Krishnagiri-Walajahpet Six Laning Project
186 Projects & Tenders ®
ASAPP Info Global Group Presents 3rd Edition of
R
U O Y K O BO
COPY!
NOW
A unique, integrated business directory on Cement Industry Contact: Subscriber@ASAPPinfoGLOBAL.com Tel: + 91 22 2419 3000 Cement Infobank is a practical database with a wealth of information that includes: •
Database of companies from the cement sector comprising –manufacturers, dealers, suppliers, cement plant machinery, consultants, cement concrete block, RMC, cement products, cement storage / transport and allied industries • Sector overview ®
•
A profile of the companies - the areas of business, key operating units, subsidiaries, etc • Names and complete contact details of key executives • Vital sector data and statistics • Project opportunities – around 200 projects where cement requirement exists
A-303, Navbharat Estate, Zakaria Bunder Road Sewri (West), Mumbai-400015. Tel.: 022-2419 3000. Fax: 022-2417 5734 Email: Subscriber@ASAPPinfoGLOBAL.com
To order online visit : www.ASAPPinfoGLOBAL.com/Subscribe
Highlights India’s Project Database www.ProjectReporter.co.in Published by: ASAPP Info Global Services Pvt Ltd, A-303, Navbharat Estates, Zakaria Bunder Road, Sewri (West), Mumbai-400 015. Tel: 022-24193000. Fax: 022-2417 5734. Editor-in-Chief Pratap Vijay Padode E-mail: Pratap@ASAPPinfoGLOBAL.com Editor@ProjectReporter.co.in Executive Editor Sandeep Sharma* Sandeep@ASAPPinfoGLOBAL.com Subscriber@ASAPPinfoGLOBAL.com Tel.: 022-2419 3000 / 6526 7838 Branch Offices • Delhi: Tel: 011 - 4131 5000 / 4656 1818 • Bangalore: Tel: 080 - 4556 4556 • Pune: Tel: 020 - 2605 2987 / 020-6602 5990 • Chennai: 044 - 4299 1234 Representative Offices Austria, Switzerland & Germany Gunter Schneider info@gsm-international.eu *Responsible for selection of news under the PRB Act. All rights reserved. While all efforts are made to ensure that the information published is correct, PROJECT REPORTER holds no responsibility for any unlikely errors that might have occurred. Printed and Published by Tarun Pal on behalf of ASAPP Info Global Services Pvt Ltd. And Published from A-303, Navbharat Estates, Zakaria Bunder Road, Sewri (West), Mumbai-400 015. Editor : Pratap Vijay Padode. The information on products and projects on offer is being provided for the reference of readers. However, readers are cautioned to make inquiries and take their decisions on purchase or investment after consulting experts on the subject. PROJECT REPORTER holds no responsibility for any decision taken by readers on the basis of information provided herein. Subject to Mumbai Jurisdiction only.
SECTOR
PROJECT SNO.
Amusement Park � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � (41-42) Hyderabad Amusement Park . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41 Chennai Theme Park . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42 Automobile � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(1) Automotive Components� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(31) Aviation/Airport � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � (30, 32, 61-62, 67) Helicopter manufacturing in India. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 Canal/Dam/Irrigation � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(10, 17) Lift irrigation scheme near Kuntogi. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Construction � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(13, 44, 50, 64, 68) Building for Animal Husbandry Department . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Administrative building of MMC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44 Dairy Products � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � (51-52) Defence � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(70) Food Park � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(43) Hospitality � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(45, 46) Luxury Property in Goa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45 Hydro Power � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � (76-77) 3x40 MW Rammam Stage-III hydro-electric project . . . . . . . . . . . . . . . . . . . . . . . . . 77 Industrial Cluster � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(72) Iron & Steel � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(6) Manufacturing� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(7) Material Handling � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(39) Mining � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(28) Power� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � (29, 37-38, 54, 63, 105) 600 MW power unit commissioned at Adilabad . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 400 kV double circuit transmission line contract . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37 R&D Centre � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(33) Railways � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(5, 65) Redevelopment of Chandigarh station. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 Railway over bridge near Burhanpur Lalbag Railway station . . . . . . . . . . . . . . . . . . 65 Real Estate � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � (26, 34-36) multi-storied residential project in Lucknow . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
India Opportunities � � � � � � � � � � � � � � � � � � �Pg 4
Renewable Energy � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(9, 18, 73) 197.40 MW wind power project in Kutch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73
Focus: Roads & Highways Sector � � � � � �Pg 24
Roads/Highways/Bridges � � � � � � � � � (9, 12, 14, 15, 47-49, 58-69, 71, 74-75, 78-92)
Power Statistics � � � � � � � � � � � � � � � � � � � � �Pg 41
Cement concrete road in Bengaluru . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Road Watch� � � � � � � � � � � � � � � � � � � � � � � � �Pg 42 Road Projects � � � � � � � � � � � � � � � � � � � � � � �Pg 43
Construction of Vishrambag to Madhavnagar road section . . . . . . . . . . . . . . . . . . . . 12 Four laning from MP/Maharashtra border to Nagpur I/C . . . . . . . . . . . . . . . . . . . . . . 92 Sewage Treatment � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(40) Shopping Mall� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(24)
PROJECTS ARE CLASSIFIED AS FOLLOWS: Conceptual / Planning Stage (1 to 35)
Contract Award (36 to 59) Project Update / Commissioned Project (60 to 69) Under Implementation Stage (70 to 90)
Smart Cities � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(60) Tourism � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(27) Transport � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � (55-56) RESCO to generate 14 MW of solar power. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55 Rolling stock requirement for Nagpur metro . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56 Urban Development � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �(8, 16, 25)
Realty Projects (91 to 99)
Hubli Dharwad Smart City Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Consultancy Bids (100 to 109)
Food Court at Puri . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
B2B Opportunities (110 to 134)
Water Sector � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � (11, 66)
Equipment Tenders (135 to 148) Industrial Projects (149 to 186)
5.00 lakh ltrs.capacity R.C.C GLSR at Vidhyanagar . . . . . . . . . . . . . . . . . . . . . . . . . 11 16 MLD water treatment plant at Kozhikode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
Project Reporter • 3 • April 1, 2016
INDIA OPPORTUNITIES SECOND UNIT OF SINGARENI THERMAL POWER PROJECT (TPP) TO COMMISSION SOON BHEL has a major contribution in Telangana’s Power Sector, with 85% of the coal-based power stations, amounting to 5,180 MW, having been commissioned by BHEL. The company has successfully synchronized the first unit of 600 MW at Singareni Thermal Power Project (TPP) located in Adilabad district in Telangana as reported earlier. The second unit of 600 MW is also in an advanced stage of construction and commissioning is expected soon.
