DESIGN STUDIO ERIK G L'HEUREUX (PHD) FAIA DEAN'S CHAIR ASSOCIATE PROFESSOR
AR5801/5805, AY 2023/2024 SEMESTER 1
Image: 36 Tôn Thất Đạm, Amy Amelia Binte Ahmad
HOT AIR IV: CARBON & CAPITAL
VOL.
BU YI FAN DAI BINYANG DENG HANYUE PHUA JUE HUA PEARL TAN WEN XUAN
AMY AMELIA BINTE AHMAD CINDY KOO XIN YU KEE YOKE CHOON YAP KAI JUN ASTON
3
DEPARTMENT OF ARCHITECTURE COLLEGE OF DESIGN AND ENVIRONMENT NATIONAL UNIVERSITY OF SINGAPORE
2
AR5801/5805 HOT AIR IV: CARBON & CAPITAL Overall comparison of Carbon, Capital & Labour across projects
4
Adaptive Reuse & New Built Projects Site A: Banking University of HCMC, Main Campus Site Plan & Model
7
Amy, Cindy & Yoke Choon Wen Xuan & Binyang
8 72
3
ADAPTIVE REUSE & NEW BUILD PROJECTS
4
Ho Chi Minh City
Embodied EUI PDE/ Carbon (kWh/m2/year) Constructn (kgCO2e/m2) Cost ($/m2) SITE A: BANKING UNIVERSITY OF HCMC
1
ASCENSION - Amy, Cindy, Yoke Choon
2
VerdeMetam0rph - Wen Xuan, Binyang
Labour Total Cost Travel (hrs/pax) of Materials Expenses & Printing ($/pax) ($)
239
132
5179 1050
535
518
395
57
31
7575 702
455
486
456
SITE B: 145 NGUYEN TRAI BUILDING 3
PARKSIDE DUO - Aston, Pearl
262
60
5319 859
592
564
410
4
SkyBreeze TOWER - Yi Fan, Hanyue
264
157
6900 1055
413
607
427
5
SITE A: BANKING UNIVERSITY OF HCMC 36 Tôn That Dam, Phuong Nguyen Thái Bình, Quan 1, Thành pho Ho Chí Minh, Vietnam
6
EXISTING SITE MODEL 7
1
ASCENSION Pioneering Capital-Centric Architecture with Environmental Harmony Banking University of HCMC Site A Ascension embodies a pioneering approach where economic strides precede environmental considerations, strategically positioned in Vietnam’s financial district. The architectural design, a testament to simplicity and efficiency, intricately balances capital demands with a commitment to reducing carbon impact. The three-block massing, innovative facades, and integrated green elements define a visually striking yet economically focused hotel. This project marks a decisive ascent toward a future where architecture seamlessly merges economic growth and environmental consciousness, emphasizing a direct capitalcentric yet sustainable ethos.
Amy, Cindy, Yoke Choon
8
AMY AMELIA BINTE AHMAD, CINDY KOO XIN YU, KEE YOKE CHOON
9
10
ARCHITECTURE CINDY KOO XIN YU
11
12
ARCHITECTURE CINDY KOO XIN YU
13
14
EMBODIED AND OPERATIONAL CARBON ANALYSIS
15
AMY AMELIA BINTE AHMAD
16
EMBODIED AND OPERATIONAL CARBON ANALYSIS
17
AMY AMELIA BINTE AHMAD
18
PROJECT DEVELOPMENT COSTS AND CAPITAL ANALYSIS
19
KEE YOKE CHOON
OVERALL CLIMATIC ANALYSIS
AMY AMELIA BINTE AHMAD
20
CLIMATIC ANALYSIS AMY AMELIA BINTE AHMAD
21
CLIMATIC ANALYSIS
22
CINDY KOO XIN YU
CLIMATIC ANALYSIS
23
KEE YOKE CHOON
Ascension
FULL DEMOLITION BUILDING PARAMETERS GFA of Destroyed GFA of Replacement
3510 sq.m 1053 sq.m 16205 sq.m 18662 sq.m
MATERIAL CARBON OF PARTIAL DEMOLISHED BUILDING Materials DISPOSED
Volume (m³)
Density (kg/m³)
Concrete Rebar (4%) Bricks Steel Aluminum Glass Timber
1327.00 53.08 674.00 2.19 0.00 9.14 4.16
Mass (kg)
2400.00 7850.00 1650.00 7850.00 2700.00 2500.00 620.00
3184800.00 416678.00 1112100.00 17191.50 0.00 22850.00 2579.20
Embodied Carbon Factor (kgCO2eq/kg) 0.13 2.89 0.24 3.91 16.53 1.22 0.53
Excavator Transport to Landfil
3510 sq.m 16205 sq.m
MATERIAL CARBON OF FULLY DEMOLISHED BUILDING Carbon per m2 (kgCO2eq/m2) 393.19 1143.59 253.47 63.84 0.01 26.47 1.30
Carbon (kgCO2eq) 414024.00 1204199.42 266904.00 67218.77 10.00 27877.00 1366.98
Materials DISPOSED
Volume (m³)
Concrete Rebar (4%) kbriq Steel Aluminum Glass Timber
ENERGY USED TO PARTIALLY DEMOLISH BUILDING Items Used
CARBON AND CAPITAL SPREADSHEET
PARTIAL DEMOLITION - ADAPTIVE REUSE BUILDING PARAMETERS GFA of Existing Building GFA of Destroyed GFA of Replacement Total GFA of Building
Density (kg/m³)
4423.33 176.93 2246.67 7.30 0.00 30.47 15.37
Mass (kg)
2400.00 7850.00 1650.00 7850.00 2700.00 2500.00 470.00
10615992.00 1388925.62 3707005.50 57305.00 0.00 76175.00 7223.90
Embodied Carbon Factor Carbon (kgCO2eq) (kgCO2eq/kg) 0.13 1380078.96 2.89 4013995.04 0.01 37070.06 3.91 224062.55 16.53 0.00 1.22 92933.50 0.53 3828.67
Carbon per m2 (kgCO2eq/m2) 393.18 1143.59 10.56 63.84 0.00 26.48 1.09
ENERGY USED TO DEMOLISH BUILDING
Carbon Emission kgCO2e/m2
Carbon Emission for Demo building kgCO2e
16.76 10.82
17648.28 11393.46
Materials USED to replace
Density (kg/m³) 3302.63 132.11 1603.76 0.00 2295.48 261.33 314.50
PV Panels
Area (m2) 531.12
58827.60 37978.20
EMBODIED CARBON OF REPLACEMENT - FULLY NEW
Volume (m³)
Green Concrete Rebar (4%) Hempcrete Steel CLT GFRC Bamboo
16.76 10.82
Excavator Transport to Landfil
EMBODIED CARBON OF REPLACEMENT - Partial Structure + Reinforcement (If any)
Carbon Emission for Demo building kgCO2e
Carbon Emission kgCO2e/m2
Items Used
Mass (kg)
2200.00 7850.00 300.00 7850.00 450.00 1800.00 600.00
7265786.00 1037025.82 481128.00 0.00 1032966.00 470394.00 188700.00
Embodied Carbon Factor (kgCO2eq/kg) 0.07 2.89 0.04 3.91 0.48 0.45 0.75 Embodied Carbon per m2 (kgCO2eq/m2) 10
Carbon per m2 (kgCO2eq/m2)
Carbon (kgCO2eq) 508605.02 2997004.62 19245.12 0.00 495823.68 211677.30 141525.00
Materials of New build
27.25 160.59 1.03 #REF! 0.00 11.34 7.58
Volume (m³)
Green Concrete Rebar (4%) Hempcrete Steel CLT GFRC Bamboo
Density (kg/m³)
5435.24 217.41 2257.72 0.00 2295.48 1099.45 261.33
Mass (kg)
2200.00 7850.00 300.00 7850.00 450.00 1800.00 600.00
11957528.00 1706665.36 677316.00 0.00 1032966.00 1979010.00 156798.00
