renovation, my sons’ bathroom vanity was such a tight fit
Frank and his team. We were so happy with the way the
(on paper it was perfect) that we realized the door jamb had
renovation went, my husband and I decided to roll right into
to be moved a full two inches. Turning this into a positive
two other bathroom renovations. Just as with the primary,
though – previously we had discussed turning that bathroom
the end results of both bathrooms were stunning.
door into a pocket door but didn’t do it because of the cost.
It’s night and day to have well lit, beautifully designed,
Because of the issue with the door jamb, we decided that
not leaking, functional bathrooms, and we couldn’t be more
since the work was needed, a pocket door could be installed.
thankful for the fantastic team who helped us create them.
We are so happy we did!
We are still waiting on our closet design to be installed
The bathroom turned out beautifully, but one of the
(three months and waiting), but as an Air Force brat I’m
most striking differences was the second part of the
accustomed to living out of a suitcase. Or in this case, wire
renovation – the fireplace in our bedroom. My husband and I
containers.
knew what we wanted, but we just didn’t know how it could
My husband and I aren’t done renovating yet, but we are
be accomplished given the setting of the fireplace. Again,
taking a little break from the dust and activity to enjoy our
John and Trevor spoke with Frank, and they were able to
new bathrooms. A new kitchen is in the future, and we know
perfectly capture and deliver the striking statement fireplace
exactly who we will reach out and ask for advice from when
we envisioned. The floor to ceiling quartz fireplace is beyond
we are ready to do it!
stunning and completely changes the look of the room. Our remodel experience was much easier than either of us expected. This was primarily due to our working with
45