AIRPORT CALICUT AIRPORT DEVELOPMENT PROJECT
Calicut International Airport, also known as Karipur Airport, is an international airport serving the cities of Kozhikkode and Malappuram in the state of Kerala. The Civil Aviation Minister Ashok Gajapathi Raju while addressing the members of the Calicut Chamber of Commerce and Industry has said that to fast track Calicut airport expansion project at Karipur, the state and the Centre has to work together. The State Government needs to expedite the land acquisition process and carry out a detailed survey of the project requirements. KEMPEGOWDA INTERNATIONAL AIRPORT PROJECT GVK Group is expanding the Kempegowda International Airport at Bangalore in three phases. Phase I included construction of a lounge, retail and concession spaces, and installation of new security checkpoints at the arrival and departure gates. The Phase II included the full expansion of Terminal 1 (T1). Both the phases got completed in 2013. The third phase expansion comprises the construction of Terminal 2, a second runway, and an express terminal building. The second runway and terminal building are likely to be operational by 2020.
POWER BHEL COMMISSIONS FIRST 250 MW POWER GENERATION UNITS AT NABINAGAR TPP Bharat Heavy Electricals Ltd (BHEL) has successfully commissioned the first 250 MW power generation units as part of the 1,000 MW Nabinagar Thermal Power Project. The thermal power plant comprises 4x250 MW, being set up by Bhartiya Rail Bijlee Company Ltd (BRBCL), a joint venture of NTPC Ltd and the Indian Railways. The project is located at Nabinagar in Aurangabad district of Bihar. The execution of the other three units is also in progress.
ODISHA DEMANDS UMPP TO MEET POWER DEMAND The average demand for Power in Odisha ranges between 3,300 MW to 4,100 MW. The state is struggling to meet the soaring demand and is able to manage to procure 2,700 MW at the most from various sources. The state government is pushing the Centre to fast track the process of setting up Ultra Mega Power at Bedabahal in Sundargarh district. The project is to be developed through two SPVs - Odisha Integrated Power Ltd and Odisha Infra Power Ltd. These companies are the subsidiaries of PFC. The state have already contributed `350 crore as sought by the project proponents of the plant. The project progress is quite slow and is likely to hurt the demand-supply situation in the state.
RAILWAYS UDHAMPUR-SRINAGAR-BARAMULLA RAIL LINK (USBRL) PROJECT Konkan Railway Corporation Ltd is implementing the construction of 35-km long Katra Dharam stretch of the Udhampur-SrinagarBaramulla rail link (USBRL) project. The completion is delayed by a year and the new deadline is 2019. The USBRL project is likely to connect the Kashmir Valley with the rest of the country. So far around 50-60 per cent work is completed. The construction has commenced 13 years back. IR EXECUTES GIS MAPPING PILOT PROJECT Indian Railways (IR) is on the verge of completing the digitization of land record comprising area, acquisition details, usages and land plans. The mapping of all fixed Railway assets have also started including land mapping on Geographical Information System (GIS) using ISRO’s Bhuvan Satellite Imagery. The system is integrated with Track Management System (TMS) of Indian Railways. Encroachment on railway land can be easily identified using the system. So far the GIS mapping pilot is being executed on the Delhi division and would be extended to the entire network on successful completion. JICA EXTENDS ODA FOR THE DEDICATED FREIGHT CORRIDOR PROJECT PHASE 1 (III): TRANCHE 3 Japan International Cooperation Agency (JICA) has recently signed an agreement with the Government of India to provide
Project Reporter • 4 • April 1, 2016
India Opportunities 103,664 million Japanese Yen (approx. 6,170 crores) Official Development Assistance (ODA) loan for the Dedicated Freight Corridor Project Phase 1 (III): Tranche 3. The ODA loan’s conditions are very concessional, i.e. 0.1% of interest rate and 40 years of repayment period (including 10 years of grace period). The main feature of the project is the construction of new double track electrified railway lines for the sole use of high speed freight cargo trains as the backbone of Delhi-Mumbai Industrial Corridor (DMIC) development plan. The agreement was signed by Takema SAKAMOTO, Chief Representative, JICA India Office with Mr. S Selvakumar, Joint Secretary, DEA, Ministry of Finance, Government of India in New Delhi. The executing agencies for the project are the Ministry of Railways (MOR) and Dedicated Freight Corridor Corporation of India Limited (DFCCIL). DFFCIL will be responsible exclusively for planning, development and management of the whole DFC railway line, with full administrative, budgetary and technical support by MOR. MOR will be responsible for the procurement of rolling stocks (locomotives), construction of locomotive depot, train operation and maintenance of the rolling stocks. The western Dedicated Freight Corridor being developed by the project runs between Delhi and Mumbai and covers the areas where significant commercial and industrial development is seen, namely Maharashtra and Gujarat, which have several deep sea ports. The project also covers the Delhi Metropolitan area which is one of the largest consumption areas in North India. In this project phase1, a new 950km freight line (Rewari to Vadodara) connecting the major cities in Gujarat, Rajasthan, and Haryana states will be constructed, and high-quality freight locomotives with large-capacity and high-speed will be introduced. This project will become the backbone of DMIC initiative, being developed as the country’s one of the largest integrated industrial areas between Delhi and Mumbai, aimed at promoting direct investment by Indian and foreign companies including Japanese companies. The task of rapid expansion of railway transport capacity in India has become the most important and urgent issue, because the existing railway transport system is fragile to meet the increased demand for passenger and freight traffic resulting from recent rapid economic growth of India.
ROADS/HIGHWAYS/BRIDGES GREATER SOUTHERN PERIPHERAL ROAD PROJECT To promote smooth traffic movement between Manesar and Delhi, a Greater Southern Peripheral Road (GSPR) is planned by HUDA. The proposed road would start from Mehrauli in Delhi and connect NH-8 in Manesar. GSPR is likely to reduce the traffic load on the section of NH-8 passing through Gurgaon. BARAPULLAH ELEVATED CORRIDOR PROJECT Barapullah elevated corridor project phase-III is being planned from Sarai Kale Khan to Mayur Vihar. The project has been sanctioned and is likely to cut the travel time for motorists driving between east and south Delhi to less than an hour on completion. The completion is likely by December, 2017.
GOVERNMENT NOD GIVEN FOR NHAI FUND RAISING PROPOSAL NHAI aims to raise funds up to `55,000 crore to undertake expansion of highways and build new expressways. The road transport ministry has recently accorded nod to this proposal. The ministry has recommended new model named Toll-OperateTransfer under which 75 completed projects of NHAI can be sold to private players for about 15 years and the proceeds can be kept with NHAI. This way the ministry estimates that around `40,000-`50,000 crore upfront revenue can be generated.
TOURISM GTDC TO INVITE TENDERS FOR INFRASTRUCTURE UPGRADATION AT BEACHES The 105-km coastline of Goa is dominated by number of scenic beaches. The Goa government is keen to upgrade the infrastructure on these beaches in three phases. Goa Tourism Development Corporation (GTDC) plans to invite tenders for projects worth `100 crore. The project includes building parking and toilets facilities on 19 most frequently visited beaches.
