Architecture Portfolio Martin Genet 2013

Page 1

Recent Works 2013 martin genet uusimmat projektit This book introduces a selection of projects made between 2011 and 2012. You will find inside my resume and an overview of each work. They are sorted by status, and the CMYK vignettes indicate the circumstance of the project. C is for personal architectural works, M is for school’s projects, Y is for projects I have worked on for architecture offices, and K is for side works.

Š Martin Genet 2013


m

:

: @ : p

Pihlajatie 5 A 7, 00270 HELSINKI 044 9595 169 mrt.genet@gmail.com

martin genet 13.11.1990

www.issuu.com/mrgnt/docs

education

experiences

Master 1 in Spatial Design -

“Concours Acier“ competition : 1st prize project (may 2012)

Bachelor’s Degree of Architecture -

ALA architects - Helsinki 4 month internship (march 2012 - june 2012)

2012-2013 Aalto University, School of Art, Design and Architecture

Design of a multi-sports Arena. Refurbishment of old gasholders.

2008-2011 École Nationale Supérieure d’Architecture de Paris-Malaquais

Competition for the new Helsinki Central Library - Technical drawings for the extension of a theatre in Kuopio - Renderings for Subway stations project in Otaniemi.

Materials’ Properties Courses -

2008-2011 Conservatoire National des Arts et Métiers (Paris)

“Dessine ton école” competition : 1st prize project (december 2012)

Furniture and Interior Design for the Malaquais’ school common spaces

CUT architectures - Paris 7 month internship (july 2011 - january 2012)

proficiency

Competition for - «Children-house» in Criquetot-l’Esneval : Award-winning project. Competition for education facilities - Drawings for extension of individual house Woodwork design for custom furniture - Workings’ supervision for a flat renovation.

Physical and virtual models.

•••••

Contribution for the wood model of Port de Solférino - urban project by APUR

3D Modeling. (Rhinocéros, Cinema4D) Rendering. (V-Ray, Artlantis, Photoshop) Parametric design and conception. (Rhinoscript, Grasshopper)

••••• ••••• •••••

“From Garden city to Ecosystem” Competition. (march 2009) Workshop Tel-Aviv-Jaffa - international competition on the urban expansion.

Architectural drawings. (AutoCAD)

•••••

Page setting & Graphic design. (Photoshop, InDesign, Illustrator) ••••• Office software. (Microsoft Office) •••••

(Internship at the STGCAI Mairie de Paris - september 2010)

(Publication of Alexis Meier in the magazine : “Urbanisme”)

management, team working. Cofounder of the School’s Sports Association and the school’s rugby team Pianist within an electro-classical band.

international.

hobbies.

Languages : French, English, German, Finnish (basics). Travels.

Rugby, Surf // Piano, Paint, Woodwork, Photography.

(january 2010)


built works renovate a small flat mimĂŠsis liquid mechanics


renovate a small flat

december 2011 • Paris 14 (France) CUT architectures • pictures © David Foessel


Flat renovation in Paris • 35 sqm location Paris 14 (France) floor area 35 sqm cost 65 000₏ architects CUT architectures status built The project is a complete of a 35 sqm flat in Paris.

renovation

The new plan offers a bedroom, an optimized bathroom, a lot of integrated storage, separated toilets and a large living space including the kitchen, a wide desk and bookshelves. The bookshelves made out of painted medium are implemented directly on the walls with hidden joints. All the custom furniture is made out of oak as well as the parquet. The shiny white of the countertop, contrasts with the wood and bring a great lightness in the living space.

CUT architectures 2011 design, technical drawings, and workings supervision

ng si

ou lh al

sm


mimésis

june 2011 • Rugles (France) Amandine Cersosimo • Martin Genet • Pierre Gourvennec • Margot Halard • Jim Rhoné




Mimésis • parasite shelter location Rugles (France) size 230 x 220 x 200 cm cost 1 200€ student team Amandine Cersosimo, Martin Genet, Pierre Gourvennec, Margot Halard, Jim Rhoné status build This artistic installation works as a high up shelter warped around an old iron framework. The wood structure is inserted sensitively and looks like levitating lightly. The dissimulated posts hold the floor which brushes the horizontal angle of the frame. Built high without touching the weak old iron structure is the main technical trick of this parasite project. It holds actually on the brick wall of the second facade. Up there, the place is made to have rest, and relax in the summer, day and night, in a peaceful loneliness.