Embodied Carbon Carbon (kgCO2eq) Factor (kgCO2eq/kg) 0.07 837026.96 2.89 4932262.89 0.04 27092.64 3.91 0.00 0.48 10.00 0.45 890554.50 0.75 117598.50
Carbon per m2 (kgCO2eq/m2) 51.65 304.37 1.67 0.00 0.00 54.96 7.26
Carbon (kgCO2eq) 5311.2
TOTALS
TOTALS kgCO2eq
Type of Carbon Embodied carbon of REPLACEMENT Carbon Emission from Partial Demolition Carbon for Adaptive Reuse
kgCO2eq/m2 4265777.00 201064.00
263.24 190.94
4466841.00
239.35
8186479.06
438.67
% of building demolished
30.0%
Type of Carbon Embodied carbon of REPLACEMENT Carbon Emission from Demolition
kgCO2eq 6804545.49 5848774.57
419.90 1666.32
Carbon for New Demolition Construction
12653320.06
780.83
kgCO2eq/m2
CARBON SAVINGS Carbon Savings
35.3% of the carbon that Full Demolition and reconstruction of the building would emit with the SAME GFA 3 times the amount of carbon emitted from Adaptive Reuse with the SAME GFA
Adaptive reuse will produce New Demolition will produce
OPERATIONAL CARBON - HOTEL HOTEL PARAMETERS GFA Usable space(m2)
18662.00
Keys
293
Room Size
17
OPERATIONAL CARBON COMPONENTS Peak Season Components
Energy per unit/kwH
No. of units
Non-Peak Season Days used per week
Hours used per day
Weeks used per Yearly Energy year Consumption (kwH) 40 0 20 14264.25 10 46620 52 0 0 0 20 1142.4 40 25.6
Air Conditioning Fan Heating (Boilers) Lighting (Incandescent) Lighting (LED) Refridgeration Microwave Any other appliances
1.2 0.048 37 0.06 0.008 0.17 0.8
0 429 3 0 429 2 2
8 5 6 10 0 24 1
7 7 7 7 0 7 0.4
Industrial Washing Machine Dryer Elevators IN USE Elevators IDLE Hair Dryer
4.75 15 0.83 0.21 1.2
5 5 4 2 293
10 3 2 22 1
6 5 7 7 7
13 52 52 52 52
Television Landline
0.1 0.003
293 293
3 7
6 1
1
1287
3
7
0.1 0.04 0.003 0.05 0.031 0.9 14.2 5
293 2 1 10 2 0 0 0
24 5 5 8 8 24 24 8
24 5 1 5 5 7 7 7
Plugs Mini Fridge Printer Landline Computer Water Cooler Swimming Pool Gym (everything included) Hot tub TOTAL ENERGY CONSUMPTION Total Energy consumed annually
Energy per unit/kwH
Components Air Conditioning Fan Heating (Boilers) Lighting (Incandescent) Lighting (LED) Refridgeration Microwave Any other appliances
No. of units
Hours used per day
Days used per week
Weeks used per year
Yearly Energy Consumption/ (kwH) 0 22822.8 195804 0 0 1827.84 7.68
1.2 0.048 37 0.06 0.008 0.17 0.8
0 429 3 0 429 2 2
8 5 6 10 0 24 1
7 7 7 7 0 7 0.4
12 32 42 0 52 32 12 52
5 5 4 2 293
10 3 2 22 1
6 5 7 7 7
39 0 0 0 0
55575 0 0 0 0
PV PANELS ROOF CAPACITY Area of Roof for PV No. of PV Panels holdable
531.12 sq.m 332.0
PV PANEL PARAMETERS Area of 1 Panel (m2) Total area of panels (m2)
18525 58500 2416.96 3363.36 127982.4
Industrial Washing Machine Dryer Elevators IN USE Elevators IDLE Hair Dryer
4.75 15 0.83 0.21 1.2
52 52
27424.8 319.956
Television Landline
0.1 0.003
293 293
3 7
6 1
0 0
0 0
Annual Operational Carbon Annual PV Carbon
52
1405404
Plugs
1
1287
3
7
0
0
Net Positive
52 52 52 52 52 52 52 52
877593.6 104 0.78 1040 128.96 0 0 0
Mini Fridge Printer Landline Computer Water Cooler Swimming Pool Gym (everything included) Hot tub
0.1 0.04 0.003 0.05 0.031 0.9 14.2 5
293 2 1 10 2 0 0 0
24 5 5 8 8 24 24 8
24 5 1 5 5 7 7 7
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
1.6 531.12
Annual Energy produced (first year)
197735.976 kWH/year
Number of Panels Daylight Hours (h)
332.0 6
Annual PV Panel Degration
0.05%
PV Efficiency Performance Ratio
20% 85%
Grid Emission Factor
0.85
CARBON SAVINGS 299327.35 168075.5796
131251.77
2860893.39 kwh/year
132.17
Energy Use Index (EUI) G.E.F Operational Carbon
kWh/m2*year
0.85 kgCO2e/kwh 2431759.38 kgCO2e/year
130.31
kgCO2e/m2/year
36 Ton That Dam - Carbon Model Spreadsheets Prepared by Tan Wen Xuan and Amy Amelia bte Ahmad
EX IS T IN G A S S ET S
PDE
C OST PARAME TE RS
O FFICE A S S ET S
ARC HI + F AÇ ADE + E NGI NE E RI NG I TE MS 17,798 ₫ = S$1
Prevailing exchange rate Break-even target
Item
BUI L DI NG PARAME TE RS Rate, %
Rate, fixed
Rate, /sq.m
10 years
for GFA
L AND / ASSE T PARAME TE RS Land plot area
1,800 sq.m
Gross floor area, existing
3,500 sq.m
Plot ratio, proposed
10.4
others
$16,678,184.60
3,500
$1,050,000.00
$60.00
510
Demolition works
$46,986.00 $1,780,577.06
$19,586,347.66
Construction subtotal
$1,049.53
85 % per sq.m
Land value
439,000,000 ₫ /sq.m
C ONSUL TANC Y F E E S
43,000,000 ₫ /sq.m
Item
Rate, %
Rate, fixed
Rate, /sq.m
Area
GFA 1,920 ₫ /kWh
Energy cost
LA ND L AND AC QUI SI TI ON C OST Rate, %
Land cost
Land acquisition title and recording fe Brokerage fees
VAT
$391,726.95
Gross revenue, per category
$9,249,164.63
$293,795.21
VAT
$924,916.46 $8,324,248.16
2.00%
$391,726.95
Net revenue, per category
2.00%
$391,726.95
Total net revenue
$8,324,248.16
1.50%
$293,795.21
Total cost
$1,664,849.63
Net operating income
$6,659,398.53
M&E engineers' fees
1.50%
$293,795.21
Quantity surveyor fees
1.00%
$195,863.48
whole area $8,456,006.29
Accredited checker fees
$422,800.31
Registered inspector fees
5%
$1,233.28
$2,219,912.35
$120.80
$422,800.31
Owner representative fees
1.50%
$0.00
$0.00
$0.00
$0.00
3.00%
$739.97
$1,331,947.41
$72.48
$253,680.19
Total fees
23.00%
Land survey fees
$25,000.00
$25,000.00
1.00%
$195,863.48 $25,000.00
$25,000.00
$50,000.00
$4,554,859.96
$9,555,287.11
OPE RATI ONAL E QUI PME NT & SUPPL I E S, L AUNC H C OSTS, AND OTHE R SOF T C OSTS Item
Rate, %
Rate, fixed
% of building used as office
0% of net floor area
% of building used as hospitality
Rate, /sq.m GFA
Area
GFA
specified
0% of net floor area 2.00% p.a.