TRANSPORT AHMEDABAD METRO PROJECT GETS JICA ODA LOAN
The metro rail project for Ahmedabad received a boost when Japan International Cooperation Agency (JICA) signed an agreement recently with the Government of India to provide 82.434 billion Japanese Yen (approx. INR 4870 crore) Official Development Assistance (ODA) loan for the project. The ODA loan’s conditions are very concessional, i.e. 1.4% of interest rate and 30 years of repayment period (including 10 years of grace period). The assistance from JICA will facilitate construction of underground and elevated rail-tracks, electrical, telecommunication and signalling systems and procurement of the trains. The cumulative loan amount provided by JICA for metro projects in India (including Delhi, Chennai, Bengaluru, Kolkata and Mumbai Metro’s) has exceeded 1 trillion Japanese Yen (approximately `59,071 crore). The agreement was signed between Takema SAKAMOTO, Chief Representative, JICA India Office and S. Selvakumar, Joint Secretary, Department of Economic Affairs, Ministry of Finance, Govt. of India at Ministry of Finance. Metro Link Express for Gandhinagar and Ahmedabad
Project Reporter • 5 • April 1, 2016
India Opportunities Company Ltd. (MEGA) is the executing agency for this project which would cover approx. 38 km in Ahmedabad from Motera Stadium to APMC (North-South Corridor) and Thaltej to Vastral Gaam (East-West Corridor). It will cover the central business district area, academic area, residential area and institutional complex area of Ahmedabad Metropolitan Area. The complete commercial operation is expected to start from 2020. RAMBOLL INDIA GETS QUALITY AUDIT ASSIGNMENT FOR RAPID METRO Ramboll India has got the contract from Rapid Metro Rail Gurgaon South Limited (RMGSL) to provide quality audit services for its Phase-II line. As per the contract, Ramboll will undertake the quality audit of the different civil and track structures such as the viaducts, stations and maintenance depot developed for the Phase-II of Rapid Metro. The Phase-II, known as South Extension, spanning across 6.6 kilometres will have five new stations. This phase will run along Golf Course Road and connect the Sikanderpur Rapid Metro station to the station in Sector 55-56. “We are honoured to play a significant role in building Rapid Metro’s Phase-II project. This is the first time RMGSL has engaged a consultant to undertake quality audits of its work which adheres to international standards; this makes the engagement even more special. The project demands a holistic approach and we shall draw on our global expertise to deliver the best solution for Rapid Metro,” said Hukam Singh Chaudhary, Head of Rail Department, Ramboll India. “Quality has been our utmost priority and we ensure that best services are provided to our commuters. With Ramboll as our quality auditors, we reiterate our commitment to provide safe, convenient and international standard mass transit system to our commuters in Gurgaon,” said Rajiv Banga, Chief Executive Officer & Managing Director, Infrastructure Leasing & Financial Services Rail Ltd.
Bhubaneswar has employed an extensive citizen engagement process to guide its journey for transformation to a smarter city. Building upon the input received from the citizens, the overall approach focuses on promoting Smart Growth supported by sound economic development principles; while at the same time, directing investment in initiatives that promote sustainability, inclusiveness and liveability by leveraging technology as an enabler. Based on the citizen feedback received during Round 1 of the engagement initiative, Mobility and Waste Management as Pan-City Smart solutions and Town Centre as Smart District were selected to create an implementable Strategic Plan. Furthermore, building upon the 24 Smart City Features identified by the Government of India’s Smart Cities Mission, Bhubaneswar shaped its approach around the following 7 ‘Smart City Pillars’ to align the citizen’s aspirations and needs with city systems. • Governance- Citizen Participation, Intelligent Government Services • City Planning and Design-Mixed Land Use, Compact Cities • Urban Utilities• Water: Water Supply, Water Management • SWM: Waste Management • Sanitation: Sanitation, Waste water management • Energy : Energy Supply, Energy Source, Energy Efficiency, Underground Electric wires • ICT: IT Connectivity Urban Mobility- Street Design, Public Transport Shelter- Inclusive Housing Economic Development-Economy and Employment Social Development- Identity and Culture, Education, Health, Open Spaces, Safety and Security, Air quality
URBAN DEVELOPMENT BHUBANESWAR SMART CITY PROJECT India proposes to build 100 Smart Cities. The Urban and Development Ministry has recently finalized 20 cities and aims to invest `50,802 crore over a period of five years through a public-private-partnership (PPP) model. The city of Bhubaneswar topped the first list of 20 cities to be developed as Smart Cities. Such cities would not only provide basic infrastructure but offer a good quality of living through smart solutions. The Special Purpose Vehicle (SPV) for the Bhubaneswar smart city would have paid up capital of `250 crore and authorised capital of `500 crore. The equity of the SPV company is being shared by the government of Odisha, Bhubaneswar Municipal Corporation (BMC) and Bhubaneswar Development Authority (BDA) on 45:45:10 basis.
BUDGET OF RS 7,074 CRORE APPROVED FOR GREATER NOIDA Greater Noida Industrial Development Authority board has recently approved a budget of `7,074 crore. The authority has earmarked funds for Night Safari project, Heliport, Land compensation, Gautam Buddha University, Eco Park, Village development and Convention centre.
Project Reporter • 6 • April 1, 2016
* Images used are for illustration purpose only
PROJECTS
CONCEPTUAL / PLANNING STAGE
Conceptual/Planning Stage Sno Organisation
Project Title / Details
Location
Budget*
1
JBM Group
Automotive parts major plans to expand and set up new plants in Karnataka and Tamil Nadu.
Karnataka
300.00
2
Airports Authority of India (AAI)
Plans to construct new integrated terminal building at Guwahati Airport.
Guwahati Assam
3
Delhi International Airport (P) Ltd
DIAL is contemplating plans to construct the fourth runway at the IGI Airport. The completion is targeted by 2020. The draft expansion plan is submitted to the Aviation Secretary.
4
Delhi International Airport (P) Ltd
5
Contacts
Sector
Poonam Gandhi, AM (Corporate Communication), Plot No.9, Institutional Area, Sector 44, Gurgaon-122003, Haryana. T: 0124-4674500, 4674550, F: 4674599, pgandhi@jbm.co.in, corp.communications@jbm.co.in (Nishanth Arya, Executive Director)
Automotive Components
NA
Anil Kumar Sharma, Regional Airport Director, LGBI Airport, Guwahati-781015 Assam, T: 0361-2840223, M: 9435546068, redner@aai.aero, (Jaydeep SIngh Balhara, Airport Director)
Aviation/ Airport
Delhi
NA
Kshitiz Singhal, Manager (Corp Comm), , New Udaan Bhawan, Opp. Terminal-3, Indira Gandhi International Airport, New Delhi-110037. T: 0124-3376000, M: 9999017344, kshitiz.singhal@gmrgroup.in, (I.Prabhakara Rao, CEO)
Aviation/ Airport
DIAL is currently working on a plan to expand Terminal 1 passenger handling capacity from the current 18 million to 30 million per annum. The completion is targeted in four years.
