREA

Concentrator civil works: coarse ore stockpile buildings, recovery and mill tunnels, including foundations for 2 SAG mills and 4 ball mills, flotation building, molybdenum plant, concentrate storage tank. Coquimbo Region IV Chile 1998 - 1999 CODOS PROJECT

Civil works and electromechanical erection of the CO2 plant. Metropolitan Region Chile 1998 PARQUE LOS DOMINICOS BUILDING

9-story building plus underground. Total area 9,115 m2. Metropolitan Region Chile 1997 – 1998

Civil works and electromechanical erection of potassium sulfate and boric acid plant in the Atacama salt mine. Antofagasta Region II Chile 1997 - 1998 LAGUNAS PROJECT

Civil works and electromechanical erection of the Nueva Victoria iodine plant; design and construction of auxiliary buildings and camp. Tarapacá Region I Chile 1997 SUPERNITROS PROJECT

Civil works and electromechanical erection of plant for production of supernitro reinforced concrete, erection of structures, instrumentation and electrical assembly and architecture. Antofagasta Region II Chile 1996 - 1997

145

BALLAST LEACHING PROJECT LOS VV PHASE I

Civil works and electromechanical erection of leaching plant in Los Bronces, located at 3,500 meters above sea level. Metropolitan Region Chile 1996 – 1998 RADOMIRO TOMIC PROJECT

Supply and installation of 55,000 m3 of reinforced concrete. Ore processing plant including a primary and secondary crusher, stock pile, belts, electro winning, tank farm, and electrical substation. Antofagasta Region II Chile 1996 – 1997 STAGE I CONSTRUCTION PROJECT

Civil works, architecture and structural erection, Quilicura Plant No.2. Metropolitan Region Chile 1996 TOCONAO CAMP CONSTRUCTION

Project development and construction of camp for plant operation (for 120 people). 1,250 m2 Antofagasta Region II Chile 1996 LITHIUM CARBONATE PLANT - SALAR DEL CARMEN (SALT MINE)

Plant perimeter enclosure, platform and installation. 1,100 m2 of architecture work for the carbonate plant: civil work, electromechanical erection and piping. Antofagasta Region II Chile 1996 – 1997


146

80 YEARS

New horizons, new challenges

MINSAL PROJECT

MEDICAL OFFICES

CHIMOLSA PLANT EXPANSION

KCL plant and powerhouse. Civil works, structural erection, mechanical erection and electrical assembly, instrumentation and commissioning of the plant at the Atacama salt mine. Antofagasta Region II Chile 1995 - 1996

METROPOLITANA SUR HEALTH

PROJECT

SERVICES

Construction of medical office building (3,000 m2). Mechanical operating floor (3,000 m2). Metropolitan Region Chile 1993 - 1994

Expansion of the casting process plant and construction of general offices. Client: Chilena de Moldeados S.A. Metropolitan Region Chile 1993

piping, electricity, instrumentation. Main areas: lithium carbonate collection system, brine storage and discharge system, sulfuric acid management system, air supply system. Client: Sociedad Chilena del Litio Antofagasta Region II Chile 1991

SERVICE INFRASTRUCTURE PROJECT

LOS BRONCES PHASE II EXPANSION

MANTO VERDE PROJECT

- LOS BRONCES

PROJECT

CARLOS SILVA BUILDING

Civil works, structural and electromechanical erection of crushing plant and heavy buildings. Atacama Region III Chile 1994 – 1995

Construction of 6-story building for the Los Bronces hotel; erection of structures and architecture. Metropolitan Region Chile 1993 – 1995

Construction of apartment building with 7 floors and one underground level. 4,000 m2 of construction. Metropolitan Region Chile 1991 – 1992

SANTA BÁRBARA PROJECT

CONCENTRATE LEACHING PROJECT

Civil works, structural erection and erection of the primary crusher and conveyor belts. Antofagasta Region II Chile 1994 - 1995

- COLOSO

Civil works and electromechanical erection for: fuel supply for mining vehicles, tire and chain workshop, chute repair workshop, ball chute building, expansion of the lime plant, water collection and systems, sewage and fire protection system. Metropolitan Region Chile 1992 - 1993

INSTALLATION OF PIPING SYSTEMS AT SX PLANT AND TANKS

Erection and installation of piping: HDP, carbon steel, stainless steel, titanium and minor lines. Antofagasta Region II Chile 1994 - 1995 ESCONDIDA PROJECT PHASE III

Construction and assembly of underground piping and ductbank for the Phase III expansion project. Antofagasta Region II Chile 1994 - 1995

Electromechanical erection of the filtration, flotation and leaching plant. Tank farm, solvent extraction and electro-tension, ammonia recovery, thickeners, compressors and 10 electrical rooms for Minera Escondida Ltda. Antofagasta Region II Chile 1993 – 1994 LAS TORTOLAS MOLYBDENUM PLANT ERECTION

Civil works in concrete and electromechanical erection of the molybdenum plant. Client: Cía. Minera Disputada de Las Condes S.A. Metropolitan Region Chile 1993 - 1994 WAREHOUSE & MISCELLANEOUS

NEGRILLAR – ZALDIVAR WATER

WORK AND SERVICES PROJECT AT

ADDUCTION

ZALDÍVAR MINE

Laying of carbon steel pipes. Antofagasta Region II Chile 1994

Warehouse construction; miscellaneous work and services at Zaldívar. Client: Compañía Minera Zaldivar Antofagasta Region II Chile 1993 - 1994

ENAEX - PANNA 2 PLANT EXPANSION

Earthmoving, civil works, structural and mechanical equipment erection, piping and electricity. Instrumentation for expansion of the ammonium nitrate and nitric acid plant, ocean water adduction and water treatment plant. Antofagasta Region II Chile 1992 - 1993 CERRO COLORADO PROJECT

Civil works, structure erection, electro-winning, construction of underground piping and electrical ductbank for the plant. Client: Cía. Minera Cerro Colorado Río Algom Ltda. Tarapacá Region I Chile 1992 - 1994

SAN FRANCISCO REPULPING STATION PROJECT

Pumping station, water collection works, thickener modification, and instrumentation and electrical work. Metropolitan Region Chile 1989 – 1990 ESCONDIDA PROJECT PROCESSING PLANT, PORT AREA PUERTO COLOSO

Construction of copper concentrate filtration plant and stock pile. Civil works in concrete, erection of structures and metal fabrication, mechanical equipment, tanks and piping, electrical assembly, instrumentation, rockfill protection and architecture. Client: Minera Escondida Ltda. Antofagasta Region II Chile 1989 – 1991 LA NEGRA 1990 CHEMICAL PLANT EXPANSION

QUEBRADA BLANCA PROJECT

Construction of warehouse, civil works and storehouse. Tarapacá Region I Chile 1992 LA NEGRA 1991 CHEMICAL PLANT EXPANSION

Foundations, metal structures, assembly of equipment, tanks,

Civil works in concrete, erection of structures and metal fabrication, mechanical erection, piping, electrical assembly, instrumentation, and commissioning at the functioning La Negra chemical plant. Client: Sociedad Chilena del Litio Antofagasta Region II Chile 1989 – 1990

Engineering and Construction

LOS BRONCES EXPANSION PROJECT

LA COIPA PROJECT

Construction of civil works and architecture, structures, metal structures, metal fabrication, piping, electricity, instrumentation and commissioning for the expansion of the copper plant from 12,000 to 37,000 t/d. Metropolitan Region Chile 1989 – 1992

1,000 TPD PLANT

FORTIFICATION AND RAIL-LAYING

147

1,000 t/d gold processing plant located in Copiapó, at 3,900 meters above sea level. Civil works in reinforced concrete, structural erection and metal fabrication, mechanical equipment, piping, electrical and instrumentation, commissioning for the plant. Atacama Region III Chile 1988 - 1989

TENIENTE 5 LEVEL

Construction of railroad at Teniente 5 level. Bolt-mesh shotcrete fortification and frames in the tunnel section 4.0 x 4.50 m. Line repair. Libertador O’Higgins Region VI Chile 1989 - 1990 ESCONDIDA PROJECT – MINE AREA

Truck shop building, warehouse and offices, auxiliary buildings, workshops. Underground piping. Concentrator and ductbank. Mechanical and electrical installations. Water supply system for the salt mine. Punta Negra Antofagasta Region II Chile 1989 - 1990 DIVERSION TUNNEL REPAIR SAN FRANCISCO RIVER

Repairs on 2,500 meters. 350x350 tunnel, 1987 defect repair, concrete slab demolitions, replacement with reinforced concrete slab, 30x30x25 pavers, framed reinforced box and vault, fortifications with mesh and shotcrete, cement injections. Metropolitan Region Chile 1989

DIVERSION TUNNEL REPAIR SAN FRANCISCO RIVER

Repairs on 1,000 meters. 3.50x3.50 tunnel, 1987 defect repair, concrete slab demolitions, replacement with reinforced concrete slab, 30x30x25 pavers, framed reinforced box and vault, fortifications with mesh and shotcrete, cement injections. Client: Cía. Minera Disputada de Las Condes S.A. Metropolitan Region Chile 1988

ESCONDIDA MINE, CHILE.

discharge structures with emergency diversion of San Francisco River. Metropolitan Region Chile 1987 - 1988

DISASSEMBLY OF PRIMARY CRUSHER MINERA OJOS DEL SALADO

Disassembly and transportation of primary El Cobre plant crusher to Copiapó: 450 tons of structures and equipment. Valparaíso Region V Chile 1988 POTASH PLANT

Civil works and erection of potassium plant. Client: Sociedad Chilena del Litio Antofagasta Region II Chile 1987 – 1988 EMERGENCY EVACUATOR AND DIVERSION SAN FRANCISCO RIVER

Construction of emergency overflow No.2 tailings dam. Reinforced concrete tube. Overflow and

P. AGUIRRE CERDA PLANT EXPANSION

Civil works and erection for the expansion of the copper plant to 1,600 t/d. Client: Compañía Minera Ojos del Salado Atacama Region III Chile 1987 - 1988 MOPA PROJECT CIVIL WORKS

Civil works and architecture for expansion of the cellulose plant, reinforced concrete (3,600 m3). Client: Celulosa Arauco Bío – Bío Region VIII Chile 1987 - 1988

TAILINGS FILTRATION PLANT AND MAINTENANCE WORKSHOP

Erection of 250 tons of mechanical equipment, metal fabrication and piping; electricity, instrumentation and commissioning of tailings filtration plant and maintenance workshop. Client: Cía. Minera Disputada de Las Condes S.A. Metropolitan Region Chile 1987 TENIENTE 3 CONVERTER FOUNDATION

Demolition with explosives of existing foundation inside the functioning converter facility. Construction of new foundation. Libertador O’Higgins Region VI Chile 1987


146

80 YEARS

New horizons, new challenges

MINSAL PROJECT

MEDICAL OFFICES

CHIMOLSA PLANT EXPANSION

KCL plant and powerhouse. Civil works, structural erection, mechanical erection and electrical assembly, instrumentation and commissioning of the plant at the Atacama salt mine. Antofagasta Region II Chile 1995 - 1996

METROPOLITANA SUR HEALTH

PROJECT

SERVICES

Construction of medical office building (3,000 m2). Mechanical operating floor (3,000 m2). Metropolitan Region Chile 1993 - 1994

Expansion of the casting process plant and construction of general offices. Client: Chilena de Moldeados S.A. Metropolitan Region Chile 1993

piping, electricity, instrumentation. Main areas: lithium carbonate collection system, brine storage and discharge system, sulfuric acid management system, air supply system. Client: Sociedad Chilena del Litio Antofagasta Region II Chile 1991

SERVICE INFRASTRUCTURE PROJECT

LOS BRONCES PHASE II EXPANSION

MANTO VERDE PROJECT

- LOS BRONCES

PROJECT

CARLOS SILVA BUILDING

Civil works, structural and electromechanical erection of crushing plant and heavy buildings. Atacama Region III Chile 1994 – 1995

Construction of 6-story building for the Los Bronces hotel; erection of structures and architecture. Metropolitan Region Chile 1993 – 1995

Construction of apartment building with 7 floors and one underground level. 4,000 m2 of construction. Metropolitan Region Chile 1991 – 1992

SANTA BÁRBARA PROJECT

CONCENTRATE LEACHING PROJECT

Civil works, structural erection and erection of the primary crusher and conveyor belts. Antofagasta Region II Chile 1994 - 1995

- COLOSO

Civil works and electromechanical erection for: fuel supply for mining vehicles, tire and chain workshop, chute repair workshop, ball chute building, expansion of the lime plant, water collection and systems, sewage and fire protection system. Metropolitan Region Chile 1992 - 1993

INSTALLATION OF PIPING SYSTEMS AT SX PLANT AND TANKS

Erection and installation of piping: HDP, carbon steel, stainless steel, titanium and minor lines. Antofagasta Region II Chile 1994 - 1995 ESCONDIDA PROJECT PHASE III

Construction and assembly of underground piping and ductbank for the Phase III expansion project. Antofagasta Region II Chile 1994 - 1995

Electromechanical erection of the filtration, flotation and leaching plant. Tank farm, solvent extraction and electro-tension, ammonia recovery, thickeners, compressors and 10 electrical rooms for Minera Escondida Ltda. Antofagasta Region II Chile 1993 – 1994 LAS TORTOLAS MOLYBDENUM PLANT ERECTION

Civil works in concrete and electromechanical erection of the molybdenum plant. Client: Cía. Minera Disputada de Las Condes S.A. Metropolitan Region Chile 1993 - 1994 WAREHOUSE & MISCELLANEOUS

NEGRILLAR – ZALDIVAR WATER

WORK AND SERVICES PROJECT AT

ADDUCTION

ZALDÍVAR MINE

Laying of carbon steel pipes. Antofagasta Region II Chile 1994

Warehouse construction; miscellaneous work and services at Zaldívar. Client: Compañía Minera Zaldivar Antofagasta Region II Chile 1993 - 1994

ENAEX - PANNA 2 PLANT EXPANSION

Earthmoving, civil works, structural and mechanical equipment erection, piping and electricity. Instrumentation for expansion of the ammonium nitrate and nitric acid plant, ocean water adduction and water treatment plant. Antofagasta Region II Chile 1992 - 1993 CERRO COLORADO PROJECT

Civil works, structure erection, electro-winning, construction of underground piping and electrical ductbank for the plant. Client: Cía. Minera Cerro Colorado Río Algom Ltda. Tarapacá Region I Chile 1992 - 1994

SAN FRANCISCO REPULPING STATION PROJECT

Pumping station, water collection works, thickener modification, and instrumentation and electrical work. Metropolitan Region Chile 1989 – 1990 ESCONDIDA PROJECT PROCESSING PLANT, PORT AREA PUERTO COLOSO

Construction of copper concentrate filtration plant and stock pile. Civil works in concrete, erection of structures and metal fabrication, mechanical equipment, tanks and piping, electrical assembly, instrumentation, rockfill protection and architecture. Client: Minera Escondida Ltda. Antofagasta Region II Chile 1989 – 1991 LA NEGRA 1990 CHEMICAL PLANT EXPANSION

QUEBRADA BLANCA PROJECT

Construction of warehouse, civil works and storehouse. Tarapacá Region I Chile 1992 LA NEGRA 1991 CHEMICAL PLANT EXPANSION

Foundations, metal structures, assembly of equipment, tanks,

Civil works in concrete, erection of structures and metal fabrication, mechanical erection, piping, electrical assembly, instrumentation, and commissioning at the functioning La Negra chemical plant. Client: Sociedad Chilena del Litio Antofagasta Region II Chile 1989 – 1990

Engineering and Construction

LOS BRONCES EXPANSION PROJECT

LA COIPA PROJECT

Construction of civil works and architecture, structures, metal structures, metal fabrication, piping, electricity, instrumentation and commissioning for the expansion of the copper plant from 12,000 to 37,000 t/d. Metropolitan Region Chile 1989 – 1992

1,000 TPD PLANT

FORTIFICATION AND RAIL-LAYING

147

1,000 t/d gold processing plant located in Copiapó, at 3,900 meters above sea level. Civil works in reinforced concrete, structural erection and metal fabrication, mechanical equipment, piping, electrical and instrumentation, commissioning for the plant. Atacama Region III Chile 1988 - 1989

TENIENTE 5 LEVEL

Construction of railroad at Teniente 5 level. Bolt-mesh shotcrete fortification and frames in the tunnel section 4.0 x 4.50 m. Line repair. Libertador O’Higgins Region VI Chile 1989 - 1990 ESCONDIDA PROJECT – MINE AREA

Truck shop building, warehouse and offices, auxiliary buildings, workshops. Underground piping. Concentrator and ductbank. Mechanical and electrical installations. Water supply system for the salt mine. Punta Negra Antofagasta Region II Chile 1989 - 1990 DIVERSION TUNNEL REPAIR SAN FRANCISCO RIVER

Repairs on 2,500 meters. 350x350 tunnel, 1987 defect repair, concrete slab demolitions, replacement with reinforced concrete slab, 30x30x25 pavers, framed reinforced box and vault, fortifications with mesh and shotcrete, cement injections. Metropolitan Region Chile 1989

DIVERSION TUNNEL REPAIR SAN FRANCISCO RIVER

Repairs on 1,000 meters. 3.50x3.50 tunnel, 1987 defect repair, concrete slab demolitions, replacement with reinforced concrete slab, 30x30x25 pavers, framed reinforced box and vault, fortifications with mesh and shotcrete, cement injections. Client: Cía. Minera Disputada de Las Condes S.A. Metropolitan Region Chile 1988

ESCONDIDA MINE, CHILE.

discharge structures with emergency diversion of San Francisco River. Metropolitan Region Chile 1987 - 1988

DISASSEMBLY OF PRIMARY CRUSHER MINERA OJOS DEL SALADO

Disassembly and transportation of primary El Cobre plant crusher to Copiapó: 450 tons of structures and equipment. Valparaíso Region V Chile 1988 POTASH PLANT

Civil works and erection of potassium plant. Client: Sociedad Chilena del Litio Antofagasta Region II Chile 1987 – 1988 EMERGENCY EVACUATOR AND DIVERSION SAN FRANCISCO RIVER

Construction of emergency overflow No.2 tailings dam. Reinforced concrete tube. Overflow and

P. AGUIRRE CERDA PLANT EXPANSION

Civil works and erection for the expansion of the copper plant to 1,600 t/d. Client: Compañía Minera Ojos del Salado Atacama Region III Chile 1987 - 1988 MOPA PROJECT CIVIL WORKS

Civil works and architecture for expansion of the cellulose plant, reinforced concrete (3,600 m3). Client: Celulosa Arauco Bío – Bío Region VIII Chile 1987 - 1988

TAILINGS FILTRATION PLANT AND MAINTENANCE WORKSHOP

Erection of 250 tons of mechanical equipment, metal fabrication and piping; electricity, instrumentation and commissioning of tailings filtration plant and maintenance workshop. Client: Cía. Minera Disputada de Las Condes S.A. Metropolitan Region Chile 1987 TENIENTE 3 CONVERTER FOUNDATION

Demolition with explosives of existing foundation inside the functioning converter facility. Construction of new foundation. Libertador O’Higgins Region VI Chile 1987


148

80 YEARS

New horizons, new challenges

TAILINGS FILTRATION PLANT

CURICO AUTOMATIC TELEPHONE

AND MAINTENANCE WORKSHOP

EXCHANGE

BUILDING

Civil works, 2,800 m3 of reinforced concrete and 450 tons of structure. Client: Cía. Minera Disputada de Las Condes S.A. Metropolitan Region Chile 1987

Civil works, architecture, equipment assembly and electrical installation for the telephone exchange. Client: Compañía de Teléfonos de Chile Maule Region VII Chile 1985

INSTALLATION OF THIRD

PANGAL PLANT SURGE TANK REPAIR

ROASTER EL INDIO MINE

Repair of interior duct of the surge tank at the El Teniente Mine Pangal hydroelectric plant. Libertador O’Higgins Region VI Chile 1985

Foundations, 1,760 m of concrete. Metal structures and tanks (625 tons); mechanical assembly, piping, electricity, instrumentation and commissioning. Replacement of 8 conveyor belts. Coquimbo Region IV Chile 1986 – 1987 3

LA REINA FUEL CYCLE

EL TENIENTE MINE, CHILE. HYDROELECTRIC PLANT

PRIMARY CRUSHER TRANSFER BELT TUNNEL

Excavation of 120 meters of 5.2 x 5.2 tunnel, with 26% slope to the interior, 0.75 meter metal frames and reinforced concrete slabs, boxes and vault for the El Teniente Project. Libertador O’Higgins Region VI Chile 1986 CYCLONE PLANT TRANSFER

Disassembly and assembly at higher level of the No.2 tailings dam cyclone station. Structures: 21 tons; mechanical equipment and pipes 98 tons. Reinforced concrete foundations, electricity and instrumentation.

Client: Comisión Chilena de Energía Nuclear Metropolitan Region Chile 1985 LO AGUIRRE HOUSES

Project and construction for the southern residential park for the Lo Aguirre nuclear studies center. 800 m2 of construction and 2,880 m2 of roads. Client: Comisión Chilena de Energía Nuclear Metropolitan Region Chile 1984

Client: Cía. Minera Disputada de Las Condes S.A. Metropolitan Region Chile 1986 TAILINGS LAUNDER TELEMETRY AND CONTROL

Engineering and erection of the remote level control system for the Colon-Caren tailings launder. Radio transceiver system, solar panels and civil works. Client: CODELCO Chile, El Teniente Division Libertador O’Higgins Region VI Chile 1986 – 1987 SIPHON BRIDGE No. 3 ADDUCTION

PULP TRANSPORTATION PIPE

EL TENIENTE MINE 2700 ADIT

Removal and installation of 740 meters of steel-manganese pipe for pulp transportation. Client: Minera Disputada de Las Condes S.A. Metropolitan Region Chile 1986

Excavation of 1,100 meters of 3x3 meter tunnel. Included fortifications with bolts, grout, frames and shotcrete. Libertador O’Higgins Region VI Chile 1985 – 1987

TUNNEL

CONCON AUTOMATIC TELEPHONE

SALTPETER REFINERY PLANT

EXCHANGE

Civil works: concrete (400 m3), metal fabrication and structural erection (120 tons), mechanical erection (60 tons), electricity, instrumentation and plant start-up. Client: SOQUIMICH. Antofagasta Region II Chile 1985 - 1986

Civil works, architecture and installations. Reinforced concrete building. Valparaíso Region V Chile 1986 EL TENIENTE PRIMARY CRUSHER

PANGAL - COYA

ROCK EXCAVATION

Repair of the Coya plant adduction pipe bridge, which had collapsed due to flooding of the Cachapoal River, El Teniente Project. Libertador O’Higgins Region VI Chile 1986

Open pit excavation of 45,000 m3 of rock for installation of the future crusher. Libertador O’Higgins Region VI Chile 1986

EL TENIENTE MINE - LA LEONERA VILLAGE

Construction of fifty 70 m2 houses and complete urbanization. Libertador O’Higgins Region VI Chile 1985 – 1986

Construction of 2-story building with an area of 1,260 m2, finishings, and facilities at Centro de Estudios Nucleares La Reina (La Reina Nuclear Studies Center). Client: Comisión Chilena de Energía Nuclear (Chilean Nuclear Energy Commission) Metropolitan Region Chile 1985 MIXING AND AGGLOMERATING TOWER

Construction of a seven-story, 1,370 m2 building in reinforced concrete, and 1,650 m2 of pavement. Client: CHIPRODAL S. A. I. C. Libertador O’Higgins Region VI Chile 1985 EL TENIENTE MINE - RAMÓN TORRES LAGOS VILLAGE

Construction and finishings for 108 houses, 70 m2 each, in Stage III of Villa Don Ramón Torres Lagos; architecture and finishings. Libertador O’Higgins Region VI Chile 1985 LO AGUIRRE REACTOR

Repair of rails on the bridge crane, lining of exterior slope, construction of vault and 590 m2 of concrete surface.

EXPANSION AND FINISHINGS

149

EL INDIO MINE PROCESSING PLANT

PAULA JARAQUEMADA HOSPITAL

CONCRETE WORKS

Construction of 3,720 m2 of hospital facilities, hospital gas systems, electrical installations, and temperature control systems. Metropolitan Region Chile 1983 - 1984

1,100 m3 of reinforced concrete in walls, tanks and mill foundations in the processing plant, warehouse and roaster workshop. Coquimbo Region IV Chile 1983

EL TENIENTE CONCRETE TAILINGS LAUNDER

ÑUÑOA JARDIN AGRÍCOLA VILLAGE

Construction of 620 meters of reinforced concrete tailings launder. Libertador O’Higgins Region VI Chile 1983 - 1984

Finishings and repairs for 120 houses Metropolitan Region Chile 1983 SANTA LUCÍA PLANT EXPANSION

DIVERSION TUNNEL REPAIR SAN FRANCISCO RIVER

NUEVO REINO – ENDESA

300kV mini power plant; inlet, adduction. Rocalit pressure pipe. Generator room and assembly of turbines. Civil works and reinforced concrete. Client: ENDESA Aysén Region XI Chile 1986 - 1987

Engineering and Construction

Filler injection in vault caverns, flooring and concrete slabs in 3.5 kilometer long, 4 x 3.5 meter section of tunnel. Client: Cía. Minera Disputada de Las Condes S.A. Metropolitan Region Chile 1984 TRINIDAD FLORIDA II TELEPHONE EXCHANGE

Civil works, architecture, equipment assembly, and electrical installation of telephone exchange. Metropolitan Region Chile 1984 THICKENER TANK AND OTHERS EL INDIO MINE

Construction of thickener tank with 1,850 m3 of reinforced concrete. Coquimbo Region IV Chile 1984

EL INDIO MINE – MISCELLANEOUS WORK

Civil works, mechanical erection, architecture, electrical assembly, and installation of piping. Coquimbo Region IV Chile 1983 – 1984

Civil works, architecture, equipment assembly and electrical installation for telephone exchange. Client: Compañía de Teléfonos de Chile Metropolitan Region Chile 1982 – 1983 PROCESSING PLANT MECHANICAL

ÑUÑOA IV TELEPHONE EXCHANGE

WORKS

Civil works, architecture, equipment assembly and electrical installation for telephone exchange. Metropolitan Region Chile 1983

Mechanical works, equipment, repairs and various installations at the cyanidation plant. Coquimbo Region IV Chile 1982 – 1982

DEPARTMENTAL TELEPHONE

SKI COURTS CAMP EXPANSION

EXCHANGE

EL INDIO MINE

Civil works, architecture, equipment assembly and electrical installation for telephone exchange. Metropolitan Region Chile 1983

6,500 m2 of construction in four 2- and 3-story buildings - reinforced concrete, metal structure, block construction, installations and finishings. Coquimbo Region IV Chile 1982

EVER CRISP SNACK INDUSTRIAL FOOD FACTORY

ADMINISTRATION BUILDING EXPANSION AND FINISHINGS

Construction of 3,100 m2 of offices in a 7-story building with one underground level, the headquarters for the Chilean Nuclear Energy Commission (Comisión Chilena de Energía Nuclear). Metropolitan Region Chile 1983 – 1984

Civil works, architecture and electromechanical erection. Metropolitan Region Chile 1983 SINDEM VILLAGE PARTS II AND III COQUIMBO – OSORNO BANK

Construction and finishings for 180 houses, with an area of 70 m2 each. Coquimbo Region IV Chile 1983

GRACE OFFICE BUILDING REMODELING

Construction of 2,000 m2 of offices in the Grace Building. Metal structures, installations and finishings. Metropolitan Region Chile 1981 - 1982


148

80 YEARS

New horizons, new challenges

TAILINGS FILTRATION PLANT

CURICO AUTOMATIC TELEPHONE

AND MAINTENANCE WORKSHOP

EXCHANGE

BUILDING

Civil works, 2,800 m3 of reinforced concrete and 450 tons of structure. Client: Cía. Minera Disputada de Las Condes S.A. Metropolitan Region Chile 1987

Civil works, architecture, equipment assembly and electrical installation for the telephone exchange. Client: Compañía de Teléfonos de Chile Maule Region VII Chile 1985

INSTALLATION OF THIRD

PANGAL PLANT SURGE TANK REPAIR

ROASTER EL INDIO MINE

Repair of interior duct of the surge tank at the El Teniente Mine Pangal hydroelectric plant. Libertador O’Higgins Region VI Chile 1985

Foundations, 1,760 m of concrete. Metal structures and tanks (625 tons); mechanical assembly, piping, electricity, instrumentation and commissioning. Replacement of 8 conveyor belts. Coquimbo Region IV Chile 1986 – 1987 3

LA REINA FUEL CYCLE

EL TENIENTE MINE, CHILE. HYDROELECTRIC PLANT

PRIMARY CRUSHER TRANSFER BELT TUNNEL

Excavation of 120 meters of 5.2 x 5.2 tunnel, with 26% slope to the interior, 0.75 meter metal frames and reinforced concrete slabs, boxes and vault for the El Teniente Project. Libertador O’Higgins Region VI Chile 1986 CYCLONE PLANT TRANSFER

Disassembly and assembly at higher level of the No.2 tailings dam cyclone station. Structures: 21 tons; mechanical equipment and pipes 98 tons. Reinforced concrete foundations, electricity and instrumentation.

Client: Comisión Chilena de Energía Nuclear Metropolitan Region Chile 1985 LO AGUIRRE HOUSES

Project and construction for the southern residential park for the Lo Aguirre nuclear studies center. 800 m2 of construction and 2,880 m2 of roads. Client: Comisión Chilena de Energía Nuclear Metropolitan Region Chile 1984

Client: Cía. Minera Disputada de Las Condes S.A. Metropolitan Region Chile 1986 TAILINGS LAUNDER TELEMETRY AND CONTROL

Engineering and erection of the remote level control system for the Colon-Caren tailings launder. Radio transceiver system, solar panels and civil works. Client: CODELCO Chile, El Teniente Division Libertador O’Higgins Region VI Chile 1986 – 1987 SIPHON BRIDGE No. 3 ADDUCTION

PULP TRANSPORTATION PIPE

EL TENIENTE MINE 2700 ADIT

Removal and installation of 740 meters of steel-manganese pipe for pulp transportation. Client: Minera Disputada de Las Condes S.A. Metropolitan Region Chile 1986

Excavation of 1,100 meters of 3x3 meter tunnel. Included fortifications with bolts, grout, frames and shotcrete. Libertador O’Higgins Region VI Chile 1985 – 1987

TUNNEL

CONCON AUTOMATIC TELEPHONE

SALTPETER REFINERY PLANT

EXCHANGE

Civil works: concrete (400 m3), metal fabrication and structural erection (120 tons), mechanical erection (60 tons), electricity, instrumentation and plant start-up. Client: SOQUIMICH. Antofagasta Region II Chile 1985 - 1986

Civil works, architecture and installations. Reinforced concrete building. Valparaíso Region V Chile 1986 EL TENIENTE PRIMARY CRUSHER

PANGAL - COYA

ROCK EXCAVATION

Repair of the Coya plant adduction pipe bridge, which had collapsed due to flooding of the Cachapoal River, El Teniente Project. Libertador O’Higgins Region VI Chile 1986

Open pit excavation of 45,000 m3 of rock for installation of the future crusher. Libertador O’Higgins Region VI Chile 1986

EL TENIENTE MINE - LA LEONERA VILLAGE

Construction of fifty 70 m2 houses and complete urbanization. Libertador O’Higgins Region VI Chile 1985 – 1986

Construction of 2-story building with an area of 1,260 m2, finishings, and facilities at Centro de Estudios Nucleares La Reina (La Reina Nuclear Studies Center). Client: Comisión Chilena de Energía Nuclear (Chilean Nuclear Energy Commission) Metropolitan Region Chile 1985 MIXING AND AGGLOMERATING TOWER

Construction of a seven-story, 1,370 m2 building in reinforced concrete, and 1,650 m2 of pavement. Client: CHIPRODAL S. A. I. C. Libertador O’Higgins Region VI Chile 1985 EL TENIENTE MINE - RAMÓN TORRES LAGOS VILLAGE

Construction and finishings for 108 houses, 70 m2 each, in Stage III of Villa Don Ramón Torres Lagos; architecture and finishings. Libertador O’Higgins Region VI Chile 1985 LO AGUIRRE REACTOR

Repair of rails on the bridge crane, lining of exterior slope, construction of vault and 590 m2 of concrete surface.

EXPANSION AND FINISHINGS

149

EL INDIO MINE PROCESSING PLANT

PAULA JARAQUEMADA HOSPITAL

CONCRETE WORKS

Construction of 3,720 m2 of hospital facilities, hospital gas systems, electrical installations, and temperature control systems. Metropolitan Region Chile 1983 - 1984

1,100 m3 of reinforced concrete in walls, tanks and mill foundations in the processing plant, warehouse and roaster workshop. Coquimbo Region IV Chile 1983

EL TENIENTE CONCRETE TAILINGS LAUNDER

ÑUÑOA JARDIN AGRÍCOLA VILLAGE

Construction of 620 meters of reinforced concrete tailings launder. Libertador O’Higgins Region VI Chile 1983 - 1984

Finishings and repairs for 120 houses Metropolitan Region Chile 1983 SANTA LUCÍA PLANT EXPANSION

DIVERSION TUNNEL REPAIR SAN FRANCISCO RIVER

NUEVO REINO – ENDESA

300kV mini power plant; inlet, adduction. Rocalit pressure pipe. Generator room and assembly of turbines. Civil works and reinforced concrete. Client: ENDESA Aysén Region XI Chile 1986 - 1987

Engineering and Construction

Filler injection in vault caverns, flooring and concrete slabs in 3.5 kilometer long, 4 x 3.5 meter section of tunnel. Client: Cía. Minera Disputada de Las Condes S.A. Metropolitan Region Chile 1984 TRINIDAD FLORIDA II TELEPHONE EXCHANGE

Civil works, architecture, equipment assembly, and electrical installation of telephone exchange. Metropolitan Region Chile 1984 THICKENER TANK AND OTHERS EL INDIO MINE

Construction of thickener tank with 1,850 m3 of reinforced concrete. Coquimbo Region IV Chile 1984

EL INDIO MINE – MISCELLANEOUS WORK

Civil works, mechanical erection, architecture, electrical assembly, and installation of piping. Coquimbo Region IV Chile 1983 – 1984

Civil works, architecture, equipment assembly and electrical installation for telephone exchange. Client: Compañía de Teléfonos de Chile Metropolitan Region Chile 1982 – 1983 PROCESSING PLANT MECHANICAL

ÑUÑOA IV TELEPHONE EXCHANGE

WORKS

Civil works, architecture, equipment assembly and electrical installation for telephone exchange. Metropolitan Region Chile 1983

Mechanical works, equipment, repairs and various installations at the cyanidation plant. Coquimbo Region IV Chile 1982 – 1982

DEPARTMENTAL TELEPHONE

SKI COURTS CAMP EXPANSION

EXCHANGE

EL INDIO MINE

Civil works, architecture, equipment assembly and electrical installation for telephone exchange. Metropolitan Region Chile 1983

6,500 m2 of construction in four 2- and 3-story buildings - reinforced concrete, metal structure, block construction, installations and finishings. Coquimbo Region IV Chile 1982

EVER CRISP SNACK INDUSTRIAL FOOD FACTORY

ADMINISTRATION BUILDING EXPANSION AND FINISHINGS

Construction of 3,100 m2 of offices in a 7-story building with one underground level, the headquarters for the Chilean Nuclear Energy Commission (Comisión Chilena de Energía Nuclear). Metropolitan Region Chile 1983 – 1984

Civil works, architecture and electromechanical erection. Metropolitan Region Chile 1983 SINDEM VILLAGE PARTS II AND III COQUIMBO – OSORNO BANK

Construction and finishings for 180 houses, with an area of 70 m2 each. Coquimbo Region IV Chile 1983

GRACE OFFICE BUILDING REMODELING

Construction of 2,000 m2 of offices in the Grace Building. Metal structures, installations and finishings. Metropolitan Region Chile 1981 - 1982


150

80 YEARS

New horizons, new challenges

MANUFACTURING OF CONCRETE

EL TAMBO CAMP

BLOCKS – EL INDIO MINE

Construction of residential facilities, casino, storehouse, water adduction and sewage for exploration camp. Client: Cía. Minera El Indio Coquimbo Region IV Chile 1980

Manufacture of 103.500 concrete blocks in block making facility. Coquimbo Region IV Chile 1981 – 1982 PAINTING OF EL INDIO MINE

Engineering and Construction

TORO MUERTO RIVER WATER

LA JUNTA- EL TENIENTE

ADDUCTION

SHOPYARD

Construction of drinking water adduction in 6 km-long pipe on mountain slope. Client: Cía. Minera El Indio Coquimbo Region IV Chile 1979

Construction of shopyard at La Junta future mine – Sewell project. Erection of concrete plant, power substation and railway. VI Libertador O’Higgins Region Chile 1978 – 1979

Región Metropolitana Chile 1978 - 1979

CONSORCIO SUPERVISOR PAITA

PAITA PORT TERMINAL Paita 2012 – 2014

PROCESS PLANT

EL TENIENTE MINE TURBID

Painting of metal tanks, pipes, structures and offices of the process plant and roaster. Coquimbo Region IV Chile 1981

OVERFLOW COLLECTION

MALO RIVER DIVERSION

HORCOL DRYING

SYSTEM

WORKS

PLANT EXPANSION

INVESTMENT PROJECTS

Civil works and mechanical equipment erection, installation of 2.514 m of pipes and electrical installation. Libertador O’Higgins Region VI Chile 1980 – 1980

Digging and installation of 750 m of reinforced concrete pipe, with works of art, intake and intermediate changers of diversion of the Malo River. Client: Cía. Minera El Indio Coquimbo Region IV Chile 1979

Construction of civil works, metal structures, mechanical assembly, piping and electricity of plant expansion. Metropolitan Region Chile 1978 – 1979

Eten - Salaverry – Chimbote 2012 – 2013

MISCELLANEOUS WORKS

GyM S.A.

