DWG REF# - ID 12215 Maramani Design - 2 Bed_Rev.0 Materials in Construction Stages Item
Description
Cement
¾ Stones
R/Sand
a) b) c) d) e) f)
Clearing & / Setting Out Trench Excavations Blinding Concrete Footing Substructure Brickwork Concrete Slab
bags 73 bags 19 bags 49 bags
0.0 m³ 8.6 m³
0.0 m³ 6.9 m³
g) h) i) j) k) l) m) n) o) p) q) r)
Doors with frame c/w hinges, screws & locksets Windows & Handles c/w nuts, bolts & washer Superstructure Brickwork, Window Level Superstructure Brickwork, Wall Plate Level Ring Beam Plaster External Plaster Internal Rhinoset Paint PVA High Gloss (Steel Frames) Sush Putty (N/A to Aluminium Frames) Wall Plate
s) t) u) v) w)
Roof Trusses (aggregates where gable ends exist) Purlins & Brandering Roof Covering Ceiling & Cornice Rainwater Goods
x) y)
Plumbing & Fittings Electricals & Fittings
z)
External Works Column Totals for Material Headings
49 14 48 15 24
bags bags bags bags bags
8 bags
Bricks
SUBSTRUCTURE (UP TO SLAB)
4.6 m³
4,177 bricks
11,114 bricks 3,175 bricks
ROOF (TRUSSES, COVERING & CEILING) 1,531 bricks
115 B/Force
230 DPC
115 DPC
3.4 m³
8.9 m³ 2.5 m³
4 rolls
11 rolls 3 rolls
2 rolls
3 rolls
1 rolls
42 bags 341 bags
8 rolls 2 rolls
1.3 m³
rebar- kgs 300m 65 m² S.193- 4 sheets
rebar 326 kgs
2.7 m³ 4.4 m³
LANDSCAPING & WASTE MANAGEMENT 16.6 m³ 2.0 m³ 3,300 bricks 263.6 m³ 36.6 m³ 18.2 m³ 23,298 bricks 286.8 m³
Page 1 of 6
others as described
$ 446.09 $ 1,938.02
20 bags 59 ℓ 3ℓ kgs 47 m 2 rolls
$
1,549.05 436 m 56 sheets $ 506.35 $ 1,041.18
SERVICES (WATER & ELECTRICITY)
ID 12215 - Maramani Design - 2 Bed_Rev.0.xlsx Materials Procurement in Stages Created on 17/8/2019 @ 12:21 AM
230 B/Force
antkill- 1.1ℓ
5.8 m³ 4.7 m³ SUPER STRUCTURE (UP TO WALL PLATE)
5.7 m³
P/Sand
$ $ 4 rolls 25 rolls
13 rolls
3 rolls
1 rolls
5,497.34 758.59
300m 12.5 m²
+263 77 192 7337 jeffstar@presageprojects.co.zw Presage Projects (Pvt) Ltd © 2019 All Rights Reserved
RICS NRM 2 Adoption 17/8/2019
PPHBQ2018_Rev.0
DWG REF# - ID 12215 Maramani Design - 2 Bed_Rev.0 Elemental Bill of Quantities Item №
Pay Ref
$
Bill Description
Unit
Quantity
Rate (US$)
-
Amount (US$)
Quick Stats
building $/m² = $694.26/m²
Summary
1
building $/m³ = $257.13/m³ 0.00% $
Bill No. 1 Preliminaries (Main Contract)
9.64% $
Bill No. 2 Substructure
-
4,355.50
Bill No. 3 Superstructure
38.97% $
17,613.49
Bill No. 5 Fittings, Furnishings and Equipment
21.61% $
9,765.92
Bill No. 7 External Works
4.31% $
1,949.70
12.60% $
5,696.65
12.87% $
5,815.13
Subtotal
$
45,196.40
Plus 3.00% Contingency Sum
$
1,355.89
Subtotal
$
46,552.29
Add Vat @ 15%
$
6,982.84
Total Amount
$
53,535.13
Bill No. 4 Finishes
Bill No. 6 Services
ID 12215 - Maramani Design - 2 Bed_Rev.0.xlsx Bill of Quantities|Interface Page 2 of 6
