Melbourne School of Design APPLIED ARCHITECTURAL TECHNOLOGY Subject Coordinator: Dr Giorgio Marfella
DESIGN DEVELOPMENT PROPOSAL WITH KEY ENVELOPE DETAILS FOR A TALL OFFICE BUILDING IN MELBOURNE CBD
ABPL90118 Applied Architectural Technology Final Submission
Team Member
Team Member
Team Member
Julia Quirk
Qinyi Mao
Xiaoyu Zhang
DESIGN DEVELOPMENT REPORT
983633
Tutor
Anthony Blazquez Due Date
904786
910445
20 November 2020
Tutorial N.
03
12:00
17:10
7:35
AR
R BO
R
12:00
IA
R TO
HA
W
VIE VI
C
I SV
EW
K D AR AY P AR B N W MA HILIP T TO A P S B ORT EW I D R V P WA RDS O T A W TOW E I V W VIE
TO
W
W TO
AR
DS
YA
RR
A
RIV
ER
Key Key
5:00
19:45
LIN
F DS
T
SS
R DE
N
TIO
STA
Low-rise (<20m) N Low-rise(<35m) (<20m) N 0 20 Mid-rise 40 60m Mid-rise(<150m) (<35m) High-rise 0 20 40 60m High-rise (<150m) 1:4000 Sky-rise (>150m) 1:4000 Sky-rise (>150m)
View Analysis
GUR
Key
NER
N 0 20 40 60m
Key Key
1:4000
L
112
Summer Solstice Summer Solstice Winter Solstice Winter Solstice Summer Wind Summer Wind Key Winter Wind Winter Wind Summer Solstice N N 05 20 40m 0 5 20Winter 40m Solstice 1:2000 1:2000 Summer Wind
TA
60
Summer Solstice Winter Solstice
10% 20% 30% FREQUENCY
0 5 10
S
3PM ANNUAL
9AM ANNUAL
20m
1:1000
Sun + Wind Analysis
Building Roof Plan
GUR
ER
5M OFFSET
ER
RIV
EW
VI
TO
RIV
VIEW TO TOWER VIEW TO TOWER
6% BUILING MIN OFFSET 6%HEIGHT BUILING HEIGHT MIN OFFSET
VIEW OUTDOOR LOCATED BETWEEN CUT OUT ONFOR SOUTH SIDE TO GARDEN HAVE MAXIMUM YARRA HOTEL, MID-RISE OFFICELOCATED AND LOW-RISE OFFICE VIEW FOR OUTDOOR GARDEN BETWEEN HOTEL, MID-RISE OFFICE AND LOW-RISE OFFICE
RIALTO MAXIMUM ORIENTATED 45° TOWER TO CITYNEARBY, GRID TORECEIVE MATCH EXISTING NORTHEN AND REDUCE WIND LOAD RIALTO TOWERSUNLIGHT NEARBY, RECEIVE MAXIMUM NORTHEN SUNLIGHT AND REDUCE WIND LOAD
RA
Groove
TO
E RIV
OF
FI
CE
EN
TR
CE
D
N FLI
N 20m
1:1000
CORE
Traffic Control
ORIENTATION
RE-ENTRANT
STEPPED CROWN
GLASS PODIUM
ORIENTATED 45° TO CITY GRID TO MATCH EXISTING RIALTO TOWER NEARBY, RECEIVE MAXIMUM NORTHEN SUNLIGHT AND REDUCE WIND LOAD
RE-ENTRANCE TO CREATE SHADOW LINE THAT EMPHASISE SLENDERNESS OF TOWER, REDUCE DOMINANCE OF BUILIDNG IN CONTEXT
CROWN AT DIFFERENT HEIGHTS TO HELP CREATE VISUAL SEPARATION, GAPS INBETWEEN THE CROWN AND STEPING HELP TO REDUCE WIND LOAD
GLASS PODIUM TO SITE BOUNDARY TO HELP REDUCE WIND TUNNEL AEFFECT TO PEDESTRIANS AND ALLOW VIEW FROM PEDESTRIAN PATHS TO TOWER
Asia Square Typology: Commercial Asia Square Concept Asia Square FPA:Typology: 2900 m2Diagram Commercial Typology: Commercial Location: Singarpore FPA: 2900 m2 FPA: 2900 m2 Location: Singarpore Location: Singarpore
ST
0 5 10
LN S ER E BUT TRI DEN GAR
CORE CORE
AN
KET
Pedestrian Flow (High-Low) Traffic Flow (High-Low) Street Lamp
VIEW TO TOWER
NY
R
E TOW
MAR
EW
VI
F
ST
Key
R
R YA
GLASS PODIUM GLASS PODIUM GLASS PODIUM TO SITE BOUNDARY TO HELP REDUCE
OF
VISUAL GAPS INBETWEEN THE CROWN GLASS WIND TUNNEL AEFFECT TO PEDESTRIANS AND ALLOW CROWN ATSEPARATION, DIFFERENT HEIGHTS TO HELP CREATE PODIUM TO SITE BOUNDARY TO HELP REDUCE AND STEPING HELPINBETWEEN TO REDUCE WIND LOAD VIEW FROM PEDESTRIAN PATHS TO ALLOW TOWER VISUAL SEPARATION, GAPS THE CROWN WIND TUNNEL AEFFECT TO PEDESTRIANS AND AND STEPING HELP TO REDUCE WIND LOAD VIEW FROM PEDESTRIAN PATHS TO TOWER
IAM
PRECEDENT Groove Groove
EMPHASISE OF TOWER, REDUCE RE-ENTRANCE TOSLENDERNESS CREATE SHADOW LINE THAT DOMINANCE OF OF BUILIDNG CONTEXT EMPHASISE SLENDERNESS TOWER,INREDUCE DOMINANCE OF BUILIDNG IN CONTEXT
STEPPED CROWN STEPPED CROWN CROWN AT DIFFERENT HEIGHTS TO HELP CREATE
L WIL
PRECEDENT PRECEDENT
RE-ENTRANT RE-ENTRANT RE-ENTRANCE TO CREATE SHADOW LINE THAT
RAN
ORIENTATION ORIENTATION ORIENTATED 45° TO CITY GRID TO MATCH EXISTING
TA RAN XI D RO CE P
ENT
ENT
250M HEIGHT TOWER WITH MAXIMUM GFA TORESTRICTION REACH MAXIMUM 250M HEIGHT RESTRICTION
CUT OUT FOR BALCONY CUT OUT FOR BALCONY CUT OUT ON SOUTH SIDE TO HAVE MAXIMUM YARRA
HOT
EL
P
ICE
EDGE OF MINIMUM OFFSET LINE TOWER WITH MAXIMUM GFA EXTENDING TO THE EDGE OF MINIMUM OFFSET LINE
MAXIMUM HEIGHT MASSING MAXIMUM HEIGHT MASSING TOWER WITH MAXIMUM GFA TO REACH MAXIMUM
SS GLA
RH
OVE
UM ODI
OFF
MAXIMUM SITE MASSING MAXIMUM SITE MASSING TOWER WITH MAXIMUM GFA EXTENDING TO THE
RY
NDA
BOU EAD
CE
6% BUILING
HEIGHT OFFSET 6% BUILING HEIGHT OFFSET
MUM YARRA ED BETWEEN SE OFFICE
ST S IN
L
COL
N S L
W
VIE
PEDESTRIAN VIEW TO TOWER
A ARR O Y ER W T RIV VIEARRA Y TO
RRA AER RYIV A TO R AERW VYI
NER
OFFSET TO PROVIDE PEDESTRIAN VIEW TO TOWER OFFSET TO PROVIDE
5M OFFSET
ER
ST
N
S
E BUT TRI DEN GAR
30% FREQUENCY
ND
FLI
KET
20%
LN S ER
MAR
Bike Lane Tram Route Parking Lot Tram Stop Greenery Podium Podium Brick Paving Street Lamp
1:2000
0
573
00
Key
40m
E
10%
F
120
W
0 5 20
T M S
E
OF
573 1:2000
LIA
W
N
>40 km/h 30-40 km/h 20-30 km/h 10-20 km/h 0-10 km/h
OP
0
WIL
Winter Wind
>40 km/h 30-40 km/h 20-30 km/h 10-20 km/h 0-10 km/h
DR
NG I D UIL RINT Winter B Wind TP O O F 0 5 20 40m
N
Summer Wind N
XI
408 00
Key
N
ST S IN
COL
N S L
Low-rise (<20m) Mid-rise (<35m) High-rise (<150m) Sky-rise (>150m)
PRECEDENT PRECEDENT Groove
Groove Groove Groove
Groove
CORE
CORE
Sky Sky Garden Sky Garden Garden
8 8Parramatta Parramatta Square Square Asia Square Typology: Commercial Typology: Commercial 8 ParramattaTypology: Square Commercial FPA: FPA:2,300 2,300m2 m2 FPA: 2900 m2 Typology: Commercial Location:Parramatta Parramatta CBD, NSW Location: CBD, NSW Location: Singarpore FPA: 2,300 m2 Location: Parramatta CBD, NSW
Precedents
Visual Slenderness Visual Slenderness Visual Slenderness
Asia Square Typology: Commercial FPA: 2900 m2 Location: Singarpore
City Skyline/River View
Sourced From: https://www.cityofparramatta.nsw.gov.au/council/parramatta-square https://www.capitaland.com/sg/en/lease/commercial-space-listing/asia-square-tower-2.html
JAM-5 Architects Introduce visual
ABPL90118:
Groove
Sky Balquez Tutorial 03 - Anthony Group no. 5 Garden Semester 02, 2020 Assignment
PROJECT: 433-455 Collins St Melbourne Site B
8 Parramatta Square Typology: Commercial FPA: 2,300 m2
TITLE:
Groove
SkySite analysis and building concept A1.1 design Garden 8 Parramatta Square Typology: Commercial FPA: 2,300 m2
DRAWN BY: Julia Quirk Qinyi Mao Xiaoyu Zhang
983633 904786 910445
SCALE @ A1:
PAGE:
VARIES
A1.1
DATE: 20/11/2020
4320 900 1020
F
MECHANICAL LEVEL
45
FFL + 5 077 GL +113 668
HOTEL AMENITY FLOOR
44
HOTEL
CORE
12 FLOORS
14
3.6m
1 713.6m2
2 FLOORS 253.8m2 12 1 216.8m 71% Efficiency
85%
SKY LOBBY
29
1
10.8m
1 713.6m
LVL UG 1 LVL UG 2
253.8m2 GFA 1 038.6m2 61%
1 918.4 m
MECHANICAL LEVEL
28
1
8m
1 713.6m2
MID RISE OFFICE 290.8m2 Usable Area 1 627.7 m2
LVL UG 2
MID RISE OFFICE
16-27
12
4m
1 713.6m2
290.8m2 Efficiency 1 422.8m2 83%
OFFICE CHANGEOVER
15
1
8m
1 713.6m2
324m2
LOW RISE OFFICE
2-14
13
4m
1 713.6m2
324m2
MECHANICAL LEVEL
2
1
8m
1 713.6m2
324m2
Efficiency 12 FLOORS
85%
GROUND FLOOR
0
1
20m
5 9464m2
324m2
5 640.0m2 GFA
1 918.4 m2
Usable Area
1 627.7 m
Efficiency
85%
92 294m2 64 001m2
250m
0
5 10
10
20m
12 FLOORS
GFA
85% 1 918.4 m2
Usable Area 2
1 627.7 m2
968.4m2 57%
20m
17704
4800
B
4800
C
A
4800
4800
48004800 48003600
4800
4800
4800
4800
4800
4800
4800
D
18300
B
C
9450 4800
18300
E
3540 4800
900 240
F
9450 4800
D
3600
3540 4800
4800
D
45060
9450
E
900 240
4800
4800
4800
C
4800
4800
4800
D
EXPRESS LIFT
EXPRESS LIFT
HOTEL LIFT
HOTEL LIFT
GOODS LIFT
EXPRESS LIFT
EXPRESS LIFT
EXPRESS LIFT
F900
3540 4800
E
EXPRESS LIFT
240
F 9450
3600
B
3540 4800
E
18300
900 240
F
BOH
BOH
3 2
BOH BOH
4
4800 4800 36004800
17704 17704
45060
BOH HOTEL LIFT
HOTEL LIFT
GOODS LIFT
EXPRESS HOTEL LIFT LIFT
EXPRESS HOTEL LIFT LIFT
EXPRESS GOODS LIFT LIFT
HOTEL LIFT
HOTEL LIFT
GOODS LIFT
HOTEL EXPRESS LIFT LIFT
HOTEL EXPRESS LIFT LIFT
GOODS EXPRESS LIFT LIFT
HOTEL LIFT
HOTEL LIFT
GOODS LIFT
HOTEL LIFT
HOTEL LIFT
GOODS LIFT
BOH
BOH GOODS LIFT BOH
4 3
GOODS LIFT BOH BOH
BOH
5 4
GOODS LIFT
3 BOH
5 4 HOTEL LIFT
HOTEL LIFT
GOODS LIFT
GOODS LIFT
6 5
6 5
S1
-
6 S1
-
6
S1
-
SKY LOBBY FLOOR PLAN NTS
S1
-
45060 9450 4800
1020 A 3300 1020 900
1
9450
18300
4800
4800
4800
3600
4800
4800
4800
3540 4800
900 240
4320 9150 4320 900 1020 900 1020 4800 4800 4800 4800 4800 4800
C 4800
4800
45060
D
18300 3600
E 4800
4800
B
4800
C
A
4800
4800
C
9450 4800
D
E 4800
48004800 48003600
4800
9450
4800
4800
D
45060
900 240
4800
4800
T
CO
4800
4800
4800
D
C
3540 4800
E
900 240
MRO LIFT
MRO LIFT
F
SCHEMATIC
HOTEL GF OFFICE TOTAL MECHANICAL CROWN GF HOTEL
MRO LIFT
GOODS LIFT
MRO LIFT
MRO LIFT
MRO LIFT
MRO LIFT
MRO LIFT
MRO LIFT
MRO FEMALELIFT WC
MRO LIFT
MRO LIFT
MRO LIFT
MRO LIFT
MRO LIFT
MRO LIFT AMB. WC MRO LIFT
MRO LIFT
MALE WC
4 3 2
MALE WC
4 3 5 4 3 5 4
AMB. WC
FEMALE MRO WC LIFT
MALE WC
MRO LIFT
FEMALE WC
6 5
GOODS GOODS LIFT LIFT
GOODS GOODS LIFT LIFT
OFFICE
AREA BREA
MECHANICAL PROGRAM GF
HOTEL AMENI
AREA BREA
MECHANICAL PROGRAM
HOTEL AMENI HOTEL HOTEL AREAAMENI BREA
GOODS LIFT
MRO LIFT
PROGRAM MECHANICAL SKY LOBBY HOTEL AMENI MECHANICAL HOTEL AMENI HOTEL MID RISEBREA OFFI MECHANICAL AREA SKY LOBBY PROGRAM OFFICE CHAN HOTEL AMENI MECHANICAL LOW RISE OFF HOTEL HOTEL AMENI MID RISE OFFI MECHANICAL SKY LOBBY MECHANICAL OFFICE CHAN GROUND FLO MECHANICAL HOTEL AMENI LOW RISE OFF MID RISE OFFI HOTEL MECHANICAL OFFICE CHAN SKY LOBBY GROUND FLO LOW RISE OFF MECHANICAL MECHANICAL MID RISE OFFI
AMB. WC
MRO LIFT
MRO LIFT
FEMALE WC
GOODS LIFT
MRO LIFT
RSE DEN FLRISNLA E
AMB. WC
E
LAN
D
FLIN
6 5
S1
-
6 S1
-
6 TYPICAL MID RISE OFFICE FLOOR PLAN NTS
GROUND FLO OFFICE CHAN
S1
-
LOW RISE OFF
5 640m
4800
4800
4800
= 89 460m
2
E
F
13470
13470
4800
2
NLA/NUA EFFICIENCY
14 1 1 1 1 1 12 14 1 1 13 1 1 12 1 1
LOW RISE OFFICE
2-14
13
MECHANICAL LEVEL
2
GROUND FLOOR
0
3.6m 10.8m 10.8m 8m 8m 10.8m 4m 3.6m 8m 10.8m 4m 8m 8m 4m 20m 8m
BOH
1 918.4m 1 918.4m2 1 918.4m2 1 918.4m2 1 918.4m2 1 918.4m2 1 918.4m2 1 918.4m2 1 918.4m2 1 918.4m2 1 918.4m2 1 918.4m2 1 918.4m2 1 918.4m2 5 964m2 1 918.4m2
253.8m 253.8m2 253.8m2 253.8m2 290.8m2 253.8m2 290.8m2 253.8m2 324m2 253.8m2 324m2 290.8m2 324m2 290.8m2 324m2 324m2
1 421.6m 74% 1 664.2m2 86% 1 243.4m2 65%
4m
1 918.4m2
324m2
1 594.4m2 83%
1
8m
1 918.4m2
324m2
1
20m
5 964m2
324m2
LRO LIFT
LRO LIFT
45060
1 918.4m2 CORE 253.8m2 1 421.6m2 EFFICIENCY 74% GFA NLA/NUA 2
GOODS LIFT
LRO LIFT
TYPICAL LOW RISE OFFICE FLOOR PLAN
JAM-5 Architects
LRO LIFT
LRO LIFT
1
2
2
1 421.6m 1 627.7m2 1 421.6m2 1 173.2m2 1 243.4m2 1 594.4m2 2
74% 85% 74% 61% 65% 83%
LOW RISE OFFICE 13 FLOORS GFA
Usable AreaOFFICE 1 594.4 m2 LOW RISE 13 FLOORS Efficiency 83%
1 627.7m2 85% 5 640.0m2 1 173.2m2 61%
5 640.0m2
1 918.4 m
2
GFA
1 918.4 m2
13 FLOORS Efficiency GFA
83% 1 918.4 m2
Usable Area
1 594.4 m2
Efficiency 13 FLOORS
83%
LOW RISE OFFICE Usable Area 1 594.4 m2
-
LOW RISE OFFICE
KEY
S1 1.1
GFA
1 918.4 m2
Usable Area
1 594.4 m2
Efficiency
83%
ABPL90118:
PROJECT:
TITLE:
Tutorial 03 - Anthony Balquez 15m 0 .5 1 Group no.5 5 Semester 02, 2020 Assignment
433-455 Collins St Melbourne Site B
A1.2: Architectural schematic plans and sections; area schedule and floor distribution.
