The Australian Pipeliner October 21

Page 34

CONTRACTORS

Supporting projects from concept to completion Finn Planning is raising the stakes in project planning and delivery services.

F

inn Planning is an expert in the delivery of top-quality project control services, with a stellar track record complete with some of the highest profile energy projects in Australia. Privately owned and Australian based, the company is headquartered out of Perth, Western Australia. Finn Planning provides attentive expert planning assistance to a diverse range of clients, including operators, EPC, implementation subcontractors and more. The company specialises in a range of planning and scheduling services at all stages of project delivery, from concept through execution to close out. Finn Planning offer specialist project control services, guaranteeing the recruitment of elite contract project staff, and delivering expert consultancy and project management. The company standard for planning delivery is Oracle Primavera P6 while also offering supply and installation of Oracle Primavera P6 and Safran Risk Analysis software options for clients. Planning, scheduling and reporting methodologies make up the backbone of Finn Planning’s capabilities; however, what differentiates Finn Planning is its intimate knowledge of the international resource industry, dynamic market conditions including supply and delivery, and client expectations. The Finn Planning team can also deliver the best staffing solutions with maximum flexibility, responding to challenges and guiding the project team through the dynamic lifecycle of a project. This is what the company calls its tried and tested flexible engagement model, customising its approach to a client’s needs and accounting for enough plasticity in the method to manage evolving requirement specifications.

34

Finn Planning Managing Director Paul Finn.

Growing in prominence Established little more than four years ago, the company has already made a name for itself within the LNG, infrastructure, subsea, pipeline and refinery industries. Finn Planning’s impressive portfolio include high-profile projects such as the Jansz-lo Compression Project, Dorado and Waitsia Gas Plant Stage 2, as well pipeline projects including Gorgon onshore pipelines, DBNGP Stage 5b looping and Kewdale pipeline. Managing Director Paul Finn migrated to Western Australia in 2005 and since, has held a variety key project roles with Chevron, Woodside and Mitsui. His experience around the globe across a broad spectrum of industries and a diverse portfolio of projects has made him an adaptable and intuitive leader. The Finn Planning team welcomes the The Australian Pipeliner | October 2021

challenge of developing and implementing project planning systems and reporting mechanisms and are highly respected project and planning construction specialists. A nimble Australian business with global expertise, the company provide highly competent and qualified resources which include primavera software as a package, to simplify and further reduce clients’ costs and their need to carry expensive and unnecessary licensing charges. The company’s mission statement is 'plan for safety, plan for quality, plan for excellence', attesting to its firm belief that the execution of success starts with an intelligent plan and considered method.

For more information visit www.finnplanning.com


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

CCE expands its corrosion management offering Corrosion inhibiting grease for equipment 72 Anode offers GreenAmp for cathodic protection 74

41min
pages 70-92

Futureproofing gas detection in a hydrogen future

4min
pages 68-69

Super Emitters no match for Picarro solution

3min
pages 66-67

Remote operation on pipeline isolation

6min
pages 62-63

Intelligent pigging and emissions reduction technologies

6min
pages 64-65

Fast game’s a good game on the Sunshine Coast

3min
pages 60-61

Spiecapag makes mark on pipeline history

5min
pages 58-59

HDD installations on the Parmelia Gas Pipeline

3min
pages 56-57

Queensland hits peak production

3min
pages 54-55

Enhanced solutions for your ESG Program

1min
page 52

Sentanil CMS supports pipeline construction

1min
page 53

Tracer wire system ensures safe utility location

2min
pages 48-49

kwik-ZIP’s simple spacer solutions

2min
pages 50-51

Supporting projects from the ground up

4min
pages 46-47

More reach for Vermeer Australia customers

2min
pages 40-41

PER teams with trusted name

4min
pages 44-45

Nacap’s approach keeps Arrow on target

5min
pages 36-37

HDD construction methodology insights

5min
pages 38-39

Unconscious bias in recruitment

6min
pages 32-33

Pollard's leaves competition in the dust

3min
pages 42-43

Supporting projects from concept to completion

2min
pages 34-35

Breaking down barriers in the pipeline industry

10min
pages 28-31

Convention goes virtual in 2021

3min
pages 18-19

VEGA equipment keeps Santos gas on track

3min
pages 24-25

Survey finds widespread support for hydrogen

2min
pages 16-17

Registration for pipeline engineers

3min
pages 14-15

APGA establishes women’s forum

1min
pages 26-27

CEO's report

10min
pages 8-11

Gas and energy policy

3min
pages 12-13

President's Message

3min
pages 6-7
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.