Lending interest rate
6.60% p.a.
Loan limit
80% of total expenditure
Loan duration
14% of net floor area
MICE facility intensity
20% of net floor area 7% of net floor area
Key size, gross
5.00%
$979,317.38
Launch cost items, estimate
5.00%
$979,317.38
18 sq. m 2,200,000 ₫ /night
Key rate
$123.61 /night Occupancy rate
$1,958,634.77 $26,099,842.39
Total soft costs
85%
Public space RevPAM
10,000,000 ₫ /sq. m p.a.
MICE facility RevPAM
15,000,000 ₫ /sq. m p.a.
$561.86 /sq. m p.a. $842.79 /sq. m p.a.
OPE RATI ONAL C OSTS Total operational costs
$91,797,679.22
Valuation
Prevailing growth assumption
59% of net floor area
Public space intensity
Cost
if not GFA
OES items, estimate
9.36%
Cap rate
100% of net floor area
% of building used as residential
Key intensity
Back-of-house space intensity
Total of all items + fees + OES
C AP RATE ROI - MI X
HOTEL A SSETS
$293,795.21 BUI L DI NG PARAME TE RS
$65,697,836.84
Total value of land + assets
60% of revenue
PROJ E C TE D NE T OPE RATI ONAL I NC OME PE R ANNUM Item
7 years
Keys
Public spaces
1
Cost
2025-12-31
2
2026-12-31
3
2027-12-31
1
2028-12-31
2
2029-12-31
3
2030-12-31
4
C ONSTRUC TI ON PE RI OD
2031-12-31
5
2032-12-31
6
2033-12-31
7
2034-12-31
8
2035-12-31
9
2036-12-31
10
OPE RATI ONAL PE RI OD
Acquiring land + assets
$65,697,836.84
$65,697,836.84
A+F+E items
$19,586,347.66
$6,528,782.55
$6,528,782.55
$6,528,782.55
Consultancy items
$4,554,859.96
$1,518,286.65
$1,518,286.65
$1,518,286.65
MICE facilities
No. of keys
428
520
Total area, sq. m
9,359
2,221
Gross revenue, per sq. m 2024-12-31 C o s t i t e ms
10%
Other misc. archi consultant fees
$120.80
$955,528.71
$583.08
C&S engineers' fees
per sq.m
$10,510,815.82
Gross revenue, per sq. m
Project management fees
$2,416.00
$5,017,001.91
Rate 15,863
Total lettable facility area, sq. m $1,762,771.29
whole plot
$55,187,021.01
Total lettable office space, sq. m
if not GFA
1.50%
$2,219,912.35
10%
Office space
2.00%
$44,398,246.99
Subtotal, per category
Item
9.00%
per sq.m
$50,170,019.10
20% of revenue
PROJ E C TE D NE T OPE RATI ONAL I NC OME PE R ANNUM
Lighting consultants' fees
$1,233.28
Subtotal, pre-VAT, per category
94% of office space
Total operational costs
Architect's fees
$24,665.69
Land acquisition consultancy fees
Cost
Projected occupancy, typical OPE RATI ONAL C OSTS
Interior designers' fees
5%
Land value Land acquisition legal fees
Asset cost
specified
$51.69 /sq. m p.m.
$30,600.00
$ 46 , 9 8 6 . 0 0 10%
15,863 sq.m
100% of net floor area 920,000 ₫ /sq. m p.m.
Office rental rate 15,162
$300.00
Asset value, indicative
Item
if not GFA $1,100.00
Contingency
15,162 sq.m
Efficiency, proposed Net floor area, proposed
Office intensity
A&A works
18,662 sq.m
Proposed additional floor area
Cost
New works
Additional greening costs Gross floor area, proposed
Area
Gross revenue, per category
$2,130.55
$561.86
$19,939,743.17
$1,247,767.35
VAT
$1,993,974.32
$124,776.74
Net revenue, per category
$17,945,768.85
$1,122,990.62
$842.79 $2,673,787.18 $267,378.72 10% $2,406,408.47
Total net revenue
OES items
$979,317.38
$979,317.38
Launch items
$979,317.38
$979,317.38
Net operating income, p.a. Net operating income to date
$21,475,167.93
Operational costs
$12,885,100.76
$8,590,067.17
Net operating income
$8,590,067.17
$8,761,868.52
$8,937,105.89
$9,115,848.00
$9,298,164.96
$9,484,128.26
$9,673,810.83
$9,867,287.05
$10,064,632.79
$10,265,925.44
$8,590,067.17
$17,351,935.69
$26,289,041.58
$35,404,889.58
$44,703,054.55
$54,187,182.81
$63,860,993.64
$73,728,280.69
$83,792,913.47
$94,058,838.92
Rate
3,173
R ES ID EN T IA L A S S ET S BUI L DI NG PARAME TE RS
Total capital required, this FY
-$73,744,906.04
-$8,047,069.21
-$10,005,703.97
of which equity
-$14,748,981.21
-$1,609,413.84
-$2,001,140.79
Total equity to date
-$14,748,981.21
-$16,358,395.05
-$18,359,535.84
$10,113.50 /sq. m p.m. PROJ E C TE D SAL E S I NC OME Item
Principal required, this FY
180,000,000 ₫ /sq. m
Selling price
Units
Rate
-$58,995,924.83
-$6,437,655.37
-$8,004,563.18
Total principal to date
-$58,995,924.83
-$65,433,580.20
-$73,438,143.38
Total equity + principal, to date
-$73,744,906.04
-$81,791,975.25
-$91,797,679.22 -$692,416.78
$0.00
VAT and levies
$16,042,723.10
Interest, this FY
-$3,893,731.04
-$424,885.25
-$528,301.17
$692,416.78
$692,416.78
$692,416.78
$692,416.78
$692,416.78
$692,416.78
$692,416.78
$0.00
$0.00
$0.00
Net revenue per category
$144,384,507.93
Total interest due
-$3,893,731.04
-$4,318,616.29
-$4,846,917.46
-$4,154,500.68
-$3,462,083.90
-$2,769,667.12
-$2,077,250.34
-$1,384,833.56
-$692,416.78
$0.00
$0.00
$0.00
$0.00
Total net revenue
Total debt serviceable
-$62,889,655.87
-$69,752,196.49
-$78,285,060.84
-$77,592,644.06
-$76,900,227.28
-$76,207,810.50
-$75,515,393.72
-$74,822,976.94
-$74,130,560.16
-$73,438,143.38
-$73,438,143.38
-$73,438,143.38
-$73,438,143.38
-$73,438,143.38
-$73,438,143.38
-$73,438,143.38
-$73,438,143.38
-$73,438,143.38
-$73,438,143.38
-$73,438,143.38
-$73,438,143.38
-$73,438,143.38
-$73,438,143.38 Gross revenue per category
-$4,154,500.68
-$3,462,083.90
-$2,769,667.12
-$2,077,250.34
-$1,384,833.56
$692,416.78
$692,416.78
$692,416.78
Total cost Total profit Total expenditure
24
-$96,644,596.69
$160,427,231.04 10% $144,384,507.93 $0.00
$144,384,507.93
CARBON, CAPITAL & LABOUR REPORT
C A R BO N R E P O R T E M BO D I E D C A R BO N Ex i s t i n g GFA: 3,510 m2
A da p t i v e r e u s e w i t h n e w a ddi t i o n GFA:
Embodied carbon: 2,041,522 KgCO2e
Discarded embodied carbon: 201,064 KgCO2e
Embodied carbon/sq.m:
Embodied carbon of new addition:
581.63 KgCO2e/m
4,265,777 KgCO2e
% i m pr ov em en t
18,662 m2
2
58%
Total embodied carbon: 4,466,841 KgCO2e Total embodied carbon/sq.m: 239.35 KgCO2e/m
2
Br e a k do w n o f n e w a ddi t i o n
=
M ater i al s
Mas s kg
C a r bo n f a c t o r KgCO2e/Kg
Green Concrete Rebar (4%) Hempcrete CLT GFRC Bamboo
7,265,786 1,037,026 481,128 1,032,966 470,394 188,700
0.07 2.89 0.04 0.48 0.45 0.75
4 ,26 5 ,7 7 7 K gC O2e E m bo di e d c a r bo n KgCO2e 508,605 2,997,005 19,245 495,824 211,677 141,525
OPERA TIONA L C A RBON Ex i s t i n g EUI: 2 222 kWh/m p.a.