P1 -
4800
9450 4800
9450
18300
4800
4800
4800
B
4800
3600
C 4800
4800
45060 18300
4800
4800
4800
4800
4800
4800
D
3600
4800
E
3540 4800
F
9450 4800
900 240
3540 4800
900 240
45060
A3300 900
9450 4800
4800
A
1020 3300 1020 900
2 1 A
B
C 4800
4800
B
D
3600
C
9450 4800
18300
45060
9450
E
D
4800
4800
4800
B
2 1
4800
D
C
4800
4800
3540 4800
E
GOODS LIFT
240
F 9450
3600
F900
E
18300
4800
3540 4800
900 240
F
MALE WC
3 2 AMB. WC MALE WC
4
GOODS LIFT
FEMALE WC
BOH GOODS GOODS LIFT LIFT
3 2
AMB. MALE LRO WCWC LIFT
4 3
AMB. WC LRO MALELIFT WC
5 4
LRO LIFT
LRO AMB. LIFT WC
LRO LIFT
LRO LIFT
LRO LIFT
BOH LRO LIFT GOODS GOODS LIFT LIFT
FEMALE WC
BOH LRO LIFT
LRO LIFT GOODS LIFT
3 5 4
FEMALE WC LRO LIFT
LRO LIFT
FEMALE WC LRO LIFT
LRO LIFT
LRO BOH LIFT
GOODS LIFT
6 5
LRO LIFT
LRO LIFT
LRO LIFT
6 5
LRO LIFT
LRO LIFT
S1 -
TYPICAL LOW RISE OFFICE FLOOR PLAN 6 NTS
0.51
5
15m
0.51
5
15m
S1 -
4800
30-43 46 29 45 28 44 16-27 30-43 15 29 2-14 28 2 16-27 0 15
FEMALE WC
9150
4 HOTEL HOTEL AMENITY FLOOR SKY LOBBY MECHANICAL LEVEL MECHANICAL LEVEL HOTEL AMENITY FLOOR MID RISE OFFICE HOTEL 5 OFFICE CHANGEOVER SKY LOBBY LOW RISE OFFICE MECHANICAL LEVEL MECHANICAL LEVEL MID RISE OFFICE GROUND FLOOR OFFICE CHANGEOVER
10.8m TFH
AMB. WC
3540 240 900
1 FLOORS
253.8m2 17700
44 FL. NO.
1 918.4m2
45060
HOTEL AMENITY FLOOR PROGRAM
8m
17700
1
253.8m2 1 664.2m2 86%
45060
45
1 918.4m2
45060
MECHANICAL LEVEL
10.8m MALE WC
13890
1
13470 17700
CORE
13890
GFA
13890
TFH
1020 1020
9150 13470
4800
FLOORS
1
48004800 48003600
41 433m
2
GROUND FLO
-
45060 9450
A
3300 1020 900
4800 4800 36004800
4800
900 240
2
* 2SITEDFAR
C
2
HOTEL TOTAL OFFICE
MECHANICAL SCHEMATIC CROWN GF HOTEL TOTAL OFFICE CROWN MECHANICAL
GOODS LIFT
MALE WC
TOTAL
CROWN SCHEMATIC
F 9450
3600
REE
ST INESET L L R CO S ST LLIN B
4800
3540F 900 240
E
3 2
4800 4800 36004800
4800
18300
4800
2 1
3600 4800 4800
4800
3540
SCHEMATIC
18300 3600
B
A
4800
F
9450
45060
2 1
3600 4800 4800
22 568m
2
3540
GOODS LIFT
46
4800
9450
1020 3300 1020 900
4320 900 1020
9450
18300
* SITE FAR = 89 460m2
FL. NO.
4800
1020
1
B
9450
A3300 1020 900
4800
5 964m
4800
9450
3600
3600
3 2
3600 4800 4800 4800
20m
4800
4800
2 1
4320 9150 4320 900 1020 900 1020 4800 4800 4800 4800 4800 4800
1
3600
C 4800
A
9150 4320 900 1020 48004800 4800 4800
5 755m2
4800
4800
9450
2 1
1020
54800640m23600
49 879m
24m
4800
B
18300
S1
13470
B
3
4800
4800
45060
A3300 900
3300 1020 900
9150 4320 900 1020 48004800 4800 4800
P2 -
17704
30 695m
9150
17704
2
17704
72m
17704
17700 13890 13890
1 389.6m MID RISE81% OFFICE
17704
16
9150 10350
17700
2
17704 10350 9150
HOTEL
9450
4800
4800
2
2 5 964m 4800
3540
4800
4800
1 627.7 m2 MID RISE OFFICE
3540 240 900
0 5
2
1 918.4 m2
10350 10350 3540 9150 3540 9150 3540 10350 9150 240 900 240 900 240 900 4800 4800 48004800 4800 48004800 4800 4800
22 568m
2
20m 26 m 4800
13890
4800
9450
1020 3300 1020 900
11020 900
240 900
1020
26 m
AREAS SCHEDULE
4800
45060
MECHANICAL
46
6
GOODS LIFT
NLA
GF CROWN
17700
17704
10350 9150
30-43
LVL UG 1
GFA * 2 41 NLA 49 879m 433m2 2 2 92 294m 64 001m 2 45060 5 755m
45060
1
9150
2 253.8m2 Usable 1 216.8mArea 71%
GFA*
AREA BREAKDOWN 3
1020 1020
3540 240 900
1 713.6m2
TFH 108m 250m 24m
P1
17704 10350 9150
45060
13890 13890
MID RISEEFFICIENCY OFFICE NLA/NUA
10.8m
FLOORS 26 46 3
-
1
9150
GFA
GL + 13 668
1
16 72m 30 695m DESIGN SCHEDULE
4320 900 1020
FFL + 5 077TFH FLOORS
253.8m2 GFA
4800 4800
3540 240 900
FL. NO.
1 713.6m2
4800
CPARK 9150 10350
13890
PROGRAM AMB. WC
FLOORS TFH
HOTEL AMENITY FLOOR
GOODS LIFT
GOODS LIFT
HOTEL LIFT
9450
1020 A 3300 1020 900
3600 4800 4800 4800
AREA BREAKDOWN
8m
SCHEMATIC DESIGN SCHEDULE
PROGRAM
GOODS LIFT
4800
GOODS LIFT
MRO LIFT
17700 13890
4800
MRO LIFT
7200
Typical Warren Truss Podium roof Typical Warren structure Truss Podium roof structure
3600
15000
45060
* SITE FAR = 89 460m2
LVL 01
LVL 00
2 AREA BREAKDOWN
GOODS LIFT
HOTEL LIFT
S1 -
1020 3300 1020 900
4320 900 1020 MRO LIFT
9150
5 9464m2 5 640m2
17704
20m
17704
1
45060
44 554m2 36 107m2 5 141m2
13470 17700
108m 24m
17700
MRO LIFT
26 3
45060
MRO LIFT
OFFICE MECHANICAL GF outrigger and belt truss system outrigger and belt truss system
GOODS LIFT
MALE WC
27 418m2 19 290m2
45060
LVL 02
72m
45060
LVL 02
16
13890
LVL 03
13470
26 m
HOTEL
LVL 03
13470
250m
NLA
17704 10350 9150
83 076m2 55 398m2
SECTION AND FLOOR DISTRIBUTION DIAGRAM S1 TYPICAL MID RISE OFFICE FLOOR PLAN 1.1 SCALE 1:500
1
HOTEL LIFT
HOTEL LIFT
TYPICAL HOTEL LEVEL FLOOR PLAN NTS
10350 10350 3540 9150 3540 9150 3540 10350 9150 240 900 240 900 240 900 4800 4800 48004800 4800 48004800 4800 4800
46
CROWN
A
LVL 01
GFA*
13890
LVL 04
FLOORS TFH
17700
TOTAL
13470
SCHEMATIC DESIGN SCHEDULE A
60250
52000
F
8250
E
LVL 04
108m
HOTEL LIFT
ET
20000
6460 5240 1220
D
C
14400
9150
4800 4800 4800
900 240
P2
26
GOODS LIFT BOH
TRE
17704
3540 4800
6
OFFICE
GOODS LIFT
ET S
17700
4800
LVL 00
A
HOTEL LIFT
6
EET
5000
P3 -
3600
4800 13470
4000 8000 8000
4800
LVL 05
GL 5 + 8 591
4800
HOTEL LIFT
T REE
45060
4800
LVL 06
FFL + 0
3350
65%
20000
4320 900 1020
B
FEMALE WC
3300
GOODS LIFT
S1 -
STR
6700
1 243.4 m
4070
4000 4000 4000 52000 4000 4000 4000 4000 4000 4000
LVL 07
MRO LIFT
1020
HOTEL LIFT
BOH
EET
3350
3600
PODIUM
OFFICE TOTAL MECHANICAL
HOTEL LIFT
BOH GOODS LIFT
6
STR
CPARK6700
Usable Area
2
5590 2580
4000
4000 4000 4000 4000 4000 52000 4000 4000 4000 4000 4000 4000 4000
4800
LVL 05
FFL - 6 700
GOODS LIFT
T ST RKE MA
8000 8000
4800
LVL 06
FFL - 6 700
GOODS LIFT
HOTEL LIFT
S1 -
S AM
15000
9450
18300
LVL 08
LVL 07
GL + 8 591 FFL - 3 000
HOTEL LIFT
HOTEL LIFT
BOH
LI WIL
20000
1 918.4 m2
Efficiency
4
5000
GFA
LVL 08
FFL + 20 000
HOTEL LIFT
BOH
1020 3300 1020 900
PODIUM
3350
65%
45060
FFL + 20 000
3
BOH
RK MA
FFL + 28 000
Efficiency 1 FLOOR
LVL 09
FFL + 28 000
MECHANICAL FLOOR MECHANICAL FLOOR
1 243.4 m2
LVL 10
FFL + 32 000 FFL + 32 000
GOODS LIFT
6 5
LVL 10
FFL + 36 000
2
F
LVL 11
FFL + 40 000
FFL + 36 000
E
900 240
6 5
LVL 11
FFL + 44 000
FFL + 40 000
4800
BOH
LVL 12
FFL + 48 000
FFL + 44 000
4800
D
HOTEL LIFT
HOTEL LIFT
HOTEL LIFT
LVL 12
LVL 09 FFL + 56 000 3300 9450 1020 900 FFL + 52 000 4800 4800
1
4800
BOH
LVL 13
FFL + 56 000
FFL + 48 000
Usable Area
LVL 13
1020
FFL + 52 000
65% 1 918.4 m2
S1 1.1
LVL 14
LVL 14
FFL + 60 000
A
1 918.4 m
Usable Area 1 FLOOR Efficiency GFA
LVL 15
FFL + 64 000
TOTAL FLOORS : 13
GFA
2
1220
outrigger and belt truss system outrigger and belt truss system
LVL 15
FFL + 64 000
FFL + 60 000
65%
HOTEL SKY LOBBY
LVL 16
FFL + 68 000 FFL + 68 000
1 243.4 m2 LOBBY
HOTEL SKY LOBBY 1 243.4 m2
LVL 19
LVL 16
FFL + 72 000 FFL + 72 000
1 918.4 m2
2550
4000
FFL + 76 000
MECHANICAL GF
45060
9150
LVL 20
LVL 17
FFL + 76 000
F 3540
5 4
10350 10350 3540 9150 3540 9150 3540 10350 9150 240 900 240 900 240 900 4800 4800 48004800 4800 48004800 4800 4800
Usable HOTELArea SKY 1 FLOOR Efficiency
17700 13890
58490
GFA
LVL 21
108008000 8000 4000
108008000 8000 4000
SKY LOBBY FLOOR PLAN
58490
1 FLOOR
GOODS LIFT
LVL 17
FFL + 80 000 FFL + 80 000
45060 45060
249600
GOODS LIFT
13890
HOTEL LIFT
49540
HOTEL LIFT
49540
LVL 22
6460 5240
4800 3540 240 900
HOTEL SKY LOBBY
52000
13890 4000
BOH
LVL 18
FFL + 88 000 FFL + 88 000
LVL 23
LVL 18
FFL + 92 000
6
45060
GOODS LIFT
17700
HOTEL LIFT
BOH
LVL 19
FFL + 96 000
FFL + 92 000
13470 17700
229600 HOTEL LIFT
249600
EXPRESS LIFT
LVL 20
FFL + 100 000 FFL + 100 000
8000 229600
EXPRESS LIFT
60250
4800
FFL + 104 000
4800
9150 10350
LVL 25
EXPRESS LIFT
8250
4800
4000 4000 4000
LVL 26
LVL 21
FFL + 104 000
FFL + 96 000
4000
LVL 27
LVL 23
FFL + 108 000
5
4000
LVL 28
8000
outrigger and belt truss system outrigger and belt truss system
13470
1220
LVL 29
BOH
FFL + 112 000 LVL 22
4800
240
3
3600 4800 4800
F
13470
E
1220
D
LVL 24
FFL + 108 000
HOTEL SCHEMATIC
81700
900 240
8300 8320
C
LVL 25
FFL + 112 000
MID RISE TOTAL FLOORS : 12 OFFICES
3600
F900
E 9450
C
5 4
4800
3540 4800
7200
4 MID RISE OFFICES
4800
3540 4800
BOH
3600 4800 4800 4800
4800
14400
FFL + 116 000
4800
4 3
4320 900 1020 4800
8300 8320
4800
3600
4800 4800 17704
3600
17700
FFL + 120 000
OFFICE CHANGE OVER OFFICE FLOOR CHANGE OVER FLOOR
6700 6700
62450
13470
9450
3600
20000
4320 900 1020
18300 4800
LVL 26
FFL + 116 000
4000
4000 4000 4000 4000
45060
LVL 30
FFL + 120 000 LVL 24
3
CROWN
74%
P4 -
4800
9150
4800
4000 4000
250000
4000 56000 4000 45060 4000
4000 56000 4000 4000
FFL + 124 000
TOTAL
1 421.6 m
Efficiency
5590 2580
10800 10800 8000 4000
13470
8000 4000 4000 4000
250000
FFL + 128 000
FFL + 124 000
S1 -
Usable Area
2
LVL 27
FFL + 128 000
4800
D
45060
9450
E
BOH
MS
9.6 m2
FFL + 132 000
4800
LIA
3.6 m2
FFL + 132 000
4800
S1 -
LVL 29
FFL + 136 000
2
2.8 m2
1 918.4 m2
LVL 31
B
FFL + 144 000
4800
D
18300
B
WIL
3.6 m2
74%
LVL 32
4800
FFL + 136 000 LVL 28
FFL - 3 000
Efficiency 15 FLOORS
S1 1.1
LVL4800 30
FFL + 144 000
MECHANICAL FLOOR MECHANICAL FLOOR
FFL + 0
1 421.6 m2
B
9450
A
1
LOW RISE OFFICES LOW RISE TOTAL FLOORS : 13 OFFICES
Usable Area
74% 1 918.4 m2
17700 13890
3600
3600 10800 10800
HOTEL SKY LOBBY HOTEL SKY LOBBY
P3
1 421.6 m2
GFA
LVL 31
FFL + 154 800
C
3 2
4320 9150 4320 900 1020 900 1020 4800 4800 4800 4800 4800 4800
LVL 33
FFL + 162 000 LVL 32 FFL + 158 400
B 9450 4800
18300 3600
4
9150 4320 900 1020 48004800 4800 4800
3600 3600
FFL + 169 200 LVL 34 FFL + 165 600
3600
LVL 34
3600
FFL + 172 800 LVL 35 FFL + 169 200
TOTAL FLOORS : 12
3350
8.6 m2
Usable Area 15 FLOORS Efficiency GFA
17704
LVL 35
3600
FFL + 176 400 LVL 36 FFL + 172 800
FFL + 165 600 LVL 33 FFL + 162 000
4800
4800
LVL 37 LVL 36
FFL4800 + 154 800
2
LVL 37
FFL + 158 400
1 918.4 m2
HOTEL
LVL 39
FFLPLAN + 176 400 TYPICAL HOTEL LEVEL FLOOR
3300 1020 900
GFA
74%
B
LVL 38
4800
4800
LVL 40
1020
1 421.6 m2
48004800 48003600
9150
FFL + 194 400 LVL 41 FFL + 190 800
A
4800
BOH
10350 10350 3540 9150 3540 9150 3540 10350 9150 240 900 240 900 240 900 4800 4800 48004800 4800 48004800 4800 4800
LVL 41
4800
3 2
3540 240 900
FFL + 198 000 LVL 42 FFL + 194 400
FFL + 180 000
1 918.4 m
Usable HOTELArea 15 FLOORS Efficiency
2550
9150 10350
4800 4800
3540 240 900
3600 3600
LVL 42
FFL + 183 600 FFL + 180 000
50400
3600
FFL + 201 600 LVL 43 FFL + 198 000
LVL 38 FFL + 183 600
3600
3600 3600 50400 3600 3600 3600 3600
LVL 43
FFL + 187 200 LVL 39
TOTAL FLOORS : 15
3600
FFL + 205 200 LVL 44 FFL + 201 600
4800
62450
4800
3600 3600 3600 3600
13890
3600 3600 3600 3600
HOTEL
TOTAL FLOORS : 15 HOTEL
3600
LVL 44
FFL + 190 800 LVL 40 FFL + 187 200
6
GFA
HOTEL
FFL + 205 200
4800
C
2 1
4800 4800 36004800
45060 45060
GOODS LIFT
13890
GOODS LIFT
13890
HOTEL LIFT
2
13890
LVL 45
10800 3600
5
17700
11350
15 FLOORS
BOH
LVL 45
4800
10800
HOTEL
7610
LVL 46
GOODS LIFT
4070
17704
3600
17700
18400
FFL + 216 000
HOTEL LIFT
HOTEL LIFT
FFL + 216 000
4
BOH
7610
4800
19190
45060
FFL + 224 000
LVL 46
81700
FFL + 224 000
HOTEL LIFT
18400
11350
4800 19190
BOH
MECHANICAL FLOOR 3 MECHANICAL FLOOR
P4
17700
4800
FFL + 235 190
2
2
13470 17700
14400 14400 14400 14400
FFL + 235 190
ROOFTOP BAR
3600
BOH
CROWN
ROOFTOP BAR
4800
B
A
3600 4800 4800
E
1
4800
2
4800
2 1
3600 4800 4800 4800
D
C
4800
3
13470
4800
4
1
2
4320 9150 4320 900 1020 900 1020 4800 4800 4800 4800 4800 4800
13470
B
FL + 247 600
4800
5
900 240
CROWN 9150
26400
13470
14810 26400
4800
3540
3
4800
9450
1020 3300 1020 900
9150
3600
6
4
13470
4800
9450
4800
45060
1020 A3300 1020 900
1
9150 4320 900 1020 48004800 4800 4800
4800
5
17704
4800
6
17704
4800
18300
1 4800
14810
4320 900 1020
A
6.8 m2
3.6 m
9450
FL + 247 600
4000
3.6 m
1020 3300 1020 900
45060
4800
1
DRAWN BY: Julia Quirk Qinyi Mao Xiaoyu Zhang
6
SCALE @ A1: 983633 904786 910445
S1 -
VARIES
DATE: 20/11/2020
PAGE: 0.51
5
0.51
5
S1 -
A1.2
15m
15m
GOODS LIFT
CROWN
CROWN
MECHANICAL FLOOR
MECHANICAL FLOOR
HOTEL LIFT
HOTEL LIFT
GOODS LIFT GOODS LIFT
GOODS LIFT
HOTEL LIFT
HOTEL AMENITIY
CROWN
GOODS LIFT
GOODS LIFT
HOTEL AMENITIY
MECHANICAL FLOOR EXPRESS LIFT
HOTEL AMENITIY
HOTEL
HOTEL
SKY LOBBY
SKY LOBBY
MECHANICAL FLOOR
HOTEL
EXPRESS LIFT
EXPRESS LIFT
HOTEL LIFT
MECHANICAL FLOOR
