Winterbourne International Academy
• NATIONAL AND INTERNATIONAL COMPANY WITH A TURNOVER OF €7.9bn • NATIONALLY 250 EDUCATION PROJECTS VALUING £3.5 BILLION IN THE LAST 10 YEARS • LOCALLY 35 EDUCATION PROJECTS VALUING £380 MILLION IN THE LAST 10 YEARS • THE RIGHT LOCAL DELIVERY TEAM SUPPORTED FROM OUR BRISTOL OFFICE 4 MILES AWAY • PROVEN TEAM THAT HAVE WORKED TOGETHER ON MANY SUCCESSFUL SCHOOL PROJECTS
A TIGHT AND CONSTRAINED SITE
AN EFFICIENT SOLUTION
CONNECTIVITY
THE RIGHT EDUCATIONAL SOLUTION
SOME OF THE HIGHLIGHTS • • • • • • • • • • •
NEW TECHNOLOGY MULTI MATERIALS FACILITY NEW MUSIC DEPARTMENT NEW 6TH FORM NEW SCIENCE, ART, MATHS, ENGLISH, HUMANITIES &MFL FLEXIBLE TEACHING SPACES INTERNATIONAL CORE WITH ALL DAY DINING FACILITY INTERACTIVE THEATRE NEW LARGE HALL AS WELL AS AN EXTENSION TO THE DRAMA HALL OUTDOOR TEACHING SPACES OUTDOOR DINING SPACES 2000M2 EXTRA OUTDOOR PLAY AREA
AND MUCH, MUCH MORE…….
APPROACH TO CONSTRUCTION- MINIMAL DISRUPTION
Early Works Technology & Sports Classrooms Eliminating Temporary Classrooms with extra new build Initial small site set up for Technology extension Aug 2012-Dec 2012 Early Asbestos surveys carried out during holiday periods Minor enabling works and further investigation surveys carried out during this phase in preparation for new build Classrooms built on sports hall viewing platform
Main Works Maximising New Build New building including new 6th form and music: Integrating with the existing buildings and eliminating Wet Travel
Final Phase Demolition of the old creating masses of external hard play 2200sqm more external space than you currently have
Full site set up but Academy remains fully operational Carefully planned site logistics Main build construction takes place Dec 2012-July 2014 July 2014 Academy fully decants into new building
Demolition of old buildings and construction of external landscape July 2014-Dec 2014 BAM on site following completion of new build to support Academy Extended aftercare
APPROACH TO CONSTRUCTION- MINIMAL DISRUPTION
APPROACH TO CONSTRUCTION- MINIMAL DISRUPTION
APPROACH TO CONSTRUCTION- MINIMAL DISRUPTION
CONSIDERATE CONTRACTORS
WE HAVE BEEN NAMED THE “MOST CONSIDERATE CONTRACTOR” •
INDUSTRY STANDARD SCORE = 32 /40
•
BAM AVERAGE SCORE = 35.5 /40 WE ALWAYS ACHIEVE “PERFORMANCE BEYOND COMPLIANCE” ON OUR PROJECTS
ANY QUESTIONS?