H ubert Namgyel PORTFOLIO
LANDSCAPE ENGINEER - URBAN DESIGNER
H ubert Namgyel
LANDSCAPE ENGINEER - URBAN DESIGNER namgyel.hubert@gmail.com Picture galerie :
- http://picasaweb.google.com/namgyel.hubert
Work documents galerie
EDUCATION 2010-2011 2005 - 2011 2004 - 2005
- http://issuu.com/namgyel/docs
n°1, Chemin royal 59570 Gussignies France Tel : +33(0)6 76 11 31 48 - Nationalitie : Franco-belge - Date of bearth : 12 Juillet 1987
- DSA (Diploma of Specialisation in Urban design) at the school of the city and territory in Marne-la-Vallée (Paris) - ENSNP (National School of Higher Studies of nature and landscape architecture) in Blois - A Level in science with honors
PROFESSIONNELLE EXPERIENCE 2010-2011
2009 2008
In office - Landscape architecture office Feuille à Feuille 2 days a week during 1 year - Programmation office Gest’AMO (Mulhouse - France) during 2 month - Architecture office, 2 month of internship in Addis Ababa (Ethiopia) - Landscape architecture and urban design office, JNC international one week in Bruxelles (Belgium) - Landscape architecture office (J.F.A.) in St John’s (Newfoundland - Canada) 3 month - Landscape architecture and urban design office (JNC international) 10 days in Tripoly (Libya) Divers activity linked to the landscape
2009 2008
- Natural parc of the ‘‘volcans d’Auvergne’’ one week of work in collaboration with architectes students in St-Étienne (France) - Land Art one week with Jacques Simon Garden and nursery
2007 2006
- Kirstenbosch botanical garden, (CapTown, South Africa) 2 month of internship - Botanical garden of Utrecht University (Deutschland) 2 month - Brunz Planzen, tree nursery (Germany) 1 month Others
2009 - 2010 2008 - 2010
- Student delegation at the administration concil of the ENSNP School (participation to the election of the new director) - Computer help for students and print manager at the ENSNP school Publications
2012
- Cahier de l’école de Blois n°10 - Lecture du paysage
SKILLS - French (native language) - English (good working knowledge, IELS level 6,5) - German (speaking and reading) - Mac OSX, Windows, Office, Adobe CS5, Sketchup, Vectorworks, Autocad - Car driving license
3
MéMoire de Fin d’étude - Hubert naMgyel - 2010 directeur de MéMoire - MicHel boulcourt tuteur de MéMoire - doMinique boutin Président de jury - claude eveno
Metz, de la Seille à la colline de Bellecroix Comment réintroduire le patrimoine militaire et naturel dans le tissu urbain?
HOM ME - NATU RE - PAYS AGE Comment reconsidérer le paysage de l’Avesnois par ses dynamiques naturelles ?
Mémoire de Fin d’Étude - Namgyel Hubert- 2011 Directeur de mémoire - Dominique Caire Tuteur de mémoire - Claude Eveno Président de jury - Dominique Boutin
5
URBAN CONTEXT PROJECTS
URBAN CONTEXT PROJECTS
LIVING IN FLOODABLE AREAS Montereau, France
1 ORGANISATION OF THE DIFFERENT TRANSPORT MODE TURNED BY THE LANDSCAPE
Octobre 2011 à Février 2012 - DSA
The project propose to rethink the way a station district can be done in a floordable area. The request made by the city was to design an additionnal parking above the train station. This station has the particularity to permit to local workers to be at one hour from paris. In consequences, we proposed to give a new importance to the station by, instead of building new parkings lots, build new houses above. This strategie permit to avoid people of using there cars and take fool advantage of the proximity of the station. This new district take part in a floodable area that offers a beautiful landscape. The implantation of the houses take in consideration the flood to respect the extention area of the river and the existing urbanisation.