HOTEL LIFT
MID RISE OFFICE LIFT
HOTEL LIFT
SKY LOBBY MECHANICAL FLOOR
MID RISE OFFICE LIFT
MID RISE OFFICE LIFT
MID RISE OFFICE CHANGE OVER & OFFICE AMENITIES
MID RISE OFFICE LIFT
MID RISE OFFICE
MID RISE OFFICE LIFT MID RISE OFFICE LIFT
CHANGE OVER &
OFFICE AMENITIES MID RISE OFFICE CHANGE OVER & OFFICE AMENITIES
LOW RISE OFFICE
LOW RISE OFFICE LIFT
LOW RISE OFFICE
LOW RISE OFFICE LIFT
LOW RISE OFFICE LIFT
EE T ST R
MECHANICAL FLOOR
WS S ILLTR IAEE MT S
PODIUM
MECHANICAL FLOOR PODIUM
MECHANICAL FLOOR PODIUM
W
ILL IA M
W
ILL IA M
S
ST R
EE T
LOW RISE OFFICE
FLIND ER N S LANE
N
OOR
GOODS LIFT
GOODS LIFT HOTEL LIFT
GOODS LIFT
GOODS LIFT
1 -
NE
FLIND ERS LA
NE
N HOTEL LIFT
FLIND ERS LA
TOWER VOLUMES
TOWER VOLUMES
ELEVATOR SHAFTS
TOWER VOLUMES AND PROGRAMMATIC DISTRIBUTION
2 -
TOWER VOLUMES
ELEVATOR SHAFTS
PODIUM
ELEVATOR ORGANISATION ELEVATOR SHAFTS
PODIUM PODIUM
OOR
OOR
EXPRESS LIFT
EXPRESS LIFT
HOTEL LIFT
HOTEL LIFT
MID RISE OFFICE LIFT
OOR
MID RISE OFFICE LIFT MID RISE OFFICE LIFT MID RISE OFFICE LIFT
& ES
& S
LOW RISE OFFICE LIFT
E
LOW RISE OFFICE LIFT
RISE E LIFT
E
CAL FLOOR
CAL FLOOR
ELEVATOR SHAFTS
PODIUM
ELEVATOR SHAFTS PODIUM
PODIUM HIGH RISE OFFICES MECHANICAL FLOOR
HIGH RISE OFFICES
3 -
HIGH RISE OFFICES
MECHANICAL FLOOR
SKY LOBBY
MECHANICAL FLOOR
SKY LOBBY HOTEL
SKY LOBBY 3D FLOOR PLATE STACKING SCHEME AND RELATION TO CORE
JAM-5 Architects
MECHANICAL FLOOR
LOW RISE OFFICES
MECHANICAL FLOOR MECHANICAL FLOOR LOW RISE OFFICES
LOW OFFICES SKYRISE LOBBY
MECHANICAL FLOOR
MECHANICAL FLOOR
SKY LOBBY
HOTEL
SKY LOBBY
MECHANICAL FLOOR
HOTEL MECHANICAL FLOOR
MECHANICAL FLOOR
FLOOR PLATE STACKING AND ORGANISATION PERSPECTIVES
ABPL90118:
PROJECT:
TITLE:
DRAWN BY: FLOOR PLATE STACKING AND ORGANISATION PERSPECTIVES
Tutorial 03 - Anthony Balquez Group no. 5 Semester 02, 2020 Assignment
433-455 Collins St Melbourne Site B
A1.3: Lift diagrams & floor plate stacking concept
Julia Quirk Qinyi Mao Xiaoyu Zhang
983633 904786 910445
FLOOR PLATE AND ORGANISATION PERSPECTIVES SCALE @ STACKING A1: PAGE: VARIES
DATE: 20/11/2020
A1.3
LEGEND / STRUCTURE SCHEDULE C1
Steel Mega-column embedded in concrete 800 x 400 mm C2 Steel column conc. embed. 600 mm square C3 Steel beam (primary) 700 WB 150 B1 Steel beam (primary) 700 WB 150 B2 Steel beam (typical) 530 UB 82 / 100 notch EB1 Steel Beam (Typical edge) 800 WB 168 SL1 Composite steel decking 120mm thick, continuously supported @ 2400 centres
TYPICAL FLOOR SCHEME FLOOR SCHEME 9: Central core LATERAL SYSTEM: Outrigger with belt truss STRUCTURAL MATERIAL : Composite MODULE: 1200mm SPAN WIDTH: 2400mm (Max 3000mm) CORE WIDTH: 450mm
CROWN CONFIGURATION Scheme D: Steel Column 400 - 600 mm depth.
PODIUM CONFIGURATION Typical 1500mm depth Two-way Warren Podium Truss @ 1200mm centred with steel bracing connected to circular column
CB1 Cantileverd beams (tapering) 150 PFC @ 1500 centres Crown Column Crown Beam
7 -
Steel Strengthening Column
ISOMETRIC CROWN STRUCTURE
Belt - Diagonal Steel Beam Facade Beam Outrigger Concrete Wall Concrete Load Transfer Beam/Column Podium Truss System
6 -
ISOMETRIC HOTEL FLOOR STRUCTURE
5 -
ISOMETRIC SKY LOBBY STRUCTURE
4 -
ISOMETRIC OFFICE FLOOR STRUCTURE
3 -
ISOMETRIC MECHANICAL FLOOR STRUCTURE
N 1 -
ISOMETRIC TOWER STRUCTURE
JAM-5 Architects
2 -
ISOMETRIC PODIUM STRUCTURE
ABPL90118:
PROJECT:
TITLE:
DRAWN BY:
Tutorial 03 - Anthony Balquez Group no. 5 Semester 02, 2020 Assignment
433-455 Collins St Melbourne Site B
A2.1: Structural concept diagrams & 3D modelling
Julia Quirk Qinyi Mao Xiaoyu Zhang
983633 904786 910445
SCALE @ A1:
PAGE:
VARIES
A2.1
DATE: 20/11/2020
2.2B HOTEL 2.2B HOTEL STRUCTURAL PLAN
STRUCTURAL PLAN
43800
B3/EB1 Steel beam (primary) 800 WB 168 Scale 1:20 810 mm 275 mm
B2
EB1
C2
B3
B2 EB1
B2
EB1
B2
C1
EB1
C3
B1 B2
B2 B1 EB1
B2
B2 C3 B1
C1 B1 B2C1
EB1
C1
EB1
C3
P1 HOTEL TYPICAL HOTEL FLOOR STRUCTURAL PLAN 2.2B N 0 5 SCALE 1:200 STRUCTURAL PLAN 1:200
C1
C1
10
C3
S1 C3 2.3
EB1
B2
EB1
B2
C1
C3
EB1
EB1
EB1
C2
EB1
C1
0
5
C3
900
900
4800 4800
4800
4800 4800
4800
3600 4800 4800
C3
C3
4800
8 9
10
EB
C1 EB1
C1 C3
9
10
EB EB1
C3 C2
SCALE 1:200 @ A1
10
2.2A LOW-RISE STRUCTURAL PLAN 1
20m
SCALE 1:200 @ A1
810 mm
2.2A LOW-RISE STRUCTURAL PLAN
2.2A LOW-RISE STRUCTURAL PLAN
B2
C3
3600
C1
EB1
4800 4800
B2
B2
C3 C1 B2 B2 B1 EB1 EB1
B2 B1 B2
B3
EB1
EB1
C1
C2
B2 B2 B1
B2
B2
EB1
EB1 EB1 C1
C3
C3
C1
EB1 C3
B1 B2 EB1 EB1
C3 C1
B2
C1
9
B2 EB1
EB1 C3
EB1
C1
C1
C3
EB1
10
EB1
900
4800
3300
B2
C3
B2
EB1 EB1
EB1
C2
C3
4800
EB1
C1
B2
B2
B1
C1 SL1 EB1 C3
B2
B1 B2
B2
B2
B1
C1
EB1 B2
C3
B2 B2
EB1
C1
B2
B2 B1 EB1B2
B1 B2 B2 B2
B2
B1 B1
B2
EB1 B2
B2 B1 B2 B2
EB1 EB1
EB1 C1
EB1
EB1
C1
EB1
EB1 EB1 C1
C3
C3
C1
EB1 C3
B2
EB1
B1
EB1
C1
EB1
EB1 C3
C1
N
PLAN 1:200
20m 0
5
10
JAM-5 Architects
20m
2.2A LOW-RISE N STRUCTURAL PLAN 1:200 P2 LOW RISE STRUCTURAL PLAN SCALE 1:200 @ A1
-
SCALE 1:200
2.3
0
5 10 2.2A LOW-RISE N STRUCTURAL PLAN 1:200
20m 0
A
55
10 10
20m 20m
SCALE 1:200 @ A1
ABPL90118:
PROJECT:
TITLE:
DRAWN BY:
Tutorial 03 - Anthony Balquez Group no. 5 Semester 02, 2020 Assignment
433-455 Collins St Melbourne Site B
A2.2: Structural plans
Julia Quirk Qinyi Mao Xiaoyu Zhang
983633 904786 910445
SCALE @ A1:
PAGE:
VARIES
A2.2
DATE: 20/11/2020
EB1 EB1
C3
AS1
B1
C3
B2
C2 C1
EB1
B2
EB1
C3
C1
B2
EB1
B2
EB1
B2
B1 B2 C3
B2
C3
C3
B2
B2 C1
EB1
B2
EB1
B2
C1
B1 C1 FLOOR SCHEME 9: Central Core Lateral System: Outrigger with belt truss B2 Structural Material: Composite EB1
B2 B2
EB1
B1
EB1
B1
C3
LEGEND I H J 900 C1 4800 Steel Mega-column em4800 bedded in concrete 1800 x 900 C3 C1 C2 C2 Steel column conc. embed. EB1 mm square EB1 800 C3 SteelB2beam (primary) 700 EB1 WB 150 B1 Steel beam (primary) 700 B2 C3 WB 150 B2SL1 Steel beam (typical) 530 UB 82 / B2 100 notch EB1 EB1 Steel Beam (Typical edge) 800 B2 WB 168 C1 SL1 Composite steel decking 120mm B2 thick, continuously supportedL1 @ EB1 2400 centres
C1
B2
3300
CB1 Cantileverd beams (taperB2 C3 ing) 300 PFC @ 1500 centres
EB1
B2
EB1
C2
B1 B2EB1B1
B2
SL1
EB1
C3
B2 B2
B2
CB1
EB1 EB1
B2
C2
C2
B1
C3 EB1
B2
EB1
10 C3
SL1
4800
B2
EB1
9
C3
EB1 B2
B1
B2
C1
B2
B2
B2
4800 B1
B2
EB1
8
B2
C1
EB1
B2
C1
B2
C1
EB1
B2
EB1
C2
B2
B3
B1 B2
EB1
8
EB1
G
4800
C2
B1
7
B2
C3
EB1
EB1
EB1
5
B2 EB1
C1
C1
J F 900
B2
6
B2
C3
EB1
B2
C3
B1 EB1
C3
B2
EB1
B2
B2
EB1
C3
B2
B3
EB1
C1
B2
ATRIUM
B2
C1
7
9150
900
6
EB1
C1
B2
EB1 B1
C1
EB1
B1
FLOOR SCHEME 9: Central Core B2 EB1truss Lateral System: Outrigger with belt Structural Material: Composite
B2
ATRIUM
EB1EB1
C1
C3
C3
B1
C1
B2
B2
C3
EB1
B2
5
C1 EB1
EB1
EB1
4
B2
C3
C3
C1
B2 EB1
E 4800 3600
EB1
3
B2
C3
EB1
B1
C3
EB1
C3
B2
EB1 B2
EB1
C1
B2
C1
B2
C1
EB1
4
B2
EB1 C3
EB1
C1 beams (tapering) 300 PFC cenB2 @ 1500 EB1 tres B1
C1
B2
B1 Cantileverd
B1
C1
EB1
4800
B2
EB1
C1
900
CB1
B1
SL1
D 4800 4800
B1 B2 B1
4800
EB1
B2
B2
C1
C 4800 4800
B2
3600
EB1
3
C3 B2
B2
I
9450
B2
4800
4800
C3
EB1
B2
2
H
3300 18300
B 4800 4800
EB1
4800
B2
B2
B1
4800
B2
SL1
B1
EB1
C1
C2
4800
4800
EB1
C1
B2
C3
G
EB1 EB1
900
C1
EB1
B2
1
9450
9450
E F A 3600 900 4800
C1
EB1
B2
C3
17700
B2
2
10350
B2
C3
EB1
B2
4800 C3
EB1
EB1
EB1
4800
4800
EB1
B2
B2
C1
C3
3300
B2
EB1
4800
43800
B1 B2 B1
EB1
4800
EB1 CB1
4800
B2
Steel column conc. embed. B2 800 mm square C3 C3 SteelSL1beam (primary) 700 B1 WB 150 B2 B1 B2 B2 B1 B2EB1B1 B2 B1 Steel beam (primary) 700 WB 150 B2 C1 SL1 B2 Steel beam (typical) 530 UB B2 82 / 100 notch EB1 EB1 Steel Beam (Typical edge) B2 800 WB 168 C3 SL1 Composite steel decking B2 continuously 120mm thick, EB1 supportedL1 @ 2400 centres
EB1
4800
D
C
SCALE 1:200 @ A1 FLOOR SCHEME 9: Central Core Lateral System: Outrigger with belt truss Structural Material: Composite Module: 1200 mm Span Width: 2400 mm (max 3000mm) Core Width: 450 mm
43800
18300 3300
B
C2 1
FACADE
B2
EB1 C3
4800
C2
EB1
C3
4800
B2
EB1
EB1
x
C1
9450
C2
4800
CB1
bedded in EB1 EB1concrete 1800 B2 900 EB1 EB1
CB1
900
4800
EB1
C3
4800
4800
4800
EB1 EB1
B
C1 C1 SteelC3 Mega-column EB1 EB1 em-
4800
4800
EB1
C2
4800
J
900
C2
C1C1 EB1
C3
4800
I
H
G
10350
EB1
C3
LEGENDC1
E 4800 3600
A 900
3600
C2
C3
D 4800 4800
3300
900
800
C1
C 4800 4800
J F 900
4800
900 C1
B 4800 B 4800
I
3300
A 3600 J 900 4800
4800
H
9150
G
3300
3300
17700
F
9450
43800
9450
43800
FACADE
3300 E
18300 3300
SCALE 1:200 @ A1 FLOOR SCHEME 9: Central Core 43800 Lateral System: Outrigger with belt truss Structural Material: Composite Module: 1200 9450 mm 3300 Span Width: 2400 mm (max 3000mm) 18300 Core Width: 450 mm
EB
2.2A LOW-RISE N STRUCTURAL PLAN 1:200
20m
SCALE 1:200 @ A1
43800
EB1
C2
C2
SCALE 1:200 @ A1
2.2B HOTEL N STRUCTURAL PLAN 1:200
4800
3300
4800
EB1
EB1
EB1
B2
C3
B2
EB1
EB1
EB1 C1
B2
B2
B3 B2
B1 B2
EB1
B1
EB1
C3
EB1
C2
B2
B2
B3
ATRIUM
B2
B2 EB1
EB1
B3
EB1
4800
B2
8
EB1
B2
EB
C3
7
C1
EB1
C1EB1
4800
B2
7
EB1 C3
B2
B2
ATRIUM
EB
C1
6
4800
B2
EB
C1
4800
C3
B2 B2
B2
6
C3
EB1 B2
5
C1
B2 B2
B2
C1
900
EB1
B2 EB1
C1
EB1
EB
C1
900
C1
C1
5 3600
EB1
C1
EB1
C3EB1
4800
B1
C3
EB1
4
C3
17700
B1
EB1
EB1 EB
C3
10350
B2
EB1
C1
4
C3
17700
B2
B1 B2
EB1
EB1
10350
B2
B2
B2
3300
EB1 B2
C3
3
B2
B2
B2
3
C1
C1
B2
C3
EB1
EB1
B2
B2
9150
B2
B2
SL1
SL1
B2
SL1
B1
B1
C2 C2
EB
2
9150
B2
B2
2
C3
C3
3300
4800
B2
B2
B2
B2
EB1
4800
10350 3300
4800 10
B1 B2 B1
B1
EB1
10
B2
B1 B2 B1
B2 B1
9
C3
B2
B1
900
B3/EB1 Steel beam (primary) 800 WB 168 Scale 1:20 275 mm
3300
209 mm
528 mm
9
528 mm
B2
B2
4800
B2 Steel beam (typical) 530 UB 82 Scale 1:20
C1
4800
209 mm
8 10350
B2 Steel beam (typical) 530 UB 82 Scale 1:20
B1
EB1 C1
8EB1
4800
710 mm
B2
B1 B2
4800
C3
B2
B1
SL1
1 1
EB1EB1
B2
B2
B2
CB1 CB1
EB1EB1
B2 B2
EB1
EB1
A 900 900 480
C2C2
EB1 EB1
EB1
B2
7EB1
7
EB1
EB1
C3 C3
C1
B1 EB1
4800
710 mm
EB1
4800
3600 4800
250 mm
EB1
EB1
C1
C3
3600
17550
4800 43800
mm B1 Steel beam (primary) 700 WB250150 SCALE 1:20
C1
B
C3
C1
4800 4800
B2
C1
6
6
EB1EB1
B
C1C1
A
J J 900 900
I
48004800
B2
EB1
C1
C1
36004800 4800 4800 4800
I
H
B2
EB1
C3
5
C3
H
G
3300
3300
3300
4800
9300
4800
4
C1 C3
3600 4800
G
F
330
3300
9450
F
E
B2
B2
EB1
C3
5
B1 Steel beam (primary) 700 WB 150 SCALE 1:20
C1
4800 4800
EB1 EB1
B2 EB1
E
D
9450
18300
43800
4800
3300
4800 4800
C1
4800 4800
EB1 B2
EB1
D
C
EB1 EB1
C3
3
C
C3C1
EB1
2
C3
4
17550
43800
1
18300
9450
A B 900 4800 4800 C3 C2
EB1
3
ing) 150 PFC @ 1500 centres
4800
C2
2
ing) 150 PFC @ 1500 cenCB1 Cantileverd beams tres(taper-
B
900
900
1
3300
Steel Mega-column emC1 Steel Mega-column embedded in concrete 800 x concrete 800 x bedded in 400 mm 400 mm Steel column conc. embed. C2 Steel columnC2 conc. embed. 600 mm square 600 mm square C3 Steel 700 beam (primary) 700 C3 Steel beam (primary) WB 150 WB 150 B1 Steel beam (primary) 700 B1 Steel beam (primary) 700 WB 150 WB 150 B2 Steel beam (typical) 530 UB B2 Steel beam (typical) 530 notch UB 82 / 100 82 / 100 notch B3 Steel beam (primary) 800 B3 Steel beam (primary) 800 WB 168 WB 168 EB1 Steel Beam (Typical edge) 800 edge) WB 168 EB1 Steel Beam (Typical 800 WB 168 SL1 Composite steel decking 120mm thick, continuously SL1 Composite steel decking supported @ 2400 centres 120mm thick, continuously supported @CB1 2400Cantileverd centres beams (taper-
9300
C1
9450
43800
A 900
LEGEND
900
LEGEND
3300
FACADE
3300
Core Width: 450 mm
43800
FACADE
SCALE 1:200 @ A1 FLOOR SCHEME 9: Central SCALECore 1:200 @ A1 Lateral System: Outrigger with belt truss FLOOR SCHEME 9: Central Core Structural Material: Composite Lateral System: Outrigger with belt truss Module: 1200 mm Structural Material: Composite 1200 mm Span Width: 2400 mmModule: (max 3000mm) Span Width: 2400 mm (max 3000mm) Core Width: 450 mm
C2
P4
TYPICAL HOTEL LEVEL FLOOR PLAN
S1 1.1
1
2
Steel angle at edge CB1 = Cantilevered beam (tapering) 300 to 150 PFC / 1500mm centres
SL1 = Composite Steel decking 120mm thick / bondek @ 54mm
FFL + 183 600
FLOOR LEVEL
10
FLOATING CEILING LEVEL
9
B1 = Steel Beam (typical) 700 WB 150
B2 = Steel Beam (typical) 530 UB 82 / 100mm notch
Gypsum wall 150mm
4800
4800
3600
4800
4800
4800
2950
2400
3540
SL1 = Composite Steel decking 120mm thick / bondek @ 54mm
900 240
