EXTRA - The added place to play, relax, sport, think, create

Page 30

D E M O L I T I O N

The first inter vention that takes place on the construction site is the demolition of a part of the viaduct. A new road leading to the thurn and taxis site will pass by the building and that is why the end of the viaduct will be broken down. We aim to obtain the deconstruction materials for future use. Therefore the next inter vention is to break down a hallway of 7,50m width. This huge space will ser ve as the main passage and storage for building materials. In the final phase of construction this will become a bicycle parking. The third stage of demolition is making an open area in the middle of the building by removing the roof and the top f loor. In this way we create an enclosed square so more light can enter the building. On the other hand it creates two double high, open spaces where new activities can take place. On the next page you can find a study of the dimensions.

The next stage of demolition allows the existing four cores to expand. By enlarging the internal staircases from one to three meters, the escape routes become wide enough to allow an occupancy rate of almost 1350 people per f loor. The existing elevators within the building are maintained. The last stage of demolition is adding seven new window openings per f loor in the east facade. We follow the existing rhythm. More light can now enter the building.

30


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.