A da p t i v e r e u s e w i t h n e w a ddi t i o n EUI:
Operational carbon: 188.7 KgCO2e p.a.
Operational carbon: 130.31 KgCO2e p.a.
2
132.17 kWh/m p.a.
O f f s ets Required PV to fully offset operational carbon: 945.88 m2 A c t u a l a r e a o f PV p r o v i de d: 531.12 m2
% i m pr ov em en t 31%
% of f s etted 56.00%
A l ter n ati v e av en u es of c a r bo n o f f s e t t i n g Renewable Energy Credits
LA BOUR Average working hours over 13 weeks: Peak working hours per week: Total incurred cost for prints and models:
535 h 202 h $518
25
26
FINAL & PROCESS MODELS - Amy, Cindy, Yoke Choon
27
28
FINAL MODEL AMY AMELIA BINTE AHMAD, CINDY KOO XIN YU, KEE YOKE CHOON
29
30
FINAL MODEL AMY AMELIA BINTE AHMAD, CINDY KOO XIN YU, KEE YOKE CHOON
31
32
WEEK 07 | MASSING AMY AMELIA BINTE AHMAD, CINDY KOO XIN YU, KEE YOKE CHOON
33
34
WEEK 08 | STRUCTURE AMY AMELIA BINTE AHMAD, CINDY KOO XIN YU, KEE YOKE CHOON
35
36
WEEK 09 | STRUCTURE, ENVELOPE, COLOUR AMY AMELIA BINTE AHMAD, CINDY KOO XIN YU, KEE YOKE CHOON
37
38
WEEK 10 | STRUCTURE, ENVELOPE, COLOUR AMY AMELIA BINTE AHMAD, CINDY KOO XIN YU, KEE YOKE CHOON
39
40
WEEK 11 | STRUCTURE, ENVELOPE, COLOUR, PROGRAM AMY AMELIA BINTE AHMAD, CINDY KOO XIN YU, KEE YOKE CHOON
41
42
WEEK 12 | STRUCTURE, ENVELOPE, COLOUR, PROGRAM AMY AMELIA BINTE AHMAD, CINDY KOO XIN YU, KEE YOKE CHOON
43
44
PROCESS DRAWINGS - Amy, Cindy, Yoke Choon
45
WEEK 07 | ARCHITECTURE AND CAPITAL
KEE YOKE CHOON
46
WEEK 08 | ARCHITECTURE AND CARBON
47
KEE YOKE CHOON
WEEK 09 | ARCHITECTURE
CINDY KOO XIN YU
48
WEEK 09 | CARBON AMY AMELIA BINTE AHMAD
49
WEEK 09 | CAPITAL
KEE YOKE CHOON
50
WEEK 09 | ARCHITECTURE
51
CINDY KOO XIN YU
WEEK 09 | CARBON & CAPITAL SPREADSHEET
52
AMY AMELIA BINTE AHMAD , KEE YOKE CHOON
53
54
WEEK 10 | ARCHITECTURE
55
CINDY KOO XIN YU
56
WEEK 10 | CARBON AMY AMELIA BINTE AHMAD
57
WEEK 10 | CAPITAL
KEE YOKE CHOON
58
59
60
WEEK 11 | ARCHITECTURE
61
CINDY KOO XIN YU
62
WEEK 11 | CARBON AMY AMELIA BINTE AHMAD
63
64
WEEK 11 | CAPITAL
65
KEE YOKE CHOON
66
WEEK 12 | ARCHITECTURE
67
CINDY KOO XIN YU
68
WEEK 12 | CARBON AMY AMELIA BINTE AHMAD
69
70
WEEK 12 | CAPITAL
71
KEE YOKE CHOON
2 VerdeMetam0rph
Transformation by doing more with less Banking University of HCMC Site A Situated in the heart of HCMC District 1’s business hub, we recognised the potential of this school building. Most of the building is kept to preserve its original value, save for a some renovations and additions. This office building strives to provide quality working spaces that impact the natural environment in a positive way - reducing embodied carbon and operational carbon without sacrificing the comfort of its users. Our project aims to achieve as high of a carbon efficiency as possible. With built infrastructure contributing 40% of our carbon emissions, architects have a huge responsibility to innovate and reduce our carbon impact.