4800
C
D
E
F
530
B
1300
4320 900 1020
935
A
Core shear wall @ 600mm
C3 = Steel beam (primary) 700 WB 150
FFL + 40 000
FLOOR LEVEL Steel angle at edge
FFL + 180 000 FLOOR LEVEL CB1 = Cantilevered beam (tapering) 300 to 150 PFC / 1500mm centres FLOATING CEILING LEVEL
B2 = Steel Beam (typical) 530 UB 82 / 100mm notch
FLOATING CEILING LEVEL
EXPRESS LIFT
EXPRESS LIFT
EXPRESS LIFT
HOTEL LIFT
HOTEL LIFT
GOODS LIFT
BOH
C1 = Steel mega-column embedded in concrete
2695
3060
4800
2
3345
3995
4800
9150
13470
4800
1
SL1 = Composite Steel decking 120mm thick / bondek @ 54mm
100
4800
9450
120
4800
18300
2600
45060 9450
8
EB1 = Steel beam ( typical edge) 800 WB 168
3600
Core shear wall 450mm
1020 3300 1020 900
1:5
100
240 900
6
120
71%
530
fficiency
HOTEL STRUCTURAL SECTION DRAFT D
3
1200
1 216.8 m2 3540
sable Area
4800
1 713.6 m2
1000
GFA
PRODUCED BY AN AUTODESK STUD
13890
5 FLOORS
EB1 = Steel beam (typical edge) 800 WB 168
3
HOTEL SKY LOBBY CROWNFFL + 235 190
240 900
LVL 46
FFL + 224 000
LVL 46
FFL + 216 000
LVL 45
MECHANICAL FFL + 216 000 LVL 45 FLOOR
SKY LOBBY FLOOR PLAN
4800
FFL + 154 800
LVL 30
FFL + 112 000
LVL 22
FFL + 116 000
LVL 23
LVL 21
FFL + 100 000
LVL 19
FFL + 104 000
LVL 20
FFL + 96 000
LVL 18
FFL + 100 000 LVL 19
FFL + 92 000
LVL 17
FFL + 96 000
LVL 18
FFL + 88 000
LVL 16
FFL + 92 000
LVL 17
FFL + 88 000
LVL 16
LVL 14
FFL + 80 000
LVL 15
FFL + 72 000
LVL 13
FFL + 76 000
LVL 14
FFL + 68 000
LVL 12
FFL + 72 000
LVL 13
FFL + 64 000
LVL 11 FFL + 68 000
LVL 12
S1 1.1
LVL 09
FFL + 60 000
LVL 10
FFL + 52 000
LVL 08
FFL + 56 000
LVL 09
9450
FFL + 36 000
LVL 04
FFL + 40 000
LVL 05
4000 4000 4000
FFL + 36 000
LVL 02
4320 900 1020
B
3600
1
LVL 03
10.8m
1 713.6m2
253.8m2 1 038.6m2 61%
MECHANICAL LEVEL
28
1
8m
1 713.6m2
290.8m2
16-27
12
4m
1 713.6m2
290.8m2 1 422.8m2 83%
15
1
8m
1 713.6m2
324m2
968.4m2 57%
LOW RISE OFFICE
2-14
13
4m
1 713.6m2
324m2
1 389.6m2 81%
MECHANICAL LEVEL
2
1
8m
1 713.6m2
324m2
GROUND FLOOR
0
1
20m
5 9464m2
E
10
4800 3600
17704
17700
Typical Warren Truss Podium roof structure
4800
LRO LIFT
LRO LIFT
FFL + 5 077 GL + 13 668
4800
LRO LIFT
FFL + 40 000
CB1 = Cantilevered beam (tapering) 300 to 150 PFC / 1500mm centres FLOATING CEILING LEVEL
B2 = Steel Beam (typical) 530 UB 82 / 100mm notch
FFL + 5 077 GL + 13 668
EB1 = Steel beam (typical edge) 800 WB 168
C1 = Steel mega-column embedded in concrete
2550
4800
CROWN CONFIGURATION S DER
FLIN
FFL + 36 000
E
LAN
NE
LA PODIUM CONFIGURATION ERS ND FLI
Typical Podium Truss (500 mm) with Transfer Beam @ 1200mm centred
100
4800 240 900
FLOOR SCHEME 9: Central core LATERAL SYSTEM: Outrigger with belt truss STRUCTURAL MATERIAL : Composite MODULE: 1200mm SPAN WIDTH: 2400mm (Max 3000mm) CORE WIDTH: 450mm
SCHEME D : Steel Column 400 - 600 mm depth.
13890
FLOOR LEVEL
S
LLIN
T
LRO LIFT
LLIN
CO ET TYPICAL FLOOR ESCHEME STR
Steel angle at edge
Typical Warren Truss Podium roof structure
BOH
Core shear wall @ 600mm
ET
RE S ST
REE
9150 10350
SL1 = Composite Steel decking 120mm thick / bondek @ 54mm
CO
outrigger and belt truss system
FEMALE WC
AMB. WC
15000
FLOOR LEVEL
LVL UG 2
3540
8
T ST
45060
9
LVL UG 1
6 FLOATING CEILING LEVEL
STRUCTURAL SECTION SCALE 1:500
0
5
10 0
P1
5 640.0m2
F
5
81%
5m
LOW-RISE STRUCTURAL SECTION DRAFT D 1:50 HOTEL STRUCTURAL SECTION DRAFT D 1:5 324m2
EET
1 713.6 m2 FFL - 6 700
1
STR
LVL UG 2
.5
0
RKE
3
LRO LIFT
GL + 8 591
5m
900 240
outrigger and belt truss system
MALE WC
4
LVL 00
1
MA
LVL 01
.5
0
MS LIA
CPARK
1
WIL
20000
29
T REE T ST
LVL 01
LVL 00
5000
SKY LOBBY
EET
3350
253.8m2 1 216.8m2 71%
STR
6700 6700
1 713.6m2
MS LIA
3350
3.6m
WIL
CPARK
14
RKE
LVL 02
1 389.6 m2
S1 -
30-43
4800
2
PODIUM
fficiency
HOTEL
1220
3540
4800
GOODS LIFT
PODIUM
sable Area
253.8m2 1 216.8m2 71%
SL1 = Composite Steel decking 120mm thick / bondek @ 54mm
S3
LVL 04
LVL UG 1
81700
8300 8320
9450 4800
GOODS LIFT
GFA
1 713.6m2
MA
8000 8000
4800
D
C
4000
FFL + 32 000
4800
4800
4000 4000
LVL 03
FFL + 20 000
FFL - 3 000
10.8m
100
LVL 06
4800
NLA/NUA EFFICIENCY
60250
FFL + 44 000
FFL + 28 000
3 FLOORSFFL - 6 700
1
8250
LVL 05
MECHANICAL FLOOR
OW RISE OFFICE
44
8250
FFL + 40 000
18300
4800
CORE
7200
LVL 07
FFL + 0
HOTEL AMENITY FLOOR
14400
FFL + 48 000
A
FFL - 3 000
253.8m2
20000
LVL 06
GL + 8 591
1 713.6m2
4070
FFL + 44 000
FFL + 0
8m
4800
LVL 08
A
9150
FFL + 52 000
MECHANICAL FFL + 20 000 FLOOR
1
13470
4000
52000 4000
LVL 07
TOTAL FLOORS : 13
FFL + 28 000
45
60250
FFL + 56 000
FFL + 32 000
MECHANICAL LEVEL
4800
4000
LVL 11
4000
FFL + 64 000
FFL + 48 000
GFA
52000
3300 1020 900
LVL 10
LOW RISE OFFICES
TFH
5590 2580
4000 4000
45060
1020 4800
TOTAL FLOORS : 13
FLOORS
outrigger and belt truss system
FFL + 60 000
FFL + 180 000
FL. NO.
120
108008000 8000
FFL + 76 000 4000
LVL 15
C3 = Steel beam (primary) 700 WB 150
* SITE FAR = 89 460m2
RISE OFFICE TYPICAL OFFICEMID FLOOR SECTION OFFICE CHANGEOVER SCALE 1:50
530
4000 4000 4000
TYPICAL MID RISE OFFICE FLOOR PLAN
4000
P2
outrigger and belt truss system
OFFICE FFL + 80 000 CHANGE OVER FLOOR
LOW RISE OFFICES
8000
4800
FFL + 108 000
OFFICE CHANGE OVER FLOOR
229600
3600
17704
17700
45060
LVL 20
4000
FFL + 104 000
6
935
83%
TOTAL FLOORS : 12
LVL 21 FFL + 112 000 LVL 22
3060
fficiency
S3 -
3995
MID RISE 2 000 FFLm + 108 1 422.8 OFFICES
EB1 = Steel beam ( typical edge) 800 WB 168
AMB. WC
5
3540 240 900
4000
2
FFL + 36 000
49540
LVL 24
5 9464m2 5 640m2
249600
FFL + 120 000
20m
58490
LVL 23
1
6460 5240
FFL + 116 000
5 141m2
1220
FFL + 124 000 LVL 25
24m
AREA BREAKDOWN
PRODUCED BY AN AUTODESK STUDENT VERSION
LVL 24
3
FLOATING CEILING LEVEL
outrigger and belt truss system
4800
FFL + 120 000
GOODS LIFT
4800
LVL 26
MRO LIFT
4800
FFL + 128 000
MECHANICAL GF
PROGRAM FLOATING CEILING LEVEL
FEMALE WC
9150 10350
LVL 25
MRO LIFT
13890
8000 4000
FFL + 124 000
4000
LVL 27
sable Area
4000
LVL 28
FFL + 132 000
1 713.6 m
TOTAL FLOORS : 12
FFL + 136 000
LVL 26
4000
56000
MID RISE OFFICES
LVL 27
44 554m2 36 107m2
FLOOR LEVEL
outrigger and belt truss system
MRO LIFT
108m
FLOOR LEVEL
B2 = Steel Beam (typical) 530 UB 82 / 100mm notch
Gypsum wall
26
MRO LIFT
4
FFL + 128 000
4000
MID RISE OFFICE
MRO LIFT
3
MECHANICAL FFL + 136 000 LVL 28 FLOOR
4000
250000
LVL 29
MRO LIFT
MALE WC
EB1 = Steel beam (typical edge) 800 WB 168
B1 = Steel Beam (typical) 700 WB 150
27 418m2150mm 19 290m2
OFFICE
1220
4800
10800 10800
FFL + 144 000
FFL + 132 000
GFA
100
GOODS LIFT
HOTEL SKY FFL + 144 000 LVL 29 LOBBY
MECHANICAL FLOOR
2600
3600
4800
3600
2
HOTEL SKY LOBBY
2 FLOORS
HOTEL
58490
LVL 31
C1 = Steel mega-column embedded in concrete 26 m Core shear wall 16 72m 450mm
CROWN
NLA
6460 5240
FFL + 158 400
250m
52000
LVL 30
LVL 32
GFA*
83 076m2 55 398m2
7200
FFL + 154 800
FFL + 162 000
FLOATING CEILING LEVEL
FLOORS TFH
46
14400
LVL 31
LVL 33
TOTAL
3600
FFL + 158 400
FFL + 165 600
SCHEMATIC DESIGN SCHEDULE
20000
LVL 32
LVL 34
FFL + 183 600
4070
FFL + 162 000
FFL + 169 200
1
Steel angle at edge CB1 = Cantilevered beam (tapering) 300 to 150 PFC / 1500mm centres
SL1 = Composite Steel decking 120mm thick / bondek @ 54mm
B2 = Steel Beam (typical) 530 UB 82 / 100mm notch
5590 2580
LVL 33
LVL 35
F
3345
3600 50400 3600 3600 3600 3600 3600
FFL + 165 600
FFL + 172 800
E
CB1 = Cantilevered beam (tapering) 300 to 150 PFC / FLOOR LEVEL 1500mm centres FLOATING CEILING LEVEL
1000
LVL 34
LVL 36
D
C
3060
FFL + 169 200
FFL + 176 400
B
4800
3995
LVL 35
LVL 37
4800
FFL + 172 800
A
FFL + 180 000
S2
4800
LVL 36
LVL 38
4320 900 1020
FFL + 176 400
FFL + 183 600
9150
LVL 37
4800
13470
3600
FFL + 180 000
4800
100
3600
100
4800
Core shear wall @ 600mm
8300 8320
4800
Steel angle at edge
900 240
100
4800
3540
1220
4800
9450
62450
B18300
9450
HOTEL TOTAL FLOORS : 15
1
8000
FFL + 187 200 LVL 39
229600
1020 3300 1020 900
1300
TOTAL FLOORS : 15
5m
FFL + 40 000
FLOOR LEVEL
45060
249600
LVL 38 FFL + 183 600
LVL 40
2695
3600
HOTEL
FFL + 190 800
81700
LVL 39
LVL 41
2
62450
FFL + 187 200
FFL + 194 400
1
8
SL1 = Composite Steel decking 120mm thick / bondek @ 54mm
SL1 = Composite Steel decking 120mm thick / bondek @ 54mm
49540
LVL 40
LVL 42
9
3
3600
FFL + 190 800
FFL + 198 000
.5
0
LOW-RISE STRUCTURAL SECTION DRAFT D 1:5
2550
LVL 41
LVL 43
530
FFL + 194 400
FFL + 201 600
2950
LVL 42
LVL 44
120
FFL + 198 000
FFL + 205 200
1200
LVL 43
2400
FFL + 201 600
10
3600
LVL 44
PRODUCED BY AN AUTODESK STUDENT VERSION
S1 1.1
120
3600 3600 3600 3600
FFL + 205 200
TYPICAL HOTEL FLOOR SECTION SCALE 1:50
PRODUCED BY AN AUTODESK STUDENT VERSION
10800
18400
P3
530
19190
ROOFTOP BAR
MECHANICAL FLOOR
S2 -
3345
FFL + 224 000
6
1300
61%
ROOFTOP BAR
2695
fficiency
FFL + 235 190
935
1 038.6 m2
3540
sable Area
4800
1 713.6 m2
26400
GFA
1:50
PRODUCED BY AN AUTODESK STUDENT VERSION
FLOOR
13890
14810
CROWN
4800
9150 10350
5
HOTEL STRUCTURAL SECTION DRAFT D
14400 14400
FL + 247 600
FLOATING CEILING LEVEL
1
11350
2
4800
3
GOODS LIFT
7610
4
5
6
1
2
5m
14400 14400
FL + 247 600
3
GOODS LIFT
1
11350
4
5
HOTEL LIFT
.5
0
7610
4800
HOTEL LIFT
PRODUCED BY AN AUTODESK STUDENT VERSION
4 6
FFL + 36 000
FLOOR LEVEL BOH
3600
17704
17700
45060
4800
BOH
TYPICAL LOW RISE OFFICE FLOOR PLAN
JAM-5 Architects
5
10
-
20m
KEY NTS
S1 1.1
ABPL90118: Tutorial 03 - Anthony Balquez Group no. 5 Semester 02, 2020 Assignment
20m
PROJECT: 0 .5 1
433-455 Collins St 5 Melbourne Site B
15m
TITLE:
DRAWN BY:
A2.3: Structural sections
Julia Quirk Qinyi Mao Xiaoyu Zhang
SCALE @ A1: 983633 904786 910445
VARIES
DATE:
0
.5
PAGE: 1
A2.3
5m
20/11/2020
LOW-RISE STRUCTURAL SECTION DRAFT D 1:5
120 1550
FLOOR LEVEL
External Vision Panel VP1
600mm Permeable Walkway
SOLAR HEAT ABSORB BY SOLAR PANEL
4000
480
FLOATING CEILING LEVEL
1180
FFL + 40 000
External Vision Panel VP1
600mm Permeable Glass louvres Walkway Glass louvres SOLAR HEAT ABSORB BY SOLAR PANEL
AIR OUT
AIR OUT
1495
2450
AIR OUT
Internal Vision Panel VP2
FFL + 36 000
210
FLOOR LEVEL
255
480
Internal Vision Panel VP2 SOLAR HEAT REFLECTEDSOLAR BY HEAT LOW-E GLAZING REFLECTED BY
AIR IN
AIR IN
AIR IN
LOW-E GLAZING
50mm cavity
50mm cavity
Aluminium Backpan Aluminium Backpan light grey finish light grey finish Insulation
FLOATING CEILING LEVEL
Insulation Aluminium Backpanel Aluminium Backpanel
Operable Window
Operable Window
6
S1 -
3
1
2
TOWER FACADE SECTION DIAGRAM SCALE 1:40
0
0
.5
.5
1
5m
5m
1
14400 14400
14810
FL + 247 600
4
5
FL + 247 600
14400
FFL + 235 190
FL + 247 600
14400
26400
CROWN
11350
Crown
14400 14400
FFL + 235 190
Crown
LVL 46
MECHANICAL FLOOR
FFL + 235 190 A
3.2
FFL + 216 000
LVLFFL 45
+ 224 000
3.2
LVL 45 FFL + 216 000 FFL + 224 000
FFL + 194 400
LVL 41
FFL + 190 800
LVL 40
FFL + 201 600
FFL + 198 000
LVL 39
FFL + 194 400
LVL 38 FFL + 183 600
FFL + 183 600
LVL 35
FFL + 162 000
LVL 32
FFL + 172 800
FFL + 169 200
LVL 31
FFL + 158 400
3600
FFL + 165 600
LVL FFL 30
FFL + 154 800
+ 162 000
LVL 28
FFL + 116 000
LVLFFL 23
LVL+25 + 124 000 FFL 132 000
LVL 27
FFL + 112 000
LVLFFL 22
LVL+24 + 120 000 FFL 128 000
LVL 26
FFL + 108 000
LVLFFL 21
LVL+23 + 116 000 FFL 124 000
LVL 25
FFL + 104 000
LVLFFL 20
LVL+22 + 112 000 FFL 120 000
LVL 24
FFL + 100 000
LVLFFL 19
LVL+21 + 108 000 FFL 116 000
LVL 23
LVLFFL 18
LVL+20 + 104 000 FFL 112 000
LVL 22
FFL + 92 000
LVLFFL 17
LVL+19 + 100 000 FFL 108 000
LVL 21
FFL + 88 000
LVLFFL 16
+ 96 000
LVL+18 FFL 104 000
LVL 20
FFL + 92 000
LVL+17 FFL 100 000
LVL 19
LVL+16 FFL 96 000
LVL 18
FFL + 92 000
LVL 17
LVL+15 FFL 88 000
LVL 16
249600 58490 49540
LVLFFL 11
+ 72 000
LVL+13 FFL 80 000
LVLFFL 09
+ 64 000
LVL+11 FFL 72 000
LVL 13
FFL + 52 000
LVLFFL 08
+ 60 000
LVL+10 FFL 68 000
LVL 12
LVL+09 FFL 64 000
LVLFFL 06
+ 52 000
LVL+08 FFL 60 000
LVL 10
FFL + 40 000
LVLFFL 05
+ 48 000
LVL+07 FFL 56 000
LVL 09
FFL + 28 000
+ 36 000
LVL+04 FFL 44 000
LVL 06
FFL + 32 000
LVL+03 FFL 40 000
LVL 05
LVL+02 FFL 36 000
LVL 04
FFL + 32 000
LVL 03
LVL+01 FFL 28 000
LVL 02
15000
49540 6460 5240 1220
-
3
Bronze Onyx 15.2mm Amorphous Silicon PV Glass Outer to Louvreclad Kensington Aluminium Three-pass Waterproof Louvre. PVF2 Anthracite Coating.