+263 77 192 7337 jeffstar@presageprojects.co.zw Presage Projects (Pvt) Ltd © 2019 All Rights Reserved
┌ Confidential Resource Usage
┐
DWG REF# - ID 12215 Maramani Design - 2 Bed_Rev.0 Bill of Resources
1
Cost Code
Resource Description
L L01 L03 L04 L05 L06 L07 L08 L09 L14 L16 L17
Payroll Budget Information @ 9 Man-hours/Day General Hand Carpenter (C) Builder (B) Painter (T) Steel Fixer (X) Glazier (G) Boiler Maker (M) Electrician (E) Plumber (P) Light Plant/Equipment Operator (L) Heavy Plant Operator (H)
(All in Labour Rates) $ 1.57/hour $ 2.49/hour $ 2.49/hour $ 2.49/hour $ 2.49/hour $ 2.49/hour $ 2.49/hour $ 2.49/hour $ 2.49/hour $ 2.84/hour $ 3.77/hour
P F01 P03 P04 P16 P17 P18 P19 M BM
Plant Hire Hours @ 8 Plant-hours/Day Diesel (Information only, already included in Plant Rates) 3CX TLB (c) Plate Compactor (d) 750/500 Concrete Mixer (n) Concrete Dumper (o) Concrete Vibrator Set (p) Power Trowel Machine (q) Bill of Materials (BoM) Procurement Building Materials Cements Tile Adhesive (20kg) Tile Grout (5kg) 22,5 (Masonry) Cement 32,5 (PC 15) Cement Aggregates 19mm Stone Washed Riversand (Cash - Pre-Payment at the Quarry) Pitsand Rhino Products Rhinoset Masonry Beta Common Bricks Cement air bricks/vents (pair) Window Cills Galvanised wall ties Reinforcement Deformed Reinforcement Bars (Cut & Bent) Tying Wire 1.6mm ø MeshRef S193 MeshRef S245 Brickforce 230 (@ every 4th course) Brickforce 115 (@ every 4th course) Shuttering Formwork for lintels Moisture Protection DPC 2 Ply 230 DPC 2 Ply 115 Polythene Sheets (2Ply) Paints & Products Dulux Universal Undercoat Dulux Int - Ext PVA White Dulux Ceiling White Dulux Steel Prime Dulux Gloss White Dulux Pink Wood Primer Dulux Tinters (Shelf price selling @ $5.00/50ml tube) Door Frames Standard 230 single door frame Standard 115 single door frame Aluminium Window Frames 1800×1250 500×1000 1200×1000 500×1000 2150×1500 Doors Solid standard single door to suit frame Hollow standard single door to suit frame Steel Trusses Roof Trusses to detail Joinery 114mm × 38mm steel wall plate 38mm × 38mm steel purlins 38mm × 38mm sw brandering 9mm Plaster Board Ceiling (Supply Dimension - 2.4m × 1.2m) Rhinocove Cornice Iron Mongery Locksets 3 Lever Hinges c.w. screws for doors Window handle c/w nut, bolt & washer Rainwater Goods PVC Rainwater Gutters ½ round 125 × 87 Rainwater Downpipe 80mm Drip stones Chromadek Roof Sheets 25mm × 220mm sw Fascia Galvanised Roof Ridge Galvanised Valley
(Plant Charges) $ 1.12/ℓ $ 32.57/hour $ 7.89/hour $ 29.49/hour $ 23.64/hour $ 4.03/hour $ 18.70/hour (Material Costs)
