REX Dec 2019

Page 58

ROLLINGSTOCK & MANUFACTURING

The digitalisation of supply chain management When the Australasian Railway Association announced the industry-wide adoption of GS1’s ISO data standards in 2015, Project i-TRACE was established to help industry with their implementation across all stakeholder companies. Head of product innovation at Siemens Mobility, Stephen Baker, spoke to Rail Express about Siemens Mobility’s Project i-TRACE journey.

T

HE DIGITALISATION OF SUPPLY chain management is well underway across a range of industries, and GS1 Australia says it is committed to making this process easier for the rail sector. As a not-for-profit provider of standards and solutions for over 20 industry sectors, GS1 introduced barcoding to Australia in 1979 to enable its more than 20,000 member companies to implement their standards more efficiently. The barcodes are now scanned across the world over six billion times daily. When the rail industry agreed in 2015 that GS1 standards were the right choice to enable best practice supply chain management, the Australasian Railway Association (ARA) led industry working group initiated Project i-TRACE to help implement consistent identification (globally unique codes) and automatic data capture (barcoding) in organisations and value chains across the rail industry. Efficiency within the rail industry is heavily reliant on successful supply chain management practices. Assuring material availability of the right quantities, the right qualities, at the right place and time with minimum effort and cost is crucial. Stronger life cycle traceability is needed for this, and best practice requires the uptake of the innovative technologies that are disrupting the sector. “Around the world there is a realisation that the digitalisation of the rail industry is essential. Project i-TRACE is a fundamental building block towards achieving digital capability in the sector,” ARA CEO, Danny Broad, has said. Project i-TRACE allows all stakeholders within the supply chain to follow a component, part or asset throughout its lifecycle (including maintenance) from procurement to disposal with ease. It is intended to help stakeholders identify products, electronically capture information about them and then share that information with relevant parties. GS1 supplies a tracking technique to give a unique identification to all rail products including items such as point machines, tracks and signalling parts. “Project i-TRACE allows us to trace every component from when it’s been manufactured all the way through to installation and to the whole of life performance of that asset,” Sydney Trains chief executive officer Howard Collins said when Sydney Trains began its digitalisation.

58

ISSUE 9 2019 | RAIL EXPRESS

Stephen Baker, head of product innovation of Siemens Mobility in Australia.

“My message to all those involved in the rail industry whether you are a small supplier, all the way through to us as a big maintainer, is get on board with i-TRACE.” Essentially, standardising the way materials in the rail industry supply chain are identified and marked enables “traceability and warranty management, which is fundamental for lifecycle tracking,” according to Stephen Baker, head of product innovation at Siemens Mobility in Australia. “This has always been a challenge for the industry,” Baker said. Under Project i-TRACE, identification codes compliant with GS1 standards are encoded into a machine-readable GS1 DataMatrix barcode, usually directly laser-engraved. According to GS1, an engraved barcode is the best option in harsh environments where labels are likely to fall off, such as for rolling stock. One GS1 client developed a process whereby the DataMatrix barcode could be vulcanised into rubber parts, for others a sticker label is enough. Once the barcode has been affixed, product data

www.railexpress.com.au


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Message from ALC

3min
pages 102-104

Message from RISSB

4min
page 99

Women in Industry awards return in 2020

3min
pages 97-98

Melvelle takes TrackPack electric

2min
page 96

Message from RTAA

3min
pages 100-101

Phoenix Contact develops IoT for surge protection

5min
pages 94-95

Lantech resolves long-held comms challenges

6min
pages 89-91

Lankhorst expands sleeper success to ANZ

5min
pages 92-93

Ross Equipment on the value of quality components

3min
pages 87-88

Omada helps tackle infrastructure pipeline

2min
pages 81-82

Frequentis ICM deployed at Sydney Trains

5min
pages 83-84

Australian Rail Technology improving OHW safety

3min
pages 79-80

Sekisui sleepers approach 40 years of action

3min
pages 77-78

tm stagetec focusses on versatility, scalability

3min
pages 75-76

Innovative wheel sensors from Frauscher

4min
pages 70-72

MRD enhancing condition monitoring range

5min
pages 67-69

SKF boosting service intervals for traction motors

3min
pages 73-74

Hitachi committed to sustainability

4min
pages 64-66

CERT adapts to changing times and needs

7min
pages 61-63

Rail Manufacturing CRC’s legacy

9min
pages 55-57

Keolis Downer talks metro transformations

12min
pages 39-42

GS1 helping digitalise supply chain management

7min
pages 58-60

Wabtec’s GE Transportation boosts Roy Hill efficiency

5min
pages 45-47

Andrew Engineering embracing digital with depot fit outs

6min
pages 51-54

Digitalisation the name of the game for Siemens

3min
pages 43-44

Downer staying agile in changing rail industry

6min
pages 48-50

Pacific National opens new Parkes freight hub

6min
pages 35-38

Systra Scott Lister adding value of confidence

4min
pages 32-34

ARA welcomes all to AusRAIL PLUS 2019

7min
pages 4-7

Q&A with John Holland’s Steve Butcher

7min
pages 25-28

News up front

19min
pages 8-19

From the Editor

4min
page 3

Thales focussed on skills for survival

7min
pages 29-31

Maximising rail’s spending boom

10min
pages 20-24
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.