1200W x 600H mm
1200W x 4000H mm
ViridianSP3 6+12+6mm Performatech Double Glazed 1200W x 2700H mm Pane. 0% Transparency. 600mm cavity Primary Glazing unit. Low E Coating.
PANEL 1
VISION PANEL 4
Bronze Onyx 15.2mm Amorphous Silicon PV Glass Outer Pane. High Transparency. 600mm cavity . Viridian 6+12+6mm Performatech Double Glazed Primary Glazing unit, Low E Coating behind. Expressed Aluminium transom PVF2 coating.
VP4
VISION PANEL 5
1200W x 1800H mm
Bronze Onyx 15.2mm Amorphous Silicon PV Glass Outer Pane. High Transparency. 600mm cavity . Viridian 6+12+6mm Performatech Double Glazed Primary Glazing unit, Low E Coating behind.
VP5
ROOF PANEL 1
1200W x 3600H mm
+
Viridian 12mm Evantage Clear + 12 + 12mm Clear Thermotech Double Glazed Toughened Glass.
P2
PANEL 2
1200W x 3600H mm
900W x 1800H mm
T
Bendheim Fritted glass panel with Lumi Frit™ Large EEDot STR 1200W x 1300H mm Tempered Laminated glass NS with Spider
RP1
SPANDREL PANEL 1
SP1
Viridian 6mm VFloat Clear + 12 +Pattern. 6mm Thermotech Low Iron Double Glazing Unit. Visible Aluminium Panel fixed to Fitting System structure behind.
PANEL 1
P1
Viridian 6mm VFloat Clear + 12 + 6mm Thermotech Double Glazing Unit. Visible Aluminium Panel fixed to structure behind.
N
N
Bronze Onyx 15.2mm Amorphous Silicon PV Glass Outer 1200W x 4000H mm Pane. High Transparency. 600mm cavity . Viridian Bendheim - Fritted glass panel with Lumi Frit™ P1Performatech Double 6+12+6mm Glazed PrimaryCeramic Glazing unit, Low E Coating behind. Large Dot Pattern. Fully Toughened Laminated Glass 10
VP3
BUILDING PERSPECTIVE AND GLAZING FINISHES 12 + 10mm
outrigger and belt truss system
Typical Warren Truss Podium roof structure
1200W x 2400H mm
LLI
CO
1200W x 3600H mm
20000
7200
4070
A
4069
2550
20000
3.1
5593
LVL UG 2
C
3.2
S LA
DER
FLIN
S DER
FLIN
E
LAN
A
0
COLLINS STREET & WILLIAMS STREET FACADE ELEVATION SCALE 1.500
COLLINS & WILLIAMS STREET FACADE ELEVATION A COLLINS STREET & WILLIAMS STREET FACADE ELEVATION SCALE 1:500 3.1 SCALE 1.500
JAM-5 Architects
5
10
0
FFL + 0 GL + 8 591
20m
5
0
10
EET STR
5590 2580
MS
FFL + 5 077 GL + 13 668
FFL + 0 GL + 8 591
NE
T REE
2549 2582
LVL UG 1
C
T
REE
S ST
IN OLL
5590 2580
14400
3600
3.1
EET
C
FFL + 5 077 GL + 13 668
C
E1 A
T
REE
S ST
IN OLL
STR
LVL 01
3.2
7200
1200W x 1800H mm
Terracotta Onyx 15.2mm Amorphous Silicon PV Glass Outer Pane. High Transparency. 600mm cavity . Viridian 6+12+6mm Performatech Double Glazed Primary Glazing unit, Low E Coating behind.
VP1
(Lobby glazing)
LVL 00
14400
Bronze Onyx 15.2mm Amorphous Silicon PV Glass Outer Pane. 0% Transparency.
T ST RKE
3600
SIZE
SP2
MA EET STR
20000
Clear
DESCRIPTION
LIA
4070
CODE
SPANDREL PANEL 2
IL EWT
2550
1200W x 1550H mm
E STR
CPARK
Viridian 12mm VFloat Clear 10+12+10mm Thermotech Double Glazing Unit. Visible light grey Aluminium Panel fixed to structure behind.
Podium Structural Glass Facade System, Truss System with Point Fixed IGUs
T RKE
8250
20000
1200W x 260-265H mm
Ceramic Fritted Glass
MA
5000
Bronze Pilkington Reflite 10+6mm On-line Coated Reflective Solar Control Glass Mechanically Controlled Louvre.
GL2
MS
3350
1200W x 260-265H mm
LIA
6700 6700
Terracotta Pilkington Reflite 10+6mm On-line Coated Reflective Solar Control Glass Mechanically Controlled Louvre.
VISION PANEL 3
Mechanical floor
3.1
E1 -
GL1
T
LVL FFL 02
Podium
GLASS LOUVRE 1
WIL
FFL - 6 700
1200W x 1800H mm
REE
LVL 07
FFL + 20 000
FFL - 3 000
Bronze Pilkington Reflite 10+6mm On-line Coated Reflective Solar Control Glass.
GLASS LOUVRE 2 SCHEDULE
NAME
PODIUM
GL + 8 591
VP4
T ST
LVL+05 FFL 48 000
Podium
VISION PANEL 4
RKE
+ 40 000
FFL + 20 000
1200W x 4000H mm
MA
LVLFFL 03
Mechanical floor
Bronze Pilkington Reflite 10+6mm On-line Coated Reflective Solar Control Glass Outer Wall. Viridian 10+12+10mm Performatech Glazed Primary Glazing unit, Low-E Coating.
MS LIA
LVL 08
+ 28 000
VP3
WIL
+ 44 000
A LVL+06 FFL 52 000
LVLFFL 01
FFL + 20 000
VISION PANEL 3
SPANDREL PANEL SP1 Unitised Curtain Wall System, Capral CW175 1 System Aluminium extrustion with PVF2 coating COLOUR SPEC NEEDED
LVL 11
FFL + 44 000
FFL + 32 000
outrigger and belt truss system
52000
FFL + 56 000
LVLFFL 04
1200W x 2700H mm
SPANDREL PANEL VISION PANEL 2 VP2 LVL 14
Low Rise FFLOffices + 36 000
Viridian 10+12+10mm Performatech Double Glazed Primary Glazing unit. Low-E Coating.
LVL 15
LVL+12 FFL 76 000
+ 56 000
VP2
VISION PANEL 1
+ 68 000
LVLFFL 07
VISION PANEL 2
Bronze Tinted
LVL 14
LVLFFL 10
4000
52000
+ 76 000
FFL + 60 000
4000
60250
LVLFFL 12
1200W x 4000H mm
B
3.2
60250
6460 5240 1220
4000
+ 80 000
Terracotta Pilkington Reflite 10+6mm On-line Coated Reflective Solar Control Glass Outer Wall. Viridian 10+12+10mm Performatech Glazed Primary Glazing unit, Low-E Coating.
8250
LVLFFL 13
VP1
7200
FFL + 72 000
SIZE
VISION PANEL 1
B
14400
LVL 14
DESCRIPTION
3.2
3600
FFL + 76 000
+ 88 000
CODE
6458
4000 4000 4000
LVL 27
60250
LVLFFL 15
MECHANICAL FLOOR
FFL + 5 077 GL + 13 668
Gold Tinted
NAME
LVL 29
249600
8000 229600
4000 56000 4000 4000 4000
FFL + 80 000
FFL + 64 000
Low Rise Offices
FFL + 0
TOWER FACADE Unitised Curtain Wall System, Capral CW175 System Aluminium extrustions with PVF2 coating Anthracite matte finish #RAL 7016
8000
8300 8320
1220
LVL+26 + 128 000 FFL 136 000
4000 4000
250000
LVLFFL 24
FFL + 48 000
3350
outrigger and belt truss system
LVL 29
FFL + 120 000
4000 108008000 8000 4000 4000 4000 4000
LVL 30
+ 132 000
4000 52000 4000
FFL + 154 800
LVLFFL 25
Office FFL + 68 000 Change Over Floor
TOTAL FLOORS : 13
4000
LVL 31
Offices
LOW RISE OFFICES
4000
+ 144 000
FFL + 158 400
SCHEDULE PODIUM Podium Structural Glass Facade System, Truss System with Point Fixed IGUs Structural Steel with Akzo Nobel International Paints Interchar® 212 Fire-rated epoxy intumescent 2 pac paint system, Anthracite matte finish #RAL 7016
1220
LVL 32
LVL+28 + 136 000 FFL 144 000
FFL + 96Rise 000 Mid
Office Change Over Floor
4000
LVL 31
LVL 34
LVLFFL 26
OFFICE CHANGE OVER FLOOR
8000 8000
LVL 32
FFL + 169 200
LVL 35
LVL 27
FFL + 124 000 Mechanical floor
Mid Rise Offices
LVL 33
FFL + 172 800
Terra Cotta Tinted
LVL 36
LVL 30 FFL + 154 800 FFL + 162 000
LVL FFL 28
FFL + 128 000
MID RISE OFFICES
FFL + 176 400
LVL 37
5239
8000 4000 4000
Mechanical floor
LVL 34
LVL 33
MECHANICALHotel Sky FLOOR Lobby
Hotel FFL + 132Sky 000 Lobby
FFL + 180 000
LVL 38
FFL + 165 600
FFL + 144 000 LVL 29
FFL + 136 000
LVL 35
1219
10800 10800
FFL + 158 400 HOTEL SKY LOBBY
FFL + 183 600
LVL 39
8000
LVL 33
LVL 36
229600
FFL + 165 600
FFL + 176 400
LVL 37
FFL + 187 200
LVL 40
249600
LVL 34
LVL 38
FFL + 190 800
LVL 41
58490
FFL +Hotel 169 200
LVL 39
FFL + 194 400
LVL 42
229600
62450
FFL + 180 000
FFL + 198 000
B
8300
81700
3600 3600 3600 3600 3600
FFL + 187 200
LVL 36
FFL + 176 400
FFL + 172 800
3600
LVL 37
LVL 40
LVL 43
58486
50400
FFL + 180 000
LVL 41
FFL + 201 600
Sliver Tinted
LVL 44
8322
3600
FFL + 190 800
LVL 42
FFL + 205 200
52000
3600
HOTEL
LVL 43
1219
FFL + 187 200
LVL 45
LVL 44
49542
3600 3600 3600 3600
FFL + 205 200
81700
LVL 42
62450
FFL + 198 000
8300 8320
LVL 43
81700
LVL 44
LVL 46
62450
FFL + 205 200
Mechanical floor FFL + 201 600
FFL + 216 000
Hotel
7608
A
Rooftop bar
8250
3600
7610
10800
Mechanical floor
TOTAL FLOORS : 15
4000
LVL 46
11350
18400
Rooftop bar
TOTAL FLOORS : 12
7610
FFL + 224 000
11350
19190
ROOFTOP BAR
5
10 20m
20m
-
FL
NE
S LA
ER IND
KEY NTS
N
N
ABPL90118:
PROJECT:
TITLE:
DRAWN BY:
Tutorial 03 - Anthony Balquez Group no. 5 Semester 02, 2020 Assignment
433-455 Collins St Melbourne Site B
A3.1: Façade Overall Elevation & Enlarged section
Julia Quirk Qinyi Mao Xiaoyu Zhang
983633 904786 910445
SCALE @ A1:
PAGE:
VARIES
A3.1
DATE: 20/11/2020
SCHEDULE PODIUM Podium Structural Glass Facade System, Truss System with Point Fixed IGUs Structural Steel with Akzo Nobel International Paints Interchar® 212 Fire-rated epoxy intumescent 2 pac paint system, Anthracite matte finish #RAL 7016
SCHEDULE TOWER FACADE
1200
1200
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
SP2
SP2
SP2
SP2
SP2
SP2
SP2
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
SP3
SP3
VP4
SP3
VP4
VP4
SP3
SP3
VP4
VP4
SP3
VP4
VP4
VP4
VISION PANEL 3
VP3
VISION PANEL 2
VP2
+ 1274 600 VISIONFFL PANEL
VP4
Bronze Pilkington Reflite 10+6mm On-line Coated Reflective Solar Control Glass.
1200W x 1800H mm
VISION PANEL 3
VP3
Bronze Pilkington Reflite 10+6mm On-line Coated Reflective Solar Control Glass Outer Wall. Viridian 10+12+10mm Performatech Glazed Primary Glazing Terracotta unit, Low-E Pilkington Coating. Reflite 10+6mm On-line Coated Reflective Solar Control Glass Mechanically Controlled Louvre. Bronze Pilkington Reflite 10+6mm On-line Coated Reflective Solar Control Glass. VP4 VP4 VP4
1200W x 4000H mm
GLASS LOUVRE 1
GL1
VISION PANEL 4
VP4
GLASS LOUVRE 2
GL2
VP4 VP4On-line Coated Reflective VP4 Bronze Pilkington Reflite 10+6mm Solar Control Glass Mechanically Controlled Louvre.