Wen Xuan, Binyang
72
TAN WEN XUAN, DAI BINYANG
73
L2 F
L3 O
L4 O
0m 0m 1:250 1:250
74
5m 8.75m
10m 17.5m
25m 25m 36 Ton That Dam - Axonometric Drawn by Tan Wen Xuan
ARCHITECTURE ARCHITECTURE
TON TAT DAM STREET
HAM NGHI BOULLEVARD
NGUYGEN CONG TRU STREET
GROUND FLOOR PLAN
FLOOR PLAN (ADAPTIVE REUSE)
L5 FLOOR PLAN (ADAPTIVE REUSE)
OFFICE FLOOR PLAN (ADAPTIVE REUSE)
L6 OFFICE FLOOR PLAN (NEW STOREY) OPEN SPACE
OFFICE FLOOR PLAN (ADAPTIVE REUSE)
L7 ROOF TERRACE FLOOR PLAN
36 Ton That Dam - Floor Plan 1:300 TAN WEN XUAN, DAI BINYANG 75 Drawn by Dai Binyang
Existing Build - 1st - 5th Floor Embodied Carbon Conventional Concrete Slabs and Beams, 4% Rebar, Glass, Steel, Timber Door Frames, Brick Infill Renovated Courtyard Walls Party Walls External Walls Paint
76
Rebar 79.71 m3 626 116 Kg 1 809 475 KgCO2e 189.56 KgCO2e /m2
EMBODIED AND OPERATIONAL CARBON ANALYSIS
Concrete 1994 m3 4 785 600 Kg 622 128 KgCO2e 65.24 KgCO2e /m2
Masonry 1080 m3 1 782 000 Kg 427 680 KgCO2e 44.85 KgCO2e /m2
New Build - 6th + 7th Floor Embodied Carbon CLT Slabs, Truss, Roof, Columns
TAN WEN XUAN
77
Steel 3.97 m3 31 164 Kg 121 853 KgCO2e 12.78 KgCO2e /m2
Glass 5.79 m3 14 475 Kg 17 659 KgCO2e 1.85 KgCO2e /m2
Timber 8.37 m3 5 189 Kg 2 750 KgCO2e 0.29 KgCO2e /m2
EXISTING BUILD (STRUCTURE, INFILL, SLABS, WALL, ENVELOPE)
Reeds 30 m3 4500 Kg 45 KgCO2e 0.01 KgCO2e /m2
Glass 2 m3 5000 Kg 6 100 KgCO2e 1.49 KgCO2e /m2
CLT 1 40 672 161 39.3
(STRUCTURE, SLABS
Embodied Carbon of E 1466 13 985
EU 30.72 kWh/ 26.11 kgCO2 New Build Operational and Evelope PV Panels, Reeds, Frames
78
EMBODIED AND OPERATIONAL CARBON ANALYSIS CARBON
T 02 m3 2 960 Kg 510 KgCO2e 33 KgCO2e /m2
PV Panels 1 703 m2 20 447 KgCO2e 12 KgCO2e /m2
NEW BUILD S, ENVELOPE)
OPERATIONAL PV PANELS
Embodied Carbon of Full Reconstruction 1466 kgCO2e/m2 13 985 008 kgCO2e
Embodied Carbon of Adaptive Reuse 57.71 kgCO2e/m2 550356 kgCO2e
Existing (Post-Renovation) kgCO2e/m2 5 008 kgCO2e
UI /m2/year e/m2/year 2
Total Embodied Carbon 337 kgCO2e/m2 3214792 kgCO2e
Embodied Carbon of Partial Demolition 57.71 kgCO2e/m2 550356 kgCO2e
Old GFA retained: 5 429 m2 New GFA added: 4 107 m2 Total GFA: 9 536 m2 Building Mass: 9 130 810 kg Total Embodied carbon (Addition + Demolished) 550 356 kgCO2e 57.71 kgCO2e/m2
Carbon Offsetting 7.6 years Net Positive: -72 144kgCO2e/m2/year
Operational Carbon (Office + FnB) 249 004 kgCO2e/year 26.11 kgCO2e/m2/year EUI: 30.71 kWh/m2/year
36 Ton That Dam - VerdeMetaM0rph Embodied and Operational Carbon Drawn By Tan Wen Xuan
TAN WEN XUAN
79
Programme: Office & Commercial Plot area: 1589 m2 Total GFA: 9536 m2 Cap rate: 4.75% Theoretical cap rate with conventional materials: 4.78%
Commercial F&B Non Leasable Office
0m 1:250
5m
10m
25m
24 22 20 18 16 14 12 10 8 6 4 2 0
W 08|16
T 08|17
F 08|18
S 08|19
S 08|20
M 08|21
T 08|22
W2 W:51h (23 + 28) T:12h (6 + 6) C:22KgCO2e
80
W 08|23
T 08|24
F 08|25
S 08|26
S 08|27
M 08|28
T 08|29 W:13h (8+5) T:4h (2+2) C:8KgCO2e
W 08|30
T 08|31
F 09|01
S 09|02
S 09|03
M 09|04
T 09|05
W: 37h (27+12) T: 4h (2+2) C: 10KgCO2e
W 09|06
T 09|07
F 09|08
S 09|09
S 09|10
M 09|11
T 09|12
W: 51h (23+28) T: 12h (6+6) C: 21KgCO2e
W 09|13
T 09|14
F 09|15
S 09|16
S 09|17
M 09|18
T 09|19
W: 46h (22+24) T:14h (8+6) C: 24KgCO2e
W 09|20
T 09|21
F 09|22
S 09|23
S 09|24
M 09|25
T 09|26 W: 24h (12+12) T: 8h (4+4) C: 8KgCO2e
W 09|27
T 09|28
F 09|29
S 09|30
S 10|01
M 10|02
T 10|03 W: 32h (16+16) T:4 (2+2) C: 10KgCO2e
W 10|04
T 10|05
F 10|06
S 10|07
S 10|08
M 10|09
T 10|10
W8 W:44h (22 + 22) T:4h (2 + 2) C:22KgCO2e
W 10|11
CAPITAL CAPITAL
4.75%
PV 2242 panels $152,489.7
$359.6/m2
NOI p.a. $3,429,186.14
CLT 1402 m3 $841,200 $757,080 over
Reed 30 m3 $7,500
Conventional concrete $84,120
Construction $68,803,651.61
Consultancies $1,590,579.67
Greening cost $917,069.70
$702.41 per sq.m
Interest $3,814,081.19
Land + asset acquisition $68,803,651.61
T 10|12
F 10|13
S 10|14
S 10|15
M 10|16
T 10|17
W:90h (45 + 45) T:16h (8 + 8) C:26KgCO2e
W 10|18
T 10|19
F 10|20
S 10|21
S 10|22
M 10|23
T 10|24
W:84h (42 + 42) T:20h (10 + 10) C:35KgCO2e
W 10|25
T 10|26
F 10|27
S 10|28
S 10|29
M 10|30
T 10|31
W:86h (43 + 43) T:16h (8 + 8) C:30KgCO2e
T W 11|01 11|02
F 11|03
S 11|04
S 11|05
M 11|06
T 11|07
W12 W:82h (41 + 41) T:20h (10 + 10) C:32KgCO2e
T W 11|08 11|09
F 11|10
S 11|11
S 11|12
M 11|13
T 11|14
W13 W:80h (40 + 40) T:20h (10 + 10) C:34KgCO2e
W 11|15
T 11|16
F S 11|17 11|18
Soft costs $669,817.25
S 11|19
T M 11|20 11|21 W14 W: T: C:
W 11|22
T 11|23 FINAL REVIEW W: T: C:
36 Ton That Dam - Building Use, Financial Model, GreeningDAI Costs,BINYANG Labor Calculations Drawn by Dai Binyang
81
82
TAN WEN XUAN
CLIMATIC INTERFACE
83
DAI BINYANG
6 6 8 5 sq.m 12 5 6 sq.m 4 10 7 sq.m
Total GFA of Building
9536 sq.m
FULL DEMOLI TI ON BUI L DI NG PA RA M E TE RS GFA of Destroyed GFA of Replacement
O P E R A T I O N A L C A R B O N - C O M M E R C I A L (O F F I C E , R E T A I L , F & B ) C OM M E RC I A L PA RA M E TE RS GFA
6 6 8 5 sq.m 9 5 3 6 sq.m
Components
M A TE RI A L C A RBON OF PA RTI A L DE M OL I SHE D BUI L DI NG