2 URBANISATION PRINCIPLES ON THE FLOOD BORDER AND ON THE DIKE
The new district integrate the existing urbanisation The evacuation principles guide the organisation
3 CREATION OF A DOUBLE AGRICULTURAL PARK THAT CONTAINS THE CITY AND ORGANISE THE STATION DISTRICT
The park contains the city extension
The park organise the limites of the station district
The walking paths cross the differents landscapes of the valley
4 3 LA VOITURE MAJORITAIREMENT UTILISE A MONTEREAU
2 niveau digue 1 31%
46%
Parking 3 600 places 5 niveaux structure démontable
P
VOITURE (CONDUCTEUR)
15%
0
LA VOITURE MAJORITAIREMENT UTILISE A MONTEREAU
LA VOITURE MAJORITAIREMENT UTILISE A MONTEREAU
31%
46%
46%
VOITURE (CONDUCTE
31%
P
15%
Parking 2 200 places
15%
VOITURE (PASSAGER)
29%
VOITURE (CO
VOITURE (PASSAG
29% VOITURE
2%
BUS
AUTRE TR
1% 2 ROUES NON MOTOR
2%
LA VOITURE MAJORITAIREMENT UTILISE A MONTEREAU
AUTRE TRAIN
2%
Cyclo vélo 31%
1% 2 ROUES NON MOTORISES
22%
1% 2 ROUES NON
46% 15%
22%
A
AP
VOITURE (CONDUCTEUR)
VOITURE (PASSAGER)
29%
A PIED
Gare de bus niveau 1
2%
2
BUS
AUTRE TRAIN
1% 2 ROUES NON MOTORISES
LA VOITURE MAJORITAIREMENT UTILISE A MONTEREAU 22%
Place de la Gare
31%
46%
P
Parking 1 130 places niveau 0
A PIED
VOITURE (CO
15%
VOITURE
Building at the hedge create an intimate relation with the fields 2%
A
1% 2 ROUES NON
2
7
The houses are thought for the flooding
Création d’un quartier sur la digue en s’intégrant dans le paysage existant
URBAN CONTEXT PROJETCS
A NEW URBAN ARTICULATION Metz, france
Diploma work 2010 / 2011 - ENSNP
The walk path articulate the landscape sequences
Create a new natural and historical park that’s links a large housing estate to the city center of Metz The project site contain some ruins of an old military fortification castle that’s used to encircle the city. Beacause of these ruins and of the topography, this part of the valley is constructable with difficulty. Because of that, this site is today a unused part of the town that seperate the old city center from a large housing estate. This project propose to reintegreate the military and natural heritage in the urban tissu by creating a new urban park liking the large housing estate to the city center of metz.
Diffusion of a new organsaition
Liking the landscape sequences TH
ES
EIL
3 REOPEN THE MILITARY FORTIFICATIONS
4 URBAN REORGANISATION OF THE LARGE HOUSING ESTATE TO OPEN IT ON THE FORTIFICATIONS
R+
R+1 R+2
État actuel
État projeté
R+
1 THE SQUARE BEETWEEN THE WALLS
2 TRANSFORMATION OF THE CITY ENTRANCE IN AN URBAN BOULEVARD TH
EC
TH
ET
TH
OP
SO
EN
FB
ELL
EM
ILIT AR YB
AR
ER
BE
LLE
CR
OIX
RO
IX
CK
S
IVE
R
Organisation plan of the project COMMUNE DE ST JULIEN
L
AM
OS
EL
9
LE
SE
NA
L DE
LA
CA
ILL E LE PARVIS DE LA RAMPE DES FOSSÉS
LA CLAIRIÈRE
L’ACROBRANCHE
AIXHA BLD P
LE MUR D’ESCALADE
LE VERGER
NS
LE BELVÉDÉRE LE DOUBLE
MAIL DU FORT
LA VOÛTE BOISÉE
LE PARVIS DES CASERNES
2
LES JARDINS DES TERRASSES
BOSQUET
3
LE BALCON SUR LA SEILLE
4
E TÉ AN PL E AD EN LA
PR
1
LA PLACE DU
OM
LA PLACE ENTRE LES MURS
+2
+3 R+3
RA
EC
OF
BLD DE TRÈ VES
LL
TER
R+4
R+3 R+2
R+4
CENTRE VILLE DE METZ
R+3 R+2 R+1
PROJET D’AVENUE DE LA SEILLE
LA PLACE DE LA MAIRIE
QUARTIER DE BELLECROIX
URBAN CONTEXT PROJECT
PROGRAMMATION FOR A NEW SCHOOL Fensch valley (57), France
2 EXEMPLE OF A DETAIL SITE STUDY
July / August 2010 - Gest’AMO Land occupation map
Programmation study for the implantation of a new school in the industrial Fensch valley The regional institutions and the agglomeration of the Fensch valley want’s to build a new technical school and need to choose between a few implantation site on several cities. We have done a study to hightlights the different potential of theese sites. This study present the needs and the objectif of the school and propose a summary to help the regional institutions to take a decision. The particularity of this study was to take in concideration all the industrial risk of the valley combinate to the transportation bus lignes and the landscape and urban integretion of the school building.