1200W VP4 x 260-265H mm
GLASS LOUVRE 1
GL1
1200W x 260-265H mm
SPANDREL PANEL 1
SP1
Terracotta Pilkington Reflite 10+6mm On-line Coated Reflective Solar Control Glass Mechanically Controlled Louvre. Viridian 12mm VFloat Clear 10+12+10mm Thermotech Double Glazing Unit. Visible light grey Aluminium Panel fixed to structure behind. Bronze Pilkington Reflite 10+6mm On-line Coated Reflective Solar Control Glass Mechanically Controlled Louvre. Bronze OnyxVP4 15.2mm Amorphous VP4 Silicon PV Glass OuterVP4 Pane. 0% Transparency. VP4 VP4 VP4 Viridian 12mm VFloat Clear 10+12+10mm Thermotech Double Glazing Unit. Visible light grey Aluminium Panel SP3 behind. SP3 SP3 fixed to structure Bronze Onyx 15.2mm Amorphous Silicon PV Glass Outer SP3 SP3 SP3 Pane. 0% Transparency. 600mm cavity to Louvreclad
1200W x 1800H VP4 mm
VP4
VP4
VP4
GLASS LOUVRE 2
GL2
SP3
SP3
SP3
SP3
SP3
SP3
SP3
SPANDREL PANEL 2
SP2
SP3
SP3
SP3
SP3
SP3
SP3
SP3
VP4
VP4
SP3 SP3
VP4
VP4
SP3 SP3
VP4
VP4
SP3
VP4
SP3
VP4
SP3
SP3
VP4
SP3
SP3
SP3
SP3
SP3
SP3
SP3
SP3
SP3 SP3
SP3
SP3 SP3
SP3
SP3
SP3
SP3
SP3
SP3
SP3
SP3
A 3.2
SPANDREL PANEL 2
SP2
PANEL 1
P1
SPANDREL PANEL 3
SP3
PANEL 2 (Lobby)
P2
PANEL 1
P1
PANEL 2 (Lobby)
P2
1200W x 4000H mm
1200W x 4000H mm SP2 1200W x 2700H mm SP2
SP2
SP2
SP2
SP2
SP2
SP2
1200W x 260-265H mm 1200W x 1800H mm VP4
VP4
VP4
VP4
VP4
VP4
VP4
1200W x 1550H mm 1200W x 260-265H mm
VP4
VP4 1200W x 1550H mm
VP4
VP4
SP3 1200W SP3 x 600H mm
Kensington Aluminium Three-pass Waterproof Louvre. Bronze Onyx 15.2mm Amorphous Silicon PV Glass Outer PVF2 Anthracite Coating. Pane. 0% Transparency.
350
CROWN FACADE ENLARGED
VP4
VP4 SP3
VP4 SP3
SP3
SP3
SP3
SP3
1200W x 1800H mm
Bendheim Fritted Lumi Frit™ Large Dot SP3 SP3 glass panel withSP3 Pattern. Fully Toughened Laminated Glass 10 + 12 + 10mm SP3 SP3 SP3 Bronze Onyx 15.2mm Amorphous Silicon PV Glass Outer Pane. 0% Transparency. 600mm cavity to Louvreclad Kensington Aluminium Three-pass Waterproof Louvre. Viridian 12mm Evantage PVF2 Anthracite Coating.Clear + 12 + 12mm Clear Thermotech Double Glazed Toughened Glass. SP3 SP3 SP3
1200W x 3600H SP3 mm
SP3Fritted glass panel with SP3 Lumi Frit™ Large SP3 Bendheim Dot Pattern. Fully Toughened Laminated Glass 10 + 12 + 10mm
1200W SP3 x 3600H mm
Viridian 12mm Evantage Clear + 12 + 12mm Clear Thermotech Double Glazed Toughened Glass.
1200W x 3600H mm
SP3
SP3
SP3
SP3
SP3
SP3
SP3
1200W x 600H mm 1200W x 3600H mm SP3
SP3
SP3
SP3
SP3
SP3
SP3
SCALE 1.50
A 3.2
CROWN FACADE ENLARGED
A A 3.2 3.2
SCALE 1.50
E1 A CROWN FACADE DETAIL ELEVATION CROWN FACADE ENLARGED A SCALE 1:50 SCALE 1.50
.5
0
CROWN FACADE ENLARGED
1
.5
0
2m
1
2m
SCALE 1.50
CROWN FACADE ENLARGED CROWN FACADE ENLARGED SCALE 1.50 SCALE 1.50
1200
1200
1200
GL1
GL1
GL1
GL1
GL1
VP1
VP1
VP1
GL2
GL1
GL1
GL1
GL1
GL1
GL2
GL1
GL1
GL1
GL1
GL1
GL2
GL1
GL1
GL1
GL1
GL1
GL2 VP3 GL2 VP4 GL2 GL2 GL2
GL1 VP1 GL1 VP4 GL1 GL1 GL1
GL1 VP1 GL1VP4 GL1 GL1 GL1
GL1 VP1 GL1VP4 GL1 GL1 GL1
GL1 VP1 GL1VP4 GL1 GL1 GL1
GL1 VP1 GL1 GL1 GL1 GL1
2450 265 260
1800
260 260 265 260
955
VP2
VP2
VP2 VP4
VP2 VP4
SP1
SP1
260
GL2 SP3
260
GL2
GL2
SP3
SP1
GL2
970
SP3
SP1
GL1
GL1
GL1
GL1
GL1
GL1 SP3
GL1 SP3
GL1 SP3
GL1 SP3
GL1
GL1
GL1
GL1
GL1
GL1
SCHEDULE
NAME
SP2
SP2
SP2
SP2
SCALE 1.50
E2 -
0
.5
1
0
0.5
.5 1
GL2 GL2 GL2
GL1
GL2 GL2
VP4
VP4
2
CROWN ENLARGED MID RISE OFFICE DETAIL ELEVATION MID RISE OFFICEFACADE FACADE ENLARGED SCALESCALE 1:50 1.50 SCALE 1.50
2
GL1 GL1
GL2 SP1
GL2
GL1
SP1
SP1
GL2
GL2
SP1
GL1
GL1
GL1
GL1
GL1 VP4
GL1
GL1 GL1
GL1
GL1
GL1
GL1
GL1
GL1
GL1
GL1
GL1
VP4
GL1
GL1
GL1
GL1
GL1
VP1 VP1
GL1
GL1
GL1
GL1
GL1 VP4
GL1
GL1 GL1
GL1
GL1
GL1
VP1 VP1
GL1
GL1
GL1
GL1
GL1 VP4
GL1
GL1 GL1
GL1
GL1
GL1
GL1 GL1 GL1 GL1 GL1 GL1
GL1
GL1
GL1
GL1
GL1
GL2
2m
4m
260
SP3
SP3
SP1
GL2
VP4
VP4
VP4
SP3
SP3
SP3
SP1 SP1 DESCRIPTION
SP3
GL1 GL1
SP1
VP1 VP1
GL1
SP3
GL1
GL1 GL1
GL1
GL1
GL1 GL1
SP3
GL1 GL1
GL1
VP1 VP1
GL1
SP3
GL1
GL1
GL1
GL1
GL1
GL1 GL1
GL1
SP3
GL1
GL1
GL1
SP3
GL1
GL1 GL1
GL1
GL1
GL1 GL1
SP3
GL1
GL1
GL1
GL1
VP1 VP1
GL1
A VP23.2 B B 3.2 3.2
VP1 VP1
GL1
SP3
GL1
GL1 GL1
GL1
GL1
GL1 GL1
SIZE GL1
SP3
GL1
GL1
GL1
GL1
GL1
Terracotta Pilkington Reflite 10+6mm On-line Coated Reflective Solar Control Glass Outer Wall. Viridian 10+12+10mm Performatech Glazed Primary Glazing unit, Low-E Coating.
VP1
VISION PANEL 2
GL1
GL1
GL2 GL2
VP1 VP1
GL1
GL2
CODEGL2GL2
VISION PANEL 1
4m
GL2
SP2
1
VP4
VP3 VP2 VP2 TOWER FACADE LVL 26 VP3 VP2 VP2 Unitised Curtain Wall System, Capral CW175 GL2 System LVL FFL 26 + 128 000 SP3 SP3 SP3 FFL + 128 000 extrustions with PVF2 coating GL2Anthracite matte finish #RAL 7016 Aluminium GL2
position. B The color color varies depending depending on on the the Sun’s Sun’s position. position. 3.2 The varies Please real samples for your reference. BAorderreal tion. Please order samples for your reference. ion. 3.2 3.2 MID RISE OFFICE FACADE ENLARGED
GL1
VP1 VP1
PODIUM VP4 VP4 VP4 VP4 Podium StructuralLVLGlass Facade System, Truss System with Point Fixed IGUs 46 FFL + 224 000 Structural Steel with Akzo Nobel International Paints Interchar® 212 Fire-rated epoxy intumescent 2 pac paint system, Anthracite matte finish #RAL SP3 7016 SP3 SP3 SP3
GL1
GL1
GL1
GL1
GL1
GL2
VP1 VP1
350
VP1
VP3
260
1550
VP4
260
VP4
2450
VP4
4000
VP4
VP1
260
MECHANICAL FLOOR
VP4
260
1550
LVL 26 FFL + 128 000
VP4
260
2450
VP4
SP1
MECHANICAL FLOOR
1825
260 260
1775
2450
2450 4000
LVL 46 FFL + 224 000
SP1
GL2
1800
GL1
SP2
1800
GL1
SP2
600
GL1
SP2
VP1 VP1
600
GL1
350
GL1
GL2
600
GL2
-
350
GL1
265
GL1
265
GL1
SP2
VP2 VP2
260
GL1
260
GL1
260
GL2
VP2 VP2
GL2 MID RISE OFFICE PERSPECTIVE GL2
260
GL1
VP3
260
GL1
VP3
LVL 27 LVL FFL 27 + 132 000 FFL + 132 000
260
GL1
SP1
SP2
2450
GL1
SP1
265
GL1
VP2
SP2
260
GL2
VP2
SP2
FFL + 127 600
260
GL1 VP1 GL1 GL1 GL1 GL1
260
GL1 VP1 GL1 GL1 GL1 GL1
260
GL1 VP1 GL1 GL1 GL1 GL1
260
GL1 VP1 GL1 GL1 GL1 GL1
1550
GL1 VP1 GL1 GL1 GL1 GL1
260
GL2 VP3 GL2 GL2 GL2 GL2
260
260
GL1
260
GL1
GL1
260
GL1
GL1
265
GL1
GL1
260
GL1
GL1
260
GL1
GL2
260
260
GL2
1200 1200
1550
GL1
2450 2450
GL1
1550
GL1
4000
GL1
1550
GL1
CROWN
GL2
HOTEL ROOFTOP AMENITIES
VP1
MID-RISE OFFICE
VP4 VP1
260 260 265 260
1550 4000
HOTEL ROOFTOP AMENITIES LVL 26 FFL + 128 000
VP4 VP2
MID-RISE OFFICE
VP4 VP1
265
VP4 VP1
260
1550
CROWN FFL + 127 600 LVL 27 FFL + 132 000
MID-RISE OFFICE MID-RISE OFFICE
VP4 VP1
260
LVL 27 FFL + 132 000
VP4 VP2
1200
260
VP4 VP3
AmorphousSilicon. Silicon.Solid. Solid. position.Amorphous
GL1 GL1 GL1 GL1 GL1 GL1
1200W x 4000H mm
CROWN FACADE ENLARGED
Viridian 10+12+10mm Performatech Double Glazed Primary Glazing unit. Low-E Coating. .5 0
1200W x 2700H mm
SCALE 1.50
MID RISE OFFICE FACADE ENLARGED
1
.5
0
MID RISE OFFICE FACADE ENLARGED SCALE 1.50
2
1
4m
2
4m
SCALE 1.50
1200
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP3
VISION PANEL 4
VP4
Bronze Pilkington Reflite 10+6mm On-line Coated Reflective Solar Control Glass Outer Wall. 1200 Viridian 10+12+10mm Performatech Glazed Primary Glazing unit, Low-E Coating.
1200W x 4000H mm
Bronze Pilkington Reflite 10+6mm On-line Coated Reflective Solar Control Glass.
1200W x 1800H mm
SP2
1825
CROWN
CROWN
1200
VISION PANEL 3
1200
FFL + 127 600
GLASS LOUVRE 1
FFL + 127 600
1200 SP2
GL1
VP4
P1
SP3
VP4
P1
P1
VP4
VP4
P1
P1
265
1550
P1
P1
P1
P1
P1
P1
P1
P1
P1
PANEL 1
E3 C-
3.2 C 3.2
GL1
GL1
GL1
GL1
GL1
GL1
GL1
GL1
GL1
GL1
APODIUM FACADE DETAIL ELEVATION SCALE 1:50 3.2 CROWN FACADE ENLARGED
PODIUM FACADE ENLARGED SCALE 1.50
.5
0
0
1
.5
1
2m 2
4m
P1
0
PODIUM FACADE ENLARGED
.5
1
2
P1
JAM-5 Architects
SP1
P1 P1 P1 P1 Viridian 12mm VFloat Clear 10+12+10mm Thermotech P1 P1 P1 P1 Double Glazing Unit. Visible light grey Aluminium Panel fixed toVP4 structure behind. VP4 VP4 VP4
1200W x P1 1550H mm
P1 P1
P1
VP4
P1 P1
VP4
600
SP3
SP3
SP3
SP3
SP3
SP3
Bronze Onyx 15.2mm Amorphous Silicon PV Glass Outer Pane. 0% Transparency.
SP3
1200W x 1800H mm
600
350
SP2
SP3
350
GL2 P1
P2
GL2
P1 P1
A 3.2
B 3.2
SP3 VP1
SP3
SP3
VP1
P1
VP1
P1
P1 SP1
P1
GL1
P1
P1
GL1
P1
GL1
GL1 GL1
P1
GL1
P1
GL1mm GL1 1200W x 3600H
Viridian 12mm Evantage Clear + 12 + 12mm Clear Thermotech Double Glazed Toughened Glass. SCALE 1.50
P1
GL1
P1
P1
1200W x 3600H mm
CROWN FACADE ENLARGED
.5
0
SP3
GL1
P1
MID RISE OFFICE FACADE ENLARGED
GL1
GL1 SP3
GL1
GL1
P1
VP1
GL1 1200W x 600HGL1 mm
GL1 GL1 GL1 with Lumi Frit™ Bendheim Fritted glass panel Large Dot Pattern. Fully Toughened Laminated Glass 10 + 12 + 10mm SP1
SP3
VP1
GL1
GL1
GL2
P1
SP3 VP2
Bronze Onyx 15.2mm Amorphous SiliconGL1 PV Glass Outer GL1 GL1 Pane. 0% Transparency. 600mm cavity to Louvreclad GL1 GL1 GL1 Kensington Aluminium Waterproof Louvre. SP3 SP3 Three-pass SP3 SP3 GL1 GL1 GL1 PVF2 Anthracite Coating.
GL2
P1
C C 3.2 3.2
VP2
GL2
GL2
4m
SP3
VP3
SP3
PANEL 2 (Lobby)
SCALE 1.50
P1
VP4
LVL 0 LVL FFL 0 + 7 150 FFL + 7 150
SCALE 1.50
SP1
GL2
P1 SP1
265
SPANDREL PANEL 3
LVL 0 FFL + 7 150
LVL 0 FFL + 7 150
GL1
SP3
LVL 26 FFL + 128 000
SP3
GL1
GL1
600
SP3
GL1
GL1
GL1
350
SP3
GL1
1200W VP4 x 260-265H mm
GL1
260
SP3
GL1
GL1
260
SP3
P1
GL1
VP1
GL2
260
SP3
P1
GL1
VP4 10+6mm On-line VP4 VP4 ReflectiveVP4 Bronze VP4 Pilkington Reflite Coated GL1 GL1 GL1 Solar Control Glass Mechanically Controlled Louvre.
VP4
VP1
GL2
2450
2450
P1
VP1
GL1
3600
P1
VP1
GL1
260
SP3
VP4
VP1
GL1
260
SP3
P1
VP4
Amorphous Silicon. Solid. SP3
970
SP3
SP3
P1
VP4
1550
SP3
P1
VP4
SPANDREL PANEL 2 MECHANICAL FLOOR
P1
VP4
PODIUM
VP4
SP3
PODIUM
P1
SP3
VP2
GL1
4000
1800 3600
VP4
SP3
1200W x 260-265H mm
GL1
LVL 46 FFL + 224 000
SP3
955
MECHANICAL FLOOR
PODIUM
SP3
GL2
SP2
GL2
SPANDREL PANEL 1
LVL 46 FFL + 224 000
VP2
GL2
GL2
260
GLASS LOUVRE 2
VP4
P1
VP3
LVL 27 FFL + 132 000
1800
VP4
SP3
P1
SP2
260
VP4
P1
SP2
260
SP3
P1
P1
SP2
260
VP4
VP4
P1
3600
SP3
P1
P1
260
P1
P1
HOTEL ROOFTOP AMENITIES
SP3
VP4
1775
VP4
P1
3600
PODIUM
VP4
P1
MID-RISE OFFICE
HOTEL ROOFTOP AMENITIES
1800
1200
P1
SP2
Terracotta Pilkington Reflite 10+6mm On-line Coated Reflective Solar Control Glass Mechanically Controlled Louvre.
1200
n the the Sun’s Sun’s position. position. n The color varies depending on the Sun’s position. our reference. our reference. tion. Please order real samples for your reference.
D
600
SP3
600
SP3
SPANDREL PANEL 3
600
VP4
SP3
SP1
600
VP4 VP4
SP3
LVL 46 FFL + 224 000 LVL SPANDREL46 PANEL 1 FFL + 224 000
600
600
VP1
VP4
350
970 970
SIZE 1200W x 2700H mm
VP4
SP3
3.2 3.2
VISION PANEL 1
1200W x 4000H mm
DESCRIPTION Viridian 10+12+10mm Performatech Double Glazed Primary Glazing unit. Low-E Coating. Terracotta Pilkington Reflite 10+6mm On-line Coated Reflective Solar Control Glass Outer Wall. Viridian 10+12+10mm Performatech Glazed Primary Glazing unit, Low-E Coating. Bronze Pilkington Reflite 10+6mm On-line Coated Reflective Solar Control Glass Outer Wall. Viridian 10+12+10mm Performatech Glazed Primary Glazing SP2 SP2 SP2 unit, Low-E Coating. Viridian 10+12+10mm Performatech Double Glazed SP2 SP2 SP2 Primary Glazing unit. Low-E Coating.