CMT01 CMT02 CMT03 CMT04 BM003 BM004 BM005 RP01 MAS01 MAS06 MAS07 MAS08 RNF01 RNF02 RNF03 RNF04 RNF06 RNF07 SH01 MP01 MP02 MP03 DP01 DP02 DP03 DP04 DP05 DP06 DP10 DF02 DF03 AWF01 AWF02 AWF03 AWF04 AWF05 DR02 DR03 TT01 J01 J02 J03 J04 J07 IM01 IM05 IM06 RG03 RG07 RG10 RG11 RG12 RG13 RG14
Cost
Page 3 of 6
33.4 hours $ 153.54 ℓ $ 6.4 hours $ 0.9 hours $ 10.9 hours $ 6.0 hours $ 6.0 hours $ 3.2 hours $ Order Quantity $ $
$5.22/sack $5.22/sack $8.26/sack $9.74/sack
12.45 4.43 7 333
bags bags bags bags
$34.78/m³ $21.74/m³ $17.39/m³
22.2 m³ 18.2 m³ 26.7 m³
$13.04/sack
20 bags
$0.16/brick $0.65 ea $0.87 ea $0.17 ea
23,702 bricks 26 no 110 cills 14 no
$3,478.26/ton $2.35/kg $5.22/m² $10.43/m² $2.17/roll $1.74/roll
0.326 tons 0.33 kgs 65 m² 38 m² 25 rolls 13 rolls
$3.91/m
19 m
$3.48/roll $1.74/roll $0.22/m²
3 rolls 1 rolls 143 m²
$5.65/ℓ $5.22/ℓ $2.61/ℓ $9.57/ℓ $10.43/ℓ $5.65/ℓ $86.96/ℓ $26.09 $14.78 1st Choice/Option $354.62 $78.80 $189.13 $118.21 $508.29
ID 12215 - Maramani Design - 2 Bed_Rev.0.xlsx Resources|Console Created on 17/8/2019 @ 12:21 AM
16.46% Bill Mark-Up @ 0.00% 1.69% 2.0 Month Timeline 81.85% US$ 45,196.40 82% 0 Excluding VAT Usage Amount (US$) $ 1.00 4,153.9 hours $ 7,439.33 3,152.9 hours $ 4,934.98 105.6 hours $ 263.33 628.1 hours $ 1,565.61 47.2 hours $ 117.56 02.5 hours $ 6.29 00.9 hours $ 2.29 02.9 hours $ 7.23 58.8 hours $ 146.60 135.4 hours $ 337.50 17.1 hours $ 48.54 02.5 hours $ 9.41 16% 2%
≡ ≡
ea ea ea ea ea ea ea
29 23 7 1.1 1.0 1.1 0.07
US$
ℓ ℓ ℓ ℓ ℓ ℓ ℓ
2 no 4 no 540.00 1 no 2 no 1 no 6 no 1 no
$86.96 ea $17.39 ea
2 no 4 no
$222.13 ea
7 no
$4.35/m $2.61/m $0.87/m $4.78/m² $1.30/m
47 m 343 m 93 m 65.1 m² 150 m
$13.91 ea $1.30 ea $1.74 ea
6 sets 6 no 11 no
$4.35/m $3.91/m $13.04 ea $10.96/sheet $10.43/m $5.22/m $3.50/m
49 m 11 m 4 no 56 sheets 49 m 32 m 14 m
$
$
$ $
$
$ $
$
$ $
$ $ $
$
$
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
762.31 172.43 207.94 7.16 321.78 141.09 24.06 60.28 36,994.76 36,537.41 3,391.79 64.95 23.12 59.56 3,244.16 1,631.76 770.59 396.08 465.09 266.95 266.95 3,824.74 3,709.88 16.96 95.48 2.43 1,942.29 1,134.67 0.77 339.65 391.30 54.00 21.89 75.74 75.74 42.61 9.13 2.46 31.02 335.86 164.12 121.20 16.98 10.56 10.37 6.15 6.47 111.30 52.17 59.13 1,918.89 354.62 157.61 189.13 709.24 508.29 243.48 173.91 69.57 1,549.05 1,549.05 1,684.08 202.17 894.91 80.65 311.35 195.00 110.43 83.48 7.83 19.13 1,651.61 214.94 42.26 52.17 610.43 515.85 166.96 49.00
info@presageprojects.co.zw Presage Projects (Pvt) Ltd © 2019 All Rights Reserved
┌ Confidential Resource Usage
┐
DWG REF# - ID 12215 Maramani Design - 2 Bed_Rev.0 Bill of Resources Cost Code
TL01 TL02