ENSAPM 2011 - 3rd year - Christian Comiot Yann Rocher

w d

oo e ur

ct ru

| st


liquid mechanics

june 2011 • Rugles (France) Martin Genet • Jim Rhoné • Xavier Seurre




Floating Diversion • device prototype location Rugles (France) size 340 x 130 x 90 cm / module cost 400€ /module student team Martin Genet, Jim Rhoné, Xavier Seurre status prototype Alongside the Risle, the old industrial site named “Les Forges” has been transformed into cottage by its owner. An hydroelectric power station still stand at the heart of this old ironworks and was unused because of the accumulation of branches and miscellaneous floating trashes. Therefore, we have designed a floating barrage made up of six semi-independent modules. The articulated system plays the part of trash runner. In this way it allows an untroubled water flow in the power station mechanism, and it doesn’t need regular maintenance. Finally, the power station will provide electricity to the rural cottage. According to our sustainable approach, we experimented a full-scale prototype of the device. The timber structure is floating thanks to three 120L drums which have been salvaged through the firm “ECOFUT”. Then the module is anchored with nylon ropes and a big rock in the river.

ENSAPM 2011 - 3rd year - Christian Comiot Yann Rocher

le ab

in ta

s su n

g si

de


competition entries gasholder olympic arena do it wisely the periwinkles triangle dreams of stone


gasholder olympic arena

may 2012 • Concours Construir’Acier OTUA (France) Nabil Aissaoui • Charles Bernard • Amandine Cersosimo • Martin Genet • Xavier Seurre


14

17 17 19 19

18 18 16 16


1922

2062

速 2012


“Build it Steel” competition • Gasholder refurbishment London Olympics 2012 1st PRIZE awarded and publicated location London (UK) floor area 10 000 sqm arena capacity 3500 spectators design team N. Aissaoui, A. Cersosimo, C. Bernard M. Genet, X. Seurre status project Olympic games represent a huge show challenging cities around the world. Architectural dares and experimentations are dealing with heavy urban questions. 2012, the Olympic park is located in London’s east suburb. Newham, an old industrial and popular district, becomes then the object of a great urban development plan. Considering the urban restructuration, the project needs to integrate a triple sided problematic : spatiality, function flexibility and urban identity. Reminding the industrial era, the gasholders left on the site offer a structure on which the project is grafting. The symbolic reconversion of the metallic framework brings the past history towards the future and establishes a strong visual identity. Nonetheless discretion and simplicity remain a central concern in the design, in order to achieve a sustainable intervention. The project aims to be an indoor arena during the games and be able to host cultural events after them, an open public space allowing and supporting the city development. student competition - 2012

y lit bi

xi fle


do it wisely

december 2011 • ENSA Paris Malaquais (France) Martin Genet • Pierre Gourvennec • Robin Stordeur


“Dessine ton école” • student competition 1st PRIZE location ENSA Paris Malaquais (France) floor area 300 sqm cost 5 K€ design team M. Genet, P. Gourvennec, R. Stordeur status prototype Malaquais Architecture school’s common space belongs to all and concentrate all functions in a single spot. Miscellaneous uses of the space include : lobby, student gathering, meeting, exhibition, workshop, cafeteria, lounge... This messy hub often leads to prejudicial compromises. The project aims at making all these functions to coexist in this linear space while offering a maximum of flexibility. The “mezzanine” becomes the school’s stage, with the ability to switch from one act to an other in a snap. That’s why we have designed adjustable workstations which can be adapted for the various needs of the first floor. In the far end is planned a student’s life space with the desk of the Student’s Association, a little fitted kitchen with a sink and microwave ovens and a lounge area. Upstairs, the fitting gets rationalized and a real workshop rises.

123

The building process takes a big part in the way the design has been thought. The implementation of the project is low-cost and the space can be used at the same time it’s being transformed.

L 107

student competition - 2011

262

L

R

O

98

or ri

te in n

ig es

|d


the periwinkles triangle

february 2012 • Geneva (Switzerland) CUT architectures


Wooden Filter • Multi-program Complex Geneva - Carouge location Geneva - Carouge (Switzerland) floor area 1675 sqm cost 4 M CHF architects CUT architectures program school complex, office spaces, archives and music rooms. status project As

the

parcel

is

located along the new relinking the green spaces surrounding the site, the project inducts a particular dialogue with its context. Surrounded by high housing buildings, one of the main challenge here is to bring ligtht in the building. The program asks also three different entrance lobbies and a garden for children outside activities.

ee e

pedestrian path

Despite the binding program and the urban rules dictating the constructible volume, the natural light comes in the rooms by wide openings and large square windows. In the basement, some zenithal light is brought thanks to the topography of the garden. The wooden filter homogenizes the facade and varies light ambiances in the different rooms. Thus the project manage the program complexity in a clear intervention into the public space.