1 THE DIFFERENT POTENTIAL SITE STUDIED. THE SITE NUMBER 4 IS DEVELOPPED AS AN EXEMPLE
The iron industrie just near by
Map of the access, the transportation lignes and the facilitie
A agricultural land at the entrance of the city
Map of the landscape horizon
Extract of the local urban plan
Map of the potential buildings implantations : useful surface of the program
es
11
A site in between to cities
GIVE A PLACE TO THE CITY USE Montoire-sur-le-Loir (41), France
2008 - 3thr year ENSNP
Design a place that organise the use of the city and brings a new diversity to the living space. The diagnosis of this city square permit us to understand the different uses of this city center. It finaly appears that it is a unorganised place and it end up create a lot of conflict between the inhabitants. This project as for aim to organise the differents uses of this city square around a composed space articuleted around a central green square.
THE DESIGN OF THIS SQUARE ORGANISE THE DYNAMIQUES OF EXISTING USES AND CREATE NEW ONES
0
5
10
15
20m
A new green square is created. It can collect the rain water
Mark the limites of the uses
Link the parts of the city square
URBAN CONTEXT PROJECT
Give a priority to the pedestrian walk
Put in value the existing bandstand Mark the pedestrian dynamiques crossing the square
Permit the installation of the weekly market
13
15
RURAL CONTEXT PROJECTS
RURAL CONTEXT PROJECT
WHAN ECOLOGY GUIDE THE LANDSCAPE Avesnois, Nord (59)
Diploma work 2009 / 2010 - ENSNP
Optimise the ecological environnement to reveal all the landscape potential. This diploma project propose to thing a landscape project by giving a priority to the study of nature. The optimisation of the natural and agricultural environnement will transforme the image of the local landscape. It end up to create a new rural scene that can give place to an agricultural park. The deal is finaly to organise the visite of peoples in this untypical land that can find a new balance between human and nature.
DEFINITION OF A LANDSCAPE AND ENVIRONNEMENTAL STRATEGY AT THE TERRITORY SCALE
TEST THE TERRITORY STRATEGY AT A LOCAL SCALE
1 CREATE A WALK ENTRANCE FOR THE VALLEY AT THE HEART OF THE CITY
2 PUT IN VALUE THE REMARQUABLE ECOLOGICAL SITE
17
3 REOPEN THE AGRICULTURAL LANDSCAPE AND OPTIMISE IT’S ECOLOGICAL SYSTEME BY A NEW GESTION
Alternative forest gestion
Guided natural developpement
Natural developpement without intervention
RURAL CONTEXT PROJECT
PROGRAMMATION OF A NEW CITY CENTER Rosenau, Haut-Rhin (68)
Juillet August-september / Août 2011 - Gest’ 2011-Gest’ AMO AMO
Situation in the territory of Basel agglomeration
Programmating study for the reorganisation of a village center. The village of Rosenau want’s to think about the reorganisation of it’s heart of town that is actually composed of three city square not optimised for there uses. The programmating study aim to redefine those three spaces and to rehabilitate an old restaurant for the extension of the town hall and the local librairy. We access our work on the definition of a new strong image for the city center and on the articulation with secondary centrality in the village. The programming strategy propose different scenarios for the three city squares and one of them will be develop in the next phases of the project.