Kitchen Fittings Kitchen sink 1.2m drop in Cupboards under sink Cupboards on walls HVAC Ceiling fan Fire Fighting 4.5kg fire extinguisher Bathroom Fittings Wall mounted cabinet with mirror Towel rack Water Closet Ceramic wash basin & pedestal Shower Cubicle 950 × 950 × 2000mm corner type Solar Installations 2m x 1m solar panel Single panel 100ℓ solar geyser Solar invertor c/w battery Tiles Floor tiles Wall tiles
PCI01 PCI02 PCI03 PCI04
Pre-Cast Items Double Cam Concrete Sink Pre-cast lintels Pre-cast security wall panel pre-cast grooved column
KF01 KF03 KF04 HVAC02 BM064 BF01 BF02 BF03 BF09 BF10 SI01 SI02 SI07
PVCSP01 PVCSP02 GP01 CP01 GF01 GF02 GF03 GF04 GF05 CF01 CF02 CF03 PVCFT01 PVCFT02 PVCFT03 PVCFT04 PVCFT05 PVCFT06 PVCFT07 PVCFT08 PVCFT09 TM01 TM02 TM06 RF01 SD01 WMS01
CN01 CNF01 CNF02 CB02 CB05 SW01 SW04 ST01 ST02 ST03 ST04 ST05 ST07 B01 B02 EMS01 EMS02
1
Resource Description
82%
0
Cost
$60.87 ea $1347.83 ea $1217.39 ea $56.52 ea $39.13 ea $52.17 $22.61 $78.26 $34.78 $130.43
ea ea ea ea ea
$91.30 ea $700.00 ea $1347.83 ea $0.65 ea $0.54 ea $78.26 ea $1.74/m $4.78 ea $10.43 ea
Plumbing PVC Sewer Pipes ø110mm sewer pipe ø60mm sewer pipe Galvanised Pipes ø20mm GI pipe Copper Pipes ø20mm copper pipe Galvanised Fittings ø20mm Gi elbow ø20mm Gi tee ø20mm Gi sleeve ø35mm brass p-trap for bath ø35mm Gate Valve Copper Fittings ø20mm copper elbow ø20mm copper tee ø20mm copper sleeve PVC Fittings ø160mm to ø110mm reducer ø110mm x 90° bend ø110mm x 45° bend ø110mm equal tees ø110mm end caps ø110mm p-trap ø110mm sieve ø110mm × 2m pvc vent pipe ø110mm fly trap over vent pipe Taps & Mixers ø15mm basin taps (Cobra) Sink Mixer ø35mm brass tap Rubber Fittings ø35mm rubber p-trap Sewer Disposal (Septic Tank) Square Manhole Cover & Frame Water Main Supply ZINWA flow meter
Usage
16.46% Bill Mark-Up @ 0.00% 1.69% 2.0 Month Timeline 81.85% US$ 45,196.40 Excluding VAT Amount (US$) $ 1.00 $ 3,973.91 1 no $ 60.87 2 no $ 2,695.65 1 no $ 1,217.39 $ 113.04 2 no $ 113.04 $ 78.26 2 no $ 78.26 $ 636.52 2 no $ 104.35 2 no $ 45.22 2 no $ 156.52 2 no $ 69.57 2 no $ 260.87 $ 4,460.87 4 no $ 365.22 2 no $ 1,400.00 2 no $ 2,695.65 $ 64.40 46 no $ 29.85 64 no $ 34.55 $
1 no 19 m 151 no 38 no $
$9.57/m $1.74/m
24 m 7 m
$21.74/m
42 m
$21.74/m
42 m
$7.83 $14.78 $13.04 $3.48 $4.78
ea ea ea ea ea
$8.70 ea $16.52 ea $14.78 ea $31.30 $31.57 $34.78 $17.39 $4.35 $30.43 $5.22 $7.39 $2.17
Electricals Conduits ø19mm pvc conduit Conduit Fittings ø20mm pvc sleeve Junction box (6 × 6) Cables 2.5mm² triple core copper conductors armoured cable Switches Single gang switch Cooker switch Sockets single electric socket double electric socket Cooker terminal Shaver socket Lamp holder (Brass) Fluorescent socket Bulbs/Lights Bulkhead c/w gland seal Osram 11watt fluorescent bulb Electrical Main Supply 3 Phase meter board Generator/Solar change over switch
ea ea ea ea ea ea ea ea ea