PAIPOTE SMELTER DUCTS

Environmental assessments

Manufacturing and erection of ducts for converter gases. Client: ENAMI. Atacama Region III Chile 1979

Construction of shops, offices, water grid, water, sewage, gas, electricity, works, roads and shops at tunnel entrances. Coquimbo Region IV Chile 1978 – 1979

CAMPS AT BAÑOS DEL TORO

MINERA SAN JOSÉ

EL INDIO MINE CONTROL BOOTHS

Control boots, remodeling and architectural finishings (1.200 m²). Coquimbo Region IV Chile 1981

CIVIL WORKS FOR EL INDIO MINE PROCESS PLANT

LOS BRONCES MINE, CHILE

BANCO MORGAN FINANSA OFFICES

Construction of 430 m² of offices for La Serena branch. Coquimbo Region IV Chile 1981

Metropolitan Region Chile 1981

HORMIGONES PREMIX OFFICES AND

PORTALES AND DIAMOND POINT –

SHOPS

EL INDIO MINE

Offices, shops and erection of premixed concrete plant. Metropolitan Region Chile 1981

Execution of reinforced concrete portal of the San José tunnel and reinforced concrete diamond points in interior detours of the mine. Coquimbo Region IV Chile 1981

TROLLEY FOR EL INDIO MINE RAILROAD

Installation of 2.500 m of trolley inside the mine and installation of rail-bonds, railway. Coquimbo Region IV Chile 1981

LOS BRONCES – SAN FRANCISCO PULP PIPE

Laying of 13.100 m of 10” y 12” Sch 80 pipes. Metropolitan Region Chile 1981

STOCKPILE METAL STRUCTURE

STOREHOUSE AND ASPHALT PAVING

Erection of 156 tons of metal structures. Client: Cía. Minera Disputada de Las Condes S.A. Metropolitan Region Chile 1980 – 1981

GRACE Y CIA

Construction of 1.200 m² of metal structure storehouse and 3.000 m² of asphalt paving. Metropolitan Region Chile 1980

SAN FRANCISCO CONCENTRATOR

INTERIOR STEEL PIPING

AND LOS BRONCES PLANT CIVIL

Preparation and installation of 2.000 m of piping for compressed air grid inside mine. Client: Cía. Minera Disputada de Las Condes S.A. Metropolitan Region Chile 1980

WORKS

Construction of all civil works for the project, 8.400 t/d, with a total 12.660 m3 of reinforced concrete. Metropolitan Region Chile 1980 – 1981 CARACOL COLONIAL BUILDING LA SERENA

ORE TRANSFER CHUTE

Excavation, construction of 2.400 m of reinforced concrete and erection of 81 tons of metal structure. Client: Cía. Minera Disputada de Las Condes S.A.

3

EXCHANGE AND ADMINISTRATION HOUSE BUILDING – EL INDIO MINE

2.500 m² in two concrete buildings, metal structure, block masonry and finishings. Coquimbo Region IV Chile 1980 - 1981

Civil works, architecture, installations and finishings of 5-story building of 1.850 m² at La Serena. Coquimbo Region IV Chile 1980 – 1981

Construction of civil works of the ore process plant, including 14.500 m3 of reinforced concrete. Coquimbo Region IV Chile 1979 - 1981

EL INDIO MINE CAMP

Construction of 6.000 m² of residential facilities, casino, shops, storehouses, drinking water adduction, sewage and electricity. Coquimbo Region IV Chile 1979 – 1980

AND SKI COURTS

PRINCIPAL OFFICE

Construction of 2.700 m² of residential facilities, offices, casino, storerooms and mechanical shop. Client: Cía. Minera El Indio. Coquimbo Region IV Chile 1979 – 1980

Remodeling of 2.000 m² at Santiago headquarters.

OUTPATIENT OFFICES AND

CONSORCIO TERMINALES EPCM

SUPERVISION OF OVERHEAD RESERVOIR CONSTRUCTION

Petrobras. Talara 2012 – 2013

EL INDIO MINE

SAN JOSÉ MINE NEVADA CAMP

Residential facilities, canteens, kitchen and storehouses, drinking water adduction and sewage. Atacama Region III Chile 1979 – 1980

151

of Xstrata’s Nueva

Urbanización Fuerabamba. Abancay 2012 – 2013 CHINALCO

Detail engineering for upgrading of solving capacity Daniel Alcides Carrión Hospital. Junín 2012 – 2013 ANTAMINA

External supervision for construction of the Nescafe dike and the mine entrance variant. Ancash 2012 – 2013

SURGERY WARDS

Civil works, finishings, facilities and remodeling of outpatient offices and surgery wards (1.200 m²) Hospital Ancud. Los Lagos Region X Chile 1978 – 1979

GYM

Review of city gate basic and detail engineering and CONTUGAS sectioning facilities. Marcona 2012 - 2013


150

80 YEARS

New horizons, new challenges

MANUFACTURING OF CONCRETE

EL TAMBO CAMP

BLOCKS – EL INDIO MINE

Construction of residential facilities, casino, storehouse, water adduction and sewage for exploration camp. Client: Cía. Minera El Indio Coquimbo Region IV Chile 1980

Manufacture of 103.500 concrete blocks in block making facility. Coquimbo Region IV Chile 1981 – 1982 PAINTING OF EL INDIO MINE

Engineering and Construction

TORO MUERTO RIVER WATER

LA JUNTA- EL TENIENTE

ADDUCTION

SHOPYARD

Construction of drinking water adduction in 6 km-long pipe on mountain slope. Client: Cía. Minera El Indio Coquimbo Region IV Chile 1979

Construction of shopyard at La Junta future mine – Sewell project. Erection of concrete plant, power substation and railway. VI Libertador O’Higgins Region Chile 1978 – 1979

Región Metropolitana Chile 1978 - 1979

CONSORCIO SUPERVISOR PAITA

PAITA PORT TERMINAL Paita 2012 – 2014

PROCESS PLANT

EL TENIENTE MINE TURBID

Painting of metal tanks, pipes, structures and offices of the process plant and roaster. Coquimbo Region IV Chile 1981

OVERFLOW COLLECTION

MALO RIVER DIVERSION

HORCOL DRYING

SYSTEM

WORKS

PLANT EXPANSION

INVESTMENT PROJECTS

Civil works and mechanical equipment erection, installation of 2.514 m of pipes and electrical installation. Libertador O’Higgins Region VI Chile 1980 – 1980

Digging and installation of 750 m of reinforced concrete pipe, with works of art, intake and intermediate changers of diversion of the Malo River. Client: Cía. Minera El Indio Coquimbo Region IV Chile 1979

Construction of civil works, metal structures, mechanical assembly, piping and electricity of plant expansion. Metropolitan Region Chile 1978 – 1979

Eten - Salaverry – Chimbote 2012 – 2013

MISCELLANEOUS WORKS

GyM S.A.

PAIPOTE SMELTER DUCTS

Environmental assessments

Manufacturing and erection of ducts for converter gases. Client: ENAMI. Atacama Region III Chile 1979

Construction of shops, offices, water grid, water, sewage, gas, electricity, works, roads and shops at tunnel entrances. Coquimbo Region IV Chile 1978 – 1979

CAMPS AT BAÑOS DEL TORO

MINERA SAN JOSÉ

EL INDIO MINE CONTROL BOOTHS

Control boots, remodeling and architectural finishings (1.200 m²). Coquimbo Region IV Chile 1981

CIVIL WORKS FOR EL INDIO MINE PROCESS PLANT

LOS BRONCES MINE, CHILE

BANCO MORGAN FINANSA OFFICES

Construction of 430 m² of offices for La Serena branch. Coquimbo Region IV Chile 1981

Metropolitan Region Chile 1981

HORMIGONES PREMIX OFFICES AND

PORTALES AND DIAMOND POINT –

SHOPS

EL INDIO MINE

Offices, shops and erection of premixed concrete plant. Metropolitan Region Chile 1981

Execution of reinforced concrete portal of the San José tunnel and reinforced concrete diamond points in interior detours of the mine. Coquimbo Region IV Chile 1981

TROLLEY FOR EL INDIO MINE RAILROAD

Installation of 2.500 m of trolley inside the mine and installation of rail-bonds, railway. Coquimbo Region IV Chile 1981

LOS BRONCES – SAN FRANCISCO PULP PIPE

Laying of 13.100 m of 10” y 12” Sch 80 pipes. Metropolitan Region Chile 1981

STOCKPILE METAL STRUCTURE

STOREHOUSE AND ASPHALT PAVING

Erection of 156 tons of metal structures. Client: Cía. Minera Disputada de Las Condes S.A. Metropolitan Region Chile 1980 – 1981

GRACE Y CIA

Construction of 1.200 m² of metal structure storehouse and 3.000 m² of asphalt paving. Metropolitan Region Chile 1980

SAN FRANCISCO CONCENTRATOR

INTERIOR STEEL PIPING

AND LOS BRONCES PLANT CIVIL

Preparation and installation of 2.000 m of piping for compressed air grid inside mine. Client: Cía. Minera Disputada de Las Condes S.A. Metropolitan Region Chile 1980

WORKS

Construction of all civil works for the project, 8.400 t/d, with a total 12.660 m3 of reinforced concrete. Metropolitan Region Chile 1980 – 1981 CARACOL COLONIAL BUILDING LA SERENA

ORE TRANSFER CHUTE

Excavation, construction of 2.400 m of reinforced concrete and erection of 81 tons of metal structure. Client: Cía. Minera Disputada de Las Condes S.A.

3

EXCHANGE AND ADMINISTRATION HOUSE BUILDING – EL INDIO MINE

2.500 m² in two concrete buildings, metal structure, block masonry and finishings. Coquimbo Region IV Chile 1980 - 1981

Civil works, architecture, installations and finishings of 5-story building of 1.850 m² at La Serena. Coquimbo Region IV Chile 1980 – 1981

Construction of civil works of the ore process plant, including 14.500 m3 of reinforced concrete. Coquimbo Region IV Chile 1979 - 1981

EL INDIO MINE CAMP

Construction of 6.000 m² of residential facilities, casino, shops, storehouses, drinking water adduction, sewage and electricity. Coquimbo Region IV Chile 1979 – 1980

AND SKI COURTS

PRINCIPAL OFFICE

Construction of 2.700 m² of residential facilities, offices, casino, storerooms and mechanical shop. Client: Cía. Minera El Indio. Coquimbo Region IV Chile 1979 – 1980

Remodeling of 2.000 m² at Santiago headquarters.

OUTPATIENT OFFICES AND

CONSORCIO TERMINALES EPCM

SUPERVISION OF OVERHEAD RESERVOIR CONSTRUCTION

Petrobras. Talara 2012 – 2013

EL INDIO MINE

SAN JOSÉ MINE NEVADA CAMP

Residential facilities, canteens, kitchen and storehouses, drinking water adduction and sewage. Atacama Region III Chile 1979 – 1980

151

of Xstrata’s Nueva

Urbanización Fuerabamba. Abancay 2012 – 2013 CHINALCO

Detail engineering for upgrading of solving capacity Daniel Alcides Carrión Hospital. Junín 2012 – 2013 ANTAMINA

External supervision for construction of the Nescafe dike and the mine entrance variant. Ancash 2012 – 2013

SURGERY WARDS

Civil works, finishings, facilities and remodeling of outpatient offices and surgery wards (1.200 m²) Hospital Ancud. Los Lagos Region X Chile 1978 – 1979

GYM

Review of city gate basic and detail engineering and CONTUGAS sectioning facilities. Marcona 2012 - 2013


152

80 YEARS

New horizons, new challenges

Engineering and Construction

153

BECHTEL

OIL TANKING ANDINA S.A.

GYM (CONGA )

COMPAÑÍA MINERA ANTAMINA

MINERA MILPO

HUD BAY

MINERA YANACOCHA S.R.L.

MINERA YANACOCHA S.R.L.

Surveying of access roads from Antapaccay and Cusco to Las Bambas. Cusco 2011 - 2013

Environmental research of pure biofuel storage terminal. Lima 2012

Management of construction, field engineering and quality control of main access to the Conga mine. Cajamarca 2011 – 2012

Supplement to the Master Contract . Ancash 2011 - 2012

Detail engineering for equipment replacement at El Porvenir Mining Unit. Pasco 2011 – 2012

Constancia mine camp. Cusco 2011 – 2012

Engineering Master Contract. Cajamarca 2011

Preparation of technical file to obtain the permit for hydraulic works of Quebrada Ocuchumachay for the Quecher project. Cajamarca 2011

GMI S.A. LA ARENA

Detail engineering of the new layout. La Arena. La Libertad 2012

Final design for excess material deposits at Fortunia Camp, Constancia mine. Cusco 2012

CANTERAS DEL HALLAZGO

CONSORCIO STRACOM – GYM S.A.

Detail engineering for upgrading of the Titire road. Ichuña 2012

Environmental assessments and supervision. La Zanja: debris disposal and Tajo Pampa Verde San Pedro road. Cajamarca 2012

COMPAÑÍA MINERA ANTAMINA S.A.

Supervision of project for mining pipe relocation. Ancash 2012 VOTORANTIM METAIS

Detail engineering for the calcine pneumatic transportation system. Lima - Cajamarquilla 2012 ABB S.A.

Detail engineering of for integration of the new e-house for SAG1 mill of Compañía Minera Antamina. Ancash 2012

COMPAÑÍA MINERA ANTAMINA

Supervision of CAPEX projects (laboratory, paving, parking, concrete slabs, sanitary landfill). Ancash 2011 – 2012 COMPAÑÍA MINERA ANTAMINA

GYM S.A.

Detail engineering of the new city of Fuerabamba. Apurímac 2011 – 2012 SOCIEDAD MINERA CERRO VERDE

Engineering Master Contract. Arequipa 2011 – 2012

External supervision (decant tunnel extension, seepage protection pipe, clean non-contact water). Ancash 2011 – 2012

SOCIEDAD MINERA CERRO VERDE

Design engineering for fresh water, sewage, waste water, recovered water and filtering systems for Fluor Daniel. Arequipa 2011 – 2012

PETROBRAS ENERGÍA PERÚ S.A.

ASOCIACIÓN CERRO VERDE

SIDERPERÚ

Quality assurance and supervision of Av. Los Incas and Av. Daniel A. Carrión road interchange. Arequipa 2011 – 2012

Engineering for construction of new waste storage center. 2011 – 2012 PETROBRAS ENERGÍA PERÚ S.A.

Preparation of environmental assessments for ETANCO III and secondary recovery of Pias Zapotal and Carrizo. Piura 2011 - 2012

COMPAÑÍA MINERA ANTAMINA S.A.

Supervision of milling circuit optimization. Ancash 2012

PACIFIC

Water feeding to Las Bambas project. Cusco 2011 – 2012 BECHTEL

Detail engineering of route 4 KP 20 – KP 86+600. Cusco 2011 – 2012 HARKEN

EPCM segregation of diesel at the Mollendo and Eten terminals. Eten 2011 – 2012

Detail engineering for silo replacement and overland cutting. 2011

BARRICK MISQUICHILCA

GMI S.A.

Development activities of the new city of Fuerabamba. Apurímac 2011 – 2013

CONSORCIO TERMINALES

VOTORANTIM METAIS

Tank construction management. Mollendo – Cusco 2011 – 2012

Silo 3 feasibility study and pneumatic transportation system. Lima 2011

GYM

GYM FERROVÍAS

Pad topographic control service. La Quinua. Cajamarca 2011 – 2013

Detail engineering for expansion of the shopyard of Line One of the Lima Metro. Lima 2011 - 2012

Detail engineering for construction of the Exploratoria-Lt.138 drilling platform. Marañon 2012

RÍO TINTO MINERA PERÚ LIMITADA S.A.C.

Profile assessment for resettlement of 1.000 families. Cajamarca 2011

SURVEYING FOR EXPANSION OF

LA ARENA MINE, PERU.

THE MOYOPAMPA HYDROELECTRIC

COMPAÑÍA MINERA ANTAMINA S.A.

PLANT - EDEGEL

Engineering Master Contract. Cajamarca 2011

Chosica 2011 – 2012

MINERA YANACOCHA S.R.L.

Statement of environmental impact of the Llavidque exploration project. Cajamarca 2011

BECHTEL

CONSORCIO TERMINALES

MINERA YANACOCHA S.R.L.

Engineering Master Contract. Cajamarca 2012

Access roads engineering for Las Bambas Route 4. Apurímac 2011 – 2012

Detail engineering for drilling platform of Block 95 prospecting well. Iquitos 2011

GYM S.A.

Implementation of GyM documentary control. Cusco 2011 - 2013

MINERA YANACOCHA S.R.L.

Semi-detailed environmental impact assessment (sdEIA) fourth amendment to the Conga exploration project. Cajamarca 2011

BECHTEL

Preparation of environmental assessments of the Etansur project. Piura 2012

SOCIEDAD MINERA CERRO VERDE

Basic and detail engineering of the debotllenecking moly project. Arequipa 2012

GYM S.A.

Urban project for resettlement of the city of Fuerabamba. Cusco 2011 – 2012

CONSORCIO PACHACÚTEC

Detail engineering for the drinking water system expansion and upgrading. Callao 2011 – 2012

GMI S.A.

Amendment to the sdEIA for construction of Urbanización Nueva Fuerabamba. Apurímac 2011 MINERA YANACOCHA S.R.L

Fuel storage area engineering for Conga pioneering camp. Cajamarca 2011 PETROBRAS ENERGÍA PERÚ S.A.

Environmental impact assessment for Block X. Piura 2011 OILTANKING

Environmental assessment of soils and aquifers. Lima 2011 GYM S.A.

Environmental assessment of the environmental impact assessments of the Cerro del Águila Hydroelectric Plant. Huancavelica 2011

MINERA YANACOCHA S.R.L.

Preparation of technical file to obtain the favorable technical report for construction of the fuel tanks of the Conga mines. Cajamarca 2011 TELEFÓNICA DEL PERÚ

Project management of Surquillo offices remodeling Lima 2010 - 2013 GYM S.A.

Detail engineering - Nueva Ciudad de Fuerabamba. Cusco 2010 - 2013 GYM S.A.

Surveying services - Nueva Fuerabamba. Cusco 2010 - 2013 COGA

Master Contract. Lima 2010 - 2012 COPESCO

Environmental assessment for solid waste management in the Vilcanota Valley. Cusco 2010 - 2012 CHINALCO

Detail engineering for relocation of the city of Morococha. Master Agreement. Junín 2010 - 2012


152

80 YEARS

New horizons, new challenges

Engineering and Construction

153

BECHTEL

OIL TANKING ANDINA S.A.

GYM (CONGA )

COMPAÑÍA MINERA ANTAMINA

MINERA MILPO

HUD BAY

MINERA YANACOCHA S.R.L.

MINERA YANACOCHA S.R.L.

Surveying of access roads from Antapaccay and Cusco to Las Bambas. Cusco 2011 - 2013

Environmental research of pure biofuel storage terminal. Lima 2012

Management of construction, field engineering and quality control of main access to the Conga mine. Cajamarca 2011 – 2012

Supplement to the Master Contract . Ancash 2011 - 2012

Detail engineering for equipment replacement at El Porvenir Mining Unit. Pasco 2011 – 2012

Constancia mine camp. Cusco 2011 – 2012

Engineering Master Contract. Cajamarca 2011

Preparation of technical file to obtain the permit for hydraulic works of Quebrada Ocuchumachay for the Quecher project. Cajamarca 2011

GMI S.A. LA ARENA

Detail engineering of the new layout. La Arena. La Libertad 2012

Final design for excess material deposits at Fortunia Camp, Constancia mine. Cusco 2012

CANTERAS DEL HALLAZGO

CONSORCIO STRACOM – GYM S.A.

Detail engineering for upgrading of the Titire road. Ichuña 2012

Environmental assessments and supervision. La Zanja: debris disposal and Tajo Pampa Verde San Pedro road. Cajamarca 2012

COMPAÑÍA MINERA ANTAMINA S.A.

Supervision of project for mining pipe relocation. Ancash 2012 VOTORANTIM METAIS

Detail engineering for the calcine pneumatic transportation system. Lima - Cajamarquilla 2012 ABB S.A.

Detail engineering of for integration of the new e-house for SAG1 mill of Compañía Minera Antamina. Ancash 2012

COMPAÑÍA MINERA ANTAMINA

Supervision of CAPEX projects (laboratory, paving, parking, concrete slabs, sanitary landfill). Ancash 2011 – 2012 COMPAÑÍA MINERA ANTAMINA

GYM S.A.

Detail engineering of the new city of Fuerabamba. Apurímac 2011 – 2012 SOCIEDAD MINERA CERRO VERDE

Engineering Master Contract. Arequipa 2011 – 2012

External supervision (decant tunnel extension, seepage protection pipe, clean non-contact water). Ancash 2011 – 2012

SOCIEDAD MINERA CERRO VERDE

Design engineering for fresh water, sewage, waste water, recovered water and filtering systems for Fluor Daniel. Arequipa 2011 – 2012

PETROBRAS ENERGÍA PERÚ S.A.

ASOCIACIÓN CERRO VERDE

SIDERPERÚ

Quality assurance and supervision of Av. Los Incas and Av. Daniel A. Carrión road interchange. Arequipa 2011 – 2012

Engineering for construction of new waste storage center. 2011 – 2012 PETROBRAS ENERGÍA PERÚ S.A.

Preparation of environmental assessments for ETANCO III and secondary recovery of Pias Zapotal and Carrizo. Piura 2011 - 2012

COMPAÑÍA MINERA ANTAMINA S.A.

Supervision of milling circuit optimization. Ancash 2012

PACIFIC

Water feeding to Las Bambas project. Cusco 2011 – 2012 BECHTEL

Detail engineering of route 4 KP 20 – KP 86+600. Cusco 2011 – 2012 HARKEN

EPCM segregation of diesel at the Mollendo and Eten terminals. Eten 2011 – 2012

Detail engineering for silo replacement and overland cutting. 2011

BARRICK MISQUICHILCA

GMI S.A.

Development activities of the new city of Fuerabamba. Apurímac 2011 – 2013

CONSORCIO TERMINALES

VOTORANTIM METAIS

Tank construction management. Mollendo – Cusco 2011 – 2012

Silo 3 feasibility study and pneumatic transportation system. Lima 2011

GYM

GYM FERROVÍAS

Pad topographic control service. La Quinua. Cajamarca 2011 – 2013

Detail engineering for expansion of the shopyard of Line One of the Lima Metro. Lima 2011 - 2012

Detail engineering for construction of the Exploratoria-Lt.138 drilling platform. Marañon 2012

RÍO TINTO MINERA PERÚ LIMITADA S.A.C.

Profile assessment for resettlement of 1.000 families. Cajamarca 2011

SURVEYING FOR EXPANSION OF

LA ARENA MINE, PERU.

THE MOYOPAMPA HYDROELECTRIC

COMPAÑÍA MINERA ANTAMINA S.A.

PLANT - EDEGEL

Engineering Master Contract. Cajamarca 2011

Chosica 2011 – 2012

MINERA YANACOCHA S.R.L.

Statement of environmental impact of the Llavidque exploration project. Cajamarca 2011

BECHTEL

CONSORCIO TERMINALES

MINERA YANACOCHA S.R.L.

Engineering Master Contract. Cajamarca 2012

Access roads engineering for Las Bambas Route 4. Apurímac 2011 – 2012

Detail engineering for drilling platform of Block 95 prospecting well. Iquitos 2011

GYM S.A.

Implementation of GyM documentary control. Cusco 2011 - 2013

MINERA YANACOCHA S.R.L.

Semi-detailed environmental impact assessment (sdEIA) fourth amendment to the Conga exploration project. Cajamarca 2011

BECHTEL

Preparation of environmental assessments of the Etansur project. Piura 2012

SOCIEDAD MINERA CERRO VERDE

Basic and detail engineering of the debotllenecking moly project. Arequipa 2012

GYM S.A.

Urban project for resettlement of the city of Fuerabamba. Cusco 2011 – 2012

CONSORCIO PACHACÚTEC

Detail engineering for the drinking water system expansion and upgrading. Callao 2011 – 2012

GMI S.A.

Amendment to the sdEIA for construction of Urbanización Nueva Fuerabamba. Apurímac 2011 MINERA YANACOCHA S.R.L

Fuel storage area engineering for Conga pioneering camp. Cajamarca 2011 PETROBRAS ENERGÍA PERÚ S.A.

Environmental impact assessment for Block X. Piura 2011 OILTANKING

Environmental assessment of soils and aquifers. Lima 2011 GYM S.A.

Environmental assessment of the environmental impact assessments of the Cerro del Águila Hydroelectric Plant. Huancavelica 2011

MINERA YANACOCHA S.R.L.

Preparation of technical file to obtain the favorable technical report for construction of the fuel tanks of the Conga mines. Cajamarca 2011 TELEFÓNICA DEL PERÚ

Project management of Surquillo offices remodeling Lima 2010 - 2013 GYM S.A.

Detail engineering - Nueva Ciudad de Fuerabamba. Cusco 2010 - 2013 GYM S.A.

Surveying services - Nueva Fuerabamba. Cusco 2010 - 2013 COGA

Master Contract. Lima 2010 - 2012 COPESCO

Environmental assessment for solid waste management in the Vilcanota Valley. Cusco 2010 - 2012 CHINALCO

Detail engineering for relocation of the city of Morococha. Master Agreement. Junín 2010 - 2012


154

80 YEARS

New horizons, new challenges

Engineering and Construction

SOL MELIÁ HOTEL CHAIN

PETROBRAS ENERGÍA PERÚ S.A.

CONSORCIO FERROVÍAS - GYM S.A.

SHOUGANG HIERRO PERÚ

PROFILE EVALUATION OF

PETROPERÚ S.A.

Supervision of works of Hotel Paradisus Resorts Playa del Carmen. Mexico 2010 – 2012

Service for obtaining environmental permits for water use and discharge at base camp La Peruanita, location Picha 2X and Paratori 4X, Block 58. Cusco - La Convención 2010 – 2011

Basic and detail engineering for the electric train shopyard. Lima 2010 – 2011

Conceptual engineering of the structural reinforcing and emergency staircase of the SHIP building. Ica 2010

THE SANTA MARÍA HYDROELECTRIC

Basic and detail engineering for separation of the electric power supply of the industrial services substation at the refinery. Talara 2010

MELIÁ

Supervision of work at Playa del Carmen. Cancún – Mexico 2010 – 2012 MINISTRY OF HEALTH

Supervision of health services at Santa Maria del Socorro Hospital. Ica 2010 – 2011

MINISTRY OF HEALTH

Supervision of performance of works and provision and erection of electromechanical equipment for the Santa María del Socorro Hospital project. Ica 2010 - 2011 PERUPLAST

PETROMINERALE S

Detail engineering for the construction of two oil platforms in Block 126. Ucayali 2010 - 2011 PERUPLAST

Supervision of the Lúcuma project. Lurín 2010 - 2011 BECHTEL

Access roads engineering for Las Bambas Route 5. Apurímac 2010 - 2011

Supervision of the Lúcuma project for a plastic containers plant. Lima 2010 - 2011 PERUPLAST

New plant for flexible wrappings. Lurín - Lima 2010 – 2011 SUPERMERCADOS PERUANOS

New distribution center. Punta Negra - Lima 2010 – 2011

Urban project for resettlement of the city of Morococha. Junín 2010

GYM S.A.

UNITED NATIONS DEVELOPMENT

Teatro Nacional del Perú management engineering. Lima 2010 – 2011

PROGRAMME

SIDERPERÚ

Engineering assessment and environmental impact assessment of safety landfill. Chimbote 2010 - 2011 COPESCO

Environmental assessments for solid waste management in a section of the Vilcanota Valley. Cusco 2010 – 2011 IMPALA PERÚ S.A.

Engineering and procurement for expansion and upgrading of Callao warehouses. Callao 2010

GYM S.A.

MINERA CHINALCO

Project management of Surquillo offices remodeling Lima 2010 GyM S.A.

IRONMAN PROJECT

Pre-engineering for the Tisur Port. Arequipa 2010 - 2011

Ancash 2010 TELEFÓNICA DEL PERÚ

Engineering services in electric power generation and transmission for projects. Peru 2010 – 2011

Lima 2010 - 2011

SHOUGANG HIERRO PERÚ

Engineering Master Contract. Ica 2010-2011

CONCAR S.A.

PLANT PROJECT

Management of the technical file of the Museo de la Memoria project for the United Nations Development Programme (UNDP). Lima 2010 RÍO TINTO MINERA PERÚ LIMITADA

Conceptual engineering for resettlement of a population of 1.000 families. Cajamarca 2010 GYM S.A.

Pre-engineering of the Megatoni Tunnel of the Techint gas pipeline. Cusco 2010

Miscellaneous geomatics services for surveying of Ciudad de Fuerabamba. Apurímac 2010

Detail engineering for Conga pre-assembly shop, Minera Chinalco. Cajamarca 2010 - 2011

PETROBRAS ENERGÍA PERÚ S.A.

GYM S.A.

Service for obtention of environmental permits for water use and discharge of seismic camp 3D - Block 58. Cusco - La Convención 2010 - 2011

Junín Hospital feasibility study as part of the Master Contract. Junín 2010 - 2011

GYM S.A.

PETROPERÚ S.A.

Basic and detail engineering for upgrading of the engine and equipment center of the power substation of sledge house No. 6 at the Talara Refinery. Talara 2010 PETROPERÚ S.A.

PETROMINERALES PERÚ S.A.C

Detail engineering for construction of 02 prospecting well drilling platforms - Colpa 1X and Colpa 2X Block 126. Ucayali 2010

Detail engineering study to adjust the fire protection system of the principal office of Petroperú to the new national building regulations. Lima 2010 PETROPERÚ S.A.

PLUSPETROL PERÚ CORPORATION

Basic engineering of the JP1 and biodiesel fuel system at Nuevo Mundo for drilling operations. Cusco 2010

Preparation of technical profile for implementation of a control room and access monitoring, CCTV, paging and fire fighting system of the Petroperú S.A. building. Lima 2010

WORKS AT THE LIMA METRO

PETROPERÚ S.A.

Basic and detail engineering for expansion and upgrading of power substation, control systems and energy distribution in Amazon sales – operations loop . Iquitos 2010

COMPAÑÍA MINERA ARGENTUM S.A.

Basic and detail engineering for project: facilities associated to the Morococha mine infrastructure. Junín 2010 - 2011

GMP - OIL TANKING

Preparation of technical profiles and extended basic engineering (FEED) of the 2010 - 2013 additional investments program for the South and North Terminals for Consorcio Terminales. 2010

HAUG - MAPLE

Detail engineering for ethanol reception, storage and dispatch terminal. Paita 2010

TALARA REFINERY FOR PETROPERÚ S.A.

COGA

GMP S.A.

Consulting services to develop the detail mechanical design for construction of 06 filters (clay, salt and coal) to improve the quality of Turbo A1, JP5 and solvent No. 3. Talara 2010

Engineering Master Contract for Compañía Operadora de Gas del Amazonas. Lima 2010

Basic engineering review and detail engineering preparation for the erection of 06 LPG tanks at Pariñas Plant. Talara 2010

LOGÍSTICA QUÍMICOS DEL SUR (LQS)

Conceptual, basic and detail engineering for sulfuric acid storage and dispatch terminal. Arequipa 2010 ROAD MAINTENANCE

155

MINSUR

Basic and detail engineering for the Pucamarca service station. Tacna 2010

CONSORCIO MINERA HORIZONTE S.A.

Preparation and implementation of the plan for adjustment to new water quality standards at the Parcoy River. La Libertad 2010 COMPAÑÍA MINERA ANTAMINA S.A.

Conceptual engineering and capital cost estimation of CAPEX 2011 projects. Ancash 2010


154

80 YEARS

New horizons, new challenges

Engineering and Construction

SOL MELIÁ HOTEL CHAIN

PETROBRAS ENERGÍA PERÚ S.A.

CONSORCIO FERROVÍAS - GYM S.A.

SHOUGANG HIERRO PERÚ

PROFILE EVALUATION OF

PETROPERÚ S.A.

Supervision of works of Hotel Paradisus Resorts Playa del Carmen. Mexico 2010 – 2012

Service for obtaining environmental permits for water use and discharge at base camp La Peruanita, location Picha 2X and Paratori 4X, Block 58. Cusco - La Convención 2010 – 2011

Basic and detail engineering for the electric train shopyard. Lima 2010 – 2011

Conceptual engineering of the structural reinforcing and emergency staircase of the SHIP building. Ica 2010

THE SANTA MARÍA HYDROELECTRIC

Basic and detail engineering for separation of the electric power supply of the industrial services substation at the refinery. Talara 2010

MELIÁ

Supervision of work at Playa del Carmen. Cancún – Mexico 2010 – 2012 MINISTRY OF HEALTH

Supervision of health services at Santa Maria del Socorro Hospital. Ica 2010 – 2011

MINISTRY OF HEALTH

Supervision of performance of works and provision and erection of electromechanical equipment for the Santa María del Socorro Hospital project. Ica 2010 - 2011 PERUPLAST

PETROMINERALE S

Detail engineering for the construction of two oil platforms in Block 126. Ucayali 2010 - 2011 PERUPLAST

Supervision of the Lúcuma project. Lurín 2010 - 2011 BECHTEL

Access roads engineering for Las Bambas Route 5. Apurímac 2010 - 2011

Supervision of the Lúcuma project for a plastic containers plant. Lima 2010 - 2011 PERUPLAST

New plant for flexible wrappings. Lurín - Lima 2010 – 2011 SUPERMERCADOS PERUANOS

New distribution center. Punta Negra - Lima 2010 – 2011

Urban project for resettlement of the city of Morococha. Junín 2010

GYM S.A.

UNITED NATIONS DEVELOPMENT

Teatro Nacional del Perú management engineering. Lima 2010 – 2011

PROGRAMME

SIDERPERÚ

Engineering assessment and environmental impact assessment of safety landfill. Chimbote 2010 - 2011 COPESCO

Environmental assessments for solid waste management in a section of the Vilcanota Valley. Cusco 2010 – 2011 IMPALA PERÚ S.A.

Engineering and procurement for expansion and upgrading of Callao warehouses. Callao 2010

GYM S.A.

MINERA CHINALCO

Project management of Surquillo offices remodeling Lima 2010 GyM S.A.