Delhi
NA
Kshitiz Singhal, Manager (Corp Comm), New Udaan Bhawan, Opp. Terminal-3, Indira Gandhi International Airport, New Delhi-110037. T: 0124-3376000, M: 9999017344, kshitiz.singhal@gmrgroup.in, (I.Prabhakara Rao, CEO)
Aviation/ Airport
Textron India Pvt Ltd
Plans to build its single-largest selling helicopter model — Bell 407 — in India. The company is undertaking feasibility study. The facility will be set up by 2018-19. Textron has a development centre in Bengaluru.
Bengaluru Karnataka
NA
Aviation/ Arneeta Vasudeva, Head (Business Airport Development & Communications), 3rd Floor, Corporate One, District Centre, Jasola, New Delhi-110025, Delhi. T: 011-49343100, F: 49343125, avasudeva@textron.com, (Inderjit Sial, President and MD)
6
Pawan Hans Ltd
Pawan Hans is in talks with Airbus to develop a maintenance repair and overhaul unit at its Juhu base.
Mumbai Maharashtra
NA
Sanjay Kumar, General Manager, Juhu Aerodrome, S.V. Road, Vile Parle (West), Mumbai-400056. T: 022-26146211, 26261700, F: 26146926, 26261704, M: 9811311382, gm_wr@pawanhans.co.in, sanjay.kumar@pawanhans.co.in, (B P Sharma, Chairperson)
Aviation/ Airport
7
Minor Irrigation Department
Plans to assign the construction of new lift irrigation scheme near Kuntogi village in Gangavathi taluk and Koppal district.
Koppal District Karnataka
Premananda Kumar, Executive Engineer, M.I.Division., Kushtagi, Koppal district-583277, Karnataka. T: 08536-267054, M: 9901989822, eemidnkst@rediffmail.com, premanandakumar9@gmail.com, (S.C.Jayachandra, Chief Engineer)
Canal/ Dam/ Irrigation
4.80
*Figures are approximate ( `. Crore)
Project Reporter • 8 • April 1, 2016
Conceptual/Planning Stage Sno Organisation
Project Title / Details
Location
Budget*
10.83
Contacts
Narsimha, Superintending Engineer, I & CADD, Prlis, Circle No.2, Nagarkurnool, Mahabubnagar-509001, Telangana, M: 7680072584, 7680072527, se.prlis2015@gmail.com
Sector
Canal/ Dam/ Irrigation
8
Government of Telangana (Irrigation and CAD Dept)
Plans to assign preparation of design, Mahabubnagar Telandrawing and estimates of main canal gana and distributory system including minors/ sub-minors/ field, channels under Venkatadri Reservoir by conducting detailed block level survey for an extant of 236000 acre to identify a minimum net ayacut of 1.29,000 acres under Palamuru Rangareddy Lift Irrigation Scheme.
9
Muzaffarpur Nagar Nigam
Plans to assign the construction of administrative building of Muzaffarpur Municipal Corporation, Muzaffarpur under SPUR programme.
Muzaffarpur Bihar
NA
Ravish Chandra Verma, City ConstrucManager, Muzaffarpur-842001, tion Bihar. T: 0621-2215279, M: 9470488916, mmc-muz-bih@nic.in, (Ramesh Prasad Ranjan, Commissioner)
10
Maharashtra Public Works Department
Plans to assign the construction of proposed office building for Animal Husbandry Department at Satara. The completion is targeted in 18 months.
Satara Maharashtra
NA
M B Waghmare, Executive Engineer, PWD office compound, Powainaka, Satara-415001, Maharashtra. T: 02162-233792-95, satara.ee@mahapwd.com
Construction
11
Airports Authority of India (AAI)
Plans to construct of CISF Barrack at M.P. Airport, Udaipur. The work has not yet started.
Udaipur Rajasthan
4.36
Ravish Kumar, Assistant GM (Civil), Maharana Pratap Airport Dabok, Udaipur-313023, Rajasthan. T: 0294-2655950, M: 9887182848, ravish@aai.aero, (Santosh Kumar)
Construction
12
New Okhla Industrial Development Authority
Plans to construction of underpass at Mamura Chowk (Crossing of Sector 60,62,66,64) Noida.
Noida Uttar Pradesh
NA
B.K Singh, Chief Project (Engineer), Administrative Building, Sector-6, Noida-201301, Uttar Pradesh. T: 0120-2422210, 2422297, M: 8447613001, projectengineerwc7@gmail.com
Construction
13
Gujarat Cooperative Milk Marketing Federation (GCMMF)
Dairy products producer under the Amul brand is contemplating plans to set up a processing unit in the Northeast.
Northeast
200.00
Ashish Mathew, Senior Executive (Projects), PO Box 10, Amul Dairy Road, Anand 388 001, Gujarat. T: 02692-258506, 258507, 258508, 258509, 02742-253881, ashish.mathew@amul.coop, (R S Sodhi, Managing Director)
Dairy Products
14
Patanjali Ayurved Ltd
Plans to add five food parks in various states. Out of this one in Maharashtra and Madhya Pradesh are decided so far.
Maharashtra
NA
Reena Gupta, Company Secretary, Department E-Commerce, D-28 Industrial area, Near Income Tax office, Haridwar-249401, Uttarakhand. T: 01334-227444, 244107, 246737 (Sumedha, Director)
Food Park
15
Pride Group of Hotels
The hotel group plans to add 72 rooms to its Nagpur property. The work has not yet started.
Nagpur Maharashtra
60.00
Arun Nayar, Executive Diretor (Corp Comm), No. 908, Dalamal Tower, 211Yogakshema, Nariman Point, Mumbai, 400021, T: 022-22844051, arun@pridehotel.com, (SP Jain, MD)
Hospitality
16
Navayuga group
The group plans to set up an industrial smart city spread across 6000 acre adjacent to Krishnapatnam port in Nellore district. SPV is likely to be created with the state government and the Japan International Cooperation Agency (JICA) for this project.
Nellore Andhra Pradesh
10000.00 Chinta Sasidhar, MD, Plot No. 379, Road No. 10, Jubilee Hills, Hyderabad - 500033, Andhra Pradesh, T: 040-23339990, F: 040-23337789, nec@navayuga.com
*Figures are approximate ( `. Crore)
Project Reporter • 9 • April 1, 2016
Industrial Cluster
Conceptual/Planning Stage Sno Organisation
Project Title / Details
Location
Jajpur District Odisha
17
Odisha Industrial Infrastructure Development Corporation (IDCO)
The state government has sought final approval for the proposed National Investment and Manufacturing Zone (NIMZ) at Kalinga Nagar in Jajpur district.
18
The Singareni Collieries Company Ltd (SCCL)
Plans to open about 20 new mines in Telangana the next five years with a capex of `4,000 crore. The work is likely to start soon.
19
Cummins India Ltd
Plans investment for the expansion of its research and development centre in India. The completion is targeted by end of 2016.
20
Public Works Department, Indore
Burhanpur Plans to construct of Railway over bridge near Burhanpur Lalbag Railway Madhya Pradesh station on Itarsi Bhusawal broad gauge track dist Burhanpur.
