RAIL AS AN Â
URBAN
CONDENSER
R a i l w ay a s m o t o r a n d re g i o n a l d eve l o p m e n t o p p o r t u n i t y
Alexia Alexopoulou (UP) Katerina Boulougoura (NTUA) Francesco Gilardi (ETH) Athina Moroglou (UP) Maria Tsoli (NTUA) Thomas Wehren (ETH) Alexandros Zomas (NTUA) Coach: Dr Rolf Signer
Athens, 19th June 2015
RAILWAY NETWORK - EUROPEAN SCALE
ORIENT / EAST-MED CORRIDOR Hamburg - Athens
GREECE
ATHENS European Commission – ec.europa.eu 19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
RAILWAY NETWORK - NATIONAL SCALE
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
RAILWAY NETWORK - REGIONAL SCALE - SITUATION 2015
Larissa RS-SKA: 100 trains/day
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
DEVELOPMENT STEP 1 (UNTIL 2020)
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
DEVELOPMENT STEP 2 (UNTIL 2025)
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
DEVELOPMENT STEP 3 (UNTIL 2030)
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
DEVELOPMENT STEP 3 (UNTIL 2030)
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
DEVELOPMENT STEP 4 (AFTER 2030)
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
STRATEGIC PLAN
Tris Gefires
Sanremo (Italy) Disused railway line transformed in a bike path along the coast (used as tourist and utilitarian purposes)
19.06.2015 | Team 1
Roof Station train lines roads bicycle paths M1 M2 M3 pedestrian passages green areas elaionas
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
ROUF STATION AREA
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
AGIOI ANARGYROI STATION AREA
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
LARISSIS RAILWAY STATION
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
LARISSIS RAILWAY STATION
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
LARISSIS RAILWAY STATION
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
LARISSIS RAILWAY STATION
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
LARISSIS RAILWAY STATION
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
LARISSIS RAILWAY STATION
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
LARISSIS RAILWAY STATION
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
LARISSIS RAILWAY STATION
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
LARISSIS RAILWAY STATION
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
AND WHAT IF?
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
AND WHAT IF?
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
AND WHAT IF?
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
AND WHAT IF?
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
AND WHAT IF?
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
AND WHAT IF?
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
AND WHAT IF?
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
AND WHAT IF?
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
AND WHAT IF?
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
AND WHAT IF?
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
AND WHAT IF?
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
AND WHAT IF?
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
AND WHAT IF?
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
AND WHAT IF?
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
AND WHAT IF?
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
AND WHAT IF?
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
AND WHAT IF?
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
AND WHAT IF?
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
AND WHAT IF?
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
THANK YOU
COSTS
• • • •
Double track new: Upgrading existing line incl. electricity: Electrification existicing line: Interlocking ? (Larissa) ca.
15-20 mio EUR/km 5-10 mio EUR/km 0.5-1.0 mio EUR/km 15 mio EUR
• •
Train: 100 m Tram: 100 m ca.
8 mio EUR 2.5-3.0 mio EUR
19.06.2015 | Team 1
ca.
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER
IERA ODOS SECTION
Manesse Strasse, Zurich (Switzerland) Underpass in 2 levels under railway line: Level -1: pedestrians / cyclists Level -2: motorised traffic
19.06.2015 | Team 1
OBSERVATION PERIMETER - OPERATIONAL PERIMETER - IN-DEPTH PERIMETER