IRONMAN PROJECT

Pre-engineering for the Tisur Port. Arequipa 2010 - 2011

Ancash 2010 TELEFÓNICA DEL PERÚ

Engineering services in electric power generation and transmission for projects. Peru 2010 – 2011

Lima 2010 - 2011

SHOUGANG HIERRO PERÚ

Engineering Master Contract. Ica 2010-2011

CONCAR S.A.

PLANT PROJECT

Management of the technical file of the Museo de la Memoria project for the United Nations Development Programme (UNDP). Lima 2010 RÍO TINTO MINERA PERÚ LIMITADA

Conceptual engineering for resettlement of a population of 1.000 families. Cajamarca 2010 GYM S.A.

Pre-engineering of the Megatoni Tunnel of the Techint gas pipeline. Cusco 2010

Miscellaneous geomatics services for surveying of Ciudad de Fuerabamba. Apurímac 2010

Detail engineering for Conga pre-assembly shop, Minera Chinalco. Cajamarca 2010 - 2011

PETROBRAS ENERGÍA PERÚ S.A.

GYM S.A.

Service for obtention of environmental permits for water use and discharge of seismic camp 3D - Block 58. Cusco - La Convención 2010 - 2011

Junín Hospital feasibility study as part of the Master Contract. Junín 2010 - 2011

GYM S.A.

PETROPERÚ S.A.

Basic and detail engineering for upgrading of the engine and equipment center of the power substation of sledge house No. 6 at the Talara Refinery. Talara 2010 PETROPERÚ S.A.

PETROMINERALES PERÚ S.A.C

Detail engineering for construction of 02 prospecting well drilling platforms - Colpa 1X and Colpa 2X Block 126. Ucayali 2010

Detail engineering study to adjust the fire protection system of the principal office of Petroperú to the new national building regulations. Lima 2010 PETROPERÚ S.A.

PLUSPETROL PERÚ CORPORATION

Basic engineering of the JP1 and biodiesel fuel system at Nuevo Mundo for drilling operations. Cusco 2010

Preparation of technical profile for implementation of a control room and access monitoring, CCTV, paging and fire fighting system of the Petroperú S.A. building. Lima 2010

WORKS AT THE LIMA METRO

PETROPERÚ S.A.

Basic and detail engineering for expansion and upgrading of power substation, control systems and energy distribution in Amazon sales – operations loop . Iquitos 2010

COMPAÑÍA MINERA ARGENTUM S.A.

Basic and detail engineering for project: facilities associated to the Morococha mine infrastructure. Junín 2010 - 2011

GMP - OIL TANKING

Preparation of technical profiles and extended basic engineering (FEED) of the 2010 - 2013 additional investments program for the South and North Terminals for Consorcio Terminales. 2010

HAUG - MAPLE

Detail engineering for ethanol reception, storage and dispatch terminal. Paita 2010

TALARA REFINERY FOR PETROPERÚ S.A.

COGA

GMP S.A.

Consulting services to develop the detail mechanical design for construction of 06 filters (clay, salt and coal) to improve the quality of Turbo A1, JP5 and solvent No. 3. Talara 2010

Engineering Master Contract for Compañía Operadora de Gas del Amazonas. Lima 2010

Basic engineering review and detail engineering preparation for the erection of 06 LPG tanks at Pariñas Plant. Talara 2010

LOGÍSTICA QUÍMICOS DEL SUR (LQS)

Conceptual, basic and detail engineering for sulfuric acid storage and dispatch terminal. Arequipa 2010 ROAD MAINTENANCE

155

MINSUR

Basic and detail engineering for the Pucamarca service station. Tacna 2010

CONSORCIO MINERA HORIZONTE S.A.

Preparation and implementation of the plan for adjustment to new water quality standards at the Parcoy River. La Libertad 2010 COMPAÑÍA MINERA ANTAMINA S.A.

Conceptual engineering and capital cost estimation of CAPEX 2011 projects. Ancash 2010


156

80 YEARS

New horizons, new challenges

SOCIEDAD MINERA CERRO VERDE

GYM S.A.

POSEIDON INVESTMENT S.A.

SHOUGAN HIERRO PERÚ S.A.A.

PETROPERÚ

Engineering for horizontal extension Phase III of jacking header. Arequipa 2010

Profile of the PMA for construction of vehicle access. 2010

Detail engineering for Club Náutico Poseidón. Lima 2009

Supervision of works for the new stocks and shipment transfer system project. San Nicolás de Marcona 2009

Supervision of environmental remediation service for La Pampilla refinery. Callao 2008 - 2012

COMPAÑÍA MINERA ANTAMINA S.A.

Engineering for expansion of recovered water system. Ancash 2010

Project management and design supervision of the Larcomar Hotel. Larcomar. Lima 2009 - 2012

Structural design for expansion of the Cemento Andino plant capacity. Junín 2009

SOCIEDAD MINERA CERRO VERDE

PLUSPETROL

SIDERPERÚ

Detail, civil and mechanical engineering for hydrocyclone relocation. Arequipa 2010

Basic and detail engineering service for Malvinas and Pisco plant projects. Pisco 2009 - 2012

Engineering for construction, change and reinforcement of new 30 ton electrical furnace. Ancash 2009

COMPAÑÍA MINERA ANTAMINA S.A.

Detail engineering of passenger stations of the electric train. Lima 2009 - 2011

FASHION CENTER S.A.

Engineering and Construction

ARPL S.A. NEO ARTE EDIFICACIONES

RELAPASA (REPSOL )

Supervision of the Neo Arte Edificaciones building. Lima 2009

Detail engineering services for investment projects. Lima 2008 - 2012

GMI S.A.

REPSOL

Metal toxicity test of Kinteroni Perú de Repsol. Cusco 2009

Detail engineering for investment projects in Relapasa. Lima 2008 - 2010

CONSORCIO TREN ELÉCTRICO

Engineering for sole plate stator SAG mill. Ancash 2010

ANGLO AMERICAN VOTORANTIM METAIS

Conceptual study of gas release – stack. Lima 2010

Management of construction of works of prefeasibility study Michiquillay. Cajamarca 2009 – 2011

CONSORCIO MINERA HORIZONTE

PETROBRAS

S.A.

Environmental assessments of surface facilities. Piopa 2009 – 2010

Assessment and control of arsenic in effluents and receiving body. La Libertad 2010

GYM S.A. SOCIEDAD MINERA CERRO VERDE

Preparation of sanitary landfill tender documents. Arequipa 2010

Detail engineering of permanent PLNG camp. Ica 2009

Technical file for sewage water plant and sanitary landfill of Marcobre. 2010

Basic engineering feasibility study for the Morococha city resettlement project. Junín 2009

CONSORCIO CAMARGO CORREA

Updating of the environmental management plan of the project for improvement of marginal areas of Lima – Lot 1, 2,3, northern branch component, diversions and reservoir. Lima 2010

COMPAÑÍA MINERA ANTAMINA S.A.

GyM S.A.

Engineering for change of the SAG mill stator. Ancash 2009

Detail engineering for the EPC

GOLD FIELDS LA CIMA

Basic and detail engineering for upgrading of line one in magnetic plant project, implementation of new filtering plant. Ica 2009

Conceptual study for relocation of office and accommodation buildings. Cajamarca 2009 ODEBRECHT PERÚ

Detail engineering for major investment projects in Recosac for Repsol Perú, 2008-2010. Coordination and verification of surveying of the South Andean Gas Pipeline location. Cusco, Puno, Arequipa y Moquegua 2009

MINERA CERRO VERDE S.A.A.

Change of 10 kV – continuation of Pad 4 development. Arequipa 2009

Studies for expansion of the Kinteroni platform Junín 2009 PROCTER & GAMBLE

Supervision and control of fabrication of the product drying tower. Callao 2009

of the Huayurí Topping Plant (Block 1AB) and Corrientes Topping Plant (Block 8) projects of Pluspetrol Norte S.A.

SHOUGAN HIERRO PERÚ S.A.A.

REPSOL MINERA CHINALCO PERÚ S.A.

GMI S.A.

GOLD FIELDS LA CIMA

Detail engineering for reinforcement of maintenance shop structures. . Cajamarca 2009

MINERA CHINALCO PERÚ S.A.

Basic engineering feasibility study for the city resettlement project. Junín 2009 GMI S.A.

Preliminary plan of environmental impacts of the Lima Metro. Lima 2009 GMI S.A.

Environmental impacts assessments of Club Náutico Poseidón. Lima 2009 RELAPASA (REPSOL)

Investment project detail engineering services. Lima 2008 - 2012

Loreto 2008 – 2009 GMP S.A.

Environmental impact assessments of the Petroperú Cusco, Arequipa, Ancash, Lambayeque, La Libertad, Mollendo, Cusco, Supe Salaverry and Eten terminals. 2008 – 2009

PARIÑAS GAS PLANT ENGINEERING

DOE RUN PERU S.R.L.

Detail engineering for off-battery limits works. Junín 2008 – 2009 OUTOTEC

Design of structures, lighting and ventilation of building and substation. 2008 AGROINDUSTRIAL COMISA

Preliminary studies of the plant for extraction of sugarcane-based ethanol. Piura 2008

2008 SOL MELIÁ HOTEL CHAIN

CONSORCIO TERMINALES

GMI S.A.

Supervision and control of works for new Palma Real discotheque. Dominican Republic 2008

Soil assessment for the Paita storage plant. Piura 2008

Design of sewage water sanitary installations (Marcobre S.A.C.). Nazca 2008

SOL MELIÁ HOTEL CHAIN

GYM S.A.

GMI S.A.

Supervision of Neva Villa Hotel Meliá Tropical. Dominican Republic. 2008

Basic and detail engineering of Block 58 operation platform and La Peruanita Base Camp of Petrobras. Cusco 2008

Selection of area and sanitary landfill design for the Justa mine (Marcobre S.A.C.). Nazca 2008

GYM S.A.

Rehabilitation of drilling trail of the Pluspetrol Andoas project Norte S.A. Loreto 2008

SOL MELIÁ HOTEL CHAIN

Supervision of civil works and finishings of remodeling of Meliá Tropical convention halls. Dominican Republic 2008

GMI S.A.

Capital and operating costs estimates for the Human Gas Pipeline project in Marcona Suez Energy – GMP. Marcona

157


156

80 YEARS

New horizons, new challenges

SOCIEDAD MINERA CERRO VERDE

GYM S.A.

POSEIDON INVESTMENT S.A.

SHOUGAN HIERRO PERÚ S.A.A.

PETROPERÚ

Engineering for horizontal extension Phase III of jacking header. Arequipa 2010

Profile of the PMA for construction of vehicle access. 2010

Detail engineering for Club Náutico Poseidón. Lima 2009

Supervision of works for the new stocks and shipment transfer system project. San Nicolás de Marcona 2009

Supervision of environmental remediation service for La Pampilla refinery. Callao 2008 - 2012

COMPAÑÍA MINERA ANTAMINA S.A.

Engineering for expansion of recovered water system. Ancash 2010

Project management and design supervision of the Larcomar Hotel. Larcomar. Lima 2009 - 2012

Structural design for expansion of the Cemento Andino plant capacity. Junín 2009

SOCIEDAD MINERA CERRO VERDE

PLUSPETROL

SIDERPERÚ

Detail, civil and mechanical engineering for hydrocyclone relocation. Arequipa 2010

Basic and detail engineering service for Malvinas and Pisco plant projects. Pisco 2009 - 2012

Engineering for construction, change and reinforcement of new 30 ton electrical furnace. Ancash 2009

COMPAÑÍA MINERA ANTAMINA S.A.

Detail engineering of passenger stations of the electric train. Lima 2009 - 2011

FASHION CENTER S.A.

Engineering and Construction

ARPL S.A. NEO ARTE EDIFICACIONES

RELAPASA (REPSOL )

Supervision of the Neo Arte Edificaciones building. Lima 2009

Detail engineering services for investment projects. Lima 2008 - 2012

GMI S.A.

REPSOL

Metal toxicity test of Kinteroni Perú de Repsol. Cusco 2009

Detail engineering for investment projects in Relapasa. Lima 2008 - 2010

CONSORCIO TREN ELÉCTRICO

Engineering for sole plate stator SAG mill. Ancash 2010

ANGLO AMERICAN VOTORANTIM METAIS

Conceptual study of gas release – stack. Lima 2010

Management of construction of works of prefeasibility study Michiquillay. Cajamarca 2009 – 2011

CONSORCIO MINERA HORIZONTE

PETROBRAS

S.A.

Environmental assessments of surface facilities. Piopa 2009 – 2010

Assessment and control of arsenic in effluents and receiving body. La Libertad 2010

GYM S.A. SOCIEDAD MINERA CERRO VERDE

Preparation of sanitary landfill tender documents. Arequipa 2010

Detail engineering of permanent PLNG camp. Ica 2009

Technical file for sewage water plant and sanitary landfill of Marcobre. 2010

Basic engineering feasibility study for the Morococha city resettlement project. Junín 2009

CONSORCIO CAMARGO CORREA

Updating of the environmental management plan of the project for improvement of marginal areas of Lima – Lot 1, 2,3, northern branch component, diversions and reservoir. Lima 2010

COMPAÑÍA MINERA ANTAMINA S.A.

GyM S.A.

Engineering for change of the SAG mill stator. Ancash 2009

Detail engineering for the EPC

GOLD FIELDS LA CIMA

Basic and detail engineering for upgrading of line one in magnetic plant project, implementation of new filtering plant. Ica 2009

Conceptual study for relocation of office and accommodation buildings. Cajamarca 2009 ODEBRECHT PERÚ

Detail engineering for major investment projects in Recosac for Repsol Perú, 2008-2010. Coordination and verification of surveying of the South Andean Gas Pipeline location. Cusco, Puno, Arequipa y Moquegua 2009

MINERA CERRO VERDE S.A.A.

Change of 10 kV – continuation of Pad 4 development. Arequipa 2009

Studies for expansion of the Kinteroni platform Junín 2009 PROCTER & GAMBLE

Supervision and control of fabrication of the product drying tower. Callao 2009

of the Huayurí Topping Plant (Block 1AB) and Corrientes Topping Plant (Block 8) projects of Pluspetrol Norte S.A.

SHOUGAN HIERRO PERÚ S.A.A.

REPSOL MINERA CHINALCO PERÚ S.A.

GMI S.A.

GOLD FIELDS LA CIMA

Detail engineering for reinforcement of maintenance shop structures. . Cajamarca 2009

MINERA CHINALCO PERÚ S.A.

Basic engineering feasibility study for the city resettlement project. Junín 2009 GMI S.A.

Preliminary plan of environmental impacts of the Lima Metro. Lima 2009 GMI S.A.

Environmental impacts assessments of Club Náutico Poseidón. Lima 2009 RELAPASA (REPSOL)

Investment project detail engineering services. Lima 2008 - 2012

Loreto 2008 – 2009 GMP S.A.

Environmental impact assessments of the Petroperú Cusco, Arequipa, Ancash, Lambayeque, La Libertad, Mollendo, Cusco, Supe Salaverry and Eten terminals. 2008 – 2009

PARIÑAS GAS PLANT ENGINEERING

DOE RUN PERU S.R.L.

Detail engineering for off-battery limits works. Junín 2008 – 2009 OUTOTEC

Design of structures, lighting and ventilation of building and substation. 2008 AGROINDUSTRIAL COMISA

Preliminary studies of the plant for extraction of sugarcane-based ethanol. Piura 2008

2008 SOL MELIÁ HOTEL CHAIN

CONSORCIO TERMINALES

GMI S.A.

Supervision and control of works for new Palma Real discotheque. Dominican Republic 2008

Soil assessment for the Paita storage plant. Piura 2008

Design of sewage water sanitary installations (Marcobre S.A.C.). Nazca 2008

SOL MELIÁ HOTEL CHAIN

GYM S.A.

GMI S.A.

Supervision of Neva Villa Hotel Meliá Tropical. Dominican Republic. 2008

Basic and detail engineering of Block 58 operation platform and La Peruanita Base Camp of Petrobras. Cusco 2008

Selection of area and sanitary landfill design for the Justa mine (Marcobre S.A.C.). Nazca 2008

GYM S.A.

Rehabilitation of drilling trail of the Pluspetrol Andoas project Norte S.A. Loreto 2008

SOL MELIÁ HOTEL CHAIN

Supervision of civil works and finishings of remodeling of Meliá Tropical convention halls. Dominican Republic 2008

GMI S.A.

Capital and operating costs estimates for the Human Gas Pipeline project in Marcona Suez Energy – GMP. Marcona

157


158

80 YEARS

New horizons, new challenges

Engineering and Construction

GyM S.A.

GYM S.A.

MINERA SANTA CRUZ

STIGLICH TRANSPORTES S.A

INDUSTRIAL TEXTIL PIURA S.A.

SCHMIDT CHÁVEZ TAFUR

Paucarcocha environmental engineering. Junín 2008

Basic engineering and detail engineering of the ancillary services of the project for expansion and upgrading of the Pariñas natural gas plant of GMP S.A. Piura 2007 – 2008

San José mining plant expansion engineering. Argentina 2007

Preliminary inspection of the General San Martín port and additional inspection and draft project for repair of Pier 2 of the Pisco-Ica General San Martín port. San Martín - Ica 2007

Engineering development for the new spinning plant. Piura 2007

Structural project for light warehouses on Floor 15 of the Ripley San Isidro building. San Isidro

COMPAÑÍA MINERA BARRICK MISQUICHILCA S.A.

Detail engineering for relocation of the fines hopper and overland cutting. La Libertad 2008 COMPAÑÍA MINERA ANTAMINA S.A.

Detail engineering for the Sag Mill bypass crushing conveying option 5 project. SAG. Ancash 2008 COMPAÑÍA MINERA ANTAMINA S.A.

Detail engineering for connection of the main grids of New Camp. Ancash 2008 COMPAÑÍA MINERA ANTAMINA S.A.

Conceptual engineering for CAPEX estimation. Ancash 2008 CEMENTO ANDINO S.A.

Industrial cleaning and solid waste management. Tarma 2007 – 2012

GYM S.A.

Civil and structural detail engineering of the project for expansion of facilities of the Malvinas Gas Plant EPC Contract-11 of Pluspetrol Corporation S.A. Cusco 2007 – 2008

Supervision of environmental remediation works at La Pampilla refinery. Lima 2007 – 2009 BARRET RESOURCES - PERENCO

Supervision of the work, rehabilitation and upgrading of the Casma Yautan Huaraz highway. Section: Casma Pariacoto. Sector 2: Cruz Punta –Pariacoto. Huaraz 2007

SOCIEDAD MINERA CERRO VERDE

NEPTUNIA

Technical profile development for expansion of 5 TMC pier. Ventanilla 2007

MINERA PERÚ LIMITADA S.A.C.

Supervision of works of the rural electrification project for Río Tinto. Cajamarca 2007

ANGLO AMERICAN QUELLAVECO S.A.

PARADISUS HOTEL PUNTA CANA SOL MELIÁ HOTEL CHAIN

Supervision of Club Meliá Paradisus Punta Cana. Dominican Republic 2007

Supervision of remodeling of the Tropical and Pasarela Bávaro restaurants. Dominican Republic 2007 COMPAÑÍA MINERA ANTAMINA S.A.

Basic engineering and development of services at Dorado Andoas pipeline. Loreto 2007-2009

PROVÍAS NACIONAL

Detail engineering of the debottlenecking project 108.000 TMPD 120.000 TMPD. Junín 2007 – 2008

SOL MELIÁ HOTEL CHAIN PETRÓLEOS DEL PERÚ S.A.

DOE RUN PERÚ

CU and PB refinery rectifiers feasibility study. La Oroya 2007

New camp engineering. Ancash 2007

GYM S.A.

CAMPER EXPLORACIONES S.A.C.

Detail engineering for the project of water reinjection to wells in Block 1AB and Block 8 of Pluspetrol Norte S.A. Loreto 2007

Engineering services for the Pinaya project. Arequipa 2007

PLUSPETROL CORPORATION S.A.

Detail engineering for development of the Cashiriari 1 and 3 projects. Cusco 2007

INDUSTRIA TEXTIL PIURA S.A.

Detail engineering for expansion of the engineering development for the new spinning plant. Piura 2007

Detail engineering for construction of the new AWTP 1200 plant at La Quinua. Cajamarca 2007

Surveying and geotechnical assessment of the project for expansion and upgrading of the Pariñas natural gas processing plant of GMP S.A . Piura 2007

Peruvian market survey for the 20082012 five-year period. Arequipa 2007 ANGLO AMERICAN QUELLAVECO S.A.

Supervision of remodeling works of the Meliá Tropical restaurant, construction of Cocotal Golf & Country Club walkway and pool. Dominican Republic. 2007

OPORSA

Preparation of the technical feasibility study for construction of the minerals and bulk cargo exclusive port off the Callao Port Terminal and the Callao urban area. Ventanilla 2007 CONCESIÓN CANCHAQUE S.A.

Preparation of the final engineering study for works and maintenance of road sections: 1B-Buenos Aires Canchaque junction and environmental assessment. 2007 COMPAÑÍA MINERA ANTAMINA

GYM

SCHMIDT CHÁVEZ TAFUR

Expansion and upgrading of the Pariñas gas processing plant. 2007

Structural assessment of basement slabs and engine room of the ipley Building elevator. San Isidro 2006

GYM

Engineering services, geotechnical studies and quality control contract for the Malvinas plant expansion contract. Cusco 2007

GYM

Updating of the base design of the new container terminal at the South Pier of the Callao Port Terminal. Callao 2006

PETRÓLEOS DEL PERÚ

Supervision of environmental remediation work at La Pampilla refinery and sales plants. Ventanilla - Lima 2007

PRIMAX

Basic engineering for its new reception, storage and dispatch of oil products plant. Callao 2006

CONCAR S.A.

IIRSA North concession. 2006 FLUOR DANIEL

PSP-108-K052- Permanent Fresh Water Engineering Project.

Engineering Master Contract. Ancash 2007 LQS

ANGLO AMERICAN QUELLAVECO S.A.

MINERA YANACOCHA S.R.L.

SOL MELIÁ HOTELS & RESORTS GYM S.A.

Prefeasibility study engineering for the Inter-Oceanic Highway route variant and relocation of the 220 kV line at eh Chilota impounding reservoir area. Arequipa 2007

GYM

Topographic control during construction of the Cerro Lindo tailings dam and earthmoving. 2007

Assessment of alternative for access roads to the Quellaveco project facilities. Arequipa 2007

159

Conceptual basic and detail engineering of new reception, storage and dispatch terminal. 2007 COMPAÑÍA MINERA ANTAMINA

Conceptual study of its new Morococha concentrating plant and ancillary services. Huaraz 2007 COMPAÑÍA MINERA ANTAMINA

Supervision of the Seepage-Tucush return line work AR-000006 project. Ancash 2007 SAN JOSÉ MINE


158

80 YEARS

New horizons, new challenges

Engineering and Construction

GyM S.A.

GYM S.A.

MINERA SANTA CRUZ

STIGLICH TRANSPORTES S.A

INDUSTRIAL TEXTIL PIURA S.A.

SCHMIDT CHÁVEZ TAFUR

Paucarcocha environmental engineering. Junín 2008

Basic engineering and detail engineering of the ancillary services of the project for expansion and upgrading of the Pariñas natural gas plant of GMP S.A. Piura 2007 – 2008

San José mining plant expansion engineering. Argentina 2007

Preliminary inspection of the General San Martín port and additional inspection and draft project for repair of Pier 2 of the Pisco-Ica General San Martín port. San Martín - Ica 2007

Engineering development for the new spinning plant. Piura 2007

Structural project for light warehouses on Floor 15 of the Ripley San Isidro building. San Isidro

COMPAÑÍA MINERA BARRICK MISQUICHILCA S.A.

Detail engineering for relocation of the fines hopper and overland cutting. La Libertad 2008 COMPAÑÍA MINERA ANTAMINA S.A.

Detail engineering for the Sag Mill bypass crushing conveying option 5 project. SAG. Ancash 2008 COMPAÑÍA MINERA ANTAMINA S.A.

Detail engineering for connection of the main grids of New Camp. Ancash 2008 COMPAÑÍA MINERA ANTAMINA S.A.

Conceptual engineering for CAPEX estimation. Ancash 2008 CEMENTO ANDINO S.A.

Industrial cleaning and solid waste management. Tarma 2007 – 2012

GYM S.A.

Civil and structural detail engineering of the project for expansion of facilities of the Malvinas Gas Plant EPC Contract-11 of Pluspetrol Corporation S.A. Cusco 2007 – 2008

Supervision of environmental remediation works at La Pampilla refinery. Lima 2007 – 2009 BARRET RESOURCES - PERENCO

Supervision of the work, rehabilitation and upgrading of the Casma Yautan Huaraz highway. Section: Casma Pariacoto. Sector 2: Cruz Punta –Pariacoto. Huaraz 2007

SOCIEDAD MINERA CERRO VERDE

NEPTUNIA

Technical profile development for expansion of 5 TMC pier. Ventanilla 2007

MINERA PERÚ LIMITADA S.A.C.

Supervision of works of the rural electrification project for Río Tinto. Cajamarca 2007

ANGLO AMERICAN QUELLAVECO S.A.

PARADISUS HOTEL PUNTA CANA SOL MELIÁ HOTEL CHAIN

Supervision of Club Meliá Paradisus Punta Cana. Dominican Republic 2007

Supervision of remodeling of the Tropical and Pasarela Bávaro restaurants. Dominican Republic 2007 COMPAÑÍA MINERA ANTAMINA S.A.

Basic engineering and development of services at Dorado Andoas pipeline. Loreto 2007-2009

PROVÍAS NACIONAL

Detail engineering of the debottlenecking project 108.000 TMPD 120.000 TMPD. Junín 2007 – 2008

SOL MELIÁ HOTEL CHAIN PETRÓLEOS DEL PERÚ S.A.

DOE RUN PERÚ

CU and PB refinery rectifiers feasibility study. La Oroya 2007

New camp engineering. Ancash 2007

GYM S.A.

CAMPER EXPLORACIONES S.A.C.

Detail engineering for the project of water reinjection to wells in Block 1AB and Block 8 of Pluspetrol Norte S.A. Loreto 2007

Engineering services for the Pinaya project. Arequipa 2007

PLUSPETROL CORPORATION S.A.

Detail engineering for development of the Cashiriari 1 and 3 projects. Cusco 2007

INDUSTRIA TEXTIL PIURA S.A.

Detail engineering for expansion of the engineering development for the new spinning plant. Piura 2007

Detail engineering for construction of the new AWTP 1200 plant at La Quinua. Cajamarca 2007

Surveying and geotechnical assessment of the project for expansion and upgrading of the Pariñas natural gas processing plant of GMP S.A . Piura 2007

Peruvian market survey for the 20082012 five-year period. Arequipa 2007 ANGLO AMERICAN QUELLAVECO S.A.

Supervision of remodeling works of the Meliá Tropical restaurant, construction of Cocotal Golf & Country Club walkway and pool. Dominican Republic. 2007

OPORSA

Preparation of the technical feasibility study for construction of the minerals and bulk cargo exclusive port off the Callao Port Terminal and the Callao urban area. Ventanilla 2007 CONCESIÓN CANCHAQUE S.A.

Preparation of the final engineering study for works and maintenance of road sections: 1B-Buenos Aires Canchaque junction and environmental assessment. 2007 COMPAÑÍA MINERA ANTAMINA

GYM

SCHMIDT CHÁVEZ TAFUR

Expansion and upgrading of the Pariñas gas processing plant. 2007

Structural assessment of basement slabs and engine room of the ipley Building elevator. San Isidro 2006

GYM

Engineering services, geotechnical studies and quality control contract for the Malvinas plant expansion contract. Cusco 2007

GYM

Updating of the base design of the new container terminal at the South Pier of the Callao Port Terminal. Callao 2006

PETRÓLEOS DEL PERÚ

Supervision of environmental remediation work at La Pampilla refinery and sales plants. Ventanilla - Lima 2007

PRIMAX

Basic engineering for its new reception, storage and dispatch of oil products plant. Callao 2006

CONCAR S.A.

IIRSA North concession. 2006 FLUOR DANIEL

PSP-108-K052- Permanent Fresh Water Engineering Project.

Engineering Master Contract. Ancash 2007 LQS

ANGLO AMERICAN QUELLAVECO S.A.

MINERA YANACOCHA S.R.L.

SOL MELIÁ HOTELS & RESORTS GYM S.A.

Prefeasibility study engineering for the Inter-Oceanic Highway route variant and relocation of the 220 kV line at eh Chilota impounding reservoir area. Arequipa 2007

GYM

Topographic control during construction of the Cerro Lindo tailings dam and earthmoving. 2007

Assessment of alternative for access roads to the Quellaveco project facilities. Arequipa 2007

159

Conceptual basic and detail engineering of new reception, storage and dispatch terminal. 2007 COMPAÑÍA MINERA ANTAMINA

Conceptual study of its new Morococha concentrating plant and ancillary services. Huaraz 2007 COMPAÑÍA MINERA ANTAMINA

Supervision of the Seepage-Tucush return line work AR-000006 project. Ancash 2007 SAN JOSÉ MINE


160

80 YEARS

New horizons, new challenges

Xstrata Coppper Tintaya

GYM

Elevation of the Camacmayo dam body from 4.000 to 4.005 m.a.s.l. Cusco 2006

Detail engineering, surveying and quality control services of Pagoreni A and B civil works. 2006

SOL MELIÁ HOTEL & RESORTS

COMPAÑÍA MINERA

Works management, evaluation and supervision of “The Reserve” Paradisus Hotel Punta Cana project. Dominican Republic 2006 - 2007

ANTAMINA S.A.

MITSUI

Miscellaneous projects engineering services. Huaraz 2006

Detail engineering development, review and redesign of the new shop and washing area project. 2005

GMD

PROVÍAS DEPARTAMENTAL

SOCIEDAD MINERA

EDEGEL

BHP BILLITON TINTAYA

ANTAMINA S.A.

Supervision and advisory for civil and conditioning works of the computer center and main building of the Ministry of Transportation and Communications - MTC. 2005

Supervision and control of rehabilitation and upgrading of asphalt paving of the Catac ChavínSan Marcos road, Kahuish Tunnel-San Marcos section. 2005

CERRO VERDE

Energy evaluation study in electrical failures at SMCV. Arequipa 2004

Study and project for improvement of Tulumayo River defenses for the Chimay Hydroelectric Plant. 2004

Assessment of the Matarani Imata Tintaya route for the new concentrate transportation system by bi-articulated cargo trucks. Cusco 2004

Engineering Services Master Contract. Ancash 2005

MINERA SANTA CRUZ S.A.

SIERRA PARIMA

GYM

Supervision and execution control of the Palma Real Village Shopping Center project. Dominican Republic 2006

Detail engineering for construction of the Chili River water line project. 2005

Northern access road additional survey. Cajamarca 2006 RÍO TINTO MINERA LIMITADA S.A.C.

Identification of locations for road construction. Cajamarca 2006 RÍO TINTO MINERA LIMITADA S.A.C.

Engineering services master contract for La Granja mining project. Cajamarca 2006 VOLCAN CIA MINERA S.A.A.

Scada system of the Cerro de Pasco, Chungar, Carahuacra, San Cristóbal and Andaychagua pumping stations. Cerro de Pasco 2006 BEAR CREEK MINING COMPANY

Corani project engineering services. 2006

GYM

Detail engineering of Pagoreni A and B civil works and surveying and quality control of Pagoreni A and B civil works. 2006 PALACE RESORTS – MEXICO HOTEL CHAIN

Management of works, evaluation and supervision of the Moon Palace Hotel. Dominican Republic 2005 – 2009 SOL MELIÁ HOTEL CHAIN

Project supervision and works management of the Meliá Tropical Hotel. Dominican Republic. 2005 – 2007 INVERSIONS PUERTO BONITO

Supervision and design and construction control of the Moon Palace Hotel Punta Cana. Dominican Republic 2005 - 2007

CONSORCIO LA QUINUA 6

La Quinua 6 surveying services. Cajamarca 2006 GYM

Preliminary cabinet geological assessment of Camisea Pipeline II. 2006

GRUPO SOL MELIÁ

Supervision of works of Gran Hotel Paradisus Palma Real. Dominican Republic 2005 GYM

Engineering for coordination with Pluspetrol Norte in connection with future projects. 2005 GyM

Development of road designs for construction of Road Network 6, Puente Pucusana-Cerro Azul-Ica section. 2005 VOLCAN CIA. MINERA S.A.A.

Adjustment of the San Expedito concentrator crushing system of the production unit. Cerro de Pasco 2005

Analysis and preliminary assessment of road solutions for the Uchumayo road variant. 2005 VOLCAN CIA MINERA S.A.A.

Detail engineering for vibratory grizzly, crusher and crane bridges. Cerro de Pasco 2005

FLUOR CHILE S.A. COMPAÑÍA MINERA

EMPRESA EDITORA EL COMERCIO S.A

GYM

ANTAMINA S.A.

Repair of the fire fighting water line El Comercio premises. Concrete slab construction. Pueblo Libre 2005

Comprehensive topography for Minera Barrick Alto Chicama project. 2005

Engineering services master contract. Ancash 2004

CONCAR

HDM evaluation of Road Network 6 maintenance. 2005 MTC

Intermodal transportation plan assessment. Perú 2005

MTC PROVÍAS NACIONAL

Supervision and control of periodic maintenance of the North PanAmerican Highway, ChiclayoBayovar Detour-Piura section. First stage. Chiclayo 2005 CONSORCIO TERMINALES

Review of detail engineering for the drainage system upgrading project. 2005

VOLCAN CIA MINERA S.A.A.

Service of assessment of the electricity system of the Ticlio Mining Unit. La Oroya 2005

Victoria plant expansion service. La Oroya 2005

Development of piping isometric drawings Carachugo Carbon Columns project. Cajamarca 2004 SOCIEDAD MINERA

SOCIEDAD MINERA CERRO VERDE

CERRO VERDE

Drawing service of shovels 6 and 7 of the mine. Arequipa 2004

Design service for repair of the primary crushing mineral reception hopper. Arequipa 2004

SOCIEDAD MINERA CERRO VERDE

Updating service for drawings of the grease digester system, oil tank. Arequipa 2004 VOLCAN CÍA. MINERA S.A.A.

SCHMIDT & CHÁVEZ TAFUR INGENIEROS S.R.L

Detail structural design for the 4 floors of Ripley San Isidro. San Isidro 2005

Detail engineering of its new compressor house at San Antonio Yauli Mining Unit. 2004 VOLCAN CÍA. MINERA S.A.A

Services Master Contract. Arequipa 2005

Assessment of technical specifications for mechanics-piping, electricity and instrumentation equipment. Cerro de Pasco 2004

GRUPO SOL MELIÁ HOTELES

VOLCAN CÍA. MINERA S.A.A.

Project management and construction supervision the Paradisus Palma Real Hotel. Dominican Republic 2004 – 2006

Preparation of automation engineering for the concentrator plant of the Animon production unit. Cerro de Pasco 2004

PROVÍAS NACIONAL

Supervision of the rehabilitation and upgrading of asphalt paving of the Chamaya-JaénSan Ignacio -Rio Canchis road. Section: Puente Tamborapa- Ciruelo Port access, km 50.000 - km 75.000. Jaén 2005 VOLCAN CIA. MINERA S.A.A.

CONCAR

BHP BILLITON TINTAYA S.A.

Services master contract, preparation of the detail engineering of the Truck Shop welding gases extraction system. Cusco 2005

161

COMPAÑÍA MINERA

Detail engineering for Minera San José plant. Comodoro - Argentina 2006 RÍO TINTO MINERA LIMITADA S.A.C.

Engineering and Construction

SOCIEDAD MINERA CERRO VERDE S.A.A

SOCIEDAD MINERA

VOLCAN CÍA. MINERA S.A.A.

LAS LOMAS S.A.C

CERRO VERDE

Evaluation of the current status of Las Lomas del Mar beach urban development project. 2005

Preparation of Descriptive Report of the SMCV Waste Water Treatment System. Arequipa 2004

Preparation of automation engineering for the concentrator Paragsha plant. Cerro de Pasco 2004

CERRO VERDE

BHP BILLITON TINTAYA

Design of Tintaya dump 23 seepage collection pond Cusco 2004


160

80 YEARS

New horizons, new challenges

Xstrata Coppper Tintaya

GYM

Elevation of the Camacmayo dam body from 4.000 to 4.005 m.a.s.l. Cusco 2006

Detail engineering, surveying and quality control services of Pagoreni A and B civil works. 2006

SOL MELIÁ HOTEL & RESORTS

COMPAÑÍA MINERA

Works management, evaluation and supervision of “The Reserve” Paradisus Hotel Punta Cana project. Dominican Republic 2006 - 2007

ANTAMINA S.A.