21
Torrent Power Ltd
Kutch The company plans development of District the 197.40 MW wind power project Gujarat across three sites in Kutch and Bhavnagar district. The completion is targeted by March 2017. The contract is signed with a wind turbine generator manufacturing group.
22
Kerala State Electricity Board (KSEB)
KSEB is looking to procure 200 MW power from Grid connected solar Photovoltaic power plants within the state of Kerala on a long term basis.
23
Karnataka Neeravari Nigam Ltd
Bengaluru Plans to assign the construction of Karnataka cement concrete road and drains in SC colonies of Antur Bentur village, Nagavi Tanda, Beladadi Thanda, Kalasapur Thanda, Soratur, Mahalingapura & Hanganakatti. Villages under SCP programme 2015-16 (Package-1).
24
Public Works Department
Plans to assign the construction of Vishrambag to Madhavnagar section as part of the Railway over bridge coming up at L.C. Gate No. 130 on Padmale Sangli Inam-Dhamni Vishrambag Madhavnagar Padmale Road.
Pune Maharashtra
Kerala
Sangli District Maharashtra
Budget*
Contacts
Sector
10000.00 Susanta Kumar Mohanty, CGM (Land) , IDCO Tower, Janpath, Bhubaneswar-22, Odisha. T: 0674-2540820, 2543506, Ext-509, F: 2542956, M: 9437153773, cgmland@idco.in, cmd@idco.in, (Sanjeev Chopra, IAS, Chairman)
Manufacturing
4000.00
B.Kishan Rao, General Manager, (Project Planning), Kothagudem Collieries, Khammam Dist - 507101, Telangana. T: 08744-242301-4, 242602, (N.Sridhar, IAS, Chairman & MD)
Mining
1000.00
Anu Soman, Sr Manager (Corp Comm), Campus Tower A, Level-5, Survey No. 21, Balewadi, Pune411045, Maharashtra T: 020-67067000, anu.soman@cummins.com, (Anant Talaulicar, Chairman)
R&D Centre
12.76
Sunil Malvi, Executive Engineer, Old Palasia, Indore-452001, M: 09826829286, 9424392336, eepwdbriind@gmail.com, (P.K. Shrivastava, Chief Engineer)
Railways
NA
Satyen Kanabar, AGM (Wind & Solar project), Torrent House, Off Ashram Road, Ahmedabad-380009, T: 079-26585090, 25502881-4
Renewable Energy
NA
Suku. R, CE (Renewable Energy and Energy Savings), Vydyuthi Bhavanam, Pattom, Thiruvananthapuram 695004, Kerala. T: 0471-2514424, 2514633, 2447404, M: 9446008007, cmdkseb@kseb.in, (M. Sivasankar IAS, CMD)
Renewable Energy
1.99
Gangappa, Executive Engineer, Division No.1, SLIS Division, Mundaragi, Gadag District-582118, Karnataka. T: 08371-262174, M: 8105140989, knnl@knnlindia.com
Roads/ Highways/ Bridges
20.00
P G Chavan, Executive Engineer, P.W.Division (West), Sangli, At & Post Sangli, Near Circuit House District Sangli-416416, Maharashtra. T: 0233-2375898, M: 9922112517, westsangli.ee@mahapwd.com
Roads/ Highways/ Bridges
*Figures are approximate ( `. Crore)
Project Reporter • 10 • April 1, 2016
Conceptual/Planning Stage Sno Organisation
Project Title / Details
Location
Budget*
Contacts
Sector
25
Maharashtra Public Works Department
Plans to assign the construction of cement concrete road at Prabhag No. 3 & Prabhag No. 4 & Prabhag No 5 Mel Chandrapur District.The completion is targeted in six months.
Chandrapur District Maharashtra
1.37
D K Balpande, Superintending Engineer, Public Works Circle, Civil line, Chandrapur-442401, Maharashtra. T: 07172-255449, M: 7387089229, chandrapur.se@mahapwd.com, chandrapur2.ee@mahapwd.com
Roads/ Highways/ Bridges
26
Meghalaya Public Works Department
Plans to undertake strengthening and widening of Bhoirymbong to Mawlasnai to Sabuda road into Intermediate lane portion 0.00 to10.00th Km under Central Roads Fund CRF in the state of Meghalaya. The completion is targeted in 18 months.
Meghalaya
9.39
L. Passah, Chief Engineer, PWD (R), O/o Chief Engineer (NH), PWD (Roads), Shillong-793001, Meghalaya. T: 0364 2226429 2216, 2506228
Roads/ Highways/ Bridges
27
ARSS Infrastructure Projects Ltd
The company has got a work order from East Coast Railway namely Jarapada-Budhapank with flyover at Talcher Road - 3rd & 4th line; Execution of Earth Work, Minor Bridges & Other Allied works (KM 525.133 to KM 483.047 i.e. 35.5 Km -3rd Line & 42.00 Km-4th line approx. excluding flyover portion at Talcher Road.
Bhubaneswar Odisha
109.27
S. K. Singla, Vice President (Project Head), Plot-no-38, Sector-A, Zone-D, Mancheswar Industrial Estate, Bhubaneswar-751010, Odisha, T: 0674-2588552, 2588554, F: 2585074, (Sunil Agarwal, President and CEO)
Roads/ Highways/ Bridges
28
Government of Telangana
The state government has mooted a proposal to the Centre for upgrading National Highway-65 connecting Vijayawada and Hyderabad cities with an express highway and a high speed bullet train parallel to the highway.
Vijayawada Telangana
NA
K. Bikshapati, Engineer-in-Chief Admn. & QC, Khairatabad-500004, Hyderabad, Telangana, M: 09177445595, bkondai@yahoo.com
Roads/ Highways/ Bridges
29
Forest Department
Establishment of Musical Fountain (10 Mtr Dia) at Botanical Garden, Mini Zoo, Haddo. The completion is targeted in six months. Bids are currently invited.
Haddo Andaman & Nicobar (U.T.)
0.25
30
Nagpur Metro Rail Corporation Ltd
Nagpur The metro rail corporation plans to Maharashtra allow a renewable energy service company to generate about 14 MW of solar power. Solar power can be generated by placing the solar panels on the rooftops, boundary walls, viaducts and vacant lands of the metro project.
NA
R. Anand Kumar, GM (Procurement), Metro House, 28/2, CK Naidu Marg, Anand Nagar, Civil Lines, Nagpur-440001. T: 0712-2554217, anand.kumar@metrorailnagpur.com, www.metrorailnagpur.com, (Brijesh Dixit, Managing Director)
Transport
31
Nagpur Metro Rail Corporation Ltd
The metro rail corporation plans to assign the design, manufacture, supply, testing, commissioning of passenger rolling stock (Electrical Multiple Units) and Training of personnel at Nagpur Metro Rail Project.