16 16 16 2 7
$ $
no no no no no
$
16 no 16 no 16 no 1 6 6 6 2 6 6 2 2
$
no no no no no no no no no
$6.96 ea $47.83 ea $4.35 ea
6 no 1 no 2 no
$1.74 ea
3 no
$39.13 ea
1.0 no
$33.04 ea
1 no
$1.74/m
51 m
$0.43 ea $0.87 ea
25 no 11 no
$0.26/m $3.48/m
153 m 30 m
$1.91 ea $8.70 ea
11 no 1 no
$2.61 $5.22 $30.43 $3.04 $1.74 $4.78
Page 4 of 6
ea ea ea ea ea ea
11 7 1 2 11 3
no no no no no no
$6.96 ea $3.04 ea
2 no 11 no
$34.78 ea $21.74 ea
1 no 1 no
$ $
$
$ $ $ $
ID 12215 - Maramani Design - 2 Bed_Rev.0.xlsx Resources|Console Created on 17/8/2019 @ 12:21 AM
16% 2%
≡ ≡
$ $ $ $ $
$ $
$ $ $ $
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
1,227.52 78.26 33.66 721.86 393.74 5,497.34 241.74 229.57 12.17 913.04 913.04 913.04 913.04 610.87 125.22 236.52 208.70 6.96 33.48 640.00 139.13 264.35 236.52 775.48 31.30 189.39 208.70 104.35 8.70 182.61 31.30 14.78 4.35 98.26 41.74 47.83 8.70 5.22 5.22 39.13 39.13 33.04 33.04 758.59 88.43 88.43 20.62 11.05 9.57 144.14 39.80 104.35 29.74 21.04 8.70 135.22 28.70 36.52 30.43 6.09 19.13 14.35 47.39 13.91 33.48 293.04 34.78 21.74
info@presageprojects.co.zw Presage Projects (Pvt) Ltd © 2019 All Rights Reserved
┌ Confidential Resource Usage
┐
DWG REF# - ID 12215 Maramani Design - 2 Bed_Rev.0 Bill of Resources Cost Code EMS04 EMS05 GT04 ACC ACC01 ACC02 ACC03 ACC08 ACC09 ACC10 ACC11
1
Resource Description
≡ ≡ Cost
Distribution board 16 Way c/w Breakers ZETDC Prepaid meter
82%
0
$213.04 ea $23.48 ea
Gates Standard security gate
$2,173.91 ea
Accessories Diesel (Information only, already included in Plant Rates) Petrol (Information only, already included in Plant Rates) 4" wire nails Termite Poison (app rate @ 5ℓ/m² of 5ℓ/95ℓ termicide/water mix) Kikuyu lawn patches 20ℓ flower pot PVC Solvent Cement (100mℓ)
ID 12215 - Maramani Design - 2 Bed_Rev.0.xlsx Resources|Console Created on 17/8/2019 @ 12:21 AM
16% 2%
Page 5 of 6
$1.07/ℓ $1.17/ℓ $1.74/packet $0.61/ℓ $3.48/m² $21.74 ea $2.61 ea
Usage
16.46% Bill Mark-Up @ 0.00% 1.69% 2.0 Month Timeline 81.85% US$ 45,196.40 Excluding VAT Amount (US$) $ 1.00 1 no $ 213.04 1 no $ 23.48 $
1 no $ 86.47 ℓ 67.07 ℓ 7 packets 1.11 ℓ 102 m² 4 no .9 no
$
$ $ $ $ $ $ $
2,173.91 2,173.91 457.34 92.48 78.74 11.81 0.68 355.55 86.96 2.35
info@presageprojects.co.zw Presage Projects (Pvt) Ltd © 2019 All Rights Reserved
Conditions of Contract 3rd Edition 1977 (International) Clause 14.1 Program