MITSUI

Miscellaneous projects engineering services. Huaraz 2006

Detail engineering development, review and redesign of the new shop and washing area project. 2005

GMD

PROVÍAS DEPARTAMENTAL

SOCIEDAD MINERA

EDEGEL

BHP BILLITON TINTAYA

ANTAMINA S.A.

Supervision and advisory for civil and conditioning works of the computer center and main building of the Ministry of Transportation and Communications - MTC. 2005

Supervision and control of rehabilitation and upgrading of asphalt paving of the Catac ChavínSan Marcos road, Kahuish Tunnel-San Marcos section. 2005

CERRO VERDE

Energy evaluation study in electrical failures at SMCV. Arequipa 2004

Study and project for improvement of Tulumayo River defenses for the Chimay Hydroelectric Plant. 2004

Assessment of the Matarani Imata Tintaya route for the new concentrate transportation system by bi-articulated cargo trucks. Cusco 2004

Engineering Services Master Contract. Ancash 2005

MINERA SANTA CRUZ S.A.

SIERRA PARIMA

GYM

Supervision and execution control of the Palma Real Village Shopping Center project. Dominican Republic 2006

Detail engineering for construction of the Chili River water line project. 2005

Northern access road additional survey. Cajamarca 2006 RÍO TINTO MINERA LIMITADA S.A.C.

Identification of locations for road construction. Cajamarca 2006 RÍO TINTO MINERA LIMITADA S.A.C.

Engineering services master contract for La Granja mining project. Cajamarca 2006 VOLCAN CIA MINERA S.A.A.

Scada system of the Cerro de Pasco, Chungar, Carahuacra, San Cristóbal and Andaychagua pumping stations. Cerro de Pasco 2006 BEAR CREEK MINING COMPANY

Corani project engineering services. 2006

GYM

Detail engineering of Pagoreni A and B civil works and surveying and quality control of Pagoreni A and B civil works. 2006 PALACE RESORTS – MEXICO HOTEL CHAIN

Management of works, evaluation and supervision of the Moon Palace Hotel. Dominican Republic 2005 – 2009 SOL MELIÁ HOTEL CHAIN

Project supervision and works management of the Meliá Tropical Hotel. Dominican Republic. 2005 – 2007 INVERSIONS PUERTO BONITO

Supervision and design and construction control of the Moon Palace Hotel Punta Cana. Dominican Republic 2005 - 2007

CONSORCIO LA QUINUA 6

La Quinua 6 surveying services. Cajamarca 2006 GYM

Preliminary cabinet geological assessment of Camisea Pipeline II. 2006

GRUPO SOL MELIÁ

Supervision of works of Gran Hotel Paradisus Palma Real. Dominican Republic 2005 GYM

Engineering for coordination with Pluspetrol Norte in connection with future projects. 2005 GyM

Development of road designs for construction of Road Network 6, Puente Pucusana-Cerro Azul-Ica section. 2005 VOLCAN CIA. MINERA S.A.A.

Adjustment of the San Expedito concentrator crushing system of the production unit. Cerro de Pasco 2005

Analysis and preliminary assessment of road solutions for the Uchumayo road variant. 2005 VOLCAN CIA MINERA S.A.A.

Detail engineering for vibratory grizzly, crusher and crane bridges. Cerro de Pasco 2005

FLUOR CHILE S.A. COMPAÑÍA MINERA

EMPRESA EDITORA EL COMERCIO S.A

GYM

ANTAMINA S.A.

Repair of the fire fighting water line El Comercio premises. Concrete slab construction. Pueblo Libre 2005

Comprehensive topography for Minera Barrick Alto Chicama project. 2005

Engineering services master contract. Ancash 2004

CONCAR

HDM evaluation of Road Network 6 maintenance. 2005 MTC

Intermodal transportation plan assessment. Perú 2005

MTC PROVÍAS NACIONAL

Supervision and control of periodic maintenance of the North PanAmerican Highway, ChiclayoBayovar Detour-Piura section. First stage. Chiclayo 2005 CONSORCIO TERMINALES

Review of detail engineering for the drainage system upgrading project. 2005

VOLCAN CIA MINERA S.A.A.

Service of assessment of the electricity system of the Ticlio Mining Unit. La Oroya 2005

Victoria plant expansion service. La Oroya 2005

Development of piping isometric drawings Carachugo Carbon Columns project. Cajamarca 2004 SOCIEDAD MINERA

SOCIEDAD MINERA CERRO VERDE

CERRO VERDE

Drawing service of shovels 6 and 7 of the mine. Arequipa 2004

Design service for repair of the primary crushing mineral reception hopper. Arequipa 2004

SOCIEDAD MINERA CERRO VERDE

Updating service for drawings of the grease digester system, oil tank. Arequipa 2004 VOLCAN CÍA. MINERA S.A.A.

SCHMIDT & CHÁVEZ TAFUR INGENIEROS S.R.L

Detail structural design for the 4 floors of Ripley San Isidro. San Isidro 2005

Detail engineering of its new compressor house at San Antonio Yauli Mining Unit. 2004 VOLCAN CÍA. MINERA S.A.A

Services Master Contract. Arequipa 2005

Assessment of technical specifications for mechanics-piping, electricity and instrumentation equipment. Cerro de Pasco 2004

GRUPO SOL MELIÁ HOTELES

VOLCAN CÍA. MINERA S.A.A.

Project management and construction supervision the Paradisus Palma Real Hotel. Dominican Republic 2004 – 2006

Preparation of automation engineering for the concentrator plant of the Animon production unit. Cerro de Pasco 2004

PROVÍAS NACIONAL

Supervision of the rehabilitation and upgrading of asphalt paving of the Chamaya-JaénSan Ignacio -Rio Canchis road. Section: Puente Tamborapa- Ciruelo Port access, km 50.000 - km 75.000. Jaén 2005 VOLCAN CIA. MINERA S.A.A.

CONCAR

BHP BILLITON TINTAYA S.A.

Services master contract, preparation of the detail engineering of the Truck Shop welding gases extraction system. Cusco 2005

161

COMPAÑÍA MINERA

Detail engineering for Minera San José plant. Comodoro - Argentina 2006 RÍO TINTO MINERA LIMITADA S.A.C.

Engineering and Construction

SOCIEDAD MINERA CERRO VERDE S.A.A

SOCIEDAD MINERA

VOLCAN CÍA. MINERA S.A.A.

LAS LOMAS S.A.C

CERRO VERDE

Evaluation of the current status of Las Lomas del Mar beach urban development project. 2005

Preparation of Descriptive Report of the SMCV Waste Water Treatment System. Arequipa 2004

Preparation of automation engineering for the concentrator Paragsha plant. Cerro de Pasco 2004

CERRO VERDE

BHP BILLITON TINTAYA

Design of Tintaya dump 23 seepage collection pond Cusco 2004


162

80 YEARS

BHP BILLITON TINTAYA

Basic engineering of the Tintaya truck wash. Cusco 2004 BHP BILLITON TINTAYA

Technical file for maintenance of the Imata-Condoroma-Tintaya road. Cusco 2004 BHP BILLITON TINTAYA

Adjustment of the engineering to the location of dump´23 seepage collection pond. Tintaya - Cusco. 2004 PROVÍAS NACIONAL

Supervision and control of rehabilitation and upgrading of asphalt paving of the Ingenio Chachapoyas road. Sector: Leymebamba-Chachapoyas detour, km 39.440-km 52.000. Amazonas 2004

SOCIEDAD MINERA

CONSORCIO GYM-SKANSKA

CONSORCIO CAMISEA

COMPAÑÍA MINERA

CERRO VERDE

CERRO VERDE S.A.A.

Technical file preparation of the engineering for expansion of the management third floor. Arequipa 2004

Civil, mechanical, electrical and instrumentation drawing updating services for the main power transmission line. 2003

Development of civil works engineering of the Camisea gas Pisco fractioning plant project. 2003

Surveying services for construction of the Camisea Pipeline. Cusco - Peru 2001

Field surveying services. Huaraz 2001

NORVIAL

PROVÍAS DEPARTAMENTAL -MTC

Surveying services for field determination of the right-of-way strip of the Huacho – Pativilca section. 2004

Supervision and control of asphalt paving rehabilitation and upgrading of the Tarapoto – Yurimaguas highway. Section: km. 114.000- km. 125.592. 2003

GYM

Engineering and surveying services for development of the Leach Pad Yanacocha Stage 5 Project. Cajamarca 2004

PROVÍAS DEPARTAMENTAL -MTC

Supervision and control of asphalt paving rehabilitation and upgrading of the Asillo, San Antón highway. Section: Asillo-Progreso (15 km). 2003

GYM

Engineering and surveying services for development of the Leach Pad Yanacocha Stage 6 Project. Cajamarca 2004 SOCIEDAD MINERA CERRO VERDE

CERRO VERDE

Civil, mechanical, electrical and instrumentation drawing updating services. Arequipa 2004

SOCIEDAD MINERA

CONSORCIO GYM-TIZÓN

CERRO VERDE

Quality control of asphalt paving rehabilitation of the Imperial Izcuchaca highway 2004

Updating and digitalizing of fuel tank and P&H2800 electrical shovel drawings. 2004

Engineering and Construction

SOCIEDAD MINERA

SOCIEDAD MINERA

Fire risk assessment service for the Matarani acid storage plant. Arequipa 2004

New horizons, new challenges

EMPRESA EDITORA EL COMERCIO S.A.

Design and construction of foundations for the Heidelberg C-CY0423 printing press and sheeter foundations. Lima 2003

BHP BILLITON TINTAYA

Basic engineering and detail engineering of the water supply line for the cyclone and concentrating plant of the Hunipampa tailings dam project. Cusco - Peru 2001

ASOCIACIÓN PERUANA DE LA IGLESIA DE JESUCRISTO DE LOS SANTOS DE LOS ÚLTIMOS DÍAS

Standard chapels project. Lima 2002

Hotel de Turistas del Cusco remodeling project. 120 rooms. Cusco - Peru 2002

Maintenance shop at concentrating plant area project. Yanacancha 2002

Engineering for remodeling of the SMCV special projects building. Arequipa 2004

Supervision and control of rehabilitation of the Rioja-Tarapoto highway section 1. San Martín 2003

Surveying and engineering services. 2003 CONSORCIO RED VIAL 5

Engineering management for the Road Network 5 project. 2003 PROVÍAS NACIONAL

Final engineering study for construction of tunnels and bridges at Vía de Evitamiento. La Oroya 2003

CAJAMARQUILLA ZINC REFINERY

CIA. MINERA ANTAMINA

Final Project See Page Collection. Yanacancha - Ancash 2002 CAJAMARQUILLA ZINC REFINERY

Basic and detail engineering of the study for replacement of fire fighting system pipe. 2002

GYM

Surveying of 150 km of the Andoas access road. Road maintenance Andoas. 2001 BHP BILLITON TINTAYA

Surveying of the tailings pipe route. Espinar - Cusco 2001 COMPAÑÍA MINERA

CONSORCIO CONCESIÓN

Highway surveying services. Huacho - Pativilca 2003

CONSTRUCTION

REFINERÍA DE CAJAMAQUILLA S.A.

SANTOS DE LOS ÚLTIMOS DÍAS

University institute project. Lima North 2002

CIA. MINERA ANTAMINA

CERRO VERDE

Detail engineering for installation of a steam turbine. 2003

IGLESIA DE JESUCRISTO DE LOS

CONSORCIO RED VIAL 5

CONSORCIO RED VIAL 5

CERRO VERDE

TECHINT S.A.C.

Contract for hydrological analysis study. 2001

New station for sulfuric acid dispatch by railroad at the Cajamarquilla refinery plant. 2002

COMMUNICATIONS, HOUSING AND

Engineering development service for erection of substation PDC3. Arequipa 2004

BHP BILLITON TINTAYA

Detail engineering, supervision and control of work: remodeling and expansion of main canteen of Tintaya Camp No. 3. Cusco - Peru 2001

Supervision and control of asphalt paving rehabilitation and maintenance of the Pativilca – Conochocha highway. 2003

MINISTRY OF TRANSPORTATION,

SOCIEDAD MINERA

INADE

CAJAMARQUILLA REFINERY

COMPAÑÍA MINERA ANTAMINA S.A.

SOCIEDAD MINERA

ANTAMINA S.A.

Work supervision, Canal Vía Sullana drainage reconstruction. Piura 2002 ASOCIACIÓN PERUANA DE LA

163

PETRÓLEOS DEL PERÚ

MINERA DEL SUR

PETROPERÚ S.A

Basic engineering for the fumes handling system, Funsur and waste material. Ica - Peru 2001

Block X environmental remediation inspection services. El Alto - Talara 2002 GRUPO SOL - MELIÁ HOTELES

BHP BILLITON TINTAYA

Coco Beach Resort final project (development of investment financial assessment and review of the engineering study developed for the investment project). San Juan - Puerto Rico 2002

Advisory for the tender of equipment supply for engineering and maintenance of the Tintaya-Arequipa highway. Arequipa-Cusco. Perú 2001

GYM S.A.

SOUTHERN PERU LIMITED

Quality control for construction and startup of operations of the Marriott Hotel, 240 rooms. Lima, Peru 2001 - 2002

Basic and detail engineering, purchasing management and preparation of the technical file for tender of construction of the project for 18 t/d production increase at the Cuajone leaching plant. Moquegua 2001

COMPAÑÍA MINERA

ANTAMINA S.A.

ANTAMINA S.A.

Design of tower special foundations for transmission line, Huallanca Antamina. Ancash - Peru 2000

Supervision and control of asphalt paving rehabilitation and upgrading of the Conococha-Yanacancha highway. Section I: ConocochaHuanzala and Section II: HuanzalaYanacancha. Ancash 2001 - 2002 BHP BILLITON TINTAYA

Surveying of the tailings piple route, pumping station and thickeners, wall area at Tailing Dam Site A Project of the tailings dam project. Huinipampa - Cusco 2001 FLUOR DANIEL

Project engineering, design, procurement, cost control and scheduling services. Yanacocha - Cajamarca 2001 BHP BILLITON TINTAYA

Remodeling of canteen for 250 people. Espinar - Cusco 2001

MINERA DEL SUR

Detail engineering of conduits of the Funsur tin smelter. Ica - Peru 2000 MINERA YANACOCHA S.R.L.

Detail engineering for the pumping system expansion project Booster Pump Stage 5 and 6. Detail engineering for the new Yanacocha North refinery building project. Detail engineering for the column plant expansion project. Detail engineering excess water treatment plant. Detail engineering for expansion of the Minera Yanacocha plant. Detail engineering for the project, expansion of the Yanacocha station, booster station. Detail engineering for the new coal column plant. La Quinua - Cajamarca 2000 - 2001


162

80 YEARS

BHP BILLITON TINTAYA

Basic engineering of the Tintaya truck wash. Cusco 2004 BHP BILLITON TINTAYA

Technical file for maintenance of the Imata-Condoroma-Tintaya road. Cusco 2004 BHP BILLITON TINTAYA

Adjustment of the engineering to the location of dump´23 seepage collection pond. Tintaya - Cusco. 2004 PROVÍAS NACIONAL

Supervision and control of rehabilitation and upgrading of asphalt paving of the Ingenio Chachapoyas road. Sector: Leymebamba-Chachapoyas detour, km 39.440-km 52.000. Amazonas 2004

SOCIEDAD MINERA

CONSORCIO GYM-SKANSKA

CONSORCIO CAMISEA

COMPAÑÍA MINERA

CERRO VERDE

CERRO VERDE S.A.A.

Technical file preparation of the engineering for expansion of the management third floor. Arequipa 2004

Civil, mechanical, electrical and instrumentation drawing updating services for the main power transmission line. 2003

Development of civil works engineering of the Camisea gas Pisco fractioning plant project. 2003

Surveying services for construction of the Camisea Pipeline. Cusco - Peru 2001

Field surveying services. Huaraz 2001

NORVIAL

PROVÍAS DEPARTAMENTAL -MTC

Surveying services for field determination of the right-of-way strip of the Huacho – Pativilca section. 2004

Supervision and control of asphalt paving rehabilitation and upgrading of the Tarapoto – Yurimaguas highway. Section: km. 114.000- km. 125.592. 2003

GYM

Engineering and surveying services for development of the Leach Pad Yanacocha Stage 5 Project. Cajamarca 2004

PROVÍAS DEPARTAMENTAL -MTC

Supervision and control of asphalt paving rehabilitation and upgrading of the Asillo, San Antón highway. Section: Asillo-Progreso (15 km). 2003

GYM

Engineering and surveying services for development of the Leach Pad Yanacocha Stage 6 Project. Cajamarca 2004 SOCIEDAD MINERA CERRO VERDE

CERRO VERDE

Civil, mechanical, electrical and instrumentation drawing updating services. Arequipa 2004

SOCIEDAD MINERA

CONSORCIO GYM-TIZÓN

CERRO VERDE

Quality control of asphalt paving rehabilitation of the Imperial Izcuchaca highway 2004

Updating and digitalizing of fuel tank and P&H2800 electrical shovel drawings. 2004

Engineering and Construction

SOCIEDAD MINERA

SOCIEDAD MINERA

Fire risk assessment service for the Matarani acid storage plant. Arequipa 2004

New horizons, new challenges

EMPRESA EDITORA EL COMERCIO S.A.

Design and construction of foundations for the Heidelberg C-CY0423 printing press and sheeter foundations. Lima 2003

BHP BILLITON TINTAYA

Basic engineering and detail engineering of the water supply line for the cyclone and concentrating plant of the Hunipampa tailings dam project. Cusco - Peru 2001

ASOCIACIÓN PERUANA DE LA IGLESIA DE JESUCRISTO DE LOS SANTOS DE LOS ÚLTIMOS DÍAS

Standard chapels project. Lima 2002

Hotel de Turistas del Cusco remodeling project. 120 rooms. Cusco - Peru 2002

Maintenance shop at concentrating plant area project. Yanacancha 2002

Engineering for remodeling of the SMCV special projects building. Arequipa 2004

Supervision and control of rehabilitation of the Rioja-Tarapoto highway section 1. San Martín 2003

Surveying and engineering services. 2003 CONSORCIO RED VIAL 5

Engineering management for the Road Network 5 project. 2003 PROVÍAS NACIONAL

Final engineering study for construction of tunnels and bridges at Vía de Evitamiento. La Oroya 2003

CAJAMARQUILLA ZINC REFINERY

CIA. MINERA ANTAMINA

Final Project See Page Collection. Yanacancha - Ancash 2002 CAJAMARQUILLA ZINC REFINERY

Basic and detail engineering of the study for replacement of fire fighting system pipe. 2002

GYM

Surveying of 150 km of the Andoas access road. Road maintenance Andoas. 2001 BHP BILLITON TINTAYA

Surveying of the tailings pipe route. Espinar - Cusco 2001 COMPAÑÍA MINERA

CONSORCIO CONCESIÓN

Highway surveying services. Huacho - Pativilca 2003

CONSTRUCTION

REFINERÍA DE CAJAMAQUILLA S.A.

SANTOS DE LOS ÚLTIMOS DÍAS

University institute project. Lima North 2002

CIA. MINERA ANTAMINA

CERRO VERDE

Detail engineering for installation of a steam turbine. 2003

IGLESIA DE JESUCRISTO DE LOS

CONSORCIO RED VIAL 5

CONSORCIO RED VIAL 5

CERRO VERDE

TECHINT S.A.C.

Contract for hydrological analysis study. 2001

New station for sulfuric acid dispatch by railroad at the Cajamarquilla refinery plant. 2002

COMMUNICATIONS, HOUSING AND

Engineering development service for erection of substation PDC3. Arequipa 2004

BHP BILLITON TINTAYA

Detail engineering, supervision and control of work: remodeling and expansion of main canteen of Tintaya Camp No. 3. Cusco - Peru 2001

Supervision and control of asphalt paving rehabilitation and maintenance of the Pativilca – Conochocha highway. 2003

MINISTRY OF TRANSPORTATION,

SOCIEDAD MINERA

INADE

CAJAMARQUILLA REFINERY

COMPAÑÍA MINERA ANTAMINA S.A.

SOCIEDAD MINERA

ANTAMINA S.A.

Work supervision, Canal Vía Sullana drainage reconstruction. Piura 2002 ASOCIACIÓN PERUANA DE LA

163

PETRÓLEOS DEL PERÚ

MINERA DEL SUR

PETROPERÚ S.A

Basic engineering for the fumes handling system, Funsur and waste material. Ica - Peru 2001

Block X environmental remediation inspection services. El Alto - Talara 2002 GRUPO SOL - MELIÁ HOTELES

BHP BILLITON TINTAYA

Coco Beach Resort final project (development of investment financial assessment and review of the engineering study developed for the investment project). San Juan - Puerto Rico 2002

Advisory for the tender of equipment supply for engineering and maintenance of the Tintaya-Arequipa highway. Arequipa-Cusco. Perú 2001

GYM S.A.

SOUTHERN PERU LIMITED

Quality control for construction and startup of operations of the Marriott Hotel, 240 rooms. Lima, Peru 2001 - 2002

Basic and detail engineering, purchasing management and preparation of the technical file for tender of construction of the project for 18 t/d production increase at the Cuajone leaching plant. Moquegua 2001

COMPAÑÍA MINERA

ANTAMINA S.A.

ANTAMINA S.A.

Design of tower special foundations for transmission line, Huallanca Antamina. Ancash - Peru 2000

Supervision and control of asphalt paving rehabilitation and upgrading of the Conococha-Yanacancha highway. Section I: ConocochaHuanzala and Section II: HuanzalaYanacancha. Ancash 2001 - 2002 BHP BILLITON TINTAYA

Surveying of the tailings piple route, pumping station and thickeners, wall area at Tailing Dam Site A Project of the tailings dam project. Huinipampa - Cusco 2001 FLUOR DANIEL

Project engineering, design, procurement, cost control and scheduling services. Yanacocha - Cajamarca 2001 BHP BILLITON TINTAYA

Remodeling of canteen for 250 people. Espinar - Cusco 2001

MINERA DEL SUR

Detail engineering of conduits of the Funsur tin smelter. Ica - Peru 2000 MINERA YANACOCHA S.R.L.

Detail engineering for the pumping system expansion project Booster Pump Stage 5 and 6. Detail engineering for the new Yanacocha North refinery building project. Detail engineering for the column plant expansion project. Detail engineering excess water treatment plant. Detail engineering for expansion of the Minera Yanacocha plant. Detail engineering for the project, expansion of the Yanacocha station, booster station. Detail engineering for the new coal column plant. La Quinua - Cajamarca 2000 - 2001


164

80 YEARS

GRUPO SOL - MELIÁ HOTELES

Supervision of the Hotel Coco Beach Resort project. Review and supervision of the project developed for construction of the resort. San Juan - Puerto Rico 1999

INVERSIONES INMOBILIARIA

COMPAÑÍA MINERA

INVERSIONES SHERATON

Inversiones Coralillo

S IAR S.A.

ANTAMINA S.A.

Supervision of the expansion of the Gran Meliá Caracas hotel. Stage II, 2 towers of 112 and 120 apartments and 2 penthouses. Caracas - Venezuela 1998 - 1999

Final engineering study for asphalt paving construction of the access road to the Antamina mine. Section: Antarraga-HuanzaláAntamina Mine. Ancash - Peru 1997 – 1998

Technical-financial assessment of the Huayrajtambo hotel . Cusco - Peru 1997

Final structure design for construction of the Iberostar Dominicana resort. Fourth Stage, 28 bungalows of 14 rooms each, 21,500 m² built-up area. Santo Domingo - Dominican Republic 1996

MINERA DEL SUR

Detail engineering for upgrading of the Funsur drossers plant. Ica - Peru 1999 MINERA DEL SUR

Detail engineering and adjustment of the smelter building expansion to install a bridge crane. Ausmelt standby furnace. Ica - Peru 1999 FACTORÍA METÁLICA HAUG

GRUPO SOL MELIÁ HOTELES

Project management and supervision of construction of the Meliá Caribe resort. 32 bungalows of 20 rooms each, 55,650 m² built-up area. Santo Domingo - Dominican Republic 1998 – 1999

COMPAÑÍA MINERA ANTAMINA S.A.

COMPAÑÍA MINERA

GRUPO SOL DE ESPAÑA

ANTAMINA S.A.

Supervision of construction of the Desarrollo Sol resort, 220 rooms. Santo Domingo - Dominican Republic 1997 – 1998

MINERA QUELLAVECO

OCCIDENTAL HOTELS MANAGEMENT B.V.

Supervision of construction of the Flamenco Bávaro resort, 853 rooms, 45.562 m² built-up area. Santo Domingo - Dominican Republic 1998 – 1999

ANTAMINA S.A.

Assessment of alternatives of the Conococha-Huanzala section. Ancash - Peru 1997

INYPSA - CADIC - DICARTU

Mechanical ventilation design for Funsur tin smelter. Ica - Peru 1998

Basic engineering study of alternatives for construction of the Quellaveco mine access road. Moquegua 1999

COMPAÑÍA MINERA

Measurement and marking of properties at the Caravani-Palos Blancos and Ixiamas mining areas. La Paz - Bolivia 1998

Detail engineering for construction of the Antamina truck maintenance shop. Mechanical designs of the Antamina mining project. Ancash - Peru 1999

Design of foundations for gantries and equipment of the Vizcarra station for the transmission line project. Ancash - Peru 1999

New horizons, new challenges

Assessment of ore concentrates transportation on the access road to the Antamina mine Antamina. Ancash - Peru 1997

MINERA DEL SUR MINERA QUELLAVECO

Basic engineering study for construction of the access road to the Quellaveco mine. Moquegua 1997 CORPORACIÓN MINERA DE BOLIVIA

Project management and supervision of construction of the Meliá Tropical resort, 22 bungalows of 24 rooms each, 56.500 m² built-up area. Santo Domingo - Dominican Republic 1997 – 1998

Consulting for location of starting points (SP) and reference points (RP) by GPS in mining settlements. Consulting for location of starting points (SP) and reference points (RP) by GPS in districts s 4, 5, 6 and 8 of the Western Andes and 5 of the Precambrian Shield. Oruro - Bolivia 1997

MINERA QUELLAVECO

COMPAÑÍA MINERA ANTAMINA

Conceptual engineering study for construction of access road. Moquegua 1997 – 1998

Surveying of the ore concentrate conduction line (mine duct) of Antamina. Final engineering work for construction of compacted earth access road to the Antamina mine. Section: Nodo LagunasAntamina (mine) y Section: Antamina - San Marcos. Geodesic and topographic surveys of the Antamina mining project. Ancash - Peru 1997

GRUPO SOL MELIÁ HOTELES

COMPAÑÍA MINERA ANTAMINA S.A.

Surveying of puya plants and archeological zones of the access road to the Antamina mine. Ancash - Peru 1997

COMPAÑÍA MINERA ANTAMINA S.A.

Preliminary assessment of alternatives of the Antamina landing strip. Ancash - Peru 1996 – 1997 ASOCIACIÓN MINERA ARES

Project management for construction of the Ares gold concentrator. Arequipa - Peru 1996 – 1997 COMPAÑÍA MINERA

Engineering and Construction

MINERA YANACOCHA

Detail engineering, works and erection for expansion of the Yanacocha precipitation plant. Cajamarca 1996 MINERA YANACOCHA

Engineering project for expansion of the leaching plant and ion exchange, interconnection and commissioning. Cajamarca 1996 CALCINE SILO DETAIL ENGINEERING - VOTORANTIM METAIS

ANTAMINA S.A.

Surveys of the access road to the Antamina mining camp. Ancash 1996 EMPRESA MINERA DEL CENTRO DEL PERÚ

Engineering study for sewage and refuse treatment at the Casapalca, Yauricocha, Andaychagua and Cobriza production units. Lima, Ayacucho, Junín, Huancavelica. 1996

COMPAÑÍA MINERA ANTAMINA S.A.

Preliminary assessment of alternative routes of the access road to Antamina. Ancash - Peru 1996

CENTRO AÉREO COMERCIAL

CENTRO AÉREO COMERCIAL

LA FABRIL

Updating of the project feasibility study, for Banco Libertador. Callao 1995

Project management. Callao 1995

Study for reinforcement of the soap mill building structure. Lima 1994

INVERSIONES CORALILLO

GRUPO SOL - MELIÁ HOTELES

Project management and supervision of construction of the Iberostar Dominicana resort . 356 rooms. Santo Domingo - Dominican Republic 1995 – 1996

Project management and supervision of the construction of Paradisus Punta Cana resort. 20 bungalows of 16 rooms each. 65.200 m² built-up area. Santo Domingo - Dominican Republic 1995

Feasibility study for construction of the access road to the Pallca mine. Ancash - Peru 1995

Design of Block I expansion. Callao 1994

SOCIEDAD MINERA LA GRANJA

INVERSIONES SHERATON

CAMBIOR

Remodeling project management and supervision for the Lima Sheraton Hotel. Including: 2.100 m² casino, Las Palmeras dining area of 1.300 m² and reception hall. Lima - Peru 1994

MITSUI MINING & SMELTING

GRUPO SOL MELIÁ HOTELES

Project management and supervision of the expansion of the Paradisus Punta Cana resort. 25.000 m² built-up area. Santo Domingo - Dominican Republic 1996

165

MINISTRY OF FOREIGN AFFAIRS

Surveying and assessment of the current air conditioning system and development of the new air conditioning project for the Ministry of Foreign Affairs. Lima 1995 DROGUERÍA KAHAN S.A.

New office building project management. Lince 1995

JOCKEY CLUB SHOPPING CENTER

Engineering services of the Jockey Club Shopping Center. 1995 BANCO DE CRÉDITO BOLIVIA

Project engineering and management. La Paz - Bolivia 1995

BANCO DE CRÉDITO DEL PERÚ

MINERA SANTA LUISA

Detail engineering, construction of the project of the concentrating plant new structure. Ancash - Peru 1995 CHIPY PLANT

EMPRESA EDITORA EL COMERCIO S.A.

Air conditioning project for the Crediconsumo premises. Lima 1995

Prefeasibility study of electric power supply to La Granja mining project. Cajamarca - Peru 1995

Designs, project management and supervision of new printing press. Lima 1995

Appraisal of the industrial plant. Lima 1994

SERLIPSA WAREHOUSES


164

80 YEARS

GRUPO SOL - MELIÁ HOTELES

Supervision of the Hotel Coco Beach Resort project. Review and supervision of the project developed for construction of the resort. San Juan - Puerto Rico 1999

INVERSIONES INMOBILIARIA

COMPAÑÍA MINERA

INVERSIONES SHERATON

Inversiones Coralillo

S IAR S.A.

ANTAMINA S.A.

Supervision of the expansion of the Gran Meliá Caracas hotel. Stage II, 2 towers of 112 and 120 apartments and 2 penthouses. Caracas - Venezuela 1998 - 1999

Final engineering study for asphalt paving construction of the access road to the Antamina mine. Section: Antarraga-HuanzaláAntamina Mine. Ancash - Peru 1997 – 1998

Technical-financial assessment of the Huayrajtambo hotel . Cusco - Peru 1997

Final structure design for construction of the Iberostar Dominicana resort. Fourth Stage, 28 bungalows of 14 rooms each, 21,500 m² built-up area. Santo Domingo - Dominican Republic 1996

MINERA DEL SUR

Detail engineering for upgrading of the Funsur drossers plant. Ica - Peru 1999 MINERA DEL SUR

Detail engineering and adjustment of the smelter building expansion to install a bridge crane. Ausmelt standby furnace. Ica - Peru 1999 FACTORÍA METÁLICA HAUG

GRUPO SOL MELIÁ HOTELES

Project management and supervision of construction of the Meliá Caribe resort. 32 bungalows of 20 rooms each, 55,650 m² built-up area. Santo Domingo - Dominican Republic 1998 – 1999

COMPAÑÍA MINERA ANTAMINA S.A.

COMPAÑÍA MINERA

GRUPO SOL DE ESPAÑA

ANTAMINA S.A.

Supervision of construction of the Desarrollo Sol resort, 220 rooms. Santo Domingo - Dominican Republic 1997 – 1998

MINERA QUELLAVECO

OCCIDENTAL HOTELS MANAGEMENT B.V.

Supervision of construction of the Flamenco Bávaro resort, 853 rooms, 45.562 m² built-up area. Santo Domingo - Dominican Republic 1998 – 1999

ANTAMINA S.A.

Assessment of alternatives of the Conococha-Huanzala section. Ancash - Peru 1997

INYPSA - CADIC - DICARTU

Mechanical ventilation design for Funsur tin smelter. Ica - Peru 1998

Basic engineering study of alternatives for construction of the Quellaveco mine access road. Moquegua 1999

COMPAÑÍA MINERA

Measurement and marking of properties at the Caravani-Palos Blancos and Ixiamas mining areas. La Paz - Bolivia 1998

Detail engineering for construction of the Antamina truck maintenance shop. Mechanical designs of the Antamina mining project. Ancash - Peru 1999

Design of foundations for gantries and equipment of the Vizcarra station for the transmission line project. Ancash - Peru 1999

New horizons, new challenges

Assessment of ore concentrates transportation on the access road to the Antamina mine Antamina. Ancash - Peru 1997

MINERA DEL SUR MINERA QUELLAVECO

Basic engineering study for construction of the access road to the Quellaveco mine. Moquegua 1997 CORPORACIÓN MINERA DE BOLIVIA

Project management and supervision of construction of the Meliá Tropical resort, 22 bungalows of 24 rooms each, 56.500 m² built-up area. Santo Domingo - Dominican Republic 1997 – 1998

Consulting for location of starting points (SP) and reference points (RP) by GPS in mining settlements. Consulting for location of starting points (SP) and reference points (RP) by GPS in districts s 4, 5, 6 and 8 of the Western Andes and 5 of the Precambrian Shield. Oruro - Bolivia 1997

MINERA QUELLAVECO

COMPAÑÍA MINERA ANTAMINA

Conceptual engineering study for construction of access road. Moquegua 1997 – 1998

Surveying of the ore concentrate conduction line (mine duct) of Antamina. Final engineering work for construction of compacted earth access road to the Antamina mine. Section: Nodo LagunasAntamina (mine) y Section: Antamina - San Marcos. Geodesic and topographic surveys of the Antamina mining project. Ancash - Peru 1997

GRUPO SOL MELIÁ HOTELES

COMPAÑÍA MINERA ANTAMINA S.A.

Surveying of puya plants and archeological zones of the access road to the Antamina mine. Ancash - Peru 1997

COMPAÑÍA MINERA ANTAMINA S.A.

Preliminary assessment of alternatives of the Antamina landing strip. Ancash - Peru 1996 – 1997 ASOCIACIÓN MINERA ARES

Project management for construction of the Ares gold concentrator. Arequipa - Peru 1996 – 1997 COMPAÑÍA MINERA

Engineering and Construction

MINERA YANACOCHA

Detail engineering, works and erection for expansion of the Yanacocha precipitation plant. Cajamarca 1996 MINERA YANACOCHA

Engineering project for expansion of the leaching plant and ion exchange, interconnection and commissioning. Cajamarca 1996 CALCINE SILO DETAIL ENGINEERING - VOTORANTIM METAIS

ANTAMINA S.A.

Surveys of the access road to the Antamina mining camp. Ancash 1996 EMPRESA MINERA DEL CENTRO DEL PERÚ

Engineering study for sewage and refuse treatment at the Casapalca, Yauricocha, Andaychagua and Cobriza production units. Lima, Ayacucho, Junín, Huancavelica. 1996

COMPAÑÍA MINERA ANTAMINA S.A.