M A TE RI A L C A RBON OF F UL L Y DE M OL I SHE D BUI L DI NG Embodied Carbon Factor (kgCO2eq/kg)
Carbon (kgCO2eq)
Embodied Carbon Factor (kgCO2eq/kg)
Carbon (kgCO2eq)
Concrete Rebar (4%) Bricks
200.00 8.00 144. 0 0
2400.00 7850.00 1650.00
480000.00 62800.00 237600.00
0.13 2.89 0.24
62400.00 181492.00 57024.00
49.68 144.50 45.40
Concrete Rebar (4%) Brick
3657.00 146.28 12 2 4. 0 0
2400.00 7850.00 1650.00
8776800.00 1148298.00 2019600.00
0.13 2.89 0.24
1140984.00 3318581.22 484704.00
170.68 496.42 72.51
Steel Aluminum Glass Timber
0.00 0.00 8.75 0.00
7850.00 2700.00 2500.00 620.00
0.00 0.00 21875.00 0.00
3.91 16.53 1.22 0.53
0.00 10.00 26687.50 0.00
0.00 0.01 21.25 0.00
Steel Aluminum Glass Timber
3.97 0.00 7.54 1412 . 0 0
7850.00 2700.00 2500.00 470.00
31164.50 0.00 18850.00 663640.00
3.91 16.53 1.22 0.53
121853.20 0.00 22997.00 351729.20
18.23 0.00 3.44 52.61
Materials DISPOSED
Volume (m³)
Density (kg/m³)
Mass (kg)
Carbon per m2 (kgCO2eq/m2)
Materials DISPOSED
E NE RGY USE D TO PA RTI A L L Y DE M OL I SH BUI L DI NG
Volume (m³)
Density (kg/m³)
Mass (kg)
Carbon per m2 (kgCO2eq/m2)
Carbon Emission kgCO2e/m2
Carbon Emission for Demo building kgCO2e
Items Used
Carbon Emission kgCO2e/m2
Excavator
16.76
21050.56
Excavator
16 . 7 6
10.82
13589.92
Transport to Landfil
No. of Floors
0.66 0.048 1.125
11 118 8 0
10 10 10
0.008 0.05 0.17
147 6 100 10
8 8 1
Energy per unit/kwH
Materials USED to replace
Volume (m³)
7
C o mp o n e n t s
72331.70
Energy per unit/kwH
Mass (kg)
Embodied Carbon Factor (kgCO2eq/kg)
Carbon (kgCO2eq)
Carbon per m2 (kgCO2eq/m2)
Materials of New build
Volume (m³)
Density (kg/m³)
Embodied Carbon Factor (kgCO2eq/kg)
Mass (kg)
Carbon (kgCO2eq)
Carbon per m2 (kgCO2eq/m2)
2 40 0 . 0 0
0.00
0 . 13
0.00
0.00
Concrete
0.00
2400.00
0.00
0.13
0.00
0.00
0.00
7850.00
0.00
2.89
0.00
0.00
Rebar (4%)
312.08
7850.00
2449828.00
2.89
7080002.92
742.45
Energy Use Index (EUI)
0.00 0.00
16 5 0 . 0 0 7850.00
0.00 0.00
0.24 3.91
0.00 0.00
0.00 0.00
Bricks Steel
0.00 10 . 0 0
1650.00 7850.00
0.00 78500.00
0.24 3.91
0.00 306935.00
0.00 32.19
G. E . F Operational Carbon
Reed
30.00
15 0 . 0 0
4500.00
0.01
45.00
0.01
Aluminum
0.00
2700.00
0.00
16.53
10.00
0.00
2.00 140 2 . 0 0
2500.00 48 0 . 0 0
5000.00 672960.00
1. 2 2 0.24 Embodied Carbon per m2 (kgCO2eq/m2)
6100.00 161510.40
1.49 39.33
Glass Cross Laminated Timber
12 . 0 0 7802.00
2500.00 480.00
30000.00 3744960.00
1.22 0.25
36600.00 936240.00
3.84 98.18
Area (m2) 1703.92
12
1
52
5241.6
7
Weeks used per year 52
Yearly Energy Consumption /kwH 4368
10
45.80 288.42
550356.42
57.71
kgCO2eq
Type of Carbon Embodied carbon of REPLACEMENT Carbon Emission from Demolition
% of building demolished
Carbon for New Demolition Construction
18 . 8 %
kgCO2eq/m2
8359787.92 5625220.92
876.66 841.47
13985008.84
1466.55
PV Efficiency Performance Ratio
18 % 75%
Grid Emission Factor
0.85
k g C O 2 e / m2 / y e a r
ROOF C A PA C I TY Area of Roof for PV
17 0 8 . 2 sq.m
No. of PV Panels holdable
2247.6 156643.2
PV PA NE L PA RA M E TE RS
C A RBON SA V I NGS
0.76 1703.92
Annual Energy produced
1409
13434652.42
k W h / m2 * y e a r
0.85 k g C O 2 e / k w h 249004.68 k g C O 2 e
26.11
PV PANELS
kgCO2eq/m2 188102.44 362253.98
292946.69 k w h / y e a r
30.72
Area of 1 Panel (m2) Total area of panels (m2)
Carbon Savings
7
Days used per week
Hours used per day
1.2
20447.04 TOTA L S
kgCO2eq
Carbon for Adaptive Reuse
29472.768 10400 520
Weeks used per Yearly Energy year Consumption /kwH 52 34944 20 96 52 419.328 52 2201.472 52 2620.8 52 2096.64
Carbon (kgCO2eq)
TOTA L S Ty p e o f C a r b o n Embodied carbon of REPLACEMENT Carbon Emission from Partial Demolition
7 2 7 7 7 7
4
No. of units
TOTA L E NE RGY C ONSUM PTI ON Total Energy consumed annually
0.00
Bricks Steel
PV Panels
8 1 6 24 24 10
3
1.2
52 52 52
6 5 6 Days used per week
Hours used per day 6 3 24 6 3 12
Yearly Energy Consumption /kwH 22651.2 177914.88 0
OPE RA TI ONA L C A RBON C OM PONE NE TS (RE TA I L )
Rebar (4%)
Glass Cross-Laminated Timber
6 6 4
Weeks used per year 52 52 10
E M BODI E D C A RBON OF RE PL A C E M E NT - F UL L Y NE W Density (kg/m³)
Concrete
No. of units
2.00 0.80 0.008 0.04 0.10 0.048
Air Conditioning E M B O D I E D C A R B O N O F R E P L A C E M E N T - P a r t i a l S t r u c t u r e + R e i n f o r c e me n t ( I f a n y )
Days used per week
Hours used per day
Lighting Computers Printers OPE RA TI ONA L C A RBON C OM PONE NE TS (F & B)
Air Conditioning
112040.60
No. of units
Air Conditioning Fan Heating
Stove Microwave Lights (LED) Freezer Refridgerator Fan
Carbon Emission for Demo building kgCO2e
10.82
Energy per unit/kwH
Components
E NE RGY USE D TO DE M OL I SH BUI L DI NG
Items Used
Transport to Landfil
9 5 3 6 . 0 0 sq.m
OPE RA TI ONA L C A RBON C OM PONE NTS (OF F I C E )
CARBON AND CAPITAL SPREADSHEET
PARTI AL DEMOLI TI ON - ADAPTI VE REUSE BUI L DI NG PA RA M E TE RS GFA of Existing Building GFA of Destroyed GFA of Replacement
377822.961 k W H / y e a r
Number of Panels Daylight Hours (h) Annual PV Panel Degration
2 2 42 4.5 0.05%
(first year)
3 .9 % of the carbon that Full Demolition and reconstruction of the building would emit with the SAME GFA 2 5 times the amount of carbon emitted from Adaptive Reuse with the SAME GFA
Adaptive reuse will produce New Demolition will produce
C A RBON SA V I NGS Annual Operational Carbon Annual PV Carbon Net Positive
249004.68 321149.5169
-72144.83
EXISTING ASSETS
PDE
COST PARAMETERS
OFFICE ASSETS
ARCHI + FAÇADE + ENGINEERING ITEMS 17,798 Ѿ = S$1
Prevailing exchange rate Break-even target
Item
BUILDING PARAMETERS
Rate, %
Rate, fixed
Rate, /sq.m
10 years
Land plot area
1,589 sq.m
Gross floor area, existing
6,685 sq.m
Plot ratio, proposed
2,851 sq.m
$3,136,078.00
6,685
$2,005,500.00
F&B intensity
$60.00
510
$30,600.00
F&B Rental rate
$917,069.70
Projected occupancy, typical
$917,069.70 10%
$608,924.77
$6,698,172.47
Construction subtotal
$702.41
per sq.m
7,629 sq.m
Land value
439,000,000 Ѿ /sq.m
CONSULTANCY FEES
Asset value, indicative
43,000,000 Ѿ /sq.m
Item
Rate, %
Rate, fixed
Rate, /sq.m
Area
GFA 1,920 Ѿ /kWh
Energy cost
LAND LAND ACQUISITION COST Rate, %
Land cost
Land value
Asset cost per sq.m
whole plot
per sq.m
whole area
Gross revenue, per category
$100,472.59
VAT
$400,334.99
Other misc. archi consultant fees
2.00%
$133,963.45
Net revenue, per category
$3,603,014.93
Project management fees
2.00%
$133,963.45
Total net revenue
C&S engineers' fees
Total cost
$180,150.75
Net operating income
$3,429,186.14
1.50%
$100,472.59
M&E engineers' fees
1.50%
$100,472.59
Quantity surveyor fees
1.00%
$66,981.72
Land survey fees
$25,000.00
$2,416.00
$16,150,972.02
Accredited checker fees
$1,960,096.27
$120.80
$807,548.60
Registered inspector fees
$1,960,096.27
$120.80
$807,548.60
Owner representative fees
1.50%
$0.00
$0.00
$0.00
$0.00
3.00%
$739.97
$1,176,057.76
$72.48
$484,529.16
Total fees
23.00%
$1,825,059.84 $20,075,658.22
1.00%
% of building used as office
100% of net floor area
% of building used as hospitality
$66,981.72
0% of net floor area
Prevailing growth assumption
2.00% p.a.
$1,590,579.67
$50,000.00
Item
Rate, %
Rate, fixed
Rate, /sq.m GFA
Area
GFA
specified
Lending interest rate
6.60% p.a.
Key intensity
73% of net floor area
Public space intensity
8% of net floor area
MICE facility intensity
8% of net floor area
Back-of-house space intensity
11% of net floor area
Cost
if not GFA
Key size, gross
OES items, estimate
5.00%
$334,908.62
Launch cost items, estimate
5.00%
$334,908.62
18 sq. m 2,000,000 Ѿ /night
Key rate
$112.37 /night Occupancy rate
$669,817.25 $939.45
Total soft costs
78%
Public space RevPAM
10,000,000 Ѿ /sq. m p.a.
MICE facility RevPAM
15,000,000 Ѿ /sq. m p.a.
$561.86 /sq. m p.a. $842.79 /sq. m p.a.
OPERATIONAL COSTS Total operational costs
$72,236,386.24
Valuation
HOTEL ASSETS
$100,472.59
4.75%
Cap rate
0% of net floor area
% of building used as residential
60% of revenue
PROJECTED NET OPERATIONAL INCOME PER ANNUM Item
Keys
Public spaces
MICE facilities
Rate
80% of total expenditure
Loan limit Loan duration
7 years
No. of keys
309
Total area, sq. m
5,569
Gross revenue, per sq. m 2024-12-31
1
Cost items
10% $3,603,014.93
$25,000.00
$25,000.00
Total of all items + fees + OES
CAP RATE ROI - MIX
$583.08 $4,003,349.92
$25,000.00
OPERATIONAL EQUIPMENT & SUPPLIES, LAUNCH COSTS, AND OTHER SOFT COSTS
$68,803,651.61
Total value of land + assets
Gross revenue, per sq. m
BUILDING PARAMETERS
$18,250,598.38
$4,429,817.58
Total lettable facility area, sq. m $133,963.45
$39,201,925.50
$48,727,993.39
if not GFA
6,866
$602,835.52
$1,233.28
10%
Rate
Total lettable office space, sq. m
1.50%
$1,233.28
VAT
Office space
2.00%
$24,665.69
Subtotal, per category
5% of revenue
Total operational costs
Item
9.00%
5%
$44,298,175.81
OPERATIONAL COSTS
PROJECTED NET OPERATIONAL INCOME PER ANNUM
Architect's fees
5%
Subtotal, pre-VAT, per category
of net floor area /sq. m p.m. 94% of office space
Lighting consultants' fees
Land acquisition title and recording fe Brokerage fees
Cost
$51.69 /sq. m p.m.
Interior designers' fees
Land acquisition legal fees Land acquisition consultancy fees
specified
920,000 Ѿ /sq. m p.m.
Office rental rate 2,851
$300.00
80 %
Net floor area, proposed
Item
if not GFA $1,100.00
Contingency
9,536 sq.m
Efficiency, proposed
90% of net floor area
Office intensity
A&A works Demolition works
6.0
Gross floor area, proposed
others
Cost
New works
Additional greening costs
Proposed additional floor area
Area
for GFA
LAND / ASSET PARAMETERS
CAPITAL
VerdeMetam0rph
Cost
2025-12-31
1
2026-12-31
2
2027-12-31
3
2028-12-31
2029-12-31
4
5
CONSTRUCTION PERIOD
2030-12-31
2031-12-31
6
2032-12-31
7
2033-12-31
8
2034-12-31
9
10
OPERATIONAL PERIOD
$842.79
$342,905.23
$514,357.84
$989,810.22
$34,290.52
$51,435.78 10%
Net revenue, per category
$8,908,291.99
$308,614.70
$462,922.05
Acquiring land + assets
$68,803,651.61
$68,803,651.61
Total net revenue
$6,698,172.47
$2,232,724.16
Operational costs
Consultancy items
$1,590,579.67
$530,193.22
OES items
$334,908.62
$334,908.62
Launch items
$334,908.62
$334,908.62
Net operating income to date
610
$561.86
$9,898,102.21
A+F+E items
Net operating income, p.a.
610
$1,777.35
Gross revenue, per category VAT
$9,679,828.74 $5,807,897.25
$3,871,931.50
Net operating income
$3,429,186.14
$3,497,769.87
$3,567,725.26
$3,639,079.77
$3,711,861.36
$3,786,098.59
$3,861,820.56
$3,939,056.98
$4,017,838.11
$4,098,194.88
$3,429,186.14
$6,926,956.01
$10,494,681.27
$14,133,761.04
$17,845,622.41
$21,631,721.00
$25,493,541.56
$29,432,598.54
$33,450,436.65
$37,548,631.53
RESIDENTIAL ASSETS BUILDING PARAMETERS
Total capital required, this FY
-$72,236,386.24
of which equity
-$14,447,277.25
Total equity to date
-$14,447,277.25
$10,113.50 /sq. m p.m. PROJECTED SALES INCOME Item
Principal required, this FY
-$57,789,108.99
Total principal to date
-$57,789,108.99
Total equity + principal, to date
-$72,236,386.24
180,000,000 Ѿ /sq. m
Selling price
-$57,789,108.99
-$57,789,108.99
-$57,789,108.99
-$57,789,108.99
-$57,789,108.99
-$57,789,108.99
-$3,269,212.45
-$2,724,343.71
-$2,179,474.97
-$1,634,606.23
-$1,089,737.48
-$57,789,108.99
-$57,789,108.99
-$57,789,108.99
-$57,789,108.99
$544,868.74
$544,868.74
$544,868.74
Gross revenue per category
Units
Rate
$77,153,675.69
-$544,868.74
$0.00
VAT and levies
$7,715,367.57
Interest, this FY
-$3,814,081.19
$544,868.74
$544,868.74
$544,868.74
$544,868.74
$544,868.74
$544,868.74
$544,868.74
$0.00
$0.00
$0.00
Net revenue per category
$69,438,308.12
Total interest due
-$3,814,081.19
-$3,269,212.45
-$2,724,343.71
-$2,179,474.97
-$1,634,606.23
-$1,089,737.48
-$544,868.74
$0.00
$0.00
$0.00
$0.00
Total net revenue
Total debt serviceable
-$61,603,190.19
-$61,058,321.44
-$60,513,452.70
-$59,968,583.96
-$59,423,715.22
-$58,878,846.48
-$58,333,977.73
-$57,789,108.99
-$57,789,108.99
-$57,789,108.99
-$57,789,108.99
Total expenditure
-$76,050,467.43
10% $69,438,308.12
Total cost
$0.00
$69,438,308.12
Total profit
Ascension 84 EXISTING ASSETS COST PARAMETERS Prevailing exchange rate Break-even target
PDE
OFFICE ASSETS
ARCHI + FAÇADE + ENGINEERING ITEMS 17,798 Ѿ = S$1 10 years
Item
BUILDING PARAMETERS Rate, %
Rate, fixed
Rate, /sq.m for GFA
Area others
if not GFA
Cost
Office intensity Office rental rate
100% of net floor area 920,000 Ѿ /sq. m p.m.
CARBON, CAPITAL & LABOUR REPORT
CARBON REPORT EMBODIED CARBON Existing GFA: 6685 m2
Adaptive reuse with new addition GFA:
% improvement
9536 m2
84%
Embodied carbon: 3388943 KgCO2e
Discarded embodied carbon:
Embodied carbon/sq.m:
Embodied carbon of new addition:
507 KgCO2e/m2
188102 KgCO2e
362253 KgCO2e
Total embodied carbon: 550 356 KgCO2e Total embodied carbon/sq.m: 57.71 KgCO2e/m2 Breakdown of new addition Materials
= Mass
Carbon factor KgCO2e/Kg
Embodied carbon KgCO2e
672,960 4,500 5,000 Area m2
0.24 0.01 1.22 Carbon factor
161,510 45 6,100
1,704
12
20,447
kg CLT Reeds Glass
PV Panels
188102 KgCO2e
KgCO2e/m2
OPERATIONAL CARBON Existing EUI:
69.37 kWh/m2 p.a. Operational carbon: 394,169.82 KgCO2e p.a.
Adaptive reuse with new addition EUI: 30.72 kWh/m2 p.a.
% Improvement 37%
Operational carbon: 249,005 KgCO2e p.a.
Offsets Required PV to fully offset operational carbon:
% offsetted 100.00%
1322 m2
Actual area of PV provided: 1703 m2
Alternative avenues of carbon offsetting
LABOUR Average working hours over 13 weeks: Peak working hours per week: Total incurred cost for prints and models:
455 h 60 h $486
85
86
FINAL & PROCESS MODELS - Wen Xuan, Binyang
87
88
FINAL MODEL TAN WEN XUAN, DAI BINYANG
89
90
FINAL MODEL
91
WEEK 07 | MASSING
92
WEEK 07 | MASSING TAN WEN XUAN, DAI BINYANG
93
94
WEEK 08 | MASSING TAN WEN XUAN, DAI BINYANG
95
96
WEEK 09 | STRUCTURE TAN WEN XUAN, DAI BINYANG
97
98
WEEK 11 | STRUCTURE, ENVELOPE. COLOUR, PROGRAM
99
TAN WEN XUAN, DAI BINYANG
100
WEEK 12 | STRUCTURE, ENVELOPE. COLOUR, PROGRAM
TAN WEN XUAN, DAI BINYANG 101
102
PROCESS DRAWINGS - Wen Xuan, Binyang
103
WEEK 07 | CARBON
104 TAN WEN XUAN, DAI BINYANG
WEEK 08 | CARBON
105
WEEK 08 | CARBON
106 TAN WEN XUAN, DAI BINYANG
WEEK 09 | ARCHITECTURE TAN WEN XUAN, DAI BINYANG 107
WEEK 09 | CARBON
108 TAN WEN XUAN
WEEK 09 | CAPITAL
DAI BINYANG 109
WEEK 10 | ARCHITECTURE
110 TAN WEN XUAN, DAI BINYANG
WEEK 10 | CARBON
111
TAN WEN XUAN
WEEK 10 | CAPITAL
DAI BINYANG
112
WEEK 11 | ARCHITECTURE TAN WEN XUAN, DAI BINYANG 113
114
WEEK 11 | CARBON TAN WEN XUAN 115
116
WEEK 11 | CAPITAL
117
DAI BINYANG
118
WEEK 12 | CAPITAL
DAI BINYANG 119
120
AR5805, AY 2023/2024 SEMESTER 1
HOT AIR IV: CARBON & CAPITAL
IMAGE: 36 TÔN THẤT ĐẠM, QUẬN 1, HỒ CHÍ MINH, VIETNAM
DESIGN STUDIO ERIK G L'HEUREUX
FINAL REVIEW 23 NOVEMBER SDE 3 LEVEL 1 GALLERY 8.30AM - 1PM
GUESTS:
RAZVAN I. GHILIC-MICU ALAN LEE HTIN AUNG MSIA, RAIA, SENIOR ASSOCIATE, HASSELL
DESIGN & PROJECTS MANAGER, HILTON
ASSISTANT VICE PRESIDENT GLOBAL DESIGN & PLANNING, CAPITALAND
CALEB SHEN MAX MA BERTRAND LASTERNAS SENIOR MANAGING DIRECTOR, HINES
DIRECTOR OF DESIGN AND TECHNICAL SERVICES, ACCOR
ASSOCIATE DIRECTOR, ENERGY & TECHNOLOGY SERVICES, NUS
BU YI FAN DAI BINYANG DENG HANYUE PHUA JUE HUA PEARL TAN WEN XUAN
AMY AMELIA BINTE AHMAD CINDY KOO XIN YU KEE YOKE CHOON YAP KAI JUN ASTON
DEPARTMENT OF ARCHITECTURE NATIONAL UNIVERSITY OF SINGAPORE
121
HOT AIR IV AR5801/5805 AY23/24 ERIK G L’HEUREUX DEPARTMENT OF ARCHITECTURE COLLEGE OF DESIGN AND ENVIRONMENT
122