CUT architectures 2012 project manager

D

n io

tit

pe m

co


school projects haut de forme over the river facing risk


haut de forme

June 2011 • Pont-Scorff (France) Kim Clement • Martin Genet • Jim Rhoné


Pont-Scorff (56)

couverture d’une aire d’activité artistique et culturelle Coveredfestive, Market •

400 sqm

PLAN 1/100

location Pont-Scorff (France) floor area 400 sqm cost N.A. student team Kim Clément, Martin Genet, Jim Rhoné status idea

Technical questions, structural calculation, materials properties, construction PLAN MASSE 1/200 ELEVATION SUD 1/100 economy. Roofing project in front of cultural inheritance.

south elevation

Middle scale project, of 400 sqm, on a square located between the church and the Pont-Scorff ELEVATION NORD 1/100 city hall.

north elevation

Roofing

project for a cultural, festive, and artistic activities area. This project has to present a covered space, which should be free, flexible, and1/100 luminous. ELEVATION OUEST The primary structure is composed by triple articulated classic porticos. The northern beam and the southern post of each portico ELEVATION EST 1/100 extend in order to raise the roof, creating a pattern of light and shadow under

west elevation office

storage

the framework.

MORPHOLOGIE

ENSAPM 2011 - 3rd year - Marc Malinowsky

COUPE TRANSVERSALE 1/100

g

n ofi

ro

VUE D’INSERTION

CONCEPTION

Kim Clement • Martin Genet • Jim Rhoné // D6 • M. Malinowski

cross section


over the river

june 2011 • Rugles (France) Martin Genet • Jim Rhoné • Xavier Seurre




“ [Refurbishment] should man-

age to open towards the future an object which takes the past into account.

( Klouche Djamel, Renovation : past reconstructed. )

longitudinal section

Refurbishment of a brick building in an old rural industrial site, Technical questions and economical consideration. Detailed design of the new life of an old building.

Mixed-use plan for inhabited shops for workers, craftsmen or artists, alone or teamed. The internal circulation is based on a longitudinal strip. Real backbone of the project, it apportions and generates interior spaces. Old ironworks located along the Risle stream, this blind building is facing a water meadow to the South, and the rest of the property to the North. The project is the transformation of the forge from limit to interface. This kind of process involves a great opening of the front facade, which needs to be considered for light and thermal performances. Extending the shared house’s terrace, four decks overlap, and form a sequenced crossing over the river. This is concluding the reversal

toward the meadow.

ENSAPM 2010 - 3rd year - Christian Comiot Yann Rocher

2nd floor

1st floor

re n

tio

ta

li bi

| ha


facing risk

January 2011 • Villeneuve-le-Roi (France) Martin Genet • Thomas Rième • Jim Rhoné • Juliette Stolz




“ The bigger the risks are, the less perceptible they get. � ( Ulrich Beck, Risk Society. )

Urban analysis, Sustainability questions, and proposition for a patrimonial conservation of

industrial wasteland.

Urban scale project in the industrial context of a site along the Seine, in Paris suburbs. We have designed a concert hall as a boombox for contemporary music integrated in an industrial enclave, and planned a research centre. The building is linked to the town with footbridges network. In this highly hostile environment K-Boom is a provocative proposal, led by the acceptance of risk. The project deals with metropolitan night questions and the diurnal functions of urban facilities.

ENSAPM 2010 - 3rd year - Prof. Steven Melemis

n

ba ur e

al

| sc


other works


Flacon #7 // 3x 60 x 20 cm

Photographs • København // Paris

Sultanahmet Camii // 50 x 40 cm

r

he ot s rk

o |w


N rTh Ii nTo sLc rEi pDt Rendus_images

Model of the Villa La Roche • Le Corbusier // 1/50 Ahmed Elshafei Workshop Untitled // Rhinoscript Sculpture Va r i a t i o n s _ p a r a m é t r i q u e s

T= dimension générale opn= ouverture entre les triangles CH= position verticale du point central N= décalage des générations=épaisseur M= rotation des points K= hauteur des points FF= nombre de générations

Model of the Port Solférino and Musée d’Orsay Internship at STGCAI Mairie de Paris // APUR 2010 opn =0.05 CH =0.9 N =0

opn =0.03 CH =0.5 N =0

opn =0.1 CH =0.3 N =0

opn

Amhed El Shafei_ENSAPM_TD Structure Complexe_2010

M . G e n e t _ P. G o u r v e n n e c _ M . H a l a r d _ E . L a u d e t _ F. l e G u e n _ M . L e c o m t e _ C . L e s c e n e

M0=0.5:M1=0.5:M2=0.5 K0=0.5:K1=0.5:K2=0.5

M0=0.6:M1=0.6:M2=0.6 K0=0.3:K1=0.3:K2=0.3

M0=0.75:M1=0.75:M2=0.75 K0=0.75:K1=0.75:K2=0.75

M0,M1,M2

r

he ot s rk

o |w opn =0 CH =2 N =0.1

CH

opn =0 CH =1 N =0.5

opn =1 CH =0.5 N =1




Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.