Preliminary assessment of alternative routes of the access road to Antamina. Ancash - Peru 1996

CENTRO AÉREO COMERCIAL

CENTRO AÉREO COMERCIAL

LA FABRIL

Updating of the project feasibility study, for Banco Libertador. Callao 1995

Project management. Callao 1995

Study for reinforcement of the soap mill building structure. Lima 1994

INVERSIONES CORALILLO

GRUPO SOL - MELIÁ HOTELES

Project management and supervision of construction of the Iberostar Dominicana resort . 356 rooms. Santo Domingo - Dominican Republic 1995 – 1996

Project management and supervision of the construction of Paradisus Punta Cana resort. 20 bungalows of 16 rooms each. 65.200 m² built-up area. Santo Domingo - Dominican Republic 1995

Feasibility study for construction of the access road to the Pallca mine. Ancash - Peru 1995

Design of Block I expansion. Callao 1994

SOCIEDAD MINERA LA GRANJA

INVERSIONES SHERATON

CAMBIOR

Remodeling project management and supervision for the Lima Sheraton Hotel. Including: 2.100 m² casino, Las Palmeras dining area of 1.300 m² and reception hall. Lima - Peru 1994

MITSUI MINING & SMELTING

GRUPO SOL MELIÁ HOTELES

Project management and supervision of the expansion of the Paradisus Punta Cana resort. 25.000 m² built-up area. Santo Domingo - Dominican Republic 1996

165

MINISTRY OF FOREIGN AFFAIRS

Surveying and assessment of the current air conditioning system and development of the new air conditioning project for the Ministry of Foreign Affairs. Lima 1995 DROGUERÍA KAHAN S.A.

New office building project management. Lince 1995

JOCKEY CLUB SHOPPING CENTER

Engineering services of the Jockey Club Shopping Center. 1995 BANCO DE CRÉDITO BOLIVIA

Project engineering and management. La Paz - Bolivia 1995

BANCO DE CRÉDITO DEL PERÚ

MINERA SANTA LUISA

Detail engineering, construction of the project of the concentrating plant new structure. Ancash - Peru 1995 CHIPY PLANT

EMPRESA EDITORA EL COMERCIO S.A.

Air conditioning project for the Crediconsumo premises. Lima 1995

Prefeasibility study of electric power supply to La Granja mining project. Cajamarca - Peru 1995

Designs, project management and supervision of new printing press. Lima 1995

Appraisal of the industrial plant. Lima 1994

SERLIPSA WAREHOUSES


166

80 YEARS

New horizons, new challenges

Inversiones Coralillo

INPE

PETROPERÚ

Project management and supervision of construction of the Iberostar Dominicana resort Stage II, 28 bungalows of 12 rooms each, 28.600 m² built-up area Santo Domingo - Dominican Republic 1994 – 1995

Supervision of construction of a new penitentiary establishment in Ayacucho. Ayacucho 1994

Supervision of repair of the building windows. Lima 1992

GRUPO SOL - MELIÁ HOTELES

Financial audit for San Isidro office. Lima 1992

MINERA YANACOCHA

Detail engineering of the leaching pads project. Cajamarca 1994 – 1995 BANCO DEL LIBERTADOR

Feasibility study of the Centro Aéreo Comercial project. Callao 1994

BANCO DE CRÉDITO DEL PERÚ

Supervision of the Bávaro commercial compound, commercial establishments, discotheque, exterior areas and other hotel facilities, 10.000 m² built-up area. Supervision of the hotel apartment compound. Includes apartments, swimming pools, outdoor facilities, 3.200 m² total area. Santo Domingo - Dominican Republic 1993 – 1994

ASOCIACIÓN EPN GYM S.A. CONSTRUCTORA ROCA, S.A.

Technical advisory for construction the Four Seasons Reforma hotel, 240 rooms, 45.000 m² built-up area. Mexico D.F. - Mexico 1992

GRUPO CARSA

Grupo Sol - MeliÁ Hoteles

EMAPE

MINERA VOLCAN

COMPAÑÍA CERVECERA

CONSTRUCTORA ROCA S.A.

Project management and supervision of construction of the Meliá Bávaro resort, 2 presidential bungalows, 53 suite bungalows, 82-room hotel, 75.000 m² built-up area. Santo Domingo - Dominican Republic 1990 – 1992

Supervision of rehabilitation of Av. Las Lomas, Gran Pajaten. Lima 1987

Detail engineering of the hoisting machine for the Huaripampa tunnel shaft personnel. Lima - Peru 1985

Administrative, social and services complex. Arequipa 1982

DE HUANCAYO

SHERATON HOTEL CHAIN

EMPRESA MINERA

Multifamily residential project and nursing home. Junín 1987

Supervision of remodeling of the Koricancha restaurant and floors 16, 17 and 18. 3.450 m² built-up area. Lima - Peru 1985

DEL CENTRO DEL PERÚ

Supervision and quality control for construction the Four Seasons Reforma hotel. 240 rooms, 45.000 m² built-up area. Mexico D.F. - Mexico 1992 - 1993 SERLIPSA

NAVY MINISTRY

Project for warehouses. Callao 1991

Casamatas project for the Paita Naval Station. Piura 1988

Technical report for construction of the Meliá Conchal resort. Santo Domingo - Dominican Republic 1991

GME

Design and installations project of Los Nogales building for GME. Lima 1988

Project management and supervision of the expansion of the Meliá Bávaro. Stage II, restaurant, main kitchen, roads, etc. 6.714 m² built-up area. Santo Domingo - Dominican Republic 1993 – 1994

BANCO DE CRÉDITO DEL PERÚ

New headquarters reception. La Molina - Lima 1988 GME

Project and design of the Jacinto Lara y Alfredo Salazar building. Lima 1988

EMPRESA MINERA ISCAYCRUZ

Surveying of the ore concentrate conduction line (mine duct) of the Iscaycruz Mining Industrial Complex project. Lima 1994 MINERA DEL SUR

Detail engineering for construction of the Funsur tin smelter project. Ica - Peru 1994

INVERSIONES CORALILLO

Project management and supervision of construction of the Iberostar Bávaro Resort. Stage I, 69 bungalows, 550 rooms, 94.310 m² built-up area. Santo Domingo - Dominican Republic 1993 – 1994

FÁBRICA TEXTIL PIURA

Structural project of partition wall. Lima 1988

EMPRESA NACIONAL

Supervision of remodeling and transformation of the San Antonio Abad del Cusco Seminar into a fivestar hotel, 138 rooms, 5.963.09 m² built-up area. Cusco - Peru 1987 ESCUELA NAVAL DEL PERÚ

Supervision of Stage II of the Unanue building of the Peruvian Navy School. La Punta - Callao 1986

MACROSA

MINISTRY OF AERONAUTICS

Residential compound project at Fundo Tejada. Lima 1985

Residential compound project for La Joya Air Force Base. Arequipa 1979

INMOBILIARIA LIMA CAMANÁ

Project and supervision of Paseo de la República shopping center, Block A, Stage I. Lima 1984 MACHU PICCHU HYDROELECTRIC PLANT

FEBAN

Economical housing project in Puno, Juliaca and Ayaviri for Banco de la Nación. Puno 1986

GRUPO SOL - MELIÁ HOTELES

BANCO DE CRÉDITO DEL PERÚ

CORPORACIÓN MINERA NOR PERÚ

Project management and supervision of expansion o f the Iberostar Bávaro Resort. Stage I, 38 bungalows, spa, lake front restaurant, swimming pool and other hotel facilities, 22.698 m²built-up area. Santo Domingo - Dominican Republic 1993

Assessment and functional evaluation of enginenering and maintenance division. La Molina headquarters. Lima 1988

Detail engineering of the intermediate tailings dike of Quiruvilca, Stage I and II. La Libertad - Peru 1985 – 1986

Bridge over the Vilcanota River for expansion of the hydroelectric plant. Cusco 1984 SOUTHERN PERÚ COPPER

SHOUGANG HIERRO PERÚ

GRUPO SOL - MELIÁ HOTELES

Final design of structures and facilities of Hotel Sol de Plata. 220 rooms. Santo Domingo - Dominican Republic 1992 – 1993

BANCO DE CRÉDITO DEL PERÚ

CENTRO DEL PERÚ

Parking area reception. La Molina. Lima 1988

Basic and detail engineering of the zinc calcine pneumatic transportation and storage project of Centromin Perú. Lima 1985

FÁBRICA TEXTIL TREN S.A.

New administrative offices project. Lima 1987 ANTAMINA MINE, PERU

Basic and detail engineering for the Cuajone concentrating plant expansion project. Moquegua - Peru 1984 – 1985 EMPRESA MINERA ISCAYCRUZ

EMPRESA MINERA DEL

Engineering project for construction of the mine water plant of Centromin Perú. Pasco - Peru 1979 – 1980

PROMOTORA Y CONSTRUCTORA

CORPORATION

Detail engineering of the milling I and II closed-crcuit project of the Shougang concentrating plant. circuito cerrado de moliendas I y II. Ica 1994

DEL SUR S.A.

SOCIEDAD DE BENEFICENCIA

DE TURISMO S.A

INVERSIONES SKALIBUR

GME

Structural project of the Playa Real building for GME. Lima 1994

167

ASOCIACIÓN EPN GYM S.A.

GRUPO SOL - MELIÁ HOTELES

Building air conditioning project advisory. Lima. 1994

Engineering and Construction

Basic and detail engineering for construction of the Iscaycruz Mining Industrial Complex project. Lima - Peru 1983 – 1984 BANCO LATINO

Supervision of the principal office expansion. Lima 1983


166

80 YEARS

New horizons, new challenges

Inversiones Coralillo

INPE

PETROPERÚ

Project management and supervision of construction of the Iberostar Dominicana resort Stage II, 28 bungalows of 12 rooms each, 28.600 m² built-up area Santo Domingo - Dominican Republic 1994 – 1995

Supervision of construction of a new penitentiary establishment in Ayacucho. Ayacucho 1994

Supervision of repair of the building windows. Lima 1992

GRUPO SOL - MELIÁ HOTELES

Financial audit for San Isidro office. Lima 1992

MINERA YANACOCHA

Detail engineering of the leaching pads project. Cajamarca 1994 – 1995 BANCO DEL LIBERTADOR

Feasibility study of the Centro Aéreo Comercial project. Callao 1994

BANCO DE CRÉDITO DEL PERÚ

Supervision of the Bávaro commercial compound, commercial establishments, discotheque, exterior areas and other hotel facilities, 10.000 m² built-up area. Supervision of the hotel apartment compound. Includes apartments, swimming pools, outdoor facilities, 3.200 m² total area. Santo Domingo - Dominican Republic 1993 – 1994

ASOCIACIÓN EPN GYM S.A. CONSTRUCTORA ROCA, S.A.

Technical advisory for construction the Four Seasons Reforma hotel, 240 rooms, 45.000 m² built-up area. Mexico D.F. - Mexico 1992

GRUPO CARSA

Grupo Sol - MeliÁ Hoteles

EMAPE

MINERA VOLCAN

COMPAÑÍA CERVECERA

CONSTRUCTORA ROCA S.A.

Project management and supervision of construction of the Meliá Bávaro resort, 2 presidential bungalows, 53 suite bungalows, 82-room hotel, 75.000 m² built-up area. Santo Domingo - Dominican Republic 1990 – 1992

Supervision of rehabilitation of Av. Las Lomas, Gran Pajaten. Lima 1987

Detail engineering of the hoisting machine for the Huaripampa tunnel shaft personnel. Lima - Peru 1985

Administrative, social and services complex. Arequipa 1982

DE HUANCAYO

SHERATON HOTEL CHAIN

EMPRESA MINERA

Multifamily residential project and nursing home. Junín 1987

Supervision of remodeling of the Koricancha restaurant and floors 16, 17 and 18. 3.450 m² built-up area. Lima - Peru 1985

DEL CENTRO DEL PERÚ

Supervision and quality control for construction the Four Seasons Reforma hotel. 240 rooms, 45.000 m² built-up area. Mexico D.F. - Mexico 1992 - 1993 SERLIPSA

NAVY MINISTRY

Project for warehouses. Callao 1991

Casamatas project for the Paita Naval Station. Piura 1988

Technical report for construction of the Meliá Conchal resort. Santo Domingo - Dominican Republic 1991

GME

Design and installations project of Los Nogales building for GME. Lima 1988

Project management and supervision of the expansion of the Meliá Bávaro. Stage II, restaurant, main kitchen, roads, etc. 6.714 m² built-up area. Santo Domingo - Dominican Republic 1993 – 1994

BANCO DE CRÉDITO DEL PERÚ

New headquarters reception. La Molina - Lima 1988 GME

Project and design of the Jacinto Lara y Alfredo Salazar building. Lima 1988

EMPRESA MINERA ISCAYCRUZ

Surveying of the ore concentrate conduction line (mine duct) of the Iscaycruz Mining Industrial Complex project. Lima 1994 MINERA DEL SUR

Detail engineering for construction of the Funsur tin smelter project. Ica - Peru 1994

INVERSIONES CORALILLO

Project management and supervision of construction of the Iberostar Bávaro Resort. Stage I, 69 bungalows, 550 rooms, 94.310 m² built-up area. Santo Domingo - Dominican Republic 1993 – 1994

FÁBRICA TEXTIL PIURA

Structural project of partition wall. Lima 1988

EMPRESA NACIONAL

Supervision of remodeling and transformation of the San Antonio Abad del Cusco Seminar into a fivestar hotel, 138 rooms, 5.963.09 m² built-up area. Cusco - Peru 1987 ESCUELA NAVAL DEL PERÚ

Supervision of Stage II of the Unanue building of the Peruvian Navy School. La Punta - Callao 1986

MACROSA

MINISTRY OF AERONAUTICS

Residential compound project at Fundo Tejada. Lima 1985

Residential compound project for La Joya Air Force Base. Arequipa 1979

INMOBILIARIA LIMA CAMANÁ

Project and supervision of Paseo de la República shopping center, Block A, Stage I. Lima 1984 MACHU PICCHU HYDROELECTRIC PLANT

FEBAN

Economical housing project in Puno, Juliaca and Ayaviri for Banco de la Nación. Puno 1986

GRUPO SOL - MELIÁ HOTELES

BANCO DE CRÉDITO DEL PERÚ

CORPORACIÓN MINERA NOR PERÚ

Project management and supervision of expansion o f the Iberostar Bávaro Resort. Stage I, 38 bungalows, spa, lake front restaurant, swimming pool and other hotel facilities, 22.698 m²built-up area. Santo Domingo - Dominican Republic 1993

Assessment and functional evaluation of enginenering and maintenance division. La Molina headquarters. Lima 1988

Detail engineering of the intermediate tailings dike of Quiruvilca, Stage I and II. La Libertad - Peru 1985 – 1986

Bridge over the Vilcanota River for expansion of the hydroelectric plant. Cusco 1984 SOUTHERN PERÚ COPPER

SHOUGANG HIERRO PERÚ

GRUPO SOL - MELIÁ HOTELES

Final design of structures and facilities of Hotel Sol de Plata. 220 rooms. Santo Domingo - Dominican Republic 1992 – 1993

BANCO DE CRÉDITO DEL PERÚ

CENTRO DEL PERÚ

Parking area reception. La Molina. Lima 1988

Basic and detail engineering of the zinc calcine pneumatic transportation and storage project of Centromin Perú. Lima 1985

FÁBRICA TEXTIL TREN S.A.

New administrative offices project. Lima 1987 ANTAMINA MINE, PERU

Basic and detail engineering for the Cuajone concentrating plant expansion project. Moquegua - Peru 1984 – 1985 EMPRESA MINERA ISCAYCRUZ

EMPRESA MINERA DEL

Engineering project for construction of the mine water plant of Centromin Perú. Pasco - Peru 1979 – 1980

PROMOTORA Y CONSTRUCTORA

CORPORATION

Detail engineering of the milling I and II closed-crcuit project of the Shougang concentrating plant. circuito cerrado de moliendas I y II. Ica 1994

DEL SUR S.A.

SOCIEDAD DE BENEFICENCIA

DE TURISMO S.A

INVERSIONES SKALIBUR

GME

Structural project of the Playa Real building for GME. Lima 1994

167

ASOCIACIÓN EPN GYM S.A.

GRUPO SOL - MELIÁ HOTELES

Building air conditioning project advisory. Lima. 1994

Engineering and Construction

Basic and detail engineering for construction of the Iscaycruz Mining Industrial Complex project. Lima - Peru 1983 – 1984 BANCO LATINO

Supervision of the principal office expansion. Lima 1983


New horizons, new challenges

INFRASTRUCTURE

169

A firm formed by Graña y Montero, JJC and Besco. It was awarded the first international public tender called by the Peruvian government to operate, build, and provide maintenance to the road infrastructure of the Ancón – Huacho – Pativilca section of the North Pan-American Highway, 200 km, in two stages. Lima 2003 – 2028 2003 - 2028

A firm formed by Graña y Montero and JJC, with the commitment to rehabilitate, implement, operate and maintain Section 1 of the IIRSA South Highway comprised between the Port of San Juan de Marcona in Ica and Urcos, where it connects with Section 2. The concession covers 757 kilometers of highway and has been awarded for 25 years as from October 2007. At present, it is owned 100% by Graña y Montero. Nazca - Cusco 2007 - 2032

HIGHWAY CONCESSION

Formed by Graña y Montero and JJC to construct, operate and maintain the 78-kilometer section between junction 1B and Canchaque in Piura, for a term of 15 years as from completion of the works. This road is the first of the “Costa-Sierra” (“Coast-Andes”) program (penetration roads to connect production centers) to be delivered in concession. At present, it is owned 100% by Graña y Montero. Piura 2010 - 2025

Formed by Graña y Montero (75%) and Ferrovías (25%), it engages in operation of Line One of the Lima Metro, which provides a comprehensive transportation service to improve the quality of life of its clients and contribute to development of the city. Line One in its entirety is 34 kilometers long and has 26 stations.

At present, the firm operates 22.20 kilometers and 16 stations, which pertain to Section 1 of Line One. The remaining 11.80 kilometers and 10 stations are under construction and pertain to Section 2, which will start operating in 2015. In 2012, new trains were purchased from Alston of France. Villa El Salvador - San Juan de Lurigancho (Lima) 2011 – 2041

In February 2011, Concesionaria La Chira, formed with Acciona Agua from Spain, executed the contract for design, funding, construction and operation of the Wastewater Treatment Plant of La Chira, south of Lima, for 30 years. On may 2 2013, La Chira obtained the permit to start construction of the PTAR. Chorrillos (Lima).


New horizons, new challenges

INFRASTRUCTURE

169

A firm formed by Graña y Montero, JJC and Besco. It was awarded the first international public tender called by the Peruvian government to operate, build, and provide maintenance to the road infrastructure of the Ancón – Huacho – Pativilca section of the North Pan-American Highway, 200 km, in two stages. Lima 2003 – 2028 2003 - 2028

A firm formed by Graña y Montero and JJC, with the commitment to rehabilitate, implement, operate and maintain Section 1 of the IIRSA South Highway comprised between the Port of San Juan de Marcona in Ica and Urcos, where it connects with Section 2. The concession covers 757 kilometers of highway and has been awarded for 25 years as from October 2007. At present, it is owned 100% by Graña y Montero. Nazca - Cusco 2007 - 2032

HIGHWAY CONCESSION

Formed by Graña y Montero and JJC to construct, operate and maintain the 78-kilometer section between junction 1B and Canchaque in Piura, for a term of 15 years as from completion of the works. This road is the first of the “Costa-Sierra” (“Coast-Andes”) program (penetration roads to connect production centers) to be delivered in concession. At present, it is owned 100% by Graña y Montero. Piura 2010 - 2025

Formed by Graña y Montero (75%) and Ferrovías (25%), it engages in operation of Line One of the Lima Metro, which provides a comprehensive transportation service to improve the quality of life of its clients and contribute to development of the city. Line One in its entirety is 34 kilometers long and has 26 stations.

At present, the firm operates 22.20 kilometers and 16 stations, which pertain to Section 1 of Line One. The remaining 11.80 kilometers and 10 stations are under construction and pertain to Section 2, which will start operating in 2015. In 2012, new trains were purchased from Alston of France. Villa El Salvador - San Juan de Lurigancho (Lima) 2011 – 2041

In February 2011, Concesionaria La Chira, formed with Acciona Agua from Spain, executed the contract for design, funding, construction and operation of the Wastewater Treatment Plant of La Chira, south of Lima, for 30 years. On may 2 2013, La Chira obtained the permit to start construction of the PTAR. Chorrillos (Lima).


170

80 AÑOS

Nuevos horizontes, nuevos retos

COMPAÑÍA LOGÍSTICA DE

LOGÍSTICA DE QUÍMICOS DEL SUR

Provides sodium hydrosulphite (NASH) reception, storage and dispatch services at the Port of Matarani. The firm is formed by Santa Sofía Puertos and Oiltanking Andina, which is in turned formed by Graña y Montero Petrolera S.A. and Oiltanking. 2007 to date PARIÑAS GAS PLANT

Natural gas liquids separation plant located in Talara. Up to 44 MMPCD associated natural gas processing, with an average output of 1.200 barrels/day of liquid petroleum gas (LPG) and 300 barrels of HAS solvent for the domestic market. 2006 to date

WATER WELL

BLOCK XIV OIL PROSPECTING

OIL WELL DRILLING

Drilling services for own and third-party oil wells with two drilling equipment: Equipment No. 10 for up to 14.000 feet deep. Equipment No. 08 for up to 6.000 feet deep. Piura - Talara 1993 to date

HIDROCARBUROS BOLIVIANA

DRILLING SERVICE

CONTRACT

A company created in Bolivia by GMP and Oiltanking GmbH, in the context of privatization by the Bolivian government of the of the Multi-Purpose Pipeline System for liquid fuel transportation (15 kilometers of pipes) and of the liquid fuel reception, storage and dispatch plants (a total of 19 plants). Liquid fuels handled were LPG, gasoline, diesel and turbo A-1. The multi-purpose pipeline system transported 20.000 barrels per day and the storage plant dispatched about 40.000 barrels per day until the year 2008, when the Bolivian government expropriated the assets and took over the business once again through YPFB. Bolivia 2000 – 2008

Purchase of up to 600 meters-depth drilling equipment. 2000 to date

Drilling of 2 prospecting wells. Tumbes 1998 - 2004

CONSORCIO TERMINALES

BLOCK XI OPERATION CONTRACT

Consorcio Terminales, formed by GMP and the German company Oiltanking GmbH, started liquid hydrocarbon logistic operations on the Peruvian coast and Andes under a contract with Petroperú for operation and maintenance of the Eten, Salaverry, Chimbote, Supe, Pisco, Mollendo, Ilo, Juliaca and Cusco terminals. Services provided are fuel reception, storage and dispatch. 1998 to date

Operation and maintenance services provided to Petroperú. 1996 - 1997

LOGISTIC TRANSPORTATION CONTRACT WITH YPFB

Diesel reception, storage, dispatch, and ground transportation. Reception of 12 vessels/year at the Ilo Terminal and transportation to Bolivia. 2004 - 2008 OPERATION AND EMERGENCY RESPONSE CONTRACT FOR THE PISCO MARITIME TERMINAL - CAMISEA

Operated by Oiltanking Andina Services (OTAS). Has facilities for loading propane and refrigerated butane, naphtha and diesel. Additionally, it provides comprehensive towing services, mooring support barges and transportation of personnel exclusively dedicated to the operation. 2004 to date.

PARIÑAS GAS PLANT

LAGUNA ZAPOTAL DRILLING SERVICE CONTRACT

Oil well drilling services for Petroperú / Perez Companc. Piura - Talara 1985 – 1988 MECHANICAL MAINTENANCE AND PRODUCTION OF THE LAGUNA ZAPOTAL - PETROPERÚ /

BLOCK I DEVELOPMENT

PEREZ COMPANC. FIELD CONTRACT

BLOCK V HYDROCARBON

CONTRACT

DEVELOPMENT CONTRACT

Hydrocarbon development over an extension of 6.943 hectares. Output of 1.500 barrels of oil per day from 188 production wells and 5.00 MMSCFD of natural gas. Piura - Talara 1991 – 2021

Operation of production and maintenance of the Laguna Zapotal oil fields, with an approximate production of 12.000 barrels per day. Piura - Talara 1985 – 1990

Hydrocarbon development over an extension of 9.026 hectares in the Districts of Los Órganos and Máncora, in the Department of Piura. Output of 147 barrels of oil per day, approximately, from 48 production wells. Piura 1993 - 2023

CARPITAS-ZORRITOS BLOCK OIL PROSPECTING CONTRACT

Hydrocarbon development over an extension of 106.000 hectares in the Department of Tumbes, in partnership with the Mexican firm Mexpetrol S.A. of C.V. The area included the fields of Zorritos, Copé, Punta Bravo, Carpitas West and Carpitas East. 2D seismics conducted on 300 kilometers and 3 prospecting wells drilled. Tumbes - Zorritos 1990 - 1996

INTERNATIONAL MULTIMODAL

INFRAESTRUCTURA

BLOCK I

171


170

80 AÑOS

Nuevos horizontes, nuevos retos

COMPAÑÍA LOGÍSTICA DE

LOGÍSTICA DE QUÍMICOS DEL SUR

Provides sodium hydrosulphite (NASH) reception, storage and dispatch services at the Port of Matarani. The firm is formed by Santa Sofía Puertos and Oiltanking Andina, which is in turned formed by Graña y Montero Petrolera S.A. and Oiltanking. 2007 to date PARIÑAS GAS PLANT

Natural gas liquids separation plant located in Talara. Up to 44 MMPCD associated natural gas processing, with an average output of 1.200 barrels/day of liquid petroleum gas (LPG) and 300 barrels of HAS solvent for the domestic market. 2006 to date

WATER WELL

BLOCK XIV OIL PROSPECTING

OIL WELL DRILLING

Drilling services for own and third-party oil wells with two drilling equipment: Equipment No. 10 for up to 14.000 feet deep. Equipment No. 08 for up to 6.000 feet deep. Piura - Talara 1993 to date

HIDROCARBUROS BOLIVIANA

DRILLING SERVICE

CONTRACT

A company created in Bolivia by GMP and Oiltanking GmbH, in the context of privatization by the Bolivian government of the of the Multi-Purpose Pipeline System for liquid fuel transportation (15 kilometers of pipes) and of the liquid fuel reception, storage and dispatch plants (a total of 19 plants). Liquid fuels handled were LPG, gasoline, diesel and turbo A-1. The multi-purpose pipeline system transported 20.000 barrels per day and the storage plant dispatched about 40.000 barrels per day until the year 2008, when the Bolivian government expropriated the assets and took over the business once again through YPFB. Bolivia 2000 – 2008

Purchase of up to 600 meters-depth drilling equipment. 2000 to date

Drilling of 2 prospecting wells. Tumbes 1998 - 2004

CONSORCIO TERMINALES

BLOCK XI OPERATION CONTRACT

Consorcio Terminales, formed by GMP and the German company Oiltanking GmbH, started liquid hydrocarbon logistic operations on the Peruvian coast and Andes under a contract with Petroperú for operation and maintenance of the Eten, Salaverry, Chimbote, Supe, Pisco, Mollendo, Ilo, Juliaca and Cusco terminals. Services provided are fuel reception, storage and dispatch. 1998 to date

Operation and maintenance services provided to Petroperú. 1996 - 1997

LOGISTIC TRANSPORTATION CONTRACT WITH YPFB

Diesel reception, storage, dispatch, and ground transportation. Reception of 12 vessels/year at the Ilo Terminal and transportation to Bolivia. 2004 - 2008 OPERATION AND EMERGENCY RESPONSE CONTRACT FOR THE PISCO MARITIME TERMINAL - CAMISEA

Operated by Oiltanking Andina Services (OTAS). Has facilities for loading propane and refrigerated butane, naphtha and diesel. Additionally, it provides comprehensive towing services, mooring support barges and transportation of personnel exclusively dedicated to the operation. 2004 to date.

PARIÑAS GAS PLANT

LAGUNA ZAPOTAL DRILLING SERVICE CONTRACT

Oil well drilling services for Petroperú / Perez Companc. Piura - Talara 1985 – 1988 MECHANICAL MAINTENANCE AND PRODUCTION OF THE LAGUNA ZAPOTAL - PETROPERÚ /

BLOCK I DEVELOPMENT

PEREZ COMPANC. FIELD CONTRACT

BLOCK V HYDROCARBON

CONTRACT

DEVELOPMENT CONTRACT

Hydrocarbon development over an extension of 6.943 hectares. Output of 1.500 barrels of oil per day from 188 production wells and 5.00 MMSCFD of natural gas. Piura - Talara 1991 – 2021

Operation of production and maintenance of the Laguna Zapotal oil fields, with an approximate production of 12.000 barrels per day. Piura - Talara 1985 – 1990

Hydrocarbon development over an extension of 9.026 hectares in the Districts of Los Órganos and Máncora, in the Department of Piura. Output of 147 barrels of oil per day, approximately, from 48 production wells. Piura 1993 - 2023

CARPITAS-ZORRITOS BLOCK OIL PROSPECTING CONTRACT

Hydrocarbon development over an extension of 106.000 hectares in the Department of Tumbes, in partnership with the Mexican firm Mexpetrol S.A. of C.V. The area included the fields of Zorritos, Copé, Punta Bravo, Carpitas West and Carpitas East. 2D seismics conducted on 300 kilometers and 3 prospecting wells drilled. Tumbes - Zorritos 1990 - 1996

INTERNATIONAL MULTIMODAL

INFRAESTRUCTURA

BLOCK I

171


New horizons, new challenges

173

Real Estate

LOS PARQUES DE PIURA CONDOMINIUM

Residential compounds consisting of 2.692 housing units distributed in 4 and 5 story buildings; 900 parking spaces. Piura - Piura 2013 EDIFICIO EL SOL 450

Sixteen-story and 40 flat and duplex apartments. Lima - Barranco 2013 LOS PARQUES DE SAN MARTÍN DE PORRES

Multifamily housing of 18 buildings of 5, 10 and 12 stories. Has 5.000 m² of parks and green areas. Lima - San Martín de Porres 2012 to date. EDIFICIO PEZET

Building of 15 floors of up to 409 m2. Lima - San Isidro 2012 to date CIPRESES

Multifamily residential building of 133 apartments, 3 towers and 4 underground levels. Interior gardens, temperate swimming pool, gymnasium and one multiple purpose hall. Lima - San Isidro 2011 – 2013

LOS PARQUES DE VILLA EL SALVADOR RESIDENTIAL COMPOUND

LOS PARQUES DE CARABAYLLO

JAVIER PRADO 200 BUILDING

GOLF MILLENIUM

RESIDENTIAL COMPOUND

Two 15-story towers with flat and duplex apartments. 141 parking spaces. Lima - Magdalena del Mar 2009 – 2010

Exclusive apartments overlooking the golf course. Four towers with 1 building of 18 and 28 floors and 2 buildings of 24 floors. 1.700m² of green areas. Lima - San Isidro 2007 – 2009

Multifamily housing of 1.200 apartments in 100 3-story buildings. Developed in 4 stages of 300 apartments each. Lima - Carabayllo 2010 to date PARQUE GAREZON CONDOMINIUM

Multifamily housing consisting of 17 buildings of 7 floors each. Has 800 m² of green area with playground and social area. Lima - Cercado 2009 – 2011

LOS PARQUES DE VILLA EL

RESIDENCIAL PARQUE CENTRAL

SALVADOR RESIDENTIAL

Multifamily housing with a new residential club concept, 2.112 apartments in 21 buildings of 12 and 15 stories each. 15.000 m2 of green areas and common entertainment areas. Cercado - Lima 2009 to date

COMPOUND

Multifamily housing of 660 apartments Lima - Villa El Salvador 2011 to date NEO 10

Multifamily housing of 3 towers of 18 and 15 floors. Lima - Miraflores 2010

MALECÓN CISNEROS 380 BUILDING

Exclusive 17-story building with privileged ocean view. Apartments of 205 m² and 230 m². 4 underground levels and storage areas. Lima - Miraflores 2009 - 2010

ALEX CIURLIZZA

Thirty-three apartments targeted at the premium segment, facing the San Isidro Golf. Flats and duplex penthouse. LOS PARQUES DE EL AGUSTINO

BALTA 1070 BUILDING

RESIDENTIAL COMPOUND

Flats of 208m² and 212 m² all overlooking the ocean and with terraces. Lima - Miraflores 2007 – 2008

Multifamily housing project of 170 5-story buildings in 11 separate condominiums. Includes 8 large parks with over 36.000m² of green areas and the first supermarket in the district. Lima - El Agustino 2007 - 2013

GOLF LOS INKAS BUILDING

Exclusive building overlooking the golf club and the building private park. Two towers with flat, duplex and penthouse apartments. Lima - Surco 2007 – 2008


New horizons, new challenges

173

Real Estate

LOS PARQUES DE PIURA CONDOMINIUM

Residential compounds consisting of 2.692 housing units distributed in 4 and 5 story buildings; 900 parking spaces. Piura - Piura 2013 EDIFICIO EL SOL 450

Sixteen-story and 40 flat and duplex apartments. Lima - Barranco 2013 LOS PARQUES DE SAN MARTÍN DE PORRES

Multifamily housing of 18 buildings of 5, 10 and 12 stories. Has 5.000 m² of parks and green areas. Lima - San Martín de Porres 2012 to date. EDIFICIO PEZET

Building of 15 floors of up to 409 m2. Lima - San Isidro 2012 to date CIPRESES

Multifamily residential building of 133 apartments, 3 towers and 4 underground levels. Interior gardens, temperate swimming pool, gymnasium and one multiple purpose hall. Lima - San Isidro 2011 – 2013

LOS PARQUES DE VILLA EL SALVADOR RESIDENTIAL COMPOUND

LOS PARQUES DE CARABAYLLO

JAVIER PRADO 200 BUILDING

GOLF MILLENIUM

RESIDENTIAL COMPOUND

Two 15-story towers with flat and duplex apartments. 141 parking spaces. Lima - Magdalena del Mar 2009 – 2010

Exclusive apartments overlooking the golf course. Four towers with 1 building of 18 and 28 floors and 2 buildings of 24 floors. 1.700m² of green areas. Lima - San Isidro 2007 – 2009

Multifamily housing of 1.200 apartments in 100 3-story buildings. Developed in 4 stages of 300 apartments each. Lima - Carabayllo 2010 to date PARQUE GAREZON CONDOMINIUM

Multifamily housing consisting of 17 buildings of 7 floors each. Has 800 m² of green area with playground and social area. Lima - Cercado 2009 – 2011

LOS PARQUES DE VILLA EL

RESIDENCIAL PARQUE CENTRAL

SALVADOR RESIDENTIAL

Multifamily housing with a new residential club concept, 2.112 apartments in 21 buildings of 12 and 15 stories each. 15.000 m2 of green areas and common entertainment areas. Cercado - Lima 2009 to date

COMPOUND

Multifamily housing of 660 apartments Lima - Villa El Salvador 2011 to date NEO 10

Multifamily housing of 3 towers of 18 and 15 floors. Lima - Miraflores 2010

MALECÓN CISNEROS 380 BUILDING

Exclusive 17-story building with privileged ocean view. Apartments of 205 m² and 230 m². 4 underground levels and storage areas. Lima - Miraflores 2009 - 2010

ALEX CIURLIZZA

Thirty-three apartments targeted at the premium segment, facing the San Isidro Golf. Flats and duplex penthouse. LOS PARQUES DE EL AGUSTINO

BALTA 1070 BUILDING

RESIDENTIAL COMPOUND

Flats of 208m² and 212 m² all overlooking the ocean and with terraces. Lima - Miraflores 2007 – 2008

Multifamily housing project of 170 5-story buildings in 11 separate condominiums. Includes 8 large parks with over 36.000m² of green areas and the first supermarket in the district. Lima - El Agustino 2007 - 2013

GOLF LOS INKAS BUILDING

Exclusive building overlooking the golf club and the building private park. Two towers with flat, duplex and penthouse apartments. Lima - Surco 2007 – 2008


174

80 YEARS

New horizons, new challenges

NICOLÁS DE RIVERA BUILDING

REFORMA 2503 BUILDING

BARRANCO III BUILDING

PLAZA SANTA FE PROJECT

Seven-story building, 11 3- and 4-bedroom apartments. Lima - San Isidro 1999 – 2000

Total area built up. Residential 5-story building, one apartment per floor, 6 parking spaces and 1 storehouse. 2.460.19 m2 Mexico – Mexico City 1996 - 1997