Nagpur Maharashtra
NA
R. Anand Kumar, GM (Procurement), Metro House, 28/2, CK Naidu Marg, Anand Nagar, Civil Lines, Nagpur-440001. T: 0712-2554217, anand.kumar@metrorailnagpur.com, www.metrorailnagpur.com, (Brijesh Dixit, Managing Director)
Transport
32
HubballiDharward Municipal Corporation
Plans to assign the preparation of Hubli Dharwad Smart City Plan for 2 Round Smart City Challenges.
Hubli Karnataka
NA
Urban C Kulkarni, Sr Executive Engineer Develop(Project), Sir Siddappa Kambali ment Road, Hubballi Karnataka. T: 0836-2213898, 2213848, 2213899, M: 9448436879, projecthdmc@gmail.com, (C W Shakeel Ahmad, Joint Commissioner)
*Figures are approximate ( `. Crore)
Project Reporter • 11 • April 1, 2016
Naveen Kumar P, IFS, Deputy Tourism Conservator of Forests (Wildlife-I), Haddo, Andaman and Nicobar Islands (UT). T: 03192-232816, M: 9531930397, dcfwl313@gmail.com
Conceptual/Planning Stage Sno Organisation
Project Title / Details
Location
Budget*
Contacts
Sector
33
ICZMP
Plans to assign the construction of Public Convenience, Food Court, Pathway & Parking at Gangadharpur, Puri.
Bhubaneswar Odisha
1.19
Urban Ranjan Kumar Das, Assitant DevelopEngineer, ICZMP, State Project ment Management Unit-Odisha, Plot no. 108, 2nd Floor, Unit-VII, Surya Nagar, Bhubaneswar-751003, Odisha. T: 0674-2397920, 30, M: 7894405839, admin@iczmpodisha.org, (Ajit Pattnaik, Project Director)
34
Karnataka Urban Water Supply and Drainage Board
Plans to assign the construction of 5.00 lakh ltrs. capacity R.C.C GLSR at Vidhyanagar in Madhugiri town and Providing & laying 200 mm Dia DI k-7 Class Pure water Rising main by Tapping 375mm MS Rising main @ Ch 1840 to proposed 5.00LL Capacity GLSR at Vidhyanagar under DC works of Madhugiri Town.
Madhugiri Karnataka
0.54
R.P.Mallik, Chief Engineer, 5th Floor, JalaBhavan, Bannerghatta Road, Bangalore -560029, Karnataka. T: 080-41106504/ 6550, F: 41106504, M: 9480813109, cekwbbng@gmail.com
Water Sector
35
Kerala Water Authority
Plans to design and construction of 16 MLD water treatment plant sump cum pump house supplying laying RWPM CWPM construction of booster station 5ll OHSR 7ll OHSR and connected works.
Kozhikode Kerala
3.10'
Preethi Mol, Superintending Engineer, PH Circle, Kozhikode, Malaparamba-673009, Kerala. T: 0495 -2371046, M: 08547638024, sekwakkd@gmail.com, (Chandramathi, Chief Engineer)
Water Sector
*Figures are approximate ( `. Crore)
DOUBLING OF RANCHI (HATIA)-BONDAMUNDA RAILWAY LINE Doubling of the Ranchi (Hatia) Railway line covering length of 158.5 km is approved at completion cost of `1,921.94 crore. The project is likely to be completed in the next six years during the 12th and 13th Plan period. The Cabinet Committee on Economic Affairs has recently approved this project. Doubling of this line will augment the line capacity of the section and serve freight traffic needs of the upcoming Super Thermal Power Plant at Barh and other Thermal Power Plants like Katni and Baruni. The construction of double line will ease traffic bottlenecks.Ranchi, Gumla and Simdega districts of Jharkhand and Sundargarh district of Odisha will be benefited through this project.
Project Reporter • 12 • April 1, 2016
CONTRACT AWARD
Contract Award Sno Organisation
Project Title / Details
Location
Budget*
Contacts
Sector
36
Tata Motors Ltd
India's largest commercial vehicle manufacturer, has signed a contract to supply 25 Tata Starbus Diesel Series Hybrid Electric Bus with Full Low floor configuration with the Mumbai Metropolitan Region Development Authority (MMRDA).
Mumbai Maharashtra
NA
Minari Shah, Head (Corporate Communications), 1st Floor, Bombay House, Homi Mody Street, Fort, Mumbai-400001, Maharashtra. T: 022-66658282, 66657824, minari@tatamotors.com, (Guenter Butschek, CEO & MD)
Automobile
37
HCC Ltd
Bagged an EPC contract from the JKSPDC for constructing a double lane tunnel of approx.1500m length which shall be the access road to 1856 MW Sawalkote Hydroelectric Power Project in Jammu & Kashmir. The contract involves investigation, designand construction of the tunnel. The project is to be completed in 30 months.
Jammu and Kashmir
NA
Sandeep Sawant, GM (Corp Comm), Hincon House, 11th Floor, 247 Park, Lal Bahadur Shastri Marg, Vikhroli West, Mumbai-400083, Maharashtra, T: 022-25775959, F: 022-25777568, M: 9833992874, sandeep.sawant@ hccindia.com, (Arun Karambelkar, President & CEO Engineering & Construction)
Construction
38
Ashok Leyland
The company has bagged orders from the Indian armed forces for the supply of field artillery tractor, super stallion vehicles and ambulance.
NA
800.00
Alok Saraoji, No.1 Sardar Patel Road, Guindy, Chennai - 600032, T: 044-22206000, F: 044-22206001, alok.saraoji@ashokleyland.com, (Vinod K. Dasari, managing director)
Defence
39
L&T Construction
The Metallurgical & Material Handling business of L&T has bagged an order to execute an Ash Handling Plant (AHP) covering high concentration slurry disposal systems on an engineering, procurement and construction basis from NTPC Ltd for the Tanda Thermal Power Project in Uttar Pradesh.
Ambedkar Nagar District Uttar Pradesh
177.00
Debojyoti Chatterjee, Corporate Communications, L&T House, Second Floor, N.M. Marg, Ballard Estate, Mumbai-400001, Maharashtra. T: 022-66965232, 67525656, 66965271, debojyoti. chatterjee@larsentoubro.com, (S. N. Subrahmanyan, Deputy Managing Director & President)
Material Handling
40
Kalpataru Power Transmission Ltd
Bagged an order from Powergrid Southern Interconnector Transmission System Ltd (A wholly owned subsidiary of PGCIL) for turnkey transmission line project of 765 KV D/C Vemagiri - Chilakaluripeta.
Vemagiri Andhra Pradesh
778.00
Rahul Shah, Company Secretary, Plot No 101, Part III, G.I.D.C Estate, Sector-28, Gandhinagar-382028, Gujarat. T: 079-23214000, rahul. shah@kalpatarupower.com, (Manish Mohnot, Managing Director)
Power
41
Kalpataru Power Transmission Ltd
Bagged an order from PGCIL for Transmission line supply project for Ultra Mega Solar Park transmission system in Andhra Pradesh.