WBS ID Operation % 1 Maramani Design - 2 Bed_Rev.0 2 Mobilisation/Procurement 2.1 Mobilise cabin and security fence c/w gate to site 2.2 Set-up temporary perimeter security 2.3 Set-up storeroom on site 2.4 Procure cement and aggregates 2.5 Mobilise tools and small equipment 3 Substructure 3.1 Earthworks 3.1.1 Clear site 3.1.2 Remove turf (nekusakura) 3.1.3 Excavate topsoil & cartaway 3.1.4 Excavate trenches 3.1.5 Compact trench bases 3.1.6 Termite treatment to surface of excavations 3.2 Strip Footing 3.2.1 Blinding to trench bases 3.2.2 Pour footing 3.3 Foundation Wall 3.3.1 Build external foundation wall 3.3.2 Build internal foundation walls 3.3.3 Backfill around external wall 3.3.4 Fill foundation with hardcore 3.4 Foundation Slab 3.4.1 Lay DPM 3.4.2 Prepare meshref S193 3.4.3 Pour slab
% Planned 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Start 20-Nov-19 20-Nov-19 20-Nov-19 22-Nov-19 22-Nov-19 22-Nov-19 24-Nov-19 22-Nov-19 22-Nov-19 22-Nov-19 27-Nov-19 1-Dec-19 4-Dec-19 6-Dec-19 8-Dec-19 9-Dec-19 9-Dec-19 10-Dec-19 12-Dec-19 12-Dec-19 14-Dec-19 14-Dec-19 15-Dec-19 17-Dec-19 17-Dec-19 18-Dec-19 19-Dec-19
Duration 59 Days 5 days 1 day 2 days 1 day 2 days 1 day 27 days 16 days 4 days 3 days 2 days 1 day 1 day 0 days 2 days 0 days 1 day 4 days 1 day 1 day 0 days 1 day 2 days 0.00 days 0 days 0 days
Finish 18-Jan-20 25-Nov-19 21-Nov-19 24-Nov-19 23-Nov-19 24-Nov-19 25-Nov-19 19-Dec-19 8-Dec-19 26-Nov-19 30-Nov-19 3-Dec-19 5-Dec-19 7-Dec-19 8-Dec-19 11-Dec-19 9-Dec-19 11-Dec-19 16-Dec-19 13-Dec-19 15-Dec-19 14-Dec-19 16-Dec-19 19-Dec-19 17-Dec-19 18-Dec-19 19-Dec-19
Superstructure 0.00% Masonry 0.00% Build external walls up to window level 0.00% 0.00% Build internal walls not exceeding 1.5m high Build-in door frames 0.00% Build-in window frames 0.00% Install lintels 0.00% Build internal walls up to wall plate 0.00% Build external walls up to wall plate with air bricks 0.00% 0.00% Build external walls at gable ends Plastering 0.00% Plaster walls internally 0.00% Plaster walls externally 0.00% Roof 0.00% Install wall plate 0.00% Supply and fix trusses by specialist 0.00% Fix purlins 0.00% Fix brandering 0.00% Install roof covering 0.00% Fix ridge on roof 0.00% Install ceiling 0.00% Install cornice 0.00% Fix fascia/barge board 0.00% Fix gutters 0.00% Install downpipes complete with shoes and dripstones 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
20-Dec-19 20-Dec-19 20-Dec-19 22-Dec-19 20-Dec-19 22-Dec-19 3-Jan-20 27-Dec-19 25-Dec-19 27-Dec-19 29-Dec-19 29-Dec-19 29-Dec-19 26-Dec-19 26-Dec-19 27-Dec-19 30-Dec-19 1-Jan-20 2-Jan-20 4-Jan-20 2-Jan-20 5-Jan-20 3-Jan-20 5-Jan-20 7-Jan-20
18 days 14 days 3 days 2 days 3 days 12 days 0 days 1 day 1 day 1 day 7 days 7 days 5 days 12 days 0 days 2 days 1 day 0 days 1 day 2 days 2 days 1 day 1 day 2 days 0 days
7-Jan-20 3-Jan-20 23-Dec-19 24-Dec-19 23-Dec-19 3-Jan-20 3-Jan-20 28-Dec-19 26-Dec-19 28-Dec-19 5-Jan-20 5-Jan-20 3-Jan-20 7-Jan-20 26-Dec-19 29-Dec-19 31-Dec-19 1-Jan-20 3-Jan-20 6-Jan-20 4-Jan-20 6-Jan-20 4-Jan-20 7-Jan-20 7-Jan-20