Two 5-story buildings, 22 apartments, flats and duplex. Lima-Barranco 1997

Forty-eight apartments in 2 residential buildings, 2 penthouses on an area of 18.713 m². Mexico - Mexico D.F 1993 - 1995

RINCÓN DEL BOSQUE BUILDING

Twenty-one apartments, 1 penthouse, 2 parking levels, 10.857.84 m² built-up area Mexico - Mexico D.F. 1998 – 2000 SANTA TERESA

660 economical apartments, 24 buildings of 5 stories each, 37.304.85 m2 built up. Mexico - Mexico D.F. 1998 – 1999

Blas Cerdeña Building

BLAS CERDEÑA BUILDING LOS PARQUES DE EL AGUSTINO I

RESIDENCIAL SAN MARTÍN

3.300 housing units, commercial areas, educational and community services. Area: 224.000 m2. Lima - El Agustino 2007 – 2010

Building of 20 apartments in 6 levels. Lima - Magdalena 2006

BALTA 1070 BUILDING

Seventeen-story residential building, 4 underground levels. Area: 10.800m². Lima - Miraflores 2007 – 2008

BALTAMAR BUILDING

Two buildings, 17 stories each, of 95m2 flats. Lima - Miraflores 2005

Seven-story building with 5 370 m² flats and 1 duplex penthouse. Lima - San Isidro 1998

LOS BOSQUES DE LA PLANICIE

A condominium of 43.000 m² consisting of 42 houses of 270 m² and 320 m², with common areas. Lima - La Molina 1995 - 1996 BARRANCO I BUILDING

Residential building facing the ocean, consisting of 2 buildings of 15 apartments. Lima - Barranco 1994 BARRANCO II BUILDING

Eight-story building overlooking the ocean, 4.026 m² built-up area. 12 luxury apartments. Lima - Barranco 1994 - 1995

DALMACIA BUILDING

Eight-story apartment building Lima - Miraflores 2004 - 2005

PLAYA KONTIKI BUILDING

Eight-story apartment building. Area: 7.000 m2. Lima - Punta Hermosa 2007

LADERAS DE MELGAREJO

33 buildings with a total of 252 apartments, 76 m² each. Lima - La Molina 2004 - 2006

BOLOGNESI 364 CONDOMINIUM

Three buildings, 55 apartments and underground parking. Area: 6.800 m2. Lima - Miraflores 2006 - 2007

Two towers of 52 and 51 apartments, 14 stories each. Lima - Jesús María 2004 - 2005

LAS TERRAZAS DE SAN FELIPE

PASEO DE LA REPÚBLICA

Three residential towers of 16 and20 stories, 136 parking spaces. Lima - Jesús María 2006 – 2007

Real Estate

CAMPO DE MARTE BUILDING

CONDOMINIUM

Seven towers, 149 apartments, 21 parking spaces. Lima - Surquillo 2003 – 2004 Baltamar Building

EDIFICIO BARRANCO IV

Seven-story building of 9 apartments and average 273 m² areas. Lima - Barranco 1998

JACINTO LARA BUILDING

Ten-apartment building, the back opening to a park. Lima - San Isidro 1988

SAN GABRIEL 421 BUILDING

Fourteen-story building of 21 apartments, with areas up to 350 m². EL PARQUE DE MONTERRICO

ALFREDO SALAZAR BUILDING

Eight-apartment building, the back opening to a park. Lima - San Isidro 1989 – 1990

CONDOMINIUM

Eight 5-story buildings, 60 apartments overlooking 2.000 m² private park. Lima - Santiago de Surco 1994 – 1995 GME

Structural project for the Playa Real building for GME. Lima 1994

LOS NOGALES BUILDING

Four-story and 5-apartment building with top quality finishings. Building of 1.922.75 m². Lima - San Isidro 1987

175


174

80 YEARS

New horizons, new challenges

NICOLÁS DE RIVERA BUILDING

REFORMA 2503 BUILDING

BARRANCO III BUILDING

PLAZA SANTA FE PROJECT

Seven-story building, 11 3- and 4-bedroom apartments. Lima - San Isidro 1999 – 2000

Total area built up. Residential 5-story building, one apartment per floor, 6 parking spaces and 1 storehouse. 2.460.19 m2 Mexico – Mexico City 1996 - 1997

Two 5-story buildings, 22 apartments, flats and duplex. Lima-Barranco 1997

Forty-eight apartments in 2 residential buildings, 2 penthouses on an area of 18.713 m². Mexico - Mexico D.F 1993 - 1995

RINCÓN DEL BOSQUE BUILDING

Twenty-one apartments, 1 penthouse, 2 parking levels, 10.857.84 m² built-up area Mexico - Mexico D.F. 1998 – 2000 SANTA TERESA

660 economical apartments, 24 buildings of 5 stories each, 37.304.85 m2 built up. Mexico - Mexico D.F. 1998 – 1999

Blas Cerdeña Building

BLAS CERDEÑA BUILDING LOS PARQUES DE EL AGUSTINO I

RESIDENCIAL SAN MARTÍN

3.300 housing units, commercial areas, educational and community services. Area: 224.000 m2. Lima - El Agustino 2007 – 2010

Building of 20 apartments in 6 levels. Lima - Magdalena 2006

BALTA 1070 BUILDING

Seventeen-story residential building, 4 underground levels. Area: 10.800m². Lima - Miraflores 2007 – 2008

BALTAMAR BUILDING

Two buildings, 17 stories each, of 95m2 flats. Lima - Miraflores 2005

Seven-story building with 5 370 m² flats and 1 duplex penthouse. Lima - San Isidro 1998

LOS BOSQUES DE LA PLANICIE

A condominium of 43.000 m² consisting of 42 houses of 270 m² and 320 m², with common areas. Lima - La Molina 1995 - 1996 BARRANCO I BUILDING

Residential building facing the ocean, consisting of 2 buildings of 15 apartments. Lima - Barranco 1994 BARRANCO II BUILDING

Eight-story building overlooking the ocean, 4.026 m² built-up area. 12 luxury apartments. Lima - Barranco 1994 - 1995

DALMACIA BUILDING

Eight-story apartment building Lima - Miraflores 2004 - 2005

PLAYA KONTIKI BUILDING

Eight-story apartment building. Area: 7.000 m2. Lima - Punta Hermosa 2007

LADERAS DE MELGAREJO

33 buildings with a total of 252 apartments, 76 m² each. Lima - La Molina 2004 - 2006

BOLOGNESI 364 CONDOMINIUM

Three buildings, 55 apartments and underground parking. Area: 6.800 m2. Lima - Miraflores 2006 - 2007

Two towers of 52 and 51 apartments, 14 stories each. Lima - Jesús María 2004 - 2005

LAS TERRAZAS DE SAN FELIPE

PASEO DE LA REPÚBLICA

Three residential towers of 16 and20 stories, 136 parking spaces. Lima - Jesús María 2006 – 2007

Real Estate

CAMPO DE MARTE BUILDING

CONDOMINIUM

Seven towers, 149 apartments, 21 parking spaces. Lima - Surquillo 2003 – 2004 Baltamar Building

EDIFICIO BARRANCO IV

Seven-story building of 9 apartments and average 273 m² areas. Lima - Barranco 1998

JACINTO LARA BUILDING

Ten-apartment building, the back opening to a park. Lima - San Isidro 1988

SAN GABRIEL 421 BUILDING

Fourteen-story building of 21 apartments, with areas up to 350 m². EL PARQUE DE MONTERRICO

ALFREDO SALAZAR BUILDING

Eight-apartment building, the back opening to a park. Lima - San Isidro 1989 – 1990

CONDOMINIUM

Eight 5-story buildings, 60 apartments overlooking 2.000 m² private park. Lima - Santiago de Surco 1994 – 1995 GME

Structural project for the Playa Real building for GME. Lima 1994

LOS NOGALES BUILDING

Four-story and 5-apartment building with top quality finishings. Building of 1.922.75 m². Lima - San Isidro 1987

175


New horizons, new challenges

177

SERVICES

MINING, OIL AND ENERGY MINERA CERRO VERDE

Virtualization solution for the “mine in box” project. Lima 2013 COMPAÑÍA MINERA BARRICK MISQUICHILCA S.A

Help desk outsourcing for offices of the Pierina Mine, Lagunas Norte Mine, and Barrick headquarters in Lima, supporting 1.221 users nationwide. Lima 2013 – 2016 Help desk outsourcing on a regional level for Peru Argentina, Chile and Colombia, providing support to 3.500 users. Lima 2010 FERREYROS

Outsourcing of applications, testing service covering from version control to putting into production. Lima 2012 CAM

Electronic mail and directory service. Lima 2012 Help desk outsourcing for its Peru, Chile, Brazil and Colombia offices, supporting 1.200 users. Electronic mail and active directory services. Lima 2011 – 2013 SAVIA

Help desk outsourcing, which includes on-site and remote support, and inventory management in both Lima and the provinces. Lima 2011

Upgrading of technological infrastructure and consolidation of servers to support its three sites in Lima, Talara and Negritos in Piura. Lima 2010 REPSOL

Help desk outsourcing, on-site support, incident management, inventory control, equipment replacement and change, credit expansion, warehouse and videoconference management, computer center and nationwide server support administration to over 1.100 users. Lima 2011 - 2013

Nationwide process outsourcing – BPO of fuel and lubricant supply billing and dispatch. Lima 2010 – 2013 Help desk outsourcing upgrading. Lima 2009 Process outsourcing: nationwide fuel billing and dispatch operation and management in terminals. Lima 2007 – 2010 Process outsourcing: nationwide fuel billing and dispatch operation and management. Lima 2007 – 2010

Help desk outsourcing of hardware support, asset management, microinformatics services and life cycle maintenance. Includes support services to 1.000 users. Lima 2003 – 2009 MINERA VOLCAN

Nationwide on site and remote help desk outsourcing for 930 collaborators and 6 branches nationwide. Lima 2011


New horizons, new challenges

177

SERVICES

MINING, OIL AND ENERGY MINERA CERRO VERDE

Virtualization solution for the “mine in box” project. Lima 2013 COMPAÑÍA MINERA BARRICK MISQUICHILCA S.A

Help desk outsourcing for offices of the Pierina Mine, Lagunas Norte Mine, and Barrick headquarters in Lima, supporting 1.221 users nationwide. Lima 2013 – 2016 Help desk outsourcing on a regional level for Peru Argentina, Chile and Colombia, providing support to 3.500 users. Lima 2010 FERREYROS

Outsourcing of applications, testing service covering from version control to putting into production. Lima 2012 CAM

Electronic mail and directory service. Lima 2012 Help desk outsourcing for its Peru, Chile, Brazil and Colombia offices, supporting 1.200 users. Electronic mail and active directory services. Lima 2011 – 2013 SAVIA

Help desk outsourcing, which includes on-site and remote support, and inventory management in both Lima and the provinces. Lima 2011

Upgrading of technological infrastructure and consolidation of servers to support its three sites in Lima, Talara and Negritos in Piura. Lima 2010 REPSOL

Help desk outsourcing, on-site support, incident management, inventory control, equipment replacement and change, credit expansion, warehouse and videoconference management, computer center and nationwide server support administration to over 1.100 users. Lima 2011 - 2013

Nationwide process outsourcing – BPO of fuel and lubricant supply billing and dispatch. Lima 2010 – 2013 Help desk outsourcing upgrading. Lima 2009 Process outsourcing: nationwide fuel billing and dispatch operation and management in terminals. Lima 2007 – 2010 Process outsourcing: nationwide fuel billing and dispatch operation and management. Lima 2007 – 2010

Help desk outsourcing of hardware support, asset management, microinformatics services and life cycle maintenance. Includes support services to 1.000 users. Lima 2003 – 2009 MINERA VOLCAN

Nationwide on site and remote help desk outsourcing for 930 collaborators and 6 branches nationwide. Lima 2011


178

80 YEARS

MINERA NORSEMONT

COMPAÑÍA MINERA ANTAMINA S.A

Implementation of data center for the Fortuna camp and wiring and structuring service for 192 network points to keep its headquarters connected with the city of Lima to facilitate remote monitoring of its facilities. Lima 2011

Implementation of the Microsoft Windows Server 2008 platform. Lima 2008

FORTUNE SILVER MINES (FSM)

Technology outsourcing, SAP platform hosting, comprehensive infrastructure management, implementation of new servers and virtualization services for operations of its three regional companies: Minería Bateas, Minera Cuscatlan of Mexico and Minera Caylloma of Arequipa. Lima 2011 – 2013 MINING, OIL AND ENERGY SOCIETY (SNMPE)

Technological infrastructure upgrading, migration of applications from a current platform on Exchange, File Server, Active Directory, SQL Server applications and consolidation of servers, virtualization, security, borderless and wireless for new headquarters. Lima 2010 ENERSUR

Help desk outsourcing nationwide, providing support to 600 users. Lima 2010 SN POWER

Technology outsourcing de: Oracle applications hosting, contingency service and communications support. Help desk outsourcing. Lima 2008 – 2013

BHP TINTAYA S.A.

Server consolidation: design and implementation of server consolidation. Lima 2006 - 2007 CEMENTOS PACASMAYO

Help desk outsourcing and server administration, technical support and assistance to 600 users. Lima 2006 - 2008

New horizons, new challenges

Technology outsourcing: hosting for the Cyzone portal, targeted to manage sales of its beauty consultants. Operation, administration and support services of its applications. Lima 2011 Technology outsourcing: hosting of the business system of the firm at our data center. Lima 2010 Outsourcing of business application services (OBAS), which involves SAP hosting services. Lima 2009

MINERA ARE S

Help desk outsourcing and server and network administration: technical support and assistance to 700 users. Lima 2006 - 2007 RED DE ENERGÍA DEL PERÚ - REP

Help desk outsourcing and server administration: technical support and assistance to 250 users. Lima 2005 - 2009 SUEZ ENERGY

Help desk outsourcing and server administration: technical support and assistance to 300 users. Lima 2004 - 2007 EGEMSA

Design and implementation of LAN / WAN communications system. Lima 2002 INDUSTRY BELCORP

Technology outsourcing: hosting of the business system of the firm for Colombia y Mexico. Lima 2013 – 2015

Regional technology outsourcing: SAP applications hosting (2.400 users) and SAP Basis support for Lima and Latin America. 2004 – 2010

DELOSI

On-site help desk outsourcing for 200 establishments in Lima and the provinces, preventive maintenance service and field management allowing to measure perception of the service in Lima and the provinces. Lima 2013 – 2015 MARATHON

Technology outsourcing: SAP Basis hosting. Lima 2013 – 2018 GYM

Remote and on-site help desk outsourcing for 3.000 users nationwide. Infrastructure upgrade, associated operation services, administration and management of such capacities. Lima 2012

179

SERVICES

UNIÓN DE CERVECERÍAS PERUANAS

SAN FERNANDO

UNIQUE

SAAB MILLER

BACKUS Y JOHNSTON S.A.A

Technology outsourcing, SAP hosting service, includes infrastructure, implementation, operation and ongoing support of selected applications. Lima 2012 – 2016

Help desk outsourcing to 2.200 users regionwide in Bolivia, Ecuador, Guatemala, Spain, Colombia, Mexico and Venezuela. Lima 2010

Software factory outsourcing for EARP SAP development in 6 countries in Latin America: Peru, Colombia, Ecuador, Bolivia, Panama, Guatemala, El Salvador and Honduras. Lima 2009

Telesales service expansion and acquisition of new infrastructure to expand its telesales call center to 500 agents in Lima and Arequipa. Lima - Arequipa 2012 Help desk outsourcing service upgrading: user service and server, network and telephone administration. Technical support and assistance to 1.500 users. Lima 2008 Help desk outsourcing: user service and server, network and telephone administration. Includes technical support and assistance services to 1.500 users. Lima 2004 - 2008 Telecommunications outsourcing: implementation of LAN – WAN communications infrastructure of plants and distributors in Lima and the provinces. Lima 2002 – 2010

Unified communications management, administration, configuration and maintenance of IP telephone system, messaging, videoconference services and nationwide contact center service. Lima 2011 – 2013 Upgrading of the software factory outsourcing service. Lima 2009 Server consolidation service. Lima 2009 Technology outsourcing: hosting, Oracle applications, help desk service, contingency service and communications support. Lima 2004 - 2012

ALICORP

Network infrastructure upgrading for the main plant, improving access to its applications, IT security, video surveillance and IP telephone service. Lima 2012 Technology outsourcing: Business warehouse, warehouse management. Lima 2007 – 2012 Technology outsourcing: SAP hosting applications (2.400 users), Lotus Notes and contingency services. Help desk outsourcing for 1.400 users. Lima 2002 – 2009

Help desk outsourcing: maintenance, support and technical assistance service to 573 users. Lima 2004 – 2009 EXSA

Unified communications, I P telephone and messaging service for its administrative offices. Lima 201 Help desk outsourcing: Technological infrastructure administration and support. Includes technical assistance to 120 users. Lima 2004 – 2009 AGROINDUSTRIAS AIB S.A

Technology outsourcing, SAP ECC 6.0 hosting implementation. Lima 2009

UNIVERSIDAD SAN IGNACIO DE LOYOLA (USIL)

A R P L TECNOLOGÍA INDUSTRIAL S.A

Unified communications, phase 4 of the project for implementation of the IP telephone system, campus wireless, and communications switch core upgrade. Lima 2012

Technology outsourcing, data center contract renewal. Lima 2009

ROCHE LABORATORIES

On-site and remote help desk outsourcing for 250 users. Incident management, change management, problem management and hardware inventory. de hardware. Lima 2011

BRITISH AMERICAN TOBACCO

Unified communications, implementation of the IP telephone service. Lima 2009

ROCHE LABORATORIES

Infrastructure, networking and technology services upgrading. Lima 2009 SN POWER

Technology outsourcing: hosting, Oracle applications, help desk service, contingency service and communications support. Lima 2008 - 2013 HONDA DEL PERÚ

Help desk outsourcing: server and network administration. Includes assistance service to 120 users. Lima 2008 – 2010 RIPLEY S.A

Development and implementation of central server and storage infrastructure. Lima 2007 FINANCOR

Consulting on physical and logical separation of its operations, to conduct operations independently, at Ripley department stores. Lima 2007 SCHLUMBERGER

Help desk outsourcing: computer center operation, technical support and assistance to 250 users. Lima 2004 – 2009

Technology outsourcing: technological infrastructure support, administration and operation. Lima 2007 – 2010


178

80 YEARS

MINERA NORSEMONT

COMPAÑÍA MINERA ANTAMINA S.A

Implementation of data center for the Fortuna camp and wiring and structuring service for 192 network points to keep its headquarters connected with the city of Lima to facilitate remote monitoring of its facilities. Lima 2011

Implementation of the Microsoft Windows Server 2008 platform. Lima 2008

FORTUNE SILVER MINES (FSM)

Technology outsourcing, SAP platform hosting, comprehensive infrastructure management, implementation of new servers and virtualization services for operations of its three regional companies: Minería Bateas, Minera Cuscatlan of Mexico and Minera Caylloma of Arequipa. Lima 2011 – 2013 MINING, OIL AND ENERGY SOCIETY (SNMPE)

Technological infrastructure upgrading, migration of applications from a current platform on Exchange, File Server, Active Directory, SQL Server applications and consolidation of servers, virtualization, security, borderless and wireless for new headquarters. Lima 2010 ENERSUR

Help desk outsourcing nationwide, providing support to 600 users. Lima 2010 SN POWER

Technology outsourcing de: Oracle applications hosting, contingency service and communications support. Help desk outsourcing. Lima 2008 – 2013

BHP TINTAYA S.A.

Server consolidation: design and implementation of server consolidation. Lima 2006 - 2007 CEMENTOS PACASMAYO

Help desk outsourcing and server administration, technical support and assistance to 600 users. Lima 2006 - 2008

New horizons, new challenges

Technology outsourcing: hosting for the Cyzone portal, targeted to manage sales of its beauty consultants. Operation, administration and support services of its applications. Lima 2011 Technology outsourcing: hosting of the business system of the firm at our data center. Lima 2010 Outsourcing of business application services (OBAS), which involves SAP hosting services. Lima 2009

MINERA ARE S

Help desk outsourcing and server and network administration: technical support and assistance to 700 users. Lima 2006 - 2007 RED DE ENERGÍA DEL PERÚ - REP

Help desk outsourcing and server administration: technical support and assistance to 250 users. Lima 2005 - 2009 SUEZ ENERGY

Help desk outsourcing and server administration: technical support and assistance to 300 users. Lima 2004 - 2007 EGEMSA

Design and implementation of LAN / WAN communications system. Lima 2002 INDUSTRY BELCORP

Technology outsourcing: hosting of the business system of the firm for Colombia y Mexico. Lima 2013 – 2015

Regional technology outsourcing: SAP applications hosting (2.400 users) and SAP Basis support for Lima and Latin America. 2004 – 2010

DELOSI

On-site help desk outsourcing for 200 establishments in Lima and the provinces, preventive maintenance service and field management allowing to measure perception of the service in Lima and the provinces. Lima 2013 – 2015 MARATHON

Technology outsourcing: SAP Basis hosting. Lima 2013 – 2018 GYM

Remote and on-site help desk outsourcing for 3.000 users nationwide. Infrastructure upgrade, associated operation services, administration and management of such capacities. Lima 2012

179

SERVICES

UNIÓN DE CERVECERÍAS PERUANAS

SAN FERNANDO

UNIQUE

SAAB MILLER

BACKUS Y JOHNSTON S.A.A

Technology outsourcing, SAP hosting service, includes infrastructure, implementation, operation and ongoing support of selected applications. Lima 2012 – 2016

Help desk outsourcing to 2.200 users regionwide in Bolivia, Ecuador, Guatemala, Spain, Colombia, Mexico and Venezuela. Lima 2010

Software factory outsourcing for EARP SAP development in 6 countries in Latin America: Peru, Colombia, Ecuador, Bolivia, Panama, Guatemala, El Salvador and Honduras. Lima 2009

Telesales service expansion and acquisition of new infrastructure to expand its telesales call center to 500 agents in Lima and Arequipa. Lima - Arequipa 2012 Help desk outsourcing service upgrading: user service and server, network and telephone administration. Technical support and assistance to 1.500 users. Lima 2008 Help desk outsourcing: user service and server, network and telephone administration. Includes technical support and assistance services to 1.500 users. Lima 2004 - 2008 Telecommunications outsourcing: implementation of LAN – WAN communications infrastructure of plants and distributors in Lima and the provinces. Lima 2002 – 2010

Unified communications management, administration, configuration and maintenance of IP telephone system, messaging, videoconference services and nationwide contact center service. Lima 2011 – 2013 Upgrading of the software factory outsourcing service. Lima 2009 Server consolidation service. Lima 2009 Technology outsourcing: hosting, Oracle applications, help desk service, contingency service and communications support. Lima 2004 - 2012

ALICORP

Network infrastructure upgrading for the main plant, improving access to its applications, IT security, video surveillance and IP telephone service. Lima 2012 Technology outsourcing: Business warehouse, warehouse management. Lima 2007 – 2012 Technology outsourcing: SAP hosting applications (2.400 users), Lotus Notes and contingency services. Help desk outsourcing for 1.400 users. Lima 2002 – 2009

Help desk outsourcing: maintenance, support and technical assistance service to 573 users. Lima 2004 – 2009 EXSA

Unified communications, I P telephone and messaging service for its administrative offices. Lima 201 Help desk outsourcing: Technological infrastructure administration and support. Includes technical assistance to 120 users. Lima 2004 – 2009 AGROINDUSTRIAS AIB S.A

Technology outsourcing, SAP ECC 6.0 hosting implementation. Lima 2009

UNIVERSIDAD SAN IGNACIO DE LOYOLA (USIL)

A R P L TECNOLOGÍA INDUSTRIAL S.A

Unified communications, phase 4 of the project for implementation of the IP telephone system, campus wireless, and communications switch core upgrade. Lima 2012

Technology outsourcing, data center contract renewal. Lima 2009

ROCHE LABORATORIES

On-site and remote help desk outsourcing for 250 users. Incident management, change management, problem management and hardware inventory. de hardware. Lima 2011

BRITISH AMERICAN TOBACCO

Unified communications, implementation of the IP telephone service. Lima 2009

ROCHE LABORATORIES

Infrastructure, networking and technology services upgrading. Lima 2009 SN POWER

Technology outsourcing: hosting, Oracle applications, help desk service, contingency service and communications support. Lima 2008 - 2013 HONDA DEL PERÚ

Help desk outsourcing: server and network administration. Includes assistance service to 120 users. Lima 2008 – 2010 RIPLEY S.A

Development and implementation of central server and storage infrastructure. Lima 2007 FINANCOR

Consulting on physical and logical separation of its operations, to conduct operations independently, at Ripley department stores. Lima 2007 SCHLUMBERGER

Help desk outsourcing: computer center operation, technical support and assistance to 250 users. Lima 2004 – 2009

Technology outsourcing: technological infrastructure support, administration and operation. Lima 2007 – 2010


180

80 YEARS

AUSA

Help desk outsourcing and server administration. Includes technical assistance service to 150 users. Lima 2006 – 2009

Design and implementation of the technological infrastructure for SRX (extended retail software) systems. Lima 2000

New horizons, new challenges

Technology outsourcing: design and implementation for computer systems through the technological operations center (TOC) of GMD. Lima 2000 – 2008

EMPRESA EDITORA EL COMERCIO

GYM , GMI and GMP

AFP HORIZONTE

S.A.

Technology outsourcing for the corporate ERP. Lima 2002 – 2003

Applications outsourcing: Development and maintenance. Lima 2013

BANKING AND FINANCE

Design and implementation of the free disaffiliation system. Lima 2007 – 2008

Design and implementation of IP-based contact center for the subscription service. Lima 2004 – 2005 Design and implementation of IP telephone system for 800 users. Lima 2004 – 2005 LIMA AIRPORT PARTNER S

Design, implementation and support of the data network system for Jorge Chávez International Airport. Lima 2003 – 2004 CMR FALABELLA

Design and implementation of main technological for the switch and management systems. Lima 2003 SAGA FALABELLA

Design and implementation of the communications infrastructure. Lima 2003 Design and implementation of technological infrastructure for Oracle Financials systems. Lima 2002 Analysis, development and implementation of the comprehensive human resources system. Lima 2002 – 2003

LIMA STOCK EXCHANGE (BVL)

Technology outsourcing: data center services, technological infrastructure housing. Lima 2012 – 2017 Technology outsourcing: ELEX applications hosting, contingency services and communications support. Lima 1998 – 2012 Analysis, development and implementation of the information transfer system for loan reporting operations between the Lima Stock Exchange (BVL) and Cavali. Lima 1998 – 2007 Technology outsourcing, development, implementation, administration and operation of electronic negotiation systems and infrastructure. Lima 1988 - 1998

Design and implementation of the computer and contingency solution infrastructure. Lima 2006 - 2007 Project Management – Multifoods Project. Development of transfer, affiliation, fund change and information exchange systems with the Banking, Insurance and Private Pension Funds Superintendence (SBS). Lima 2005 Applications development and maintenance services. Lima 2005 – 2008

Outsourcing of the administration, support and operation of registration, transfer and clearing of securities and funds. Lima 2008

Analysis, development and implementation of the requirements administration system. Lima 2006 Project Management – Multifunds Project. Development of transfer, affiliation, fund change and information exchange systems with the Banking, Insurance and Private Pension Funds Superintendence (SBS). Lima 2005 - 2006 Development and implementation of business management system and development, analysis and implementation of the account statement system for members. Lima 2005 – 2006 Development and implementation of the system for dematerialization of bonds and development and implementation of checking account system. Lima 2005

AFP INTEGRA

Upgrading of applications outsourcing: development and maintenance. Lima 2012 – 2014

CAVALI

Applications outsourcing: development and maintenance of applications. Lima 2013

Software factory Outsourcing: development of systems, corrective maintenance, evolutive maintenance and data retrieval with improved CMMI processes. Lima 2006 – 2009

Applications outsourcing for development and maintenance of its systems. Lima 2009 – 2010 Design and implementation of the free disaffiliation system. Lima 2007 – 2008

Development and implementation of the welcome kit system, analysis, development and implementation of the new interactive evaluation system. Lima 2005 BBVA BANCO CONTINENTAL

Applications outsourcing to optimize its applications production cycle – APC management of the technical and functional analysis and testing services in development of its applications. Lima 2011

181

SERVICES

Technology outsourcing. Lima 2009 Upgrading of LAN communications equipment technological infrastructure. Lima 2007 Design and implementation of the corporate intranet technological infrastructure. Lima 2005 LA POSITIVA

Technology outsourcing, data center operation to ensure continued operation of its systems. Lima 2011 – 2013 Applications outsourcing: development and maintenance, testing of the main applications of the insurance company. Lima 2011 RIMAC SEGUROS

Help desk outsourcing, on-site and remote support and inventory management in Lima and the provinces. Lima 2011 Design and implementation of the data network communication system. Lima 2007 Help desk outsourcing, technical support and assistance to 1.600 users. Lima 2004 - 2007 PACÍFICO SEGUROS

Help desk outsourcing, serving o ver 1.200 users nationwide. Lima 2009

AFP UNIÓN

BANCO DE CRÉDITO - BCP

Analysis, development and implementation of the operations management system. Lima 2001 - 2005

Analysis, design, implementation and maintenance of the human resources system. Lima 1998 – 2003

CAVALI AND EDV BOLIVIA

Analysis, design and implementation of the Banking and Insurance System (SBS) Lima 1998 – 2003

Analysis, design and implementation of the Hipotecasa mortgage system. Lima 1998 – 2003

TELECOMMUNICATIONS Analysis, development and implementation of the securities registration, clearing and settlement system for Cavali and EDV Bolivia. Lima 1999 - 2000 UNIBANCA

Analysis, development and implementation of the disaster recovery service for the ATM credit card switch system. Lima 1999 – 2008

Analysis, design and implementation of the business credit system. Lima 1998 – 2003 Analysis, design and implementation of the leasing comprehensive system. Lima 1998 - 2003

TELEFÓNICA DEL PERÚ

Applications outsourcing: corrective and evolutive maintenance of its information systems for landline and mobile telephone operators in Latin America. Lima 2010 - 2013 Process Outsourcing - BPO Lima 2008


180

80 YEARS

AUSA

Help desk outsourcing and server administration. Includes technical assistance service to 150 users. Lima 2006 – 2009

Design and implementation of the technological infrastructure for SRX (extended retail software) systems. Lima 2000

New horizons, new challenges

Technology outsourcing: design and implementation for computer systems through the technological operations center (TOC) of GMD. Lima 2000 – 2008

EMPRESA EDITORA EL COMERCIO

GYM , GMI and GMP

AFP HORIZONTE

S.A.

Technology outsourcing for the corporate ERP. Lima 2002 – 2003

Applications outsourcing: Development and maintenance. Lima 2013

BANKING AND FINANCE

Design and implementation of the free disaffiliation system. Lima 2007 – 2008

Design and implementation of IP-based contact center for the subscription service. Lima 2004 – 2005 Design and implementation of IP telephone system for 800 users. Lima 2004 – 2005 LIMA AIRPORT PARTNER S

Design, implementation and support of the data network system for Jorge Chávez International Airport. Lima 2003 – 2004 CMR FALABELLA

Design and implementation of main technological for the switch and management systems. Lima 2003 SAGA FALABELLA

Design and implementation of the communications infrastructure. Lima 2003 Design and implementation of technological infrastructure for Oracle Financials systems. Lima 2002 Analysis, development and implementation of the comprehensive human resources system. Lima 2002 – 2003

LIMA STOCK EXCHANGE (BVL)

Technology outsourcing: data center services, technological infrastructure housing. Lima 2012 – 2017 Technology outsourcing: ELEX applications hosting, contingency services and communications support. Lima 1998 – 2012 Analysis, development and implementation of the information transfer system for loan reporting operations between the Lima Stock Exchange (BVL) and Cavali. Lima 1998 – 2007 Technology outsourcing, development, implementation, administration and operation of electronic negotiation systems and infrastructure. Lima 1988 - 1998

Design and implementation of the computer and contingency solution infrastructure. Lima 2006 - 2007 Project Management – Multifoods Project. Development of transfer, affiliation, fund change and information exchange systems with the Banking, Insurance and Private Pension Funds Superintendence (SBS). Lima 2005 Applications development and maintenance services. Lima 2005 – 2008

Outsourcing of the administration, support and operation of registration, transfer and clearing of securities and funds. Lima 2008

Analysis, development and implementation of the requirements administration system. Lima 2006 Project Management – Multifunds Project. Development of transfer, affiliation, fund change and information exchange systems with the Banking, Insurance and Private Pension Funds Superintendence (SBS). Lima 2005 - 2006 Development and implementation of business management system and development, analysis and implementation of the account statement system for members. Lima 2005 – 2006 Development and implementation of the system for dematerialization of bonds and development and implementation of checking account system. Lima 2005

AFP INTEGRA

Upgrading of applications outsourcing: development and maintenance. Lima 2012 – 2014

CAVALI

Applications outsourcing: development and maintenance of applications. Lima 2013

Software factory Outsourcing: development of systems, corrective maintenance, evolutive maintenance and data retrieval with improved CMMI processes. Lima 2006 – 2009

Applications outsourcing for development and maintenance of its systems. Lima 2009 – 2010 Design and implementation of the free disaffiliation system. Lima 2007 – 2008

Development and implementation of the welcome kit system, analysis, development and implementation of the new interactive evaluation system. Lima 2005 BBVA BANCO CONTINENTAL

Applications outsourcing to optimize its applications production cycle – APC management of the technical and functional analysis and testing services in development of its applications. Lima 2011

181

SERVICES

Technology outsourcing. Lima 2009 Upgrading of LAN communications equipment technological infrastructure. Lima 2007 Design and implementation of the corporate intranet technological infrastructure. Lima 2005 LA POSITIVA

Technology outsourcing, data center operation to ensure continued operation of its systems. Lima 2011 – 2013 Applications outsourcing: development and maintenance, testing of the main applications of the insurance company. Lima 2011 RIMAC SEGUROS

Help desk outsourcing, on-site and remote support and inventory management in Lima and the provinces. Lima 2011 Design and implementation of the data network communication system. Lima 2007 Help desk outsourcing, technical support and assistance to 1.600 users. Lima 2004 - 2007 PACÍFICO SEGUROS

Help desk outsourcing, serving o ver 1.200 users nationwide. Lima 2009

AFP UNIÓN

BANCO DE CRÉDITO - BCP

Analysis, development and implementation of the operations management system. Lima 2001 - 2005

Analysis, design, implementation and maintenance of the human resources system. Lima 1998 – 2003

CAVALI AND EDV BOLIVIA

Analysis, design and implementation of the Banking and Insurance System (SBS) Lima 1998 – 2003

Analysis, design and implementation of the Hipotecasa mortgage system. Lima 1998 – 2003

TELECOMMUNICATIONS Analysis, development and implementation of the securities registration, clearing and settlement system for Cavali and EDV Bolivia. Lima 1999 - 2000 UNIBANCA

Analysis, development and implementation of the disaster recovery service for the ATM credit card switch system. Lima 1999 – 2008

Analysis, design and implementation of the business credit system. Lima 1998 – 2003 Analysis, design and implementation of the leasing comprehensive system. Lima 1998 - 2003

TELEFÓNICA DEL PERÚ

Applications outsourcing: corrective and evolutive maintenance of its information systems for landline and mobile telephone operators in Latin America. Lima 2010 - 2013 Process Outsourcing - BPO Lima 2008


182

80 YEARS

New horizons, new challenges

Analysis, design and implementation of the call management system. Lima 2007 Analysis, design and implementation of the per second (rate) system. Lima 2007 Analysis, design and implementation of call-by-call system. Lima 2007

Design and implementation the prepayment system technological infrastructure (SS7). Lima 1997

Process outsourcing: operation, administration and custody of dockets (files). Lima 2006 – 2009

Design, development and implementation of the public telephone and short message system (SMS). Lima 1997

Software factory outsourcing: Development of administrative systems maintenance. Lima 2006 - 2008

Analysis, design, implementation and maintenance of the mobile telephone intelligent prepayment system (SS7). Lima 1995 – 1997

Analysis, design and implementation of the public telephone and yellow pages operation system (activation, provision). Lima 2007