1 UNDERSTANDING THE URBAN AND NATURAL CONTEXT OF ROSENAU
2 ANALYSE HOW THE CITY CENTER IS COMPOSED One city square as a big parking
The front square of the town hall occuped by different uses unorganised
3 COMPOSE A PROGRAMMING BY TAKING BASE ON THE VALUE OF THE SITE The different sequences of the city center
t
19
Articulate the different sequence and reveal there particularities
RURAL CONTEXT PROJECT
GIVE SPACE TO THE BIODIVERSITY Niort, Deux-Sèvres (79)
October 2009 - 5ft year ENSNP
Look at the city by the loop of biodiversity to learn teachings back. In the context of a seminary called ‘‘the sustainable developpement in the landscape project’’ we have worked on the theme of biodiversity in sub-urban environnement. After a very fine field study we have proposed different scenario to improve the respect of the environnement in case of city extension. This is one of the two scenarios. It’s the most ‘‘utopia’’ one. It propose to organise the limite of the city extension by maximise the protection of the crops, principal holder of the plants and animals life and as well of a nice living environnement. The highway is also reorganised to maximise the crossing and developpement of the biodiversity.
The highway, a new road for biodiversity Densify the existing district A slow transition between rural and urban environnement Vegetable organique agriculture
Walking path Actual urban limit conserved People and product flow
4 A SOFT TRANSITION BETWEEN URBAN AND RURAL AREA
WOOD / ENERGIE Selective gestion of the hedge
Champonnier District Agriculture informations
The products of wood
Energetic transformation
A walk b millen etween city ium w and fie alk lds co nnect ed to t he
Urban
Champonnier district
Pissardant farm Rural
1 THE HIGHWAY, A ROAD FOR BIODIVERSITY
Limoge Avenue
Highway
A relay for the crossing of the plants and animals
Highway
Pathways made with a stabilised soil that permit the infiltration of rain water
An easy crossing in two times
2 TRANSITION TO AN ORGANIQUE AGRICULTURE
No chemical fertiliser
Fallo w
1 year
1 year
21
Crop rotation
Cere
als
Mea
1 year
M ais et
dow
s
Céréales
Existing situation
Fru its e t légumes
The harvest
3 DENSIFY THE EXISTING DISTRICT Dormir
Magasin
travailler
se cultiver vendre & acheter se restaurer
The storage
The transportation
RURAL CONTEXT PROJECT
3 CREATE A NATURAL PARK TO REVEAL THE LANDSCAPE
REVEAL A LIVING CONTEXT Lorient (56), France
Janvier 2009 - 4ème année ENSNP
Territory scale study and fine scale project about the link between urbanisation and fragile natural environnement The first step of this study was the organisation of a big scale study with all the students of the class. This helped us to define the global challenges directions for the local project that every student had to define. My intervention site was choosen because of it’s strategic position at the border of the city and the fields. It was composed of a little valley that was localy important. The project proposed to protect this valley by taking advantage of it’s landscape for the local inhabitations. Ecological gestion, definition of limits and creation of walking path composed a kind of new local park.
Discovering the fields above the valley
1 BIG SCALE LANDSCAPE MAP Pe nt ea br up te 0 1
3
Biodiversity
+ Actual context
5m
Biodiversity
+++
Pente douce
0 1
2 LOCAL LANDSCAPE MAP
Zone industrielle
St Guenaël
Lanester
Le B lave t
Parc Urbain
Zone industrielle
3
5m
Project
reusing an old railway for a walking path Turne back the urbanisation to take advantage of the valley lanscape
23
0
1
2
Build some light structures to invite the visitors to discover the landscape
3m