Andhra Pradesh
77.00
Rahul Shah, Company Secretary, Plot No 101, Part III, G.I.D.C Estate, Sector-28, Gandhinagar-382028, Gujarat. T: 079-23214000, rahul. shah@kalpatarupower.com, (Manish Mohnot, Managing Director)
Power
42
Kalpataru Power Transmission Ltd
The company has received an order from PGCIL for power substation project.
Andhra Pradesh
44.00
Rahul Shah, Company Secretary, Plot No 101, Part III, GIDC Estate, Sector-28, Gandhinagar-382028, Gujarat. T: 079-23214000, rahul. shah@kalpatarupower.com, (Manish Mohnot, Managing Director)
Power
43
L&T Construction
Cuddapah The Power Transmission & DistribuAndhra tion business has bagged a major turnkey order has been received from Pradesh PowerGrid Southern Interconnector Transmission System Ltd (a subsidiary of PGCIL) for the construction of a 400 kV double circuit transmission line linking Cuddapah to Madhugiri.
NA
T Madhavadas, Executive VP & Head Power Transmission and Distribution, Post Box No-979, Mount Poonamallee Road, Manapakkam, Chennai-600089, Tamil Nadu. T: 044-22705306, 22705000, madhavadas@lntecc.com, (S. N. Subrahmanyan, Deputy Managing Director & President)
Power
*Figures are approximate ( `. Crore)
Project Reporter • 14 • April 1, 2016
Contract Award Sno Organisation
Project Title / Details
Location
Budget*
Contacts
Sector
NA
T Madhavadas, Executive VP & Head Power Transmission and Distribution, Post Box No-979, Mount Poonamallee Road, Manapakkam, Chennai-600089, Tamil Nadu. T: 044-22705306, 22705000, madhavadas@lntecc.com, (S. N. Subrahmanyan, Deputy Managing Director & President)
Power
153.99
Abdul Majeed, Head Business Development, Door No. 8-2120/113/3/4F, Sanali Info Park, Cyber Towers, Road No. 2, Banjara Hills, Hyderabad-500033, Telangana. T: 040-40409333, abdul_majeed@ ilfsengg.com, www.ilfsengg.com, (Sambhu Nath Mukherjee, CFO)
Power
44
L&T Construction
The Power Transmission & Distribution business has bagged a contract from Power Grid Corporation of India Ltd (PGCIL) for the construction of a 765kV double circuit transmission line at Cuddapah.
45
IL&FS Engineering and Construction Company Ltd
Gujarat The company in JV with Unitech Power Transmission Ltd has received LoA from Power Grid for the works of 765 kV transmission line in the state of Gujarat. The scope of work includes supply contract for tower package TW02 for 765kV D/C Bhujbanaskanta Transmission Line (Part - II) associated with Green Energy Corridors: ISTS - Part C along with contract for construction work line in Gujarat.
46
Kalpataru Power Transmission Ltd
Bagged an order from Powergrid Warora Transmission Ltd (A wholly owned subsidiary of PGCIL) for Transmission line supply project for Gadarwara - Warora transmission line project.
Gadarwara Madhya Pradesh
353.00
Rahul Shah, Company Secretary, Plot No 101, Part III, G.I.D.C Estate, Sector-28, Gandhinagar-382028, Gujarat. T: 079-23214000, rahul.shah@kalpatarupower.com, (Manish Mohnot, Managing Director)
Power
47
JMC Projects (India) Ltd
Bagged a building project in Bangalore.
Bangalore Karnataka
62.00
Gunja Shrinivas, DGM (Business Development), 6th Floor, Kalpatru Synergy, Santacruz (East) Mumbai400055, Maharashtra, India, T: 022-30051500, M: 9320106266, gshrinivas@jmcprojects.com, (S K Tripathi, CEO & Dy. Managing Director)
Real Estate
48
L&T Construction
The Buildings & Factories business of L&T has bagged turnkey order from a leading developer in Mumbai for the construction of a multi-storied residential building and retail space. The scope involves civil, structural, mechanical, electrical, plumbing and finishes.
Mumbai Maharashtra
NA
Vinod Chacko, Head (Corporate Communication), Mount Poonamallee Road, Manapakkam, P.B.No.979, Chennai-600089, Tamil Nadu. T: 044-22526000, M: 9841416233, vinodchacko@lntecc.com, (S. N. Subrahmanyan, Deputy Managing Director & President)
Real Estate
49
L&T Construction
A major turnkey high rise residential project has been bagged from a leading developer in Mumbai. The scope involves civil, structural, mechanical, electrical, plumbing and finishing works for six towers each with 55 to 60 floors.
Mumbai Maharashtra
2018.00
Vinod Chacko, Head (Corporate Communication), Mount Poonamallee Road, Manapakkam, P.B.No.979, Chennai-600089, Tamil Nadu. T: 044-22526000, M: 9841416233, vinodchacko@lntecc.com, (S. N. Subrahmanyan, Deputy Managing Director & President)
Real Estate
50
L&T Construction
The Buildings & Factories business has bagged an order from UP Avas Vikas Parisad for the engineering, procurement and construction of a multi-storied residential project in Lucknow. The scope involves civil, structural, mechanical, electrical, plumbing and finishes.
Lucknow Uttar Pradesh
NA
Vinod Chacko, Head (Corporate Communication), Mount Poonamallee Road, Manapakkam, P.B.No.979, Chennai-600089, Tamil Nadu. T: 044-22526000, M: 9841416233, vinodchacko@lntecc.com, (S. N. Subrahmanyan, Deputy Managing Director & President)
Real Estate
Cuddapah Andhra Pradesh
*Figures are approximate ( `. Crore)
Project Reporter • 15 • April 1, 2016
Contract Award Sno Organisation
Project Title / Details
Location
51
Suzlon Energy Ltd
52
Janardhan Wind Energy
`5.06 per kwH in the NTPC reverse
53
Maharashtra Seamless Ltd
54
Budget*
Contacts
Sector
Bagged 60 MW solar power project at `5.07 per kwH in the NTPC reverse e-auction.
Rajasthan
NA
Ishwar Mangal, Chief Sales Officer, Fortune 2000, A1, 1st Floor, A wing, G Block, BKC, Bandra (E), Mumbai-400051, T: 022-61843700
Renewable Energy
Bagged 20 MW solar power project at
Rajasthan
NA
Yogesh Bangur, Director, 7, Munshi Premchand Sarani, Hastings, Kolkata-700022, T: 033-22230018
Renewable Energy
Bagged 20 MW solar power project at `5.07 per kwH in the NTPC reverse e-auction.
Rajasthan
NA
D C Gupta, VP & CS, Plot No 30, Institutional, Sector-44, Gurgaon - 122001, T: 0124-2574325 4624000, dcgupta@mahaseam.com
Renewable Energy
Sadbhav Infrastructure Project Ltd
The company has been declared as the lowest bidder for four laning of about 43 km of Rampur-Kathgodam section of NH 87 (New NH 9) in Uttar Pradesh. The project is awarded under NH Development Project (NHDP) hybrid annuity mode.
