Site environmental management services

Page 1

PROVIDING ESSENTIAL SITE ENVIRONMENTAL COMPLIANCE AND MONITORING SERVICES FOR CONSTRUCTION AND INDUSTRY

Site Environmental Management Services Sedgman Yeats is a multidisciplinary organisation, providing a no-nonsense, practical and common sense approach to site environmental management – our job is to remove obstacles, and make the process of environmental compliance simple. Our environmental specialists are uniquely positioned to understand our clients’ needs and tailor solutions with a focus on maintaining production or construction, providing cost efficiency, and forging a partnership with site management. Due to the complexity of changing legislation and the science and engineering required, site managers need rapid and focused responses to their needs, with the prime focus on managing environmental problems to maintain continuity of site operations. We understand that disruptions to timecritical works have far-reaching effects on our clients’ business. Having a specialist team with inside industry expertise allows our clients to do what they do best, while we work with local, State and Federal government bodies in maintaining and negotiating site compliance. We assist managers to develop their own site auditing and monitoring capabilities, with significant savings and opportunities to partner with projects in the overall site management process. Our collaborative approach has earned us a highly respected position in our field and has resulted in long-term alliances with existing clients. Our comprehensive management systems are certified to ISO 9001, ISO 14001 and ISO 4801 standards for quality, environment, and health and safety management, and we engage NATA accredited laboratories for all our testing.

Sedgman Yeats site environmental management services include:-

On-site Environmental Management 

On-call and regular compliance assistance

Environmental Management Representative (EMR) roles

Erosion and sediment control plans and audits

Provision of advice and management strategies

 Environmental management plans (EMPs) and transitional environmental programs (TEPs)

 Mentoring and training Environmental and Compliance Monitoring 

Surface and groundwater quality

Irrigation water quality, process water and drinking water (health and aesthetic)

Corrosion and scaling assessments

Effluent and waste water treatment and disposal

Microbiological testing

Event/incident water quality monitoring for pollution investigations and reporting

Dust deposition monitoring

Environmental Auditing 

Phase 1 Audits – environmental site assessment to determine potential environmental liabilities

Environmental Impact Audits

Environmental Compliance Audits

EMS Certification Audits - to determine conformance with the EMS Standard


Our experience Styx Coal Project

Horizon Shores Marina

Queensland Nickel Pty Ltd Styx Coal Basin, Queensland

Meridien Marinas Horizon Shores Woongoolba, Queensland

As part of the pre-feasibility stages for this proposed open cut coal mine in Central Queensland, Sedgman Yeats was engaged to undertake an environmental assessment program in this little-studied part of the Central Queensland coastal region. The program was developed, managed and delivered as a baseline report within the specified timeframes.

As the nominated Environmental Management Representative for the site, we provided ongoing advice and consultancy services for the marina during major development works to make it the largest marina in the southern hemisphere.

Follow up environmental studies were then initiated based on identified data gaps and long lead time components, including groundwater, surface water, air, noise, land, contaminated land, cultural heritage, aquatic and marine ecology, flora and fauna. Project management and implementation of the Styx Coal Project was controlled by Sedgman Yeats, including field work programs, sub-consultant management and client liaison, adapting the program to meet client requirements and expectations as the project developed.

Services undertaken by our staff on this project have included:  Annual license compliance audits and 5-yearly energy use audits 

Drinking water supply risk assessment

Water Efficiency Audit and management plan

EMS Audit and revision

Ongoing monitoring program management, and site monitoring (surface and groundwater, STP and irrigation, microbiological, potable, soil)

Environmental Approvals - dredging, contaminated land matters, ERAs, DEHP Permits

Ongoing liaison with State Government and Council

Ongoing compliance management

Proven Staff capability Project

Location

Scope

Client

Gold Coast Rapid Transit Project (Sth)

Gold Coast, QLD

Environmental compliance audit of the construction works against the requirements of the Construction EMP and applicable development approvals.

Baulderstone

Rocky Point Green Power Cogeneration Plant

Woongoolba, QLD

Review and revise existing Environmental Management System, weekly sampling and analysis of plant (cooling tower, pond waters, outflow) and environment for cogeneration plant.

Rocky Point Green Power

Nucon Oxenford Quarry

Gold Coast ,QLD

Site audit works including review of quarry records (environmental monitoring results, ERA licence conditions, the site-specific Integrated Environmental Management Plan), preparation of the audit procedure checklist and preparation of the annual report to be submitted to the EPA with recommended mitigation measures.

Nucon

Harlaxton Quarry

Toowoomba, QLD

Coordination of air quality monitoring, technical analysis of dust monitoring results in accordance with air quality criteria and environmental reports for submission with the ERA licence annual return.

Frost Bros.

Boral Quarries

South-east QLD

Monthly water quality and dust monitoring, annual site compliance audits and ongoing compliance advice (Jabiru Island Sand Plant, West Burleigh, Petrie and Stapylton hard rock quarries).

Boral (Qld)

Varsity Lakes Water Quality Monitoring Program

Varsity Lakes, QLD

Water quality, wetland and blue-green algae monitoring and assessment of Varsity Lakes, Silvabank Lake, Reedy Creek inflows and surrounding areas, assessment of algal risk associated with Lake Azzura bunding management.

Delfin Ltd

Lake Lomandra Management Plan

Robina, QLD

An assessment of the lake including water quality, sediment quality, the stormwater system and contributing catchment. These were combined into a catchment and in-lake water quality model to develop management measures to be utilised for the lake.

Gold Coast City Council

The Point Development

Hastings Point, NSW

Dewatering compliance monitoring (groundwater) for construction of a multi-unit development.

Hutchinson Builders

Construction and demolition waste landfill

Oxenford, QLD

Monitoring and environmental management program, construction and demolition waste landfill.

JJ Richards North End Recycling

Aggregate Recycling Centre

Steiglitz, QLD

Site environmental management, beneficial reuse application and onsite groundwater and surface water monitoring

North End Industrial Solutions

Queensland Recycling

Archerfield, QLD

Groundwater sampling, waste composition audit reporting and analysis.

Queensland Recycling

info@yeats.com.au February 2013

www.sedgmanyeats.com ABN 99 282 106 832


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.