VP4
SP3
SP3
CODE VP2
VP4
MECHANICAL FLOOR
VP4 VP4
VP4 VP4
MECHANICAL FLOOR
350 600 600 350 350 600 600
1800
1800
VP4
955
955
SP3
VP4
VP4
HOTEL ROOFTOP AMENITIES
VP4
VP4
HOTEL ROOFTOP AMENITIES
VP4
600 1800
VP4
350 350
MECHANICAL FLOORMECHANICAL FLOOR
LVL 46 FFL + 224 000
LVL 46 LVL FFL 46 + 224 000 FFL + 224 000
VP4
NAME VISION PANEL 2
FFL + 127 600
1800 1800 1775
VP4
VP4
MECHANICAL FLOOR
VP4
CROWN
1800
VP4
1825
1825
LVL 46 FFL + 224 000
1775
HOTEL ROOFTOP AMENITIES
HOTEL ROOFTOP AMENITIES
VP4
VP4
FFL + 127 600
FFL + 127 600 FFL + 127 600
MECHANICAL FLOOR
VP4
CROWN
VP4
HOTEL ROOFTOP AMENITIES HOTEL ROOFTOP AMENITIES
CROWN
CROWN
CROWN
FFL + 127 600
1800
SP2
1800
SP2
1800
SP2
1800
SP2
600
SP2
350
SP2
350
SP2
350
1200
350
1200
SIZE
TOWER FACADE Unitised Curtain Wall1 System, Capral CW175 System Terracotta Pilkington Reflite 10+6mm On-line Coated VISION PANEL VP1 Aluminium extrustions with PVF2 coating Anthracite matte finish #RAL 7016 Reflective Solar Control Glass Outer Wall. 1200 Viridian 10+12+10mm Performatech Glazed Primary Glazing 1200 unit, Low-E Coating.
350
CROWN
Unitised Curtain Wall System, Capral CW175 System Aluminium extrustions with PVF2 coating Anthracite matte finish #RAL 7016 PODIUM Podium Structural Glass Facade System, Truss System with Point Fixed IGUs Structural Steel with Akzo Nobel International Paints Interchar® 212 Fire-rated epoxy intumescent 2 pac paint system, Anthracite matte finish #RAL 7016 NAME CODE DESCRIPTION
1
2
4m
SCALE 1.50
.5
0
PODIUM FACADE ENLARGED
.5
0
PODIUM FACADE ENLARGED SCALE 1.50
1
2
1
2
4m
SCALE 1.50
ABPL90118:
PROJECT:
TITLE:
DRAWN BY:
Tutorial 03 - Anthony Balquez Group no. 5 Semester 02, 2020 Assignment
433-455 Collins St Melbourne Site B
A3.2: Enlarged elevations & Schedules
Julia Quirk Qinyi Mao Xiaoyu Zhang
983633 904786 910445
1200
SCALE @ A1:
PAGE:
1: 50
A3.2
DATE: 20/11/2020
1200
VP3
VP2
VP2
VP1
VP1
VP1
VP1
VP1
Aluminium Back Panel Insulation Aluminium Backpan bronze finish to match Vision Panel colour on exterior Spandrel Panel 2 600mm permeable walkway Aluminium Transom and Mullion Aluminium frame External Glass Lourve 2
External Vison Panel 3
Stack Joint
Transom and Mullion Operable Window Frame Operable window Glazing - Vision Panel 2 Internal -Vision Panel 2
-
3D EXPLODED TOWER FACADE DIAGRAM
3° Fall to roof Gutter. BENDHEIM 12+20+12 mm Ceramic-fritted Low Iron Tempered Laminated glass with Spider Fitting System, 1200mm x 2400 mm.
DOUBLE SKIN FACADE SYSTEM as specified SINGLE SKIN FACADE SYSTEM with double-glazed curtain wall facade system
PODIUM STRUCTURAL TRUSS FACADE SYSTEM
N -
SOLAR PATH RESPONSE DIAGRAM
Dark Grey Aluminium Cladding with PVF2 Coating. Structural Steel with Akezo Nobel International Paints Interchar® 212 Fire-rated epoxy intumescent 2 pac paint system, Dark grey matte finishes.
Top Roof Two-way Truss System Steel Batten Lateral Support Podium Steel Column Pin-Jointed System Top Hung Steel Truss System Glass Fin Structural Facade System with 1200mm x 3600 mm 12+20+12mm ThermoTech™ Point Fixed Toughened Glass Panel
Extra Louvre System on Mechanical level for ventilation.
WINTER WIND
SUMMER WIND
BENDHEIM Ceramic-fritted Low Iron Tempered Laminated glass with Spider Fitting System, 1200 mm x 3600 mm 12+20+12mm Pattern Varied.
Glass Podium to remain transparency whilst avoiding wind downwashing effect.
N
Vegetation to further divert and decelerate the wind speed.
-
WIND RESPONSE DIAGRAM
JAM-5 Architects
-
EXPLODED PODIUM FACADE DIAGRAM
ABPL90118:
PROJECT:
TITLE:
DRAWN BY:
Tutorial 03 - Anthony Balquez Group no. 5 Semester 02, 2020 Assignment
433-455 Collins St Melbourne Site B
A3.3: Facade concept diagrams and 3D representation
Julia Quirk Qinyi Mao Xiaoyu Zhang
983633 904786 910445
SCALE @ A1:
PAGE:
1: 50
A3.2
DATE: 20/11/2020
3690
1
MECHANICAL FLOOR
LVL 01 FFL + 20 000
6
3° Fall
2
A4.2
A4.2
7 5
3600
3690
A4.2A4.2
OVERHUNG TRUSS BEHIND
7
3600
3600
A4.2
P1 PODIUM PANEL SUPPORTED BY 2-WAY TRUSS SYSTEM WITH SPIDER FITTING
PODIUM
OVERHUNG TRUSS BEHIND
LOBBY
0
3600
P2 LOBBY VISION PANEL SUPPORTED BY FIN STRUCTURE WITH SPIDER FITTING
1910
ALUMINUM CLAD DIAGONAL STEEL COLUMN BEHIND
A4.2
P1 PODIUM PANEL SUPPORTED ALUMINUM LINTEL BEHIND BY 2-WAY TRUSS SYSTEM WITH SPIDER FITTING CIRCULAR STEEL COLUMN
PODIUM
4
A4.2
1910
ALUMINUM CLAD DIAGONAL GROUND STEEL COLUMN BEHIND LEVEL FFL + 4900 P2 LOBBYGL VISION PANEL + 13500 SUPPORTED BY FIN STRUCTURE
1
WITH SPIDER FITTING
A4.2
ALUMINUM LINTEL BEHIND
UNDERGROUND CARPARK BELOW
CIRCULAR STEEL COLUMN
ELEVATION
2400
2 -
SCALE1:50 900
1200
1200
1200
1200
1200
1200
3 -
GROUND 1200 X 1200 X 50 FFLFLOOR + 4900 LEVEL BLUESTONE TILE GL + 13500
1200
0
A4.2
SECTION 4 SCALE1:50
A4.2
1
A4.2
1200
UNDERGROUND CARPARK BELOW
ELEVATION
1200
2 -
SCALE1:50 900
1200
1200
1200
1200
1200
1200
3 -
1200 X 1200 X 50 BLUESTONE FLOOR TILE
1200
SCALE1:50
R11
3
25
DARK GREY ALUMINUM CLADDING WITH PVF2 COATING.
A
1200
900
1200
2380
SECTION
A4.2
600W x 400D BOX GUTTER SYSTEM
1200
1200
3° FALL TO ROOF GUTTER BENDHEIM 12+20+12 mm CERAMIC-FRITTED LOW IRON TEMPERED LAMINATED GLASS WITH SPIDER FITTING SYSTEM, 1200MM X 2400 MM.
RD: ASSA ABLOY RD4-300 ALL GLASS REVOLVING DOORS BEHIND
1200
2380
800 MM x 350 MM x 90 MM BRICK TILE PAVING
A
900
R11
3
ALUMINUM CLADDED CONCRETE COMPOSITE COLUMN
25
1200
A4.2
1
BENDHEIM CERAMIC-FRITTED LOW IRON TEMPERED LAMINATED GLASS WITH SPIDER FITTING SYSTEM, 1200 MM X 3600 MM 12+20+12MM PATTERN VARIED.
RD: ASSA ABLOY RD4-300 ALL GLASS REVOLVING DOORS BEHIND
GLASS FIN STRUCTURAL FACADE SYSTEM WITH 1200mm x 3600 mm 12+20+12mm ThermoTech™ POINT FIXED TOUGHENED GLASS PANEL
800 MM x 350 MM x 90 MM BRICK TILE PAVING
1
CIRCULAR STEEL COLUMN
PODIUM OVERHEAD
CIRCULAR STEEL COLUMN
PODIUM STEEL COLUMN PIN-JOINT SYSTEM
N
1 -
GRASS LAWN
2 -
3 -
PLAN
1 -
STRUCTURAL STEEL 2-WAY TRUSS SYSTEM WITH AKEZO NOBEL INTERNATIONAL PAINTS INTERCHAR® 212 FIRE-RATED EPOXY INTUMESCENT 2 PAC PAINT SYSTEM, DARK GREY MATTE FINISHES.
SCALE1:50
ISOMETRIC
4 -
PODIUM OVERHEAD
-
PRODUCED BY AN AUTODESK STUDENT VERSION N
2 1 -
GRASS LAWN
3 -
1 -
PLAN
4 -
SCALE1:50
ISOMETRIC -
PRODUCED BY AN AUTODESK STUDENT VERSION
JAM-5 Architects
ABPL90118:
PROJECT:
TITLE:
DRAWN BY:
Tutorial 03 - Anthony Balquez Group no. 5 Semester 02, 2020 Assignment
433-455 Collins St Melbourne Site B
Podium/Typical Office Façade: General Arrangement
Qinyi Mao
904786
SCALE @ A1:
PAGE:
1: 50
A4.1
DATE: 20/11/2020
PRODUCED BY AN AUTODESK STUDENT VERSION PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION PRODUCED BY AN AUTODESK STUDENT VERSION
2400
LOBBY
PRODUCED BY AN AUTODESK STUDENT VERSION
EXTRUDED ALUMINUM SKIRTING DUCT SMOKE SEAL FIRE STOP 50 x 50 x 4 EA
125 x 125 x 6 EA
150mm BONDEK COMPOSITE SLAB
600MM DOUBLE FACADE WALKWAY STEEL BRACKET TO SUPPORT WALKWAY ALUMINUM CLADDING AL1
400MM GLASS FIN BEHIND
VAPOR PERMEABLE MEMBRANE
125 x 150 x 6 RHS LINTEL GLASS PANEL P2
18MM MARINE PLYWOOD SUBSTRATE
STEEL SPLICE PLATE BOLTED TO GLASS FIN
90 MM INSULATION WITH ALUMINUM BACKPAN
SPIDER FITTING FIXED TO GLASS FIN
ALUMINUM CLADDING AL1
125 X 125 X 6 SHS LINTEL
COLORBOND FLASHING TO GUTTER TOP HAT
RP1 LAMINATED ROOF GLAZING WITH SPIDER FIXING SYSTEM Z150 PURLIN FIXED TO 10MM CLEAT PLATE
OVERFLOW PIPE 600W x 400D BOX GUTTER AT SLOPE BOX GUTTER BRACKET
RD: ASSA ABLOY RD4-300 ALL GLASS REVOLVING DOORS BEHIND
18MM MARINE PLYWOOD SUBSTRATE 150 X 150 SHS 2-WAY TRUSS SYSTEM
0 A4.1
LINTEL_CONNECTION SCALE1:5
RD: ASSA ABLOY RD4-300 ALL GLASS REVOLVING DOORS BEHIND
GLASS PANEL P2
1200 X 1200 X 50 BLUESTONE FLOOR TILE
180 X 180 EA SEALANT WITH BACKER ROD
125 MM CEMENT MORTAR
WATERPROOF MEMBRANE 10 MM RUBBER WATERSTOP
50
90
DOWNPIPE 75 x 75 x 5 SHS SUPPORTING AL1BOLTED AT CONNECTION
125
ALUMINUM CLADDING AL1 WITH 18MM MARINE PLYWOOD SUBSTRATE
150
UB 530 TAPERED TO SUPPORT TRUSS SYSTEM
65
CUSTOMISED WELDED BEAM WITH 2HR FIRE-PROTECTED INTUMESCENT SPRAY
CONCRETE SLAB
ALUMINUM SUSPENDED CEILING PANEL FIXED TO 13 MM PLASTERBOARD
250 X 90 PFC BOLTED TO TRANSFER BEAM
150 MM 6:1 SAND CEMENT BEDDING 800 MM x 350 MM x 90 MM BRICK TILE PAVING
400 MM GLASS FIN PANEL BOLTED TO STEEL CONNECTION PLATE
FILLET
LOBBY_GROUND_CONNECTION
1 A4.1 SCALE1:5
P2 LOBBY GLAZING POINT-FIXED WITH SPIDER FITTING SYSTEM
PODIUM_LOBBY_CONNECTION
2 A4.1 SCALE1:10
50 X 50 EA
RP1 LAMINATED ROOF GLAZING WITH SPIDER FIXING SYSTEM
SEALANT WITH BACKER ROD
SPIDER FITTING
4mm ALUMINUM CLADDING AL1 WITH 18MM MARINE PLYWOOD SUBSTRATE
TOP HAT BOLTED INTO C1
800 MM x 800 MM C1 CONCRETE COMPOSITE COLUMN
P1 LAMINATED PODIUM GLAZING
Z150 PURLIN FIXED TO 10MM CLEAT PLATE
150 X 150 SHS 2-WAY TRUSS SYSTEM
GLASS FIN FIXED IN ALUMINUM CHANNEL SEALED WITH SEALANT AND BACKER ROD
5 A4.1
PODIUM_GLAZING SCALE1:5
6 A4.1
PODIUM_GLAZING
P2 LOBBY GLAZING POINT-FIXED WITH SPIDER FITTING SYSTEM
SCALE1:5 CORNER SPIDER FITTING FIXED TO STEEL SPLICE PLATE 40 mm x 2 STRENGTHENED LAMINATED GLASS FIN
1200 X 1200 X 50 BLUESTONE FLOOR TILE BELOW
P1 LAMINATED PODIUM GLAZING
SEALANT WITH BACKER ROD
3 A4.1
7 A4.1
LOBBY_CORNER_CONNECTION_PLAN SCALE1:5
PODIUM_GLAZING
CIRCULAR STEEL COLUMN WITH AKEZO NOBEL NTERNATIONAL PAINTS INTERCHAR® 212 FIRE-RATED EPOXY INTUMESCENT 2 PAC PAINT SYSTEM, DARK GREY MATTE FINISHES.
SCALE1:5
SCHEDULE
800 MM x 350 MM x 90 MM BRICK TILE PAVING
PODIUM Podium Structural Glass Facade System, Truss System with Point Fixed IGUs Structural Steel with Akzo Nobel International Paints Interchar® 212 Fire-rated epoxy intumescent 2 pac paint system, Anthracite matte finish #RAL 7016
CODE
DESCRIPTION
P1
Bendheim Ceramic - Fritted glass panel with Lumi Frit™ Large Dot Pattern. Fully Toughened Laminated Glass 10 + 12 + 10mm
1200W x 3600H mm
PANEL 2
P2
Viridian 12mm Evantage Clear 16 + 10+ 16mm Clear Thermotech Double Glazed Toughened Glass.
1200W x 3600H mm
(Podium glazing)
(Lobby glazing)
ROOF PANEL 1
RP1
Bendheim Fritted glass panel with Lumi Frit™ Large Dot Pattern. Low Iron Tempered Laminated glass with Spider Fitting System
1200W x 2400H mm
ALUMINUM EXTERNAL CLADDING
AL1
4MM Dark Grey folded Aluminum Cadding system fixed to 18 mm marine plywood substrate.
1200W x VariesH mm
AL2
3MM Dark Grey folded Aluminum Cadding system fixed to Plasterboard.
1200W x VariesH mm
(Podium glazing)
ALUMINUM PANEL CEILING
REVOLVING DOOR SYSTEM
RD
20 mm GROUT ANCHOR BOLT CAGE
Concrete Slab
SIZE
PANEL 1
36 mm BASE PLATE
4 A4.1
PODIUM_COLUMN_GROUND_CONNECTION SCALE1:10
ASSA ABLOY RD4-300 ALL GLASS REVOLVING DOORS
JAM-5 Architects
ABPL90118:
PROJECT:
TITLE:
Tutorial 03 - Anthony Balquez Group no. 5 Semester 02, 2020 Assignment
433-455 Collins St Melbourne Site B
PRODUCED BY AN AUTODESK STUDENT VERSION
NAME
150 MM 6:1 SAND CEMENT BEDDING
Podium/Typical Office Façade: Details
DRAWN BY: Qinyi Mao
904786
SCALE @ A1:
PAGE:
VARIES
A4.2
DATE: 20/11/2020
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
STEEL CONNECTION PLATE BOLTED TO WELDED BEAMS
VP1
VP1
VP2
VP1
VP1
1895
Office Change Over Floor
SP1
SP1
SP1
SP1
SP1
SP1
SP1
SP1
SP1
SP1
SP1
120
SP1
SP1
SP1
SP1
SP1
SP1
SP1
SP1
SP1
SP1
SP1
SP1
SP1
220 155
30
VP2
VP1
01 Capral CW175 stack joint with black power coating 02 VP 1 Terracotta Pilkington Reflite 10+6mm On-line Coated Reflective Solar Control Glass. 03 VP 2 Viridian 10+12+10mm Performatech Glazed Primary Glazing with Low-E Coating 04 200 RHS stiffening support with black power coating 05 Capral CW175 Aluminum mullion with black power coating 06 Capral CW175 Aluminum Transom with black power coating 07 Aluminum motorized awning window frame with black power coating 08 Extruded aluminum sorting duct with black power coating 09 Nepean Weldlok Aluminum I-Bar grated maintenance walkway 10 SP1 Viridian 12mm VFloat Clear 10+12+10mm Thermotech Double Glazing 11 Aluminium Backpan colour to match VP1 12 120mm bondek slab 13 Rondo Key-lock suspended ceiling system 14 200mm Motorized blind 15 Aluminium motorized opearable louvre frame with clear power coating 16 Ventilation ducting and slot diffuser 17 Slab edge 18 400*800mm Composite column with aluminium cladding 19 Monoclad Aluminum composite panel in colour charcoal
E 4.4 D 4.4
C 4.4
175
70
1495
LEGEND
B 4.4
175
A 4.4
255
FFL + 76 000
VP1
210
VP2
Lowrise Office Floor
480
2450
4000
480
VP2
VP1
1180
FFL + 80 000
VP1
1550
VP2
480
80
2490
210
1235
VP2
JAM-5 Architects
ABPL90118:
PROJECT:
TITLE:
DRAWN BY:
Tutorial 03 - Anthony Balquez Group no. 5 Semester 02, 2020 Assignment
433-455 Collins St Melbourne Site B
Change over floor/Typical Low Rise Office Floor: General Arrangement
Xiaoyu Zhang
910445
SCALE @ A1:
PAGE:
1: 20
A4.3
DATE: 20/11/2020
-
-
JAM-5 Architects
-
-
ABPL90118:
PROJECT:
TITLE:
DRAWN BY:
Tutorial 03 - Anthony Balquez Group no. 5 Semester 02, 2020 Assignment
433-455 Collins St Melbourne Site B
Change over floor/Typical Low Rise Office Floor: Details
Xiaoyu Zhang
910445
SCALE @ A1:
PAGE:
VARIES
A4.4
DATE: 20/11/2020
VP 1 Terracotta Pilkington Reflite 10+6mm On-line Coated Reflective Solar Control Glass.
