1 minute read

6.2 Navisworks Viewpoints

Next Article
1.0 SUMMARY

1.0 SUMMARY

6.2 Navisworks Viewpoints Clashes saved using the Clash Detective in Navisworks Manage are NOT visible using

Navisworks Freedom, hence it is advisable for all ‘critical’ clashes to be saved as Saved Viewpoints instead for the design & construction teams to review (example below).

Advertisement

Clash Detective Image (not available in Freedom) Saved Viewpoint of the same Clash (saved by BIM Coordinator)

An example of the ‘Saved Viewpoints’ from a typical project are shown below-left and is accessbile by going to the View tab > Windows and check the ☑ Saved Viewpoints box.

Viewpoint Naming Strategy

For Advanced users I have created a separate Navisworks Viewpoint Naming Strategy document that goes through various naming conventions. This can be downloaded from: https://bit.ly/3g2G5OZ

This article is from: