Engineering With Nature: An Atlas, Volume 1.

Page 142

Eugene Field Park Restoration Project Riverine Systems

Chicago, Illinois, United States The Chicago River was once a wide, slowly moving marshland that supported a variety of wildlife with its lush aquatic plant communities of reeds, sedges, and rushes. Over time, the city of Chicago’s development led to the relocation and the channelization of the river’s north branch that runs diagonally through the sixteen-acre Eugene Field Park. The riverbed was also paved with concrete to transport water downstream more rapidly. The unintended consequences of these engineering decisions were that the river depleted the marshes, the life-giving marsh vegetation was destroyed, and the area became particularly vulnerable to flooding. In 2011, the U.S. Army Corps of Engineers (USACE) Chicago District (LRC) contracted ENCAP, Incorporated, to restore the wetlands. Completed in 2014, non-native plant and tree species were replaced with native specimens; 150-year-old, native white oaks were preserved in a natural oak savanna environment; and rock riffles were constructed across the river to stabilize upstream riverbanks and provide valuable aquatic habitat. The project earned the 2014 Conservation and Native Landscaping Award from Chicago Wilderness for outstanding efforts to address environmental problems and restore lost function and native biodiversity in the Chicago region.

126


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

MacDill Oyster Reef Shoreline Stabilization

3min
pages 124-127

Conclusion

4min
pages 265-268

Mud Mountain Fish Passage

4min
pages 260-263

Soo Locks Fish Habitat Restoration

4min
pages 256-259

Rich Revetments: Enhancing Hard Substrates for Ecology

4min
pages 252-255

Fowl River Private Living Shorelines

3min
pages 248-251

Houtrib Dike Pilot Project

3min
pages 244-247

Cleveland Harbor East Arrowhead Breakwater Demonstration Project

3min
pages 240-243

Milwaukee Harbor Breakwater Fish Habitat Demonstration Project

3min
pages 236-239

Ashtabula Harbor Breakwater Tern Nesting Habitat

4min
pages 232-235

Skagit River Rehabilitation of Flood Control Works

4min
pages 226-229

Lower Boulder Creek Ecosystem Restoration Project

4min
pages 222-225

Making Space for Water

4min
pages 218-221

Beneficial Use Site 4A Vegetation Workshop

4min
pages 214-217

Bowmont Catchment Initiative

3min
pages 210-213

Dunn Creek Confluence Habitat Restoration

4min
pages 206-209

Sankey Natural Flood Management Initiative

4min
pages 202-205

Building with Nature in Indonesia

4min
pages 198-201

The Polders of Kruibeke

4min
pages 192-195

Redman Point–Loosahatchie Bar Environmental Restoration

4min
pages 188-191

Alkborough Flats Managed Realignment

3min
pages 184-187

Medmerry Managed Realignment Scheme

4min
pages 180-183

Kalkense Meersen Cluster

4min
pages 176-179

Missouri River Levee Setbacks

4min
pages 172-175

Belford Natural Flood Management Scheme

4min
pages 168-171

Springhouse Run Stream Restoration

4min
pages 162-165

River Glaven Restoration Project

3min
pages 158-161

Stroud Rural Sustainable Drainage Systems

4min
pages 154-157

Horner Park Restoration Project

4min
pages 150-153

Slowing the Flow at Pickering

4min
pages 146-149

Eugene Field Park Restoration Project

4min
pages 142-145

Swift Tract Oyster Reef Breakwaters

3min
pages 136-139

Oesterdam Sand Nourishment Project

4min
pages 132-135

Coffee Island Oyster Reefs

3min
pages 128-131

Redistribution and Impacts of Nearshore Berm Sediment

3min
pages 118-121

Cat Island Chain Restoration

3min
pages 114-117

Evia Island Bird Habitat

4min
pages 110-113

Horseshoe Bend Island

3min
pages 106-109

Mordecai Island Restoration

4min
pages 102-105

Dredged Sediment in an Uncontrolled Diversion

4min
pages 96-99

Duluth 21st Avenue West Demonstration Project

4min
pages 92-95

Blackwater National Wildlife Refuge Marsh Resiliency

4min
pages 88-91

Sears Point Wetland Restoration

4min
pages 84-88

Salt Marsh Development with a Mud Motor

3min
pages 80-83

Savannah Harbor Dredged Material Containment Areas

4min
pages 76-79

Salt Marsh Development Marconi Delfzijl

3min
pages 72-75

Hamilton Wetlands Restoration

4min
pages 68-71

Braddock Bay Restoration

5min
pages 64-67

Oriental Bay Foreshore Restoration

4min
pages 58-61

Galveston Beach Nourishment at 61st Street

3min
pages 54-57

Taumanu Reserve–Onehunga Foreshore Restoration

4min
pages 50-53

Long Beach Island Coastal Storm Damage Reduction

4min
pages 46-49

North Norfolk Coast Restoration

3min
pages 42-45

Murrells Inlet Beneficial Use of Dredged Material

3min
pages 38-41

Delfland Sand Motor Pilot

4min
pages 34-37

Hondsbossche Dunes

4min
pages 30-33

Deer Island Aquatic Ecosystem Restoration

4min
pages 26-29

Introduction

6min
pages 16-23

Foreword

7min
pages 5-10
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.