VP 2 Viridian 10+12+10mm Performatech Glazed Primary Glazing with Low-E Coating.
SP1 Viridian 12mm VFloat Clear 10+12+10mm Thermotech Double Glazing with aluminium backpan at back
Operable louvres frame with VP 1 Terracotta Pilkington Reflite 10+6mm On-line Coated Reflective Solar Control Glass.
A -
FACADE VIEW
B -
INTERIOR VIEW
D -
SECTIONAL VIEW
VP 2 Viridian 10+12+10mm Performatech Glazed Primary Glazing with Low-E Coating Capral CW175 Aluminum transom with black power coating 400*800mm composite column with solid aluminium panel cladding Capral CW175 Aluminum mullion with black power coating
Operable louvres frame with VP 1 Terracotta Pilkington Reflite 10+6mm On-line Coated Reflective Solar Control Glass
VP 2 Viridian 10+12+10mm Performatech Glazed Primary Glazing with Low-E Coating
120mmBondek slab with carpet finish
Nepean Weldlok Aluminum I-Bar grated maintenance walkway with T profile supporting bracket fixed to steel mullion
Rondo Key-lock suspended ceiling system
Aluminum motorized awning window frame with black power coating.
VP 1 Terracotta Pilkington Reflite 10+6mm On-line Coated Reflective Solar Control Glass
Extruded aluminum sorting duct with black power coating
Capral CW175 stack joint with black power coating
16mm suspended ceiling panels 200mm Motorized blind
C -
OVERALL ISOMETRIC VIEW
JAM-5 Architects
ABPL90118:
PROJECT:
TITLE:
DRAWN BY:
Tutorial 03 - Anthony Balquez Group no. 5 Semester 02, 2020 Assignment
433-455 Collins St Melbourne Site B
Change over floor/Typical Low Rise Office Floor: Details
Xiaoyu Zhang
910445
SCALE @ A1:
PAGE:
VARIES
A4.5
DATE: 20/11/2020
A 1720 520
1200
A
B 4800
1200
1200
1200
1200
10
B
1090 470
10
390
9 4800 5010 3300
1090 1720
FFL + 241 850
1200
470
1200
1200
5010 390
1200
1780125
3300
D1
D2
D1
D2
SP2
SP2
SP2
SP2
SP2
SP2
A4.7
2740
Manntech Standard machine (BMU) with horizontal track on roof concrete slab with 200mm concrete upstand. waterproofed with 1mm thick water proofing membrane concrete slab with 200mm 4mm Alucobond cladding concrete upstand. waterproofed with 1mm thick water proofing membrane 4mm Alucobond cladding Siphonic drain system with trafficable grate on mechanical service floor
D3
A4.7
205
SP2
SP2
SP2
SP2
SP2
SP2
SP2
SP2
SP2
SP2
SP2
250
65
SP2
D3
A4.7
875
1090
1325
1825
D4
Alucobond anthracite Siphonic drain system with powdergrate coated trafficable on mechanicalceiling servicepanel floor
D4
Alucobond anthracite 700 WB 150 Typical steel powder coated column crown structure ceiling panel
A4.7
EP12706
EPD0223
1325
VP4 Viridian Clear 6 + 12 + 6mm Crown glass 700 WB 150 Typical steel column crown structure
Photovoltaic Manntech Standard crystalline roof machinesolar (BMU) with mounted panels horizontal track on roof
A4.7
250 65875 205
315
SP2
1090
SP2
1825
Crown 700 WB 150 Typical steel column crown structure
Rectangular hollow Photovoltaic section structural mullion crystalline roof to support mounted solarunitised panels curtain wall parrapet
SP2
315
1775
LVL 47 FFL + 238 890
200
SP2
1775
LVL 47 FFL + 238 890
2945
SP2
2740
SP2
2945
SP2
2945
SP2
2945
1780
SP2
2945
CROWN
SP2
Rectangular hollow section structural mullion to support unitised curtain wall parrapet
490
1500
A4.7 2945
CROWN
FFL + 241 850
200
4800
A4.7
Alucobond aluminium parapet flashing SP2 Bronze Onyx Amphorous PV spandrel panel Alucobond aluminium 4mm tempered parapet flashingglass 3.2mm PV active float glass SP2 cell film a-Si Bronze Onyx Amphorous PV 1.5mm dedicated interlayer spandrel panel glass 4mm tempered 4mm tempered glass 3.2mm PV active float glass a-Si cell film 1.5mm dedicated interlayer 4mm tempered glass
1200
125
520
4800
9
490
1500
EP13141
A4.7
200 x 100mm rectangular hollow section with 700anthracite WB 150 Typical steel aluminium column crown cladding structure
EP12706
1775
EPD0223
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
3595
VP4
Unitised rectangular curtain wall 200 x 100mm panel hollow section with Vision panel glass VP4 anthracite aluminium Viridian Clearcladding 6 + 12 + 6mm glass Unitised curtain wall panel Vision panel glass VP4 Viridian Clear 6 + 12 + 6mm glass
3595
8275
9615 9615
8275
9365
1825
HOTEL ROOFTOP HOTEL BAR AND ROOFTOP TERRACE BAR AND TERRACE
1825
9365
1775
VP4 Viridian Clear 6 + 12 + 6mm glass
EP13141
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
VP4
3880
VP4
amenity floor UnitisedHotel curtain wall panel with native Vision panelAustralian glass VP4 floraClear landscaping Viridian 6 + 12 + 6mm glass Planting in concrete Hotel amenity floor planter with inspection with native Australian chamber above flora landscaping drainage point in concrete 600 x Planting 600 x 50mm non-slip plantertile with inspection charcoal mounted on chamber above self-leveling tile pedestal drainage point
3880
VP4
1775
1775
1775
Unitised curtain wall panel Vision panel glass VP4 Viridian Clear 6 + 12 + 6mm glass
VP4 SP3
VP4 SP3
SP3
SP3
SP3
SP3
SP3
SP3
PV spandrel glass with 4-rail PV junction box
820
970930
Mechanical floor Louvreclad Kensington aluminium louvres dark grey finish
245
880
VP4 SP3
820
VP4 SP3
245
VP4 SP3
880
VP4 SP3
520 975 315
VP4 SP3
Bondek decking 100mm Soffit insulation
520
930
LVL 46 FFL + 229 530
600 x 600 x 50mm non-slip charcoal tile mounted on self-leveling tile pedestal 315
1775
LVL 46 FFL + 229 530
SP3
D5
D6
Lourveclad Kensington aluminium louvres bird/vermin mesh behind
A4.7
SP3
SP3
SP3
SP3
SP3
SP3
SP3
SP3
SP3
SP3
SP3
SP3
D5
A4.7
A4.7
890 925
SP3
2855
930970
SP3
2855
965930
800 WB 168 Typical steel column tower structure
SP3
SP3
SP3
SP3
SP3
SP3
SP3
SP3
SP3
SP3
SP3
SP3
925
E1 E1
S1
ELEVATION SCALE 1.50 1690
SECTION SCALE 1.50 SECTION SCALE 1.50
4800
1170
2925 1690
1200
2270 1200
100
1200
490 1200
1200
5245
1690
490 4800
1170
2925 1690
1020
535
S1
ELEVATION SCALE 1.50
1020
535
SP3
935
SP3
RHS beam to support J-mount unitised curtain wall bracket 800 WB 168fixing Typical steel Intumescent coated column tower structure B2 Steel beam RHS beam to support 530 UB 82 J-mount unitised curtain wall fixing bracket Intumescent coated B2 Steel beam 530 UB 82
85
935965
925 890
85
MECHANICAL FLOOR MECHANICAL FLOOR
Mechanical floor Louvreclad SP3 Kensington aluminium Bronze Onyx Amphorous PV louvres dark grey finish spandrel panel 4mm tempered glass 3.2mm PV active float glass SP3 cell film a-Si Bronze Onyx Amphorous PV 1.5mm dedicated interlayer spandrel panel glass 4mm tempered 4mm tempered glass 3.2mm PV active float glass a-Si cell film 1.5mm dedicated interlayer 4mm tempered glass
D6
925975
A4.7
Bondek decking 100mm Soffit insulation Lourveclad PV spandrelKensington glass with aluminium louvres 4-rail PV junction box bird/vermin mesh behind
1200
2270 1200
100
1200
Roof mounted PV panels at 38° angle of incident in a North Western direction
490 1200
1200
5245
490
Roof mounted PV panels at 38° angle of incident in a North Western Building service floor direction
4mm Alucobond aluminium parapet flashing panel 1200 490 1200
1200
SP2
9
BMU unit - standard machine with multi-layer hoist mechanism and horizontal tracks on roof.
1200
Building maintenance unit housing shed
R2 00 0
1200
Photovoltaic crystalline solar panels
490
4800
1200
Gerberit siphonic drain with trafficable grate
0
4800
Photovoltaic crystalline solar panels
Hotel outdoor amenity floor
Hotel outdoor amenity floor
300 1500 300
Roof mounted garden bed around floor perimeter
100
Roof mounted garden bed around floor perimeter
100
470
1090
1090
Mechanical floor
470
A
Manntech Standard machine (BMU) with horizontal track on roof
A
625
2855
A
625
-
625
2855
A MECHANICAL FLOOR PLAN ENLARGED SCALE 1.50
-
B -
N N
-
AXONOMETRIC SECTION
-
AXONOMETRIC SECTION
R3500
MECHANICAL FLOOR PLAN ENLARGED SCALE 1.50
B
DATE:
31 / 10 / 2020 Julia Quirk 983633
Drawing no. 4.1
Julia Quirk 983633
R2000 R2000
R2000
c -
20/11/2020
c -
R2000
Parapet Building maintenance unit Rooftop amenity floor
A4.6
1: 50
Scale @ A1 : 1.50 Drawing no. 4.1
PAGE:
R2000
433-455 Collins Street Melbourne Site B
983633
R3500
Julia Quirk
Parapet Arrangement Building maintenance unit Rooftop amenity floor Deatils:
R2000
R2000
Crown and parapet facade: General
Project: 433-455 Collins St 433-455 Collins Street Melbourne Melbourne Site B Site B Project:
SCALE @ A1:
R3500
DRAWN BY:
N
R2000
Tutorial 03 - Anthony Balquez Group no. 5 Semester 2, 2020 Assignment 4 - Detailed design
Deatils:
TITLE:
R2000
Tutorial - Anthony Balquez Tutorial 03 03 - Anthony Balquez Group no.no. 5 5 Group Semester 2, 2020 Semester 02, 2020 Assignment 4 - Detailed design Assignment
PROJECT:
R2000
R2000
ABPL90118:
31 / 10 / 2020
Scale @ A1 : 1.50
R2000
R2000
R2000
R2000
JAM-5 JAM-5 Architects JAM-5 Architects Architects
1600
625
R2000
P1
B
Mechanical floor
R3500
P1
1600
700
B
700
1090
Manntech Standard machine (BMU) with horizontal track on roof
1090
10
1200
10
1500
1200
1200
5195
Gerberit siphonic drain with trafficable grate
R2 00
Building maintenance unit housing shed
9
Building service floor BMU unit - standard machine with multi-layer hoist mechanism and horizontal tracks on roof.
5195
Building maintenance unit horizontal track
SP2
1200
Building maintenance unit horizontal track 4mm Alucobond aluminium parapet flashing panel
N
Photovoltaic galzanised steel support structure
530 205
70
200
45
Alzone standard PV panel rail mount
5
4mm solid aluminium parapet flashing panel U-bracket with fixing bolts to timber member
tee-hat to aluminium Alucobond flashing
4mm Alucobond aluminium parapet flashing panel strucutral plywood attached to stackjoint
LVL 47 FFL + 241 850
LVL 47 FFL + 241 850
structural plywood attached to stackjoint
stackjoint
z-bracket to aluminium Alucobond flashing rigid insulation
SP2 - Bronze Onyx Amphorous PV spandrel panel 4mm tempered glass 3.2mm PV active float glass a-Si cell film 1.5mm dedicated interlayer 4mm tempered glass
Screed to fall
65-50mm screed to fall 1mm waterproof membrane, filleted at upstand
tee-hat to aluminium Alucobond flashing
B2 Steel Beam (typical) 530 UB 82
450 x 400 x 4mm Alucobond cladding panels
ONYX crystalline PV glass 4.0 mm tempered glass 6" Mono-Cryst PV cells 1.0mm backsheet
concrete slab
1mm thick water proof membrane
TE Connectivity SOLARLOK 4-rail PV bar junction box 1500V rating
Aluminium back pan
D1
Alzone rail bolt with M6 GR304 stainless steel bolt
SECTION SCALE 1.10
D2
Aluminium stack joint
SECTION SCALE 1.10
Manntech Standard machine (BMU) with horizontal track on roof Concealed T bracket to curtain wall mullion Anthracite powder coated aluminium overclad RHS 200 x 100mm rectangular hollow section with anthracite aluminium cladding
200
30
350
Storm Clamp steel BMU track
150 x 100mm 12mm L bracket to concrete upstand
Sump cast into concrete Gerberit siphonic drain trafficable grate Anti-condensation insulation 1mm waterproofing membrane
Collar aluminium flashing z-bracket to aluminium Alucobond flashing
LVL 47 1mm thick FFL + 238 890 waterproof membrane, filleted at upstand
Screed to fall
520
50
Screed to fall
100
250
SP2 - Bronze Onyx Amphorous PV spandrel panel 4mm tempered glass 3.2mm PV active float glass a-Si cell film 1.5mm dedicated interlayer 4mm tempered glass Parallel flange channel angle to support suspension rail
anti-condensation insulation Tension resistant connection 60mm Ø PVC connection pipe
CB1 Cantilevered beam (tapering) 300 to 150 PFC / 1500mm centres Soffit insulation
suspension rail rigid mount
780
TE Connectivity SOLARLOK 4-rail PV bar junction box - 1500V rating Aluminium curtain wall transom
pipe anchor bracket with electrofusion sleeve coupling
EB1 Steel beam 800 WB 168 Alucobond aluminium panel with folded edges Rondo 266 top hat
90° PVC pipe bend
ceiling suspension clip
D3
D4
SECTION SCALE 1.10
SECTION SCALE 1.10
700 WB 150 Typical steel column crown structure 200 x 100 x 60mm overclad steel RHS VP4 Viridian Clear 6 + 12 + 6mm glass 4mm Alucobond aluminium flashing
600 x 600 x 50mm Porcelain ExteriorPietra Lavica Flint floor tile with Grip surface finish 6mm gaps
ALU250 inspection chamber ET& - Bauder AL100 edge trim secured by capping sheet stone pebble vegetation barrier 30mm mulch growing substrate
base plate leveling pad Smoke seal LVL 46 FFL + 229 530
Keksia self-leveling SE14 tile pedestal 315-550mm
structural plywood RHS steel plate stack joint grout bolt cage welded to reinforcement HZS bolt serrated channel imbedded in concrete
Geberit Pluvia siphonic drain outlet 1mm secondary waterproofing membrane 50-65mm screed to fall 1mm primary waterproofing membrane
steel reinfocement fire stop rigid insulation
Screed to fall
1mm primary waterproofing membrane 250mm reinforced concrete slab 150mm / 12mm steel angle Bondek decking / 200mm centres 150mm / 9mm steel hollow section SP3 -Bronze Onyx Amphorous PV spandrel panel 4mm tempered glass 3.2mm PV active float glass a-Si cell film 1.5mm dedicated interlayer 4mm tempered glass
Insulation fixing 100mm Kingspan K10 Soffit board insulation Set in siphonic drain with ring clamping onto waterproofing membrane 90° PVC pipe bend Sliding point pipe bracket Suspension rail Rigid mount
Bauder filter fleece
Aluminium Backpan light grey finish Aluminium sub-head Flashing
Bauder DSE 60 drainage mat filed with mineral drain FSM600 protection fleece 2mm PE foil seperation layer Root resistant capping sheet Underlayer
Unitised curtain wall transom Unitised curtain wall mullion 6mm CALCO spray film Intumescent fireproof paint EB1 = Steel beam 800 WB 168 Bird/vermin mesh Louvreclad Kensington aluminium louvre dark grey finish
D5
Pipe anchor bracket with electrofusion sleeve coupling
D6
SECTION SCALE 1.10
JAM-5 JAM-5 Architects Architects
ABPL90118:
Tutorial 03 - Anthony Balquez Group no. 5 Semester 02, 2020 Assignment Tutorial 03 - Anthony Balquez Group no. 5 Semester 2, 2020 Assignment 4 - Detailed design
Project:
PROJECT:
TITLE:
DRAWN BY:
433-455 Collins St Melbourne Site B
Crown and parapet facade: Details
Julia Quirk
433-455 Collins Street Melbourne Site B
Deatils: Parapet Building maintenance unit Rooftop amenity floor
SECTION SCALE 1.10
SCALE @ A1: 983633
VARIES
Scale @ A1 : 1.10
DATE:
PAGE: 31 / 10 / 2020
20/11/2020 Drawing no. 4.2
Julia Quirk 983633
A4.7