5 5.1 5.1.1 5.1.2 5.1.3 5.2 5.2.1 5.3 5.3.1 5.3.2 5.3.3 5.4 5.4.1 5.4.2
Finishes Wall & Floor Finishes Rhinoset finish on internal walls Rhinoset finish on ceiling Grano screed floor finish Glazing Glazing to all windows Painting Paint internal walls Paint ceiling High gloss paint steel to frames Tiling Wall tiles to bathroom and kitchen Floor tiles to bathroom and kitchen
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3-Jan-20 3-Jan-20 6-Jan-20 9-Jan-20 3-Jan-20 3-Jan-20 3-Jan-20 3-Jan-20 5-Jan-20 13-Jan-20 3-Jan-20 9-Jan-20 9-Jan-20 11-Jan-20
13 days 13 days 10 days 4 days 0 days 0 days 0 days 11 days 4 days 1 day 0 days 3 days 2 days 1 day
16-Jan-20 16-Jan-20 16-Jan-20 13-Jan-20 3-Jan-20 3-Jan-20 3-Jan-20 14-Jan-20 9-Jan-20 14-Jan-20 3-Jan-20 12-Jan-20 11-Jan-20 12-Jan-20
6 7 8 9
Fittings and Equipment Services External Works Project Completion Furnish home and move in
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
5-Jan-20 20-Dec-19 7-Jan-20 16-Jan-20 16-Jan-20
9 days 22 days 3 days 2 days 2 days
14-Jan-20 11-Jan-20 10-Jan-20 18-Jan-20 18-Jan-20
4 4.1 4.1.1 4.1.2 4.1.3 4.1.4 4.1.5 4.1.6 4.1.7 4.1.8 4.2 4.2.1 4.2.2 4.3 4.3.1 4.3.2 4.3.3 4.3.4 4.3.5 4.3.6 4.3.7 4.3.8 4.3.9 4.3.10 4.3.11
Created on 17/8/2019 @ 12:21 AM
9.1
Complete 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
01-Oct-19
31-Oct-19
ID 12215 - Maramani Design - 2 Bed_Rev.0.xlsx Construction Schedule|Baseline
30-Nov-19 20-Nov-19
59 Days
20-Nov-19
1 days
20-Nov-19
30-Dec-19
29-Jan-20
5 days
Duration
22-Nov-19
2 days
22-Nov-19
2 days
22-Nov-19
% Complete
1 days
24-Nov-19
22-Nov-19
1 days
4 days
27-Nov-19
3 days
1-Dec-19
2 days
4-Dec-19
1 days
6-Dec-19
1 days
8-Dec-19
9-Dec-19
0 days
10-Dec-19
0 days
1 days
12-Dec-19
1 days
14-Dec-19 14-Dec-19
1 days
15-Dec-19
0 days
1 days
17-Dec-19
18-Dec-19
0.00 days
19-Dec-19
0 days
0 days
20-Dec-19
18 days
20-Dec-19
3 days
20-Dec-19
14 days
22-Dec-19
2 days
22-Dec-19
12 days
20-Dec-19
3 days
3-Jan-20
27-Dec-19
1 days
27-Dec-19
1 days
25-Dec-19
29-Dec-19
7 days
29-Dec-19
5 days
26-Dec-19 26-Dec-19
0 days
1 days
29-Dec-19
27-Dec-19
7 days
12 days 0 days
2 days
30-Dec-19
1 days
1-Jan-20
2-Jan-20
0 days
1 days
4-Jan-20
2-Jan-20
2 days
2 days
5-Jan-20
1 days
5-Jan-20
2 days
3-Jan-20
1 days
7-Jan-20
3-Jan-20 3-Jan-20
3-Jan-20 3-Jan-20 3-Jan-20 3-Jan-20
13 days
10 days
9-Jan-20 0 days
4 days
0 days 0 days
11 days
5-Jan-20
3-Jan-20
0 days
13 days
6-Jan-20
4 days
13-Jan-20
0 days
9-Jan-20 9-Jan-20
20-Dec-19
22 days
5-Jan-20
1 days
3 days 2 days
11-Jan-20
1 days
9 days
7-Jan-20
3 days
16-Jan-20 16-Jan-20
Page 6 of 6
28-Feb-20
2 days 2 days
+263 77 192 7337 info@presageprojects.co.zw Presage Projects (Pvt) Ltd Š 2019 All Rights Reserved