GCAD, Thesis 2021
again. Hence, it becomes more challenging to design as a live project while taking the consideration of existing architectural incorporations on the site. Irregular shape of the site may restrict the designer to limited utilization of spaces; only 1 big size field could be developed on site. 1.8 Methodology
Figure 7: Methodology
(Source: Author)
22