Development and maintenance of new document handling system. Lima 2006 – 2007 Process outsourcing: Pension payment process. Lima 2003 – 2006

GOVERNMENT Analysis, design and implementation of the Speedy system. Lima 2006

OFFICINAL DE NORMALIZACIÓN PREVISIONAL (PENSION STANDARDIZING OFFICE) - (ONP)

Technology outsourcing: provision of platform and specialized consulting for institutional portal and intranet development. Lima 2013

Development and implementation of the mediation system. Lima 2004 Analysis, design and implementation of the Omega and Gestel installation system. Lima 2003 Development and implementation of the Internet Service Provider system. Lima 2003 Design and implementation of SAP R/3 finance and management systems. Lima 2002 – 2003 Analysis, design and implementation of the single client code interconnected system. Lima 2002

Design and implementation of the high availability corporate back-up system for all platforms (LEGATO). Lima 1998 – 1999 Design and implementation servers, communication equipment and wiring nationwide corporate platform: 12.000 PC, 70 servers and LAN and WAN networks that connected 70 cities to the corporate systems. Lima 1994 – 1995 TIM

Platform support maintenance service, LAN–WAN communication equipment. Lima 2005 - 2008

Design and implementation of the operator reconciling system. Lima 2005 Design and implementation data network communication system. Lima 2004 NAP-PERU

Operation outsourcing, administration and management service, facilities administration and management service. Includes operation, administration and management service of the communications platform. Lima 2003 – 2009

AT&T

Design and implementation of the billing system technological infrastructure. Lima 2000 Design and implementation of the Iplanet messaging system. Lima 2000 BELL SOUTH

Design and implementation of the technological infrastructure for the Oracle Financials system. Lima 1998

Data center, applications, communications, help desk and specialized technological series outsourcing. Lima 2010 – 2013 Process outsourcing: administration and custody of 1.2 million files and dockets. Lima 2009 Technology outsourcing: expansion of the services to the computer center. Lima 2009

183

SERVICES

Process outsourcing: FONHAPU operation. Lima 2003 – 2006 Web portal design and development. Lima 2003 Analysis, development and implementation of the budget system. Lima 2002 – 2003 Process outsourcing: Operation and management the pension beneficiary service, guidance and reception process (OYR). Lima 2001 – 2004 Development of the real estate system. Lima 2001 Outsourcing of operation and management of the Recognition Bonus process. Lima 1999 – 2005

METROPOLITAN LIMA MUNICIPALITY - MML

Upgrading of technological infrastructure allowing the various MML areas timely access to services available through the intranet and Internet, furthering integration of the MML offices with the various decentralized bodies and municipal entities. Lima 2013 OSINERGMIN

Applications outsourcing: development and maintenance of applications. Lima 2013 – 2015 Help desk outsourcing: Service delivered to 1.000 users nationwide. Lima 2010 Process outsourcing: Optimizing of the user complaint response process. Lima 2007 – 2010 OSCE Upgrading of SEACE platform infrastructure. Lima 2013 Server consolidation service allowing increased business continuity levels by a robust and fail-safe platform. Lima 2010 SUNARP

Upgrading of technological infrastructure of servers and storage containing SUNARP information systems to improve the provision of services. Lima 2013 Upgrading of LAN network infrastructure for faster sending, receiving and sharing of files and data. Lima 2010

Upgrading of networking and technology services infrastructure. Lima 2009 RENIEC

Technological infrastructure maintenance to ensure continued operation of the services provided to citizens, ensuring and maintaining critical mission applications and services of the institution operational. Lima 2013 Updating and upgrading of the IP telephone infrastructure, including the unified communications and collaboration environment. Lima 2012 Technology infrastructure, networking and services upgrading. Lima 2009 BANCO CENTRAL DE RESERVA

Upgrading of data center technological infrastructure. Lima 2013 SUNAT Upgrading of LAN switching infrastructure, core, distribution and border switches. Lima 2012 Help desk outsourcing: on-site and remote support and inventory management in Lima and the provinces. Lima 2011 Provision of the LAN–WAN network for headquarters and offices nationwide. Lima 2000


182

80 YEARS

New horizons, new challenges

Analysis, design and implementation of the call management system. Lima 2007 Analysis, design and implementation of the per second (rate) system. Lima 2007 Analysis, design and implementation of call-by-call system. Lima 2007

Design and implementation the prepayment system technological infrastructure (SS7). Lima 1997

Process outsourcing: operation, administration and custody of dockets (files). Lima 2006 – 2009

Design, development and implementation of the public telephone and short message system (SMS). Lima 1997

Software factory outsourcing: Development of administrative systems maintenance. Lima 2006 - 2008

Analysis, design, implementation and maintenance of the mobile telephone intelligent prepayment system (SS7). Lima 1995 – 1997

Analysis, design and implementation of the public telephone and yellow pages operation system (activation, provision). Lima 2007

Development and maintenance of new document handling system. Lima 2006 – 2007 Process outsourcing: Pension payment process. Lima 2003 – 2006

GOVERNMENT Analysis, design and implementation of the Speedy system. Lima 2006

OFFICINAL DE NORMALIZACIÓN PREVISIONAL (PENSION STANDARDIZING OFFICE) - (ONP)

Technology outsourcing: provision of platform and specialized consulting for institutional portal and intranet development. Lima 2013

Development and implementation of the mediation system. Lima 2004 Analysis, design and implementation of the Omega and Gestel installation system. Lima 2003 Development and implementation of the Internet Service Provider system. Lima 2003 Design and implementation of SAP R/3 finance and management systems. Lima 2002 – 2003 Analysis, design and implementation of the single client code interconnected system. Lima 2002

Design and implementation of the high availability corporate back-up system for all platforms (LEGATO). Lima 1998 – 1999 Design and implementation servers, communication equipment and wiring nationwide corporate platform: 12.000 PC, 70 servers and LAN and WAN networks that connected 70 cities to the corporate systems. Lima 1994 – 1995 TIM

Platform support maintenance service, LAN–WAN communication equipment. Lima 2005 - 2008

Design and implementation of the operator reconciling system. Lima 2005 Design and implementation data network communication system. Lima 2004 NAP-PERU

Operation outsourcing, administration and management service, facilities administration and management service. Includes operation, administration and management service of the communications platform. Lima 2003 – 2009

AT&T

Design and implementation of the billing system technological infrastructure. Lima 2000 Design and implementation of the Iplanet messaging system. Lima 2000 BELL SOUTH

Design and implementation of the technological infrastructure for the Oracle Financials system. Lima 1998

Data center, applications, communications, help desk and specialized technological series outsourcing. Lima 2010 – 2013 Process outsourcing: administration and custody of 1.2 million files and dockets. Lima 2009 Technology outsourcing: expansion of the services to the computer center. Lima 2009

183

SERVICES

Process outsourcing: FONHAPU operation. Lima 2003 – 2006 Web portal design and development. Lima 2003 Analysis, development and implementation of the budget system. Lima 2002 – 2003 Process outsourcing: Operation and management the pension beneficiary service, guidance and reception process (OYR). Lima 2001 – 2004 Development of the real estate system. Lima 2001 Outsourcing of operation and management of the Recognition Bonus process. Lima 1999 – 2005

METROPOLITAN LIMA MUNICIPALITY - MML

Upgrading of technological infrastructure allowing the various MML areas timely access to services available through the intranet and Internet, furthering integration of the MML offices with the various decentralized bodies and municipal entities. Lima 2013 OSINERGMIN

Applications outsourcing: development and maintenance of applications. Lima 2013 – 2015 Help desk outsourcing: Service delivered to 1.000 users nationwide. Lima 2010 Process outsourcing: Optimizing of the user complaint response process. Lima 2007 – 2010 OSCE Upgrading of SEACE platform infrastructure. Lima 2013 Server consolidation service allowing increased business continuity levels by a robust and fail-safe platform. Lima 2010 SUNARP

Upgrading of technological infrastructure of servers and storage containing SUNARP information systems to improve the provision of services. Lima 2013 Upgrading of LAN network infrastructure for faster sending, receiving and sharing of files and data. Lima 2010

Upgrading of networking and technology services infrastructure. Lima 2009 RENIEC

Technological infrastructure maintenance to ensure continued operation of the services provided to citizens, ensuring and maintaining critical mission applications and services of the institution operational. Lima 2013 Updating and upgrading of the IP telephone infrastructure, including the unified communications and collaboration environment. Lima 2012 Technology infrastructure, networking and services upgrading. Lima 2009 BANCO CENTRAL DE RESERVA

Upgrading of data center technological infrastructure. Lima 2013 SUNAT Upgrading of LAN switching infrastructure, core, distribution and border switches. Lima 2012 Help desk outsourcing: on-site and remote support and inventory management in Lima and the provinces. Lima 2011 Provision of the LAN–WAN network for headquarters and offices nationwide. Lima 2000


184

Design, development and implementation of the major taxpayers system (PRICOS). Lima 1992 Upgrading of the central technological infrastructure. Lima 1991, 1995, 1998, 2000, 2002

80 YEARS

Integrated System of the public sector Financial Administration. Upgrading of its web-based applications and technological updating of the systems based on the BPM / SOA service-oriented platform. Lima 2011 ONPE

REGISTRY ZONE IV

High availability database monitoring solution for its two data centers. Lima 2012 Updating of technological infrastructure, migration from Alpha infrastructure to Integrity servers. Lima 2007 Help desk outsourcing, preventive and corrective service and maintenance of computer equipment, technical support and assistance to 499 users in 6 offices. Lima 2006 - 2008

Technology and process outsourcing for municipal and regional elections and FONAVI referendum. Includes implementation of infrastructure, information technology equipment and transfer of equipment nationwide. Lima 2010 Process outsourcing for 2002 municipal and regional elections, including electoral software development, electronic vote pilot, development of a network of 140 computer centers distributed nationwide, typing and supervision of over 2.000 typists. Lima 2002 MINISTERIO PÚBLICO

New horizons, new challenges

MAGDALENA DEL MAR

COLOMBIA

MUNICIPALITY

Analysis, design and implementation of the centralized securities integrated system (Deceval) of Colombia. Lima 1998 – 1999

Process outsourcing: tax collection. Lima 2008 – 2012 CONSUCODE

Provision of base hardware and software platform for the new public purchases and procurement electronic portal. Lima 2007 – 2008

AND FINANCE

Development and implementation of three processes of the

Upgrading of infrastructure, networking and technology services. Lima 2009

MINISTRY OF TRANSPORTATION AND COMMUNICATIONS

Service level-based conservation service of the regional border – Bayóvar Detour and Vía de Evitamiento Chiclayo - Lambayeque Mocce – Olmos Detour highway. Length: 261.7 km Lambayeque and Piura 2009 – 2014

PANAMA

Professional services. Lima 1999 - 2000

SURCO MUNICIPALITY

VENEZUELA

Internet security services at PDVSA. Lima 1998 – 1999

Process outsourcing of nationwide warehouse operation and management. Lima 1995 – 1998 MARINA DE GUERRA DEL PERÚ

MINISTRY OF TRANSPORTATION

GYM FERROVÍAS S.A.

AND COMMUNICATIONS

Operation and maintenance of Line One of the Lima Metro. Length: 20.9 km Stations: Villa El Salvador, Parque Industrial, Pumacahua, Villa María, María Auxiliadora, San Juan, Atocongo, Jorge Chávez, Ayacucho, Cabitos, Angamos, San Borja Sur, La Cultura, Arriola, Gamarra and Grau. 30 years of the concession. Lima 2011 – 2014

Cora Cora Road Conservation Project Service level-based road management: Puquio - Cora Cora PE 1S (Chala) Junction Cora Cora - Yauca - PE 1S Junction Ullaccasa – Pausa. Length: 526 km. Arequipa and Ayacucho 2012 – 2017

(PERUVIAN NAVY)

Design, development and implementation of the human resources system. 50.000 people. Lima 1992 LATIN AMERICA BOLIVIA

Operation (platform and application) outsourcing in partnership with Cavali for the Securities Deposit Entity of Bolivia. Lima 2002 – 2008

CUSCO REGIONAL GOVERNMENT

Road Conservation Project Road Network 3 - Cusco Service level-based road management of Network 3 of the regional road network project integrating Cusco. Length: 524 km Conservation contractor: Concar S.A. - Obrainsa. Cusco 2012 – 2017

S.A. COMPLETED

IIRSA North Road Conservation Project Maintenance and operation of the Paita - Yurimaguas highway. Length: 954.7 km Tolls: Paita, Chulucanas, Olmos, Pomahuaca, Bagua, Pedro Ruiz, Aguas Claras, Moyobamba and El Pongo stations. Weighing: Bagua and Piura mobile weighing, Lambayeque, Cajamarca, Amazonas, San Martín and Loreto. 2006 – 2011

AND COMMUNICATIONS

NORVIAL S.A.

Length: 253 km Piura 2010 – 2015

Ayacucho - Andahuaylas - Puente Sahuinto Road Conservation Project Road conservation service of Ayacucho – Andahuaylas - Puente Sahuinto highway. Length: 384.5 km Ayacucho and Apurímac 2008 - 2014

MINISTRY OF TRANSPORTATION

SURVIAL S.A.

AND COMMUNICATIONS

Survial Road Conservation Project Maintenance and operation of Section 1 of the IIRSA South highway: San Juan de Marcona – Urcos highway. Length: 757.7 km Tolls: Marcona, Pampa Galeras, Pampamarca, Pichirhua and Ccasacancha stations. Weighing: Nazca, Quilcaccasa and Anta. Ica, Ayacucho, Apurímac and Cusco 25 years of the concession. 2007 – 2014

Norvial Road Conservation Project Maintenance and conservation of Road Network 5: Ancón – Huacho – Pativilca highway. Length: 182.7 km Tolls: Serpentín de Pasamayo, Variante de Pasamayo and El Paraíso stations. Weighing: Serpentín de Pasamayo 25 years of the concession. Lima 2003 – 2018

La Merced Road Conservation Project Service level-based road management of Las Vegas Detour Tarma - La Merced – Satipo highway. Length: 230.4 km Junín 2010 – 2015

CONCESIÓN CANCHAQUE

Canchaque Road Conservation Project Maintenance and operation of the Buenos Aires – Canchaque road Length: 78.1 km. Tolls. Loma Baja Station 15 years of the concession. Piura 2010 – 2025

CUSCO REGIONAL GOVERNMENT

Road Conservation Project Road Network 1 - Cusco Service level-based road management of Network 1 of the regional road network project integrating Cusco. Length: 641 km Cusco 2012 - 2017

CONCESIONARIA IIRSA NORTE

MINISTRY OF TRANSPORTATION

ESSALUD

Design and implementation of the technological infrastructure for the SAP/R3 systems. Lima 2000

(GOVERNMENT ATTORNEY’S OFFICE) MINISTRY OF ECONOMY

service of the Guadalupe - Ica - Palpa – Atico highway. Length: 379.8 km Ica and Arequipa 2010 - 2015

ECUADOR , EL SALVADOR AND Y

Design and implementation of the revenue system technological infrastructure. Lima 2005 – 2008

185

SERVICES

MINISTRY OF TRANSPORTATION AND COMMUNICATIONS

Bappo Road Conservation Project Service level-based road management of the Bayóvar Detour - Bappo - Sechura - Piura Detour Bayóvar Highway.

MINISTRY OF TRANSPORTATION AND COMMUNICATIONS

Sullana Road Conservation Project Service level-based conservation service of the Paita Detour - - Sullana – Talara Detour Máncora - Aguas Verdes, Sullana - Macará and international border on Peruvian Side Road Axis No. 1.Length: 437.6 km. Piura and Tumbes 2010 – 2015 MINISTRY OF TRANSPORTATION AND COMMUNICATIONS

Icapal Road Conservation Project Service level-based conservation

MINISTRY OF TRANSPORTATION AND COMMUNICATIONS

Tacna Road Conservation Project Service level-based conservation service of the Puente Camlara Tacna - La Concordia, Tacna Tarata, Tacna - Palca and Ilo – Tacna section. Length: 399 km. Tacna 2007 – 2014

ÓVALO GUTIÉRREZ COMPLETED

Parking lot concession in the limit between the districts of San Isidro and Miraflores in the city of Lima. Parking spaces: 220. Lima 2000 – 2007 MINISTRY OF TRANSPORTATION AND COMMUNICATIONS COMPLETED

Arequipa – Matarani Highway Concession Project Service level-based conservation service of the Arequipa – Matarani highway. Length: 105.0 km Tolls: Uchumayo and Matarani stations. Matarani. Arequipa 1994 - 2007


184

Design, development and implementation of the major taxpayers system (PRICOS). Lima 1992 Upgrading of the central technological infrastructure. Lima 1991, 1995, 1998, 2000, 2002

80 YEARS

Integrated System of the public sector Financial Administration. Upgrading of its web-based applications and technological updating of the systems based on the BPM / SOA service-oriented platform. Lima 2011 ONPE

REGISTRY ZONE IV

High availability database monitoring solution for its two data centers. Lima 2012 Updating of technological infrastructure, migration from Alpha infrastructure to Integrity servers. Lima 2007 Help desk outsourcing, preventive and corrective service and maintenance of computer equipment, technical support and assistance to 499 users in 6 offices. Lima 2006 - 2008

Technology and process outsourcing for municipal and regional elections and FONAVI referendum. Includes implementation of infrastructure, information technology equipment and transfer of equipment nationwide. Lima 2010 Process outsourcing for 2002 municipal and regional elections, including electoral software development, electronic vote pilot, development of a network of 140 computer centers distributed nationwide, typing and supervision of over 2.000 typists. Lima 2002 MINISTERIO PÚBLICO

New horizons, new challenges

MAGDALENA DEL MAR

COLOMBIA

MUNICIPALITY

Analysis, design and implementation of the centralized securities integrated system (Deceval) of Colombia. Lima 1998 – 1999

Process outsourcing: tax collection. Lima 2008 – 2012 CONSUCODE

Provision of base hardware and software platform for the new public purchases and procurement electronic portal. Lima 2007 – 2008

AND FINANCE

Development and implementation of three processes of the

Upgrading of infrastructure, networking and technology services. Lima 2009

MINISTRY OF TRANSPORTATION AND COMMUNICATIONS

Service level-based conservation service of the regional border – Bayóvar Detour and Vía de Evitamiento Chiclayo - Lambayeque Mocce – Olmos Detour highway. Length: 261.7 km Lambayeque and Piura 2009 – 2014

PANAMA

Professional services. Lima 1999 - 2000

SURCO MUNICIPALITY

VENEZUELA

Internet security services at PDVSA. Lima 1998 – 1999

Process outsourcing of nationwide warehouse operation and management. Lima 1995 – 1998 MARINA DE GUERRA DEL PERÚ

MINISTRY OF TRANSPORTATION

GYM FERROVÍAS S.A.

AND COMMUNICATIONS

Operation and maintenance of Line One of the Lima Metro. Length: 20.9 km Stations: Villa El Salvador, Parque Industrial, Pumacahua, Villa María, María Auxiliadora, San Juan, Atocongo, Jorge Chávez, Ayacucho, Cabitos, Angamos, San Borja Sur, La Cultura, Arriola, Gamarra and Grau. 30 years of the concession. Lima 2011 – 2014

Cora Cora Road Conservation Project Service level-based road management: Puquio - Cora Cora PE 1S (Chala) Junction Cora Cora - Yauca - PE 1S Junction Ullaccasa – Pausa. Length: 526 km. Arequipa and Ayacucho 2012 – 2017

(PERUVIAN NAVY)

Design, development and implementation of the human resources system. 50.000 people. Lima 1992 LATIN AMERICA BOLIVIA

Operation (platform and application) outsourcing in partnership with Cavali for the Securities Deposit Entity of Bolivia. Lima 2002 – 2008

CUSCO REGIONAL GOVERNMENT

Road Conservation Project Road Network 3 - Cusco Service level-based road management of Network 3 of the regional road network project integrating Cusco. Length: 524 km Conservation contractor: Concar S.A. - Obrainsa. Cusco 2012 – 2017

S.A. COMPLETED

IIRSA North Road Conservation Project Maintenance and operation of the Paita - Yurimaguas highway. Length: 954.7 km Tolls: Paita, Chulucanas, Olmos, Pomahuaca, Bagua, Pedro Ruiz, Aguas Claras, Moyobamba and El Pongo stations. Weighing: Bagua and Piura mobile weighing, Lambayeque, Cajamarca, Amazonas, San Martín and Loreto. 2006 – 2011

AND COMMUNICATIONS

NORVIAL S.A.

Length: 253 km Piura 2010 – 2015

Ayacucho - Andahuaylas - Puente Sahuinto Road Conservation Project Road conservation service of Ayacucho – Andahuaylas - Puente Sahuinto highway. Length: 384.5 km Ayacucho and Apurímac 2008 - 2014

MINISTRY OF TRANSPORTATION

SURVIAL S.A.

AND COMMUNICATIONS

Survial Road Conservation Project Maintenance and operation of Section 1 of the IIRSA South highway: San Juan de Marcona – Urcos highway. Length: 757.7 km Tolls: Marcona, Pampa Galeras, Pampamarca, Pichirhua and Ccasacancha stations. Weighing: Nazca, Quilcaccasa and Anta. Ica, Ayacucho, Apurímac and Cusco 25 years of the concession. 2007 – 2014

Norvial Road Conservation Project Maintenance and conservation of Road Network 5: Ancón – Huacho – Pativilca highway. Length: 182.7 km Tolls: Serpentín de Pasamayo, Variante de Pasamayo and El Paraíso stations. Weighing: Serpentín de Pasamayo 25 years of the concession. Lima 2003 – 2018

La Merced Road Conservation Project Service level-based road management of Las Vegas Detour Tarma - La Merced – Satipo highway. Length: 230.4 km Junín 2010 – 2015

CONCESIÓN CANCHAQUE

Canchaque Road Conservation Project Maintenance and operation of the Buenos Aires – Canchaque road Length: 78.1 km. Tolls. Loma Baja Station 15 years of the concession. Piura 2010 – 2025

CUSCO REGIONAL GOVERNMENT

Road Conservation Project Road Network 1 - Cusco Service level-based road management of Network 1 of the regional road network project integrating Cusco. Length: 641 km Cusco 2012 - 2017

CONCESIONARIA IIRSA NORTE

MINISTRY OF TRANSPORTATION

ESSALUD

Design and implementation of the technological infrastructure for the SAP/R3 systems. Lima 2000

(GOVERNMENT ATTORNEY’S OFFICE) MINISTRY OF ECONOMY

service of the Guadalupe - Ica - Palpa – Atico highway. Length: 379.8 km Ica and Arequipa 2010 - 2015

ECUADOR , EL SALVADOR AND Y

Design and implementation of the revenue system technological infrastructure. Lima 2005 – 2008

185

SERVICES

MINISTRY OF TRANSPORTATION AND COMMUNICATIONS

Bappo Road Conservation Project Service level-based road management of the Bayóvar Detour - Bappo - Sechura - Piura Detour Bayóvar Highway.

MINISTRY OF TRANSPORTATION AND COMMUNICATIONS

Sullana Road Conservation Project Service level-based conservation service of the Paita Detour - - Sullana – Talara Detour Máncora - Aguas Verdes, Sullana - Macará and international border on Peruvian Side Road Axis No. 1.Length: 437.6 km. Piura and Tumbes 2010 – 2015 MINISTRY OF TRANSPORTATION AND COMMUNICATIONS

Icapal Road Conservation Project Service level-based conservation

MINISTRY OF TRANSPORTATION AND COMMUNICATIONS

Tacna Road Conservation Project Service level-based conservation service of the Puente Camlara Tacna - La Concordia, Tacna Tarata, Tacna - Palca and Ilo – Tacna section. Length: 399 km. Tacna 2007 – 2014

ÓVALO GUTIÉRREZ COMPLETED

Parking lot concession in the limit between the districts of San Isidro and Miraflores in the city of Lima. Parking spaces: 220. Lima 2000 – 2007 MINISTRY OF TRANSPORTATION AND COMMUNICATIONS COMPLETED

Arequipa – Matarani Highway Concession Project Service level-based conservation service of the Arequipa – Matarani highway. Length: 105.0 km Tolls: Uchumayo and Matarani stations. Matarani. Arequipa 1994 - 2007


186

80 YEARS

CAM PERÚ COMPREHENSIVE SECURITY PROJECT - LINK TOWER

Development of a single security solution for the first high value building in Peru, the Link Tower. Installation of closedcircuit television (CCTV) systems, systems for fire detection, audio evacuation, access control, intrusion, and automation with power consumption control (common areas). Lima 2012

ARMY VIRTUAL LIBRARY PROJECT

EXPANSION OF 10KV

PETT (Ministry of

NEW 138 KV TL TRUJILLO

Development and installation of management software for the Army’s virtual library. It also included construction of the building and installation of structured cabling, PC equipment, printers, networking equipment, CCTV, and an IP telephone exchange. Lima 2011

DISTRIBUTION LINE – MILPO

Agriculture - Special Land

NORTH TRANSMISSION

Execution of civil works and electromechanical erection for expansion of the 10kV distribution line for the Phase II Cerro Lindo Project. Chincha-Ica 2010

Titling Project) CORPORATE

SUBSTATION - TRUJILLO NORTHWEST

OFFICES PROJECT

TRANSMISSION SUBSTATION

Installation of 750 voice/data connections with structured cabling, installation of fiber optics backbone, electrical cabling, grounding wells, and equipment for LAN network. Lima 2009

AND NEW 138 KV TRUJILLO

DATA CENTER PROJECT - INTERBANK

PETROPERU CORPORATE BUILDING PROJECT

SERVICE FOR IMMEDIATE CLIENTS (CACI XIII)

The work consisted of the expansion of primary networks for 85 sectors, and secondary networks for 247 sectors. Junin and Pasco 2010-2011

Installation of 2,140 structured cabling connections and the fiber optics backbone, as well as active equipment for the 10Gb backbone network. Lima 2010 CETAC (ARMY TACTICAL TRAINING CENTER) PROJECT

ARMY MAGAZINES PROJECT

The project consisted of supplying and installing cabinets for Interbank’s alternative data center, and included installation of structured cabling and fiber optics. Lima 2012

New horizons, new challenges

Installation of electronic security equipment at 13 army ammunition warehouses, in addition to closed circuit television (CCTV), structured cabling and fiber optics. Lima 2010-2011

Supplying and installing Staff training software. It also included construction of the building and installation of structured cabling, PC equipment, printers, networking equipment, CCTV, and an IP telephone exchange. Lima 2010

GROUP No.12 RURAL EDELNOR COMMERCIAL

ELECTRIFICATION IN 11

NATIONAL STADIUM EXTERIOR

OPERATIONS SERVICE

DEPARTMENTS

LIGHTING PROJECT

The contract comprised services for: reading, distribution, power cuts, restoration, installation, maintenance, and normalization of new connections and loss control. North Lima 2012 to date

As part of the National Rural Electrification Plan, 63 projects were executed at 576 rural locations in 11 departments of Peru, bringing electric power to over 90,000 residents for the first time. Amazonas, Ancash, Apurimac, Huancavelica, Huanuco, La Libertad, Lambayeque, Piura, Puno, San Martin and Tacna. 2010

Lighting system consisting of RGB lights and projectors, a main control system, and an interactive system. One of the world’s largest crowd control projects and interactive light displays. Lima 2010

ASSEMBLY OF 500 kV AND 220 kV SUBSTATIONS

Contract for electromechanical erection and telecommunications assembly at six 500 kV and 220 kV substations. Lima (Carabayllo), Chimbote and Trujillo 2011 – 2012

MODIFICATION OF PRIMARY 22.9 KV LINE – YANACOCHA

Contract for construction of the 22.9kV L210/211 Primary Line modification. Cajamarca 2010

TOTAL SUPPLY SERVICES

Contract to provide services for major client operations, including services for: reading, power cuts, restoration, installation, maintenance, and others. North Lima 2009 to date

ELECTRIC INSTALLATIONS FOR YURA PRODUCTION LINE III

The project included installation of electrical, electronic and instrumentation equipment for operation of the new Line III for production of 4,200 metric tons per day of clinker. Arequipa 2009 MEDIUM VOLTAGE FEEDER OUTPUT TRUJILLO SUR SUBSTATION

Three-phase underground primary networks, and 4 and 6-way concrete pipes were implemented. Supply, transportation, assembly, testing and commissioning of works for feeder output in medium voltage TS-01, TS-02, TS-07 and TS-08 at the Trujillo Sur Substation. Trujillo 2009 RURAL ELECTRIFICATION IN THE AYACUCHO-HUANCAVELICA CONCESSION AREA

Supply, transportation, electromechanical erection, testing and commissioning of: Project 507Part I, rural electrification in the Ayacucho-Huancavelica concession area. Ayacucho and Huancavelica 2009 SEAL – COMMERCIAL OPERATIONS SERVICE

Providing commercial operations services including: installation, maintenance, normalization and control for new connections. Arequipa 2009-2011

187

SERVICES

NORTHWEST SUBSTATION

6 km of 138 KV T.L. and a new fully equipped transformation substation for the 138 kV Trujillo Norte –Trujillo Northwest Transmission Line and the New Trujillo Northwest Transmission Substation. Trujillo - La Libertad 2008 PROVIDING ELECTRIC POWER SERVICES IN THE ENOSA CONCESSION AREA

Execution of connections for new electric power supply services and restorations, removal of former clients, execution of power cuts and re-connections, emergency services and new power supply services, meter inspections and delivery of bills. Piura and Tumbes 2008 – 2010 ELECTRICAL INSTALLATIONS FOR THE NEW SHOUGANG TRANSFER SYSTEM

Electrical installations were implemented at substations and belts, two 13.8 kV and 4.16 kV transmission lines were wired, and instrumentation for the new transfer system was installed. Marcona - Ica 2008 - 2009 SERVICE FOR IMMEDIATE CLIENTS (CACI IX)

Limited access to electric power services was resolved for new urban installations in the cities of Huancayo and Tarma through the expansion of the medium and low voltage networks. Supplying materials, transportation, electromechanical erection, testing and commissioning. Huancayo and Tarma - Junín 2007 – 2008

RURAL ELECTRIFICATION FOR

MELCHORITA PLANT PROJECT

HUANCABAMBA PAUCARTAMBO

The project consisted of electrification of 61 rural locations in the Pasco Region. Oxapampa - Pasco 2007 – 2008

Installation of 3,500 structured cabling connections, 28 km of fiber optics and multi-pair, and a fire detection system with 5,500 smoke detectors. Ica 2007

REMODELING MEDIUM

COMMERCIAL

AND LOW VOLTAGE NETWORKS

ACTIVITIES – NORTHERN SERVICES

SUBSTATION PROJECT

IN THE CITY OF HUANCAYO

MANAGEMENT

STAGE II

Commercial management activities in the Northern Services Management area, (North Lima and Callao), including services for: commercial inspections, verification of late payment of bills, status inspections, distribution of collection notices, and communication with clients. Lima 2006 – 2008

Remodeling the primary 10kV distribution subsystem networks for Salesianos and Parque Industrial Transmission Substation feeders. Supply, transportation, electromechanical erection, testing and commissioning. Huancayo - Junín 2007 – 2008

GROUP II DISTRIBUTION PROJECTS

Electric power was supplied for the first time to 11 shanty towns in Casma, Nepeña and Chimbote, through expansion of the primary, secondary networks and residential connections. Supply, transportation, assembly, testing and commissioning for rural electrification Group II. El Santa and Casma - Ancash 2006 - 2007


186

80 YEARS

CAM PERÚ COMPREHENSIVE SECURITY PROJECT - LINK TOWER

Development of a single security solution for the first high value building in Peru, the Link Tower. Installation of closedcircuit television (CCTV) systems, systems for fire detection, audio evacuation, access control, intrusion, and automation with power consumption control (common areas). Lima 2012

ARMY VIRTUAL LIBRARY PROJECT

EXPANSION OF 10KV

PETT (Ministry of

NEW 138 KV TL TRUJILLO

Development and installation of management software for the Army’s virtual library. It also included construction of the building and installation of structured cabling, PC equipment, printers, networking equipment, CCTV, and an IP telephone exchange. Lima 2011

DISTRIBUTION LINE – MILPO

Agriculture - Special Land

NORTH TRANSMISSION

Execution of civil works and electromechanical erection for expansion of the 10kV distribution line for the Phase II Cerro Lindo Project. Chincha-Ica 2010

Titling Project) CORPORATE

SUBSTATION - TRUJILLO NORTHWEST

OFFICES PROJECT

TRANSMISSION SUBSTATION

Installation of 750 voice/data connections with structured cabling, installation of fiber optics backbone, electrical cabling, grounding wells, and equipment for LAN network. Lima 2009

AND NEW 138 KV TRUJILLO

DATA CENTER PROJECT - INTERBANK

PETROPERU CORPORATE BUILDING PROJECT

SERVICE FOR IMMEDIATE CLIENTS (CACI XIII)

The work consisted of the expansion of primary networks for 85 sectors, and secondary networks for 247 sectors. Junin and Pasco 2010-2011

Installation of 2,140 structured cabling connections and the fiber optics backbone, as well as active equipment for the 10Gb backbone network. Lima 2010 CETAC (ARMY TACTICAL TRAINING CENTER) PROJECT

ARMY MAGAZINES PROJECT

The project consisted of supplying and installing cabinets for Interbank’s alternative data center, and included installation of structured cabling and fiber optics. Lima 2012

New horizons, new challenges

Installation of electronic security equipment at 13 army ammunition warehouses, in addition to closed circuit television (CCTV), structured cabling and fiber optics. Lima 2010-2011

Supplying and installing Staff training software. It also included construction of the building and installation of structured cabling, PC equipment, printers, networking equipment, CCTV, and an IP telephone exchange. Lima 2010

GROUP No.12 RURAL EDELNOR COMMERCIAL

ELECTRIFICATION IN 11

NATIONAL STADIUM EXTERIOR

OPERATIONS SERVICE

DEPARTMENTS

LIGHTING PROJECT

The contract comprised services for: reading, distribution, power cuts, restoration, installation, maintenance, and normalization of new connections and loss control. North Lima 2012 to date

As part of the National Rural Electrification Plan, 63 projects were executed at 576 rural locations in 11 departments of Peru, bringing electric power to over 90,000 residents for the first time. Amazonas, Ancash, Apurimac, Huancavelica, Huanuco, La Libertad, Lambayeque, Piura, Puno, San Martin and Tacna. 2010

Lighting system consisting of RGB lights and projectors, a main control system, and an interactive system. One of the world’s largest crowd control projects and interactive light displays. Lima 2010

ASSEMBLY OF 500 kV AND 220 kV SUBSTATIONS

Contract for electromechanical erection and telecommunications assembly at six 500 kV and 220 kV substations. Lima (Carabayllo), Chimbote and Trujillo 2011 – 2012

MODIFICATION OF PRIMARY 22.9 KV LINE – YANACOCHA

Contract for construction of the 22.9kV L210/211 Primary Line modification. Cajamarca 2010

TOTAL SUPPLY SERVICES

Contract to provide services for major client operations, including services for: reading, power cuts, restoration, installation, maintenance, and others. North Lima 2009 to date

ELECTRIC INSTALLATIONS FOR YURA PRODUCTION LINE III

The project included installation of electrical, electronic and instrumentation equipment for operation of the new Line III for production of 4,200 metric tons per day of clinker. Arequipa 2009 MEDIUM VOLTAGE FEEDER OUTPUT TRUJILLO SUR SUBSTATION

Three-phase underground primary networks, and 4 and 6-way concrete pipes were implemented. Supply, transportation, assembly, testing and commissioning of works for feeder output in medium voltage TS-01, TS-02, TS-07 and TS-08 at the Trujillo Sur Substation. Trujillo 2009 RURAL ELECTRIFICATION IN THE AYACUCHO-HUANCAVELICA CONCESSION AREA

Supply, transportation, electromechanical erection, testing and commissioning of: Project 507Part I, rural electrification in the Ayacucho-Huancavelica concession area. Ayacucho and Huancavelica 2009 SEAL – COMMERCIAL OPERATIONS SERVICE

Providing commercial operations services including: installation, maintenance, normalization and control for new connections. Arequipa 2009-2011

187

SERVICES

NORTHWEST SUBSTATION

6 km of 138 KV T.L. and a new fully equipped transformation substation for the 138 kV Trujillo Norte –Trujillo Northwest Transmission Line and the New Trujillo Northwest Transmission Substation. Trujillo - La Libertad 2008 PROVIDING ELECTRIC POWER SERVICES IN THE ENOSA CONCESSION AREA

Execution of connections for new electric power supply services and restorations, removal of former clients, execution of power cuts and re-connections, emergency services and new power supply services, meter inspections and delivery of bills. Piura and Tumbes 2008 – 2010 ELECTRICAL INSTALLATIONS FOR THE NEW SHOUGANG TRANSFER SYSTEM

Electrical installations were implemented at substations and belts, two 13.8 kV and 4.16 kV transmission lines were wired, and instrumentation for the new transfer system was installed. Marcona - Ica 2008 - 2009 SERVICE FOR IMMEDIATE CLIENTS (CACI IX)

Limited access to electric power services was resolved for new urban installations in the cities of Huancayo and Tarma through the expansion of the medium and low voltage networks. Supplying materials, transportation, electromechanical erection, testing and commissioning. Huancayo and Tarma - Junín 2007 – 2008

RURAL ELECTRIFICATION FOR

MELCHORITA PLANT PROJECT

HUANCABAMBA PAUCARTAMBO

The project consisted of electrification of 61 rural locations in the Pasco Region. Oxapampa - Pasco 2007 – 2008

Installation of 3,500 structured cabling connections, 28 km of fiber optics and multi-pair, and a fire detection system with 5,500 smoke detectors. Ica 2007

REMODELING MEDIUM

COMMERCIAL

AND LOW VOLTAGE NETWORKS

ACTIVITIES – NORTHERN SERVICES

SUBSTATION PROJECT

IN THE CITY OF HUANCAYO

MANAGEMENT

STAGE II

Commercial management activities in the Northern Services Management area, (North Lima and Callao), including services for: commercial inspections, verification of late payment of bills, status inspections, distribution of collection notices, and communication with clients. Lima 2006 – 2008

Remodeling the primary 10kV distribution subsystem networks for Salesianos and Parque Industrial Transmission Substation feeders. Supply, transportation, electromechanical erection, testing and commissioning. Huancayo - Junín 2007 – 2008

GROUP II DISTRIBUTION PROJECTS

Electric power was supplied for the first time to 11 shanty towns in Casma, Nepeña and Chimbote, through expansion of the primary, secondary networks and residential connections. Supply, transportation, assembly, testing and commissioning for rural electrification Group II. El Santa and Casma - Ancash 2006 - 2007


188

80 YEARS

New horizons, new challenges

PROFUTURO AFP BUILDING

TELECOMMUNICATIONS

COMMERCIAL OPERATIONS

EXTERIOR LIGHTING PROJECT

SERVICES - HUA WEI

SUPERVISION

Peru’s first LED-RBG technology lighting project and one of the first in Latin America. Using smart lighting, a dynamic effect was achieved using LEDs connected to software that allows changes to the lighting scenes, creating a spectacular and unique effect. Lima 2006

Contract for nationwide Optical Networks (SDH and DWDM) equipment installation since 2004, and Contract for microwave and wireless installation in the country’s Central region and 50% of Lima (2012). Nationwide 2004 to date

Lima (Edelnor concession area) 2001 – 2008

60/10 kV TRANSMISSION LINE DISTRIBUTION SYSTEMS AND

FOR JORGE CHAVEZ INTERNATIONAL

ELECTRICAL INSTALLATIONS IN

AIRPORT

SHOPPING CENTERS

Contract for design, supply, and transportation of materials and equipment, electromechanical erection, civil works, testing and commissioning of services for: 60 kV junction box at Tomás Valle Transmission Substation, 60kV Transmission Line for Tomás Valle Transmission Substation - LAP Transmission Substation, and the 12 MVA 60/10 kV LAP Transmission Substation. Callao - Lima 2004

Supply, installation and commissioning of electrical distribution and usage systems and electrical installations in medium and low voltage for the client’s new stores, including: C.C. Plaza Atocongo, Tiendas Saénz Peña, Quilca, C.C. Open Plaza Callao, C.C. Aventura Mall Plaza, C.C. Megaplaza Norte. 2005 – 2009 COMMERCIAL ACTIVITIES FOR SPECIAL CLIENTS

Contract for commercial management activities for special clients, including services for: reading, distribution and inspections. Lima 2005 – 2009 INTERIOR AND EXTERIOR LIGHTING PROJECT FOR PERU’S GOVERNMENT PALACE

“Tourist Lighting Circuit”, an initiative by the Municipality of Lima to improve the city’s historical center. Lighting to highlight the monument’s materials, textures and shapes. It was internationally recognized with the IIDA 2006 “Award of Merit” by IES (Illuminating Engineering Society of North America). Lima 2005

ELECTRICAL SERVICES WITH LIVE LINES

Cam Perú is a pioneer in Peru in providing electrical maintenance without power cuts, in medium and high voltage, a highly specialized service that ensures continuity of the client’s operations. Some of the services offered include: preventive and corrective maintenance, network alterations, commissioning, emergency services, etc. Nationwide 2002 to date CONTRACT FOR MISCELLANEOUS WORK - TELEFÓNICA

Contract for various services, such as installation of internal plant, installation and commissioning of optical network equipment, microwave PDH and SDH. Nationwide 2001 to date

ARTISTIC LIGHTING OF HISTORICAL MONUMENTS

“Making Light” (“Hacer Luz”) Project: Executing lighting projects at cathedrals, churches and other buildings with National artistic-historical heritage status. Municipality of Lima, National Congress, Club de la Unión, Main Square / San Martin Square Arcades, Club Nacional, Lima Archbishopric, Roosevelt Building, Lima Art Museum, and others. Lima and Provinces 2001 - 2005 METER LABORATORY SERVICE

Includes verification and calibration of electric power meters and related services. Services are provided to companies such as Edelnor, Luz del Sur, Sedapal, Egasa, San Gabán, Elster, Electrosur, etc. The metering laboratory is currently the Cam Perú inspection department. Lima 2000 to date CAM CHILE S.A. NETWORK TRANSFER UNDERGROUND TUNNELING ON GERÓNIMO DE ALDERETE AVENUE – MUNICIPALITY OF VITACURA

Executing a boulevard that requires prior underground tunneling work for all electrical and telecommunications installations between Kennedy Av. and Vitacura Av. The full extent is a total of 4,000 linear meters of excavation and 110,000 linear meters of pipes for installation. Execution of five underground vaults, medium and low voltage circuits, and supplying and installing all new street lighting. 2013

189

SERVICES

TELEMETERING SYSTEM

IMPLEMENTATION OF ENERGY

SANTA CRUZ SOCOICSA

MANAGEMENT SYSTEM FOR

HOSPITALS

TELEMETERING FOR MAJOR CLIENTS

CHILECTRA ELECTRIC POWER

Operation of a platform that currently has over 2,000 metering sites in Chilectra’s major clients segment. In this case there is a communication channel for each on-site meter, through which historical data can be collected to create trends/reports for consumption and usage of maximum demand, in accordance with the client’s contract rate. 2003 to date

SUBSTATIONS

Design, implementation and commissioning of the centralized control system that comprises several specialties such as air conditioning, heating, lighting, hospital gases, power management, sanitary sewage, fire detection system, air tube and security systems (CCTV, access control), among others. This project was executed at Santa Cruz Hospital (11,740 sq. m). 2010

Energy management platform with 130 high performance meters located in the distributor’s substations. With this system, Chilectra can display the real time behavior of energy demand profiles at the points of sale and purchase of large blocks (each meter). GPS-synchronized (satellite). 2009 – 2010 MODERNIZATION OF ELECTRIC POWER STATIONS - ENDESA

TELEMETERING FOR RESIDENTIAL BUILDING CUSTOMERS

Consists of readings for over 168,000 residential customers. The installed meters have the ability to communicate by electrical network (PLC), and its information is collected in a meter concentrator which generates a historical data base. The operators validate the consistency of the information for processing in the distributor’s billing platforms. TELEMETERING FOR DISTRIBUTION TRANSFORMERS

Over 1,800 metering sites in two types of segments installed in the distributor’s network; micrometering and macro-metering segments. The objective is to compare power losses and distribution in the medium and low voltage segment. Each associated site is telemetered separately and its energy information is centralized and validated by operators, which then issue reports for distributor energy confirmation. 1,893 micrometerings and 124 macro-meterings are performed. 2009 to date

TELEMETERING FOR ANTI-THEFT NETWORKS SYSTEM

several power stations that have implemented ISO 50001 (Energy Management Systems). 2010 – 2014

The service currently has over 24,000 customers in sectors in which on-site readings, power cuts, and restoration of service are difficult. Thanks to it, it is possible to generate power reports on what the meter reads and what is actually used by the customer, thus remotely detecting power theft. Power cuts and restoration of power supply to a customer can also be performed this way at the distributor’s request. 2008 to date

Implementation of management platform and meter verification at E-CL substations, in accordance with CDEC-SING procedures, for which Cam Chile S.A. is a metering system auditor since 2011. 2012 – 2013

ENERGY MANAGEMENT SYSTEM

IMPLEMENTATION OF ENERGY

Engineering, supply, erection, testing and commissioning for modernization of the Cipreses, Abanico, Sauzal, Sauzalito and Los Molles power stations. Civil works, dismantling and assembly of the new turbine control equipment, as well as incorporation of new communications and SCADA systems. 2010 – 2011

POWER STATIONS - COLBÚN

MANAGEMENT PLATFORM

Installation of thermal insulation for the boiler at the Santa María and Bocamina II power station. As simultaneous projects, it is the largest of its kind that has been executed in Chile. 2010 – 2011

FOR E-CL:

CENTRALIZED CONTROL SYSTEMS

MANAGEMENT PLATFORM FOR COLBÚN GENERATOR

MANAGEMENT FOR ENDESA

Supply, installation and maintenance contract for management platform with over 50 high function meters. Some of the meters are part of the generator’s carbon offsetting sales system. The metering equipment is divided into hydraulic generation and thermal generation. 2010

Five-year contract to supply 150 high function meters and implement the centralized Management System to display power injections and cut-offs in the backbone network. Billing reports are generated at each site. GPS synchronization. Implementation of local systems to display consumption at

Cam laboratories are certified and authorized to act as a Certifying Agency by the Electricity and Fuel Superintendency (SEC, for its Spanish acronym) in the following areas: - Testing laboratory for electrical products - Electrical product certifier (energy meters)

MODERNIZATION OF ELECTRIC IMPLEMENTATION OF

IMPLEMENTATION OF ENERGY GENERATOR

CAM CERTIFYING AGENCY

BMS SYSTEM SAN PABLO HOSPITAL COMQUIMBO REGION - OHL S.A.

Design and implementation of centralized control and structured cabling for the BMS for San Pablo Hospital (12,703 sq. m), located in Coquimbo, Region IV. 2010

PUBLIC LIGHTING MAINTENANCE AND INSTALLATION SERVICE Service consisting of ensuring the proper functioning of public lighting through preventive and corrective actions. It also includes switching to new lighting equipment with energy efficiency criteria. Cam currently maintains 100,000 light connections in the Metropolitan Santiago Region. In the past five years, 130 thousand lights have been changed in different parts of the country.


188

80 YEARS

New horizons, new challenges

PROFUTURO AFP BUILDING

TELECOMMUNICATIONS

COMMERCIAL OPERATIONS

EXTERIOR LIGHTING PROJECT

SERVICES - HUA WEI

SUPERVISION

Peru’s first LED-RBG technology lighting project and one of the first in Latin America. Using smart lighting, a dynamic effect was achieved using LEDs connected to software that allows changes to the lighting scenes, creating a spectacular and unique effect. Lima 2006

Contract for nationwide Optical Networks (SDH and DWDM) equipment installation since 2004, and Contract for microwave and wireless installation in the country’s Central region and 50% of Lima (2012). Nationwide 2004 to date

Lima (Edelnor concession area) 2001 – 2008

60/10 kV TRANSMISSION LINE DISTRIBUTION SYSTEMS AND

FOR JORGE CHAVEZ INTERNATIONAL

ELECTRICAL INSTALLATIONS IN

AIRPORT

SHOPPING CENTERS

Contract for design, supply, and transportation of materials and equipment, electromechanical erection, civil works, testing and commissioning of services for: 60 kV junction box at Tomás Valle Transmission Substation, 60kV Transmission Line for Tomás Valle Transmission Substation - LAP Transmission Substation, and the 12 MVA 60/10 kV LAP Transmission Substation. Callao - Lima 2004

Supply, installation and commissioning of electrical distribution and usage systems and electrical installations in medium and low voltage for the client’s new stores, including: C.C. Plaza Atocongo, Tiendas Saénz Peña, Quilca, C.C. Open Plaza Callao, C.C. Aventura Mall Plaza, C.C. Megaplaza Norte. 2005 – 2009 COMMERCIAL ACTIVITIES FOR SPECIAL CLIENTS

Contract for commercial management activities for special clients, including services for: reading, distribution and inspections. Lima 2005 – 2009 INTERIOR AND EXTERIOR LIGHTING PROJECT FOR PERU’S GOVERNMENT PALACE

“Tourist Lighting Circuit”, an initiative by the Municipality of Lima to improve the city’s historical center. Lighting to highlight the monument’s materials, textures and shapes. It was internationally recognized with the IIDA 2006 “Award of Merit” by IES (Illuminating Engineering Society of North America). Lima 2005

ELECTRICAL SERVICES WITH LIVE LINES

Cam Perú is a pioneer in Peru in providing electrical maintenance without power cuts, in medium and high voltage, a highly specialized service that ensures continuity of the client’s operations. Some of the services offered include: preventive and corrective maintenance, network alterations, commissioning, emergency services, etc. Nationwide 2002 to date CONTRACT FOR MISCELLANEOUS WORK - TELEFÓNICA

Contract for various services, such as installation of internal plant, installation and commissioning of optical network equipment, microwave PDH and SDH. Nationwide 2001 to date

ARTISTIC LIGHTING OF HISTORICAL MONUMENTS

“Making Light” (“Hacer Luz”) Project: Executing lighting projects at cathedrals, churches and other buildings with National artistic-historical heritage status. Municipality of Lima, National Congress, Club de la Unión, Main Square / San Martin Square Arcades, Club Nacional, Lima Archbishopric, Roosevelt Building, Lima Art Museum, and others. Lima and Provinces 2001 - 2005 METER LABORATORY SERVICE

Includes verification and calibration of electric power meters and related services. Services are provided to companies such as Edelnor, Luz del Sur, Sedapal, Egasa, San Gabán, Elster, Electrosur, etc. The metering laboratory is currently the Cam Perú inspection department. Lima 2000 to date CAM CHILE S.A. NETWORK TRANSFER UNDERGROUND TUNNELING ON GERÓNIMO DE ALDERETE AVENUE – MUNICIPALITY OF VITACURA

Executing a boulevard that requires prior underground tunneling work for all electrical and telecommunications installations between Kennedy Av. and Vitacura Av. The full extent is a total of 4,000 linear meters of excavation and 110,000 linear meters of pipes for installation. Execution of five underground vaults, medium and low voltage circuits, and supplying and installing all new street lighting. 2013

189

SERVICES

TELEMETERING SYSTEM

IMPLEMENTATION OF ENERGY

SANTA CRUZ SOCOICSA

MANAGEMENT SYSTEM FOR

HOSPITALS

TELEMETERING FOR MAJOR CLIENTS

CHILECTRA ELECTRIC POWER

Operation of a platform that currently has over 2,000 metering sites in Chilectra’s major clients segment. In this case there is a communication channel for each on-site meter, through which historical data can be collected to create trends/reports for consumption and usage of maximum demand, in accordance with the client’s contract rate. 2003 to date

SUBSTATIONS

Design, implementation and commissioning of the centralized control system that comprises several specialties such as air conditioning, heating, lighting, hospital gases, power management, sanitary sewage, fire detection system, air tube and security systems (CCTV, access control), among others. This project was executed at Santa Cruz Hospital (11,740 sq. m). 2010

Energy management platform with 130 high performance meters located in the distributor’s substations. With this system, Chilectra can display the real time behavior of energy demand profiles at the points of sale and purchase of large blocks (each meter). GPS-synchronized (satellite). 2009 – 2010 MODERNIZATION OF ELECTRIC POWER STATIONS - ENDESA

TELEMETERING FOR RESIDENTIAL BUILDING CUSTOMERS

Consists of readings for over 168,000 residential customers. The installed meters have the ability to communicate by electrical network (PLC), and its information is collected in a meter concentrator which generates a historical data base. The operators validate the consistency of the information for processing in the distributor’s billing platforms. TELEMETERING FOR DISTRIBUTION TRANSFORMERS

Over 1,800 metering sites in two types of segments installed in the distributor’s network; micrometering and macro-metering segments. The objective is to compare power losses and distribution in the medium and low voltage segment. Each associated site is telemetered separately and its energy information is centralized and validated by operators, which then issue reports for distributor energy confirmation. 1,893 micrometerings and 124 macro-meterings are performed. 2009 to date

TELEMETERING FOR ANTI-THEFT NETWORKS SYSTEM

several power stations that have implemented ISO 50001 (Energy Management Systems). 2010 – 2014

The service currently has over 24,000 customers in sectors in which on-site readings, power cuts, and restoration of service are difficult. Thanks to it, it is possible to generate power reports on what the meter reads and what is actually used by the customer, thus remotely detecting power theft. Power cuts and restoration of power supply to a customer can also be performed this way at the distributor’s request. 2008 to date

Implementation of management platform and meter verification at E-CL substations, in accordance with CDEC-SING procedures, for which Cam Chile S.A. is a metering system auditor since 2011. 2012 – 2013

ENERGY MANAGEMENT SYSTEM

IMPLEMENTATION OF ENERGY

Engineering, supply, erection, testing and commissioning for modernization of the Cipreses, Abanico, Sauzal, Sauzalito and Los Molles power stations. Civil works, dismantling and assembly of the new turbine control equipment, as well as incorporation of new communications and SCADA systems. 2010 – 2011

POWER STATIONS - COLBÚN

MANAGEMENT PLATFORM

Installation of thermal insulation for the boiler at the Santa María and Bocamina II power station. As simultaneous projects, it is the largest of its kind that has been executed in Chile. 2010 – 2011

FOR E-CL:

CENTRALIZED CONTROL SYSTEMS

MANAGEMENT PLATFORM FOR COLBÚN GENERATOR

MANAGEMENT FOR ENDESA

Supply, installation and maintenance contract for management platform with over 50 high function meters. Some of the meters are part of the generator’s carbon offsetting sales system. The metering equipment is divided into hydraulic generation and thermal generation. 2010

Five-year contract to supply 150 high function meters and implement the centralized Management System to display power injections and cut-offs in the backbone network. Billing reports are generated at each site. GPS synchronization. Implementation of local systems to display consumption at

Cam laboratories are certified and authorized to act as a Certifying Agency by the Electricity and Fuel Superintendency (SEC, for its Spanish acronym) in the following areas: - Testing laboratory for electrical products - Electrical product certifier (energy meters)

MODERNIZATION OF ELECTRIC IMPLEMENTATION OF

IMPLEMENTATION OF ENERGY GENERATOR

CAM CERTIFYING AGENCY

BMS SYSTEM SAN PABLO HOSPITAL COMQUIMBO REGION - OHL S.A.

Design and implementation of centralized control and structured cabling for the BMS for San Pablo Hospital (12,703 sq. m), located in Coquimbo, Region IV. 2010

PUBLIC LIGHTING MAINTENANCE AND INSTALLATION SERVICE Service consisting of ensuring the proper functioning of public lighting through preventive and corrective actions. It also includes switching to new lighting equipment with energy efficiency criteria. Cam currently maintains 100,000 light connections in the Metropolitan Santiago Region. In the past five years, 130 thousand lights have been changed in different parts of the country.


190

80 YEARS

ELECTRICAL NETWORK CONNECTION SERVICE LIGHTING AND POWER SYSTEM FOR 28 STATIONS ON SANTIAGO METRO LINES 4 AND 4ª

33 km of the lighting system and the ventilation system were installed for the Recoleta North extension of Line 2 of the Santiago Metro. 2005 SIGNALING SYSTEM,

New horizons, new challenges

UNDERGROUND ELECTRICAL

ECOPETROL GROUP

CODENSA BACATÁ SUBSTATION

INDIVIDUAL PROTECTION

URBANIZATION – ENEA

SUPPLY CHAIN AND CONTRACTS

CONSTRUCTION

EQUIPMENT LABORATORY

Project executed at the ENEA airport complex, in the Municipality of Pudahuel. 1999

SUPPORT

Supply purchasing. Hiring specialized and non-specialized services. 2008 – 2012

Supplying ABB equipment for construction of the Bacatá substation in Bogota. 2005

ELECTRICAL URBANIZATION AND

CODENSA, HIGH AND MEDIUM

ENDESA COLOMBIA GROUP

UNDERGROUND PUBLIC LIGHTING

VOLTAGE SUBSTATION WORKS

SERVICE CONTRACT FOR EQUIPMENT

Project executed at Ciudad Empresarial, Municipality of Huechuraba. 1997

AND MAINTENANCE CONTRACT

AND SUPPLY PROCUREMENT FOR

Maintenance is provided for 110 substations in the Bogota area. Electrical and civil works, maintenance services. Operating in conjunction with SERINEL. 2010 to date

ENDESA GROUP COMPANIES IN

Dielectric testing, mechanical protection equipment and hand tools, and collective production capacity for up to 1,000 units per month in the Ceará Branch. At the Río de Janeiro Branch, the implementation of the EPI laboratory is expected to be operating in April 2013. 2011 to date

ELECTRIFICATION, AND COMMUNICATIONS FOR

CAM COLOMBIA

THE SANTIAGO – CHILLÁN RAILWAY LINE FERROCARRILES DEL

CODENSA TELEMETERING

ESTADO (EFE)

CONTRACT

Signaling system, electrification, and communications for the SantiagoChillán railway line. Modernization of 17 substations and system Electrical Maintenance. 2005

Remote reading service for electronic power meters – telemetering – for clients, trade borders, and macrometered transformers for the CODENSA distribution system at the Local Distribution System, Regional Transmission System, and National Transmission System level in the capital district and all municipalities in the coverage area. Effective to date

ELECTRICAL URBANIZATION SERVICES

CUNDINAMARCA - EEC

ENERGY EFFICIENCY

METERING EQUIPMENT

Medium voltage substation works and maintenance contract. Maintenance is provided for 156 substations in the Cundinamarca area. Electrical and civil works. Maintenance services. Operating in conjunction with SERINGEL. 2010 to date

Consulting and efficiency services for execution of power consumption by small, medium and large companies, its main activities are: rate adjustment, power factor correction, management and control for installation of electric power systems, analysis of power quality analysis, and power factor correction. 2011 - 2012

MANAGEMENT PROJECT (COELCE

EMPRESA ELÉCTRICA DE CUNDINAMARCA - EEC

CODENSA MEDIUM VOLTAGE

TELEMETERING CONTRACT

OVERHEAD AND UNDERGROUND

Remote electronic power meter reading service – telemetering – for clients, trade borders and macro-metered transformers for the EEC distribution system at the Local Distribution System, Regional Transmission System, and National Transmission System level in the Cundinamarca area. February 2013 to date

NETWORK WORKS AND

CODENSA METER CALIBRATION

CODENSA READING AND DELIVERY

SYSTEM ADJUSTMENT

CODENSA MAJOR CLIENTS

CONTRACT IN CAM LABORATORY

CONTRACT

ELECTRICAL URBANIZATION

CONTRACT

AND PUBLIC LIGHTING IN BRISAS

CODENSA SA ESP loss control program for inspection of metering equipment and electrical connections for major consumers. Visits to borders between distributors. Service for Mantis Project alarms. Equipment inspections for consumption deviations. Verification of technical metering conditions, through inspections with master equipment. Effective to date

Calibration of single phase-two phase-three phase meters. On-site meter inspection and calibration service. Effective to date

Meter reading and delivery of bills and other documents for clients in the mass market of residential utility companies in Bogotá, Sabana and Cundinamarca. Field services 2012 – 2017

Internal installations. Playing field lighting. Substations. 2010 - 2011

Construction of medium and low voltage underground networks and public lighting on Av. Los Maitenes and El Parque, ENEA. 2009 ELECTRICAL URBANIZATION AND UNDERGROUND PUBLIC LIGHTING

On the Chicureo and Chamisero route, in the Municipality of Colina. 2003

DE CHICUREO

Project executed in Stages F, G and H, Municipality of Colina. 2003 CONSTRUCTION AND PUBLIC LIGHTING

Executed on Route 5 North crossover, walkways and accesses. Santiago los Vilos 2001

EMGESA TELEMETERING CONTRACT

Remote reading service for electronic power meters – telemetering – for clients, trade borders, and macrometered transformers for the distribution system. Installation of metering and communication systems for unregulated clients in EMGESA trade borders. Effective to date

COMGAS INVENTORIES

CAM BRAZIL

CONNECTION CONTRACT

CONSTRUCTION - CHILECTRA

Equipment purchasing. Negotiation for services. Supply purchasing. 2002 - 2008

Distribution material inventory services. 2011 - January 2013

Modification of property meterings. Physically changing meters and security elements (seals), and respective updates in the commercial information system. Execution of electrical and civil works related to service connection. Support for connections with a complementary electrical and civil work execution process. Effective to date

UNDERGROUND NETWORK

COLOMBIA

EMPRESA ELÉCTRICA DE

CODENSA NEW SUPPLY SERVICE

MAINTENANCE CONTRACT

Over 300 km of medium voltage networks are executed. Maintenance for Bogota area networks. Electrical works for network construction. Operating in conjunction with MEC. 2010 to date BOGOTA EL CAMPÍN STADIUM CONTRACT FOR ELECTRICAL

CODENSA TECHNICAL METERING

Implementation of technical metering for reduction and control of electric power losses in the entire area of influence. Installation of metering compacts for mediumvoltage circuits. Effective to date

PETROBRAS GROUP SUPPLY CHAIN AND CONTRACTS SUPPORT

Supply purchasing. Hiring specialized and non-specialized services. Lighting towers. 2007 – 2008

191

SERVICES

CLIENT)

Managing all of Compañía de Energía del Estado de Ceará’s metering equipment, which is estimated to have 3.5 million active clients. Includes analysis and proposal services per site, and technical evaluation of the equipment. Deteriorated or discarded scrape equipment, control and release

of new and used equipment, programming field, storage memory recovery and analysis, report management. 2011 – 2012 BORDER METERING

Performing all activities related to maintenance and inspection of the billing metering system in accordance with procedures currently in force. Monthly production capacity of 90 units. The accumulated meter calibration in the field plus free meters in 2011 was 195, and 395 in 2012. 2011 – 2012


190

80 YEARS

ELECTRICAL NETWORK CONNECTION SERVICE LIGHTING AND POWER SYSTEM FOR 28 STATIONS ON SANTIAGO METRO LINES 4 AND 4ª

33 km of the lighting system and the ventilation system were installed for the Recoleta North extension of Line 2 of the Santiago Metro. 2005 SIGNALING SYSTEM,

New horizons, new challenges

UNDERGROUND ELECTRICAL

ECOPETROL GROUP

CODENSA BACATÁ SUBSTATION

INDIVIDUAL PROTECTION

URBANIZATION – ENEA

SUPPLY CHAIN AND CONTRACTS

CONSTRUCTION

EQUIPMENT LABORATORY

Project executed at the ENEA airport complex, in the Municipality of Pudahuel. 1999

SUPPORT

Supply purchasing. Hiring specialized and non-specialized services. 2008 – 2012

Supplying ABB equipment for construction of the Bacatá substation in Bogota. 2005

ELECTRICAL URBANIZATION AND

CODENSA, HIGH AND MEDIUM

ENDESA COLOMBIA GROUP

UNDERGROUND PUBLIC LIGHTING

VOLTAGE SUBSTATION WORKS

SERVICE CONTRACT FOR EQUIPMENT

Project executed at Ciudad Empresarial, Municipality of Huechuraba. 1997

AND MAINTENANCE CONTRACT

AND SUPPLY PROCUREMENT FOR

Maintenance is provided for 110 substations in the Bogota area. Electrical and civil works, maintenance services. Operating in conjunction with SERINEL. 2010 to date

ENDESA GROUP COMPANIES IN

Dielectric testing, mechanical protection equipment and hand tools, and collective production capacity for up to 1,000 units per month in the Ceará Branch. At the Río de Janeiro Branch, the implementation of the EPI laboratory is expected to be operating in April 2013. 2011 to date

ELECTRIFICATION, AND COMMUNICATIONS FOR

CAM COLOMBIA

THE SANTIAGO – CHILLÁN RAILWAY LINE FERROCARRILES DEL

CODENSA TELEMETERING

ESTADO (EFE)

CONTRACT

Signaling system, electrification, and communications for the SantiagoChillán railway line. Modernization of 17 substations and system Electrical Maintenance. 2005

Remote reading service for electronic power meters – telemetering – for clients, trade borders, and macrometered transformers for the CODENSA distribution system at the Local Distribution System, Regional Transmission System, and National Transmission System level in the capital district and all municipalities in the coverage area. Effective to date

ELECTRICAL URBANIZATION SERVICES

CUNDINAMARCA - EEC

ENERGY EFFICIENCY

METERING EQUIPMENT

Medium voltage substation works and maintenance contract. Maintenance is provided for 156 substations in the Cundinamarca area. Electrical and civil works. Maintenance services. Operating in conjunction with SERINGEL. 2010 to date

Consulting and efficiency services for execution of power consumption by small, medium and large companies, its main activities are: rate adjustment, power factor correction, management and control for installation of electric power systems, analysis of power quality analysis, and power factor correction. 2011 - 2012

MANAGEMENT PROJECT (COELCE

EMPRESA ELÉCTRICA DE CUNDINAMARCA - EEC

CODENSA MEDIUM VOLTAGE

TELEMETERING CONTRACT

OVERHEAD AND UNDERGROUND

Remote electronic power meter reading service – telemetering – for clients, trade borders and macro-metered transformers for the EEC distribution system at the Local Distribution System, Regional Transmission System, and National Transmission System level in the Cundinamarca area. February 2013 to date

NETWORK WORKS AND

CODENSA METER CALIBRATION

CODENSA READING AND DELIVERY

SYSTEM ADJUSTMENT

CODENSA MAJOR CLIENTS

CONTRACT IN CAM LABORATORY

CONTRACT

ELECTRICAL URBANIZATION

CONTRACT

AND PUBLIC LIGHTING IN BRISAS

CODENSA SA ESP loss control program for inspection of metering equipment and electrical connections for major consumers. Visits to borders between distributors. Service for Mantis Project alarms. Equipment inspections for consumption deviations. Verification of technical metering conditions, through inspections with master equipment. Effective to date

Calibration of single phase-two phase-three phase meters. On-site meter inspection and calibration service. Effective to date

Meter reading and delivery of bills and other documents for clients in the mass market of residential utility companies in Bogotá, Sabana and Cundinamarca. Field services 2012 – 2017

Internal installations. Playing field lighting. Substations. 2010 - 2011

Construction of medium and low voltage underground networks and public lighting on Av. Los Maitenes and El Parque, ENEA. 2009 ELECTRICAL URBANIZATION AND UNDERGROUND PUBLIC LIGHTING

On the Chicureo and Chamisero route, in the Municipality of Colina. 2003

DE CHICUREO

Project executed in Stages F, G and H, Municipality of Colina. 2003 CONSTRUCTION AND PUBLIC LIGHTING

Executed on Route 5 North crossover, walkways and accesses. Santiago los Vilos 2001

EMGESA TELEMETERING CONTRACT

Remote reading service for electronic power meters – telemetering – for clients, trade borders, and macrometered transformers for the distribution system. Installation of metering and communication systems for unregulated clients in EMGESA trade borders. Effective to date

COMGAS INVENTORIES

CAM BRAZIL

CONNECTION CONTRACT

CONSTRUCTION - CHILECTRA

Equipment purchasing. Negotiation for services. Supply purchasing. 2002 - 2008

Distribution material inventory services. 2011 - January 2013

Modification of property meterings. Physically changing meters and security elements (seals), and respective updates in the commercial information system. Execution of electrical and civil works related to service connection. Support for connections with a complementary electrical and civil work execution process. Effective to date

UNDERGROUND NETWORK

COLOMBIA

EMPRESA ELÉCTRICA DE

CODENSA NEW SUPPLY SERVICE

MAINTENANCE CONTRACT

Over 300 km of medium voltage networks are executed. Maintenance for Bogota area networks. Electrical works for network construction. Operating in conjunction with MEC. 2010 to date BOGOTA EL CAMPÍN STADIUM CONTRACT FOR ELECTRICAL

CODENSA TECHNICAL METERING

Implementation of technical metering for reduction and control of electric power losses in the entire area of influence. Installation of metering compacts for mediumvoltage circuits. Effective to date

PETROBRAS GROUP SUPPLY CHAIN AND CONTRACTS SUPPORT

Supply purchasing. Hiring specialized and non-specialized services. Lighting towers. 2007 – 2008

191

SERVICES

CLIENT)

Managing all of Compañía de Energía del Estado de Ceará’s metering equipment, which is estimated to have 3.5 million active clients. Includes analysis and proposal services per site, and technical evaluation of the equipment. Deteriorated or discarded scrape equipment, control and release

of new and used equipment, programming field, storage memory recovery and analysis, report management. 2011 – 2012 BORDER METERING

Performing all activities related to maintenance and inspection of the billing metering system in accordance with procedures currently in force. Monthly production capacity of 90 units. The accumulated meter calibration in the field plus free meters in 2011 was 195, and 395 in 2012. 2011 – 2012


192

80 YEARS

ELECTRICAL EQUIPMENT

LOGISTICS OPERATOR

METERING PROJECTS

COMMISSIONING PROJECT (COELCE)

Providing and managing services for material reception, storage, sorting, and transportation for Elektro and Comgás in distribution centers located in Sumaré-SP and San José dos Campos-SP. All managed by WMS, with 3.5 million units (un, kg, m) managed/month, with 12,000 sq.m of warehouses and 7,000 positions for pallets. Service to 35 suppliers/day and 15 vehicles/day. Elektro award winning project for Social Responsibility in 2011. 2008 to date

ELECTRIC POWER METER

Testing and functional verification services resulting from metering, protection, control, operation and supervision operations at electric substations. Monthly average of 10 substations. 2011 to date TRANSPORTATION OF WASTE AND OTHER MATERIALS

Transportation services for earth that has been contaminated by waste. Around 20 trips are made per year, over a total of 40,000 km, transporting 200 mt/year to incinerator companies. 2011 to date LOGISTICS PROJECTS

Material reception, storage, sorting, and transportation services 2010 – 2012 TESTING LABORATORY

Electric power meter testing services. Río de Janeiro laboratory, authorized by INMETRO since 2008 in accordance with ISO / IEC 17025:2005, and also certified by the National Bureau Veritas ISO 9001:2008, since 2006. Services include testing of electromechanical, electronic and SDMEE (Spanish acronym for “Distributed Electrical Power Metering System”) meters. 2008 to date

TESTING SERVICES (TECHNICAL DECISION)

Testing service for meters that have been withdrawn from the field is performed in the laboratory or on-site with the main objective of impartially reporting to distributors and their consumers on the meters’ technical compliance. Approximate production of 9,200 meters/month in the INMETROapproved laboratories located in San Gonzalo-RJ and Eusebio-CE. 2003 to date

DISTRIBUTION MATERIAL TRANSPORTATION

Distribution material transportation services using heavy vehicles. Performed in approximately 180 trips over 80,000 km, transporting 1.5 million tons of material per month to sites, warehouses and others in the State of Sao Paulo. 2008 to date SALE AND INSTALLATION OF ELECTRIC POWER CONCENTRATORS

Sale, installation, and maintenance of Cam metering concentrators. Approved by the regulating agency INMETRO agency, with 200 thousand installed clients throughout Brazil. The system is installed at the top of the post to prevent low voltage power theft. 2005 to date

ELECTRIC POWER METER MAINTENANCE

Recovery service for electronic and induction electric power meters. Includes performing all physical maintenance, cleaning, changing parts, meter calibration and testing. Approximate maximum production of 13,000 meters/month. 2003 - 2012


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.