Rampur Uttar Pradesh
NA
Parul Shah, GM (BD), Opp.Law Garden Police Chowki,Ellisbridge, Ahmedabad-380006. T: 079- 26463384, M: 09909960364, parul.shah@sadbhav.co.in
Roads/ Highways/ Bridges
55
Sadbhav Infrastructure Project Ltd
The company has been declared as the lowest bidder for widening of another about 50 km stretch of the Rampur-Kathgodam section of NH-87 (New NH 9,109) in Uttarakhand. The project is awarded under NHDP hybrid annuity mode.
Rampur Uttarakhand
NA
Parul Shah, GM (BD), Opp.Law Garden Police Chowki,Ellisbridge, Ahmedabad-380006. T: 079- 26463384, M: 09909960364, parul.shah@sadbhav.co.in
Roads/ Highways/ Bridges
56
UEM India Pvt Ltd
Bagged a contract for the construction Sahibganj Jharkhand of two sewage treatment plants at Sahibganj from JUIDCO. Both the plants will be based on sequencing batch reactor technology, with 5 million and 7 million litre per day capacities. The contract also includes construction of a 55 kilometre sewerage network and seven pumping stations and covers 10 years of operation and maintenance services.
132.60
Neeraj Shrivastava, President, 2nd & 3rd Floor, Tower-B, A-1, Windsor IT Park, Sector-125, Noida-201301, Uttar Pradesh. T: 0120-3817015, 3817000/1/2, F: 3817005, neeraj@uemgroup.com, uemindia@uemgroup.com
Sewage Treatment
57
JMC Projects India Ltd
Baggged a Retail Mall project in Bangalore from Mantri Developers.
Bangalore Karnataka
235.00
Gunja Shrinivas, DGM (Business Development), 6th Floor, Kalpatru Synergy, Santacruz (East) Mumbai400055, Maharashtra, India, T: 022-30051500, M: 9320106266, gshrinivas@jmcprojects.com, (S K Tripathi, CEO & Dy. Managing Director)
Shopping Mall
58
Sterlite Technologies
The company has bagged Gandhinagar smart city project. The contract entails creating a Wi-Fi city, with applications like smart parking and lighting.
Gandhinagar Gujarat
30-40
Manish Ingole, Manager (Corp Comm), 3rd Floor, IFFCO Tower, Plot No. 3, Sector 29, Gurgaon-122001, Haryana. T: 0124-6146000, communications@sterlite.com, manish.ingole@sterlite.com, (Anand Agarwal, CEO)
Smart Cities
59
JMC Projects India Ltd
Bagged an order from Naya Raipur Development Authority for Area infrastructure development project.
Naya Raipur Chhattisgarh
169.00
Gunja Shrinivas, DGM (Business Development), 6th Floor, Kalpatru Synergy, Santacruz (East) Mumbai400055, Maharashtra, India, T: 022-30051500, M: 9320106266, gshrinivas@jmcprojects.com, (S K Tripathi, CEO & Dy. Managing Director)
Urban Development
e-auction.
*Figures are approximate ( `. Crore)
Project Reporter • 16 • April 1, 2016
Project Update/Commissioned Projects Sno Organisation
Project Title / Details
Location
Budget*
Contacts
Sector
60
Wonderla Holidays Ltd
Kochi based company plans to build Chennai theme park by 2018. The work is likely to start soon.
Chennai Tamil Nadu
350.00
Bimalendu Tarafdar, Head Marketing, 28th km, Mysore Road, Bangalore-562109, Karnataka. T: 080-22010333-322, mail.blr@wonderla.com, (Arun K Chittilappilly, MD)
Amusement Park
61
Wonderla Holidays Ltd
Kochi based company is all set to open its Hyderabad amusement park spread over 50 acre shortly.
Hyderabad Telangana
250.00
Bimalendu Tarafdar, Head (Marketing), 28th km, Mysore Road, Bangalore-562109, Karnataka. T: 080-22010333-322, mail.blr@wonderla.com, (Arun K Chittilappilly, MD)
Amusement Park
62
Pride Group of Hotels
The group plans to come up with a luxury property in Goa. Land parcel already acquired.
Goa
250.00
Arun Nayar, Executive Diretor (Corp Comm), No. 908, Dalamal Tower, 211Yogakshema, Nariman Point, Mumbai, 400021, T: 022-22844051, arun@pridehotel.com, (SP Jain, MD)
Hospitality
63
BHEL
The company has commissioned second 40 MW hydropower generating unit at the Teesta low dam hydro electric project (HEP) stage-IV in West Bengal. A run-of-the-river Greenfield project located in Darjeeling district of West Bengal, Teesta HEP is being set up by National Hydroelectric Power Corporation (NHPC), on the River Teesta. The remaining two units of the project are also in advanced stages of execution. The order for the electrical & mechanical (E&M) work of four units of 40 MW each was awarded to BHEL.
Darjeeling district West Bengal
NA
Rohit Singh, DGM-Corp Comm, BHEL House, Siri Fort, New Delhi-110049. T: 011-23365669, 23742017-20, F: 26493021, M: 9910997301, bhelrohit@gmail.com, (Atal Saraya, Director-Power)
Hydro Power
64
Kanti Bijlee Utpadan Nigam Ltd
The joint venture company of NTPC and Bihar State Power Generation Company Ltd has successfully synchronized the fourth unit of 195-MW Muzaffarpur Thermal Power Station (MTPS) with the national grid.
Bihar
NA
R.K Sinha, CEO, Kanti Thermal, Distt - Muzaffarpur - 843130 Bihar, T: 06223-267310, F: 06223-267322, 267362, 267310
Power
65
BHEL
The company has recently commissioned a 600 MW coal based unit at Singareni Thermal Power Project in Adilabad district of Telangana.
Adilabad District Telangana
NA
Rohit Singh, DGM-Corp Comm, BHEL House, Siri Fort, New Delhi - 110049. T: 011-23365669, 23742017- 20, F: 26493021, M: 9910997301, bhelrohit@gmail.com (Atul Sobti, CMD)
Power
66
Indian Railway Station Development Corporation Ltd
IRSDCL is assigned the task of redeveloping the following stations: 1) Chandigarh 2) Anand Vihar 3) Gandhinagar 4) Habibganj - Bhopal 5) Shivaji Nagar - Pune 6) SAS Nagar 7) Mohali and 8) Surat. So far the RFQ for Anand Vihar and Bijwasan stations have been opened and Letter of intent issued for Habibganj project.
Multiple
NA
Parag Verma, COO, 4th, Floor, Palika Bhawan, Sector XIII, R.K.Puram, New Delhi - 110066, Delhi. T: 011-24672718, 2467219, 24672723, F: 24672720, parag.verma@irsdc.com, (S.K Lohia, Chief Executive Officer)
Railways
*Figures are approximate ( `. Crore)
Project Reporter • 18 • April 1, 2016
Project Update/Commissioned Projects Sno Organisation
Project Title / Details
Location
Budget*
Contacts
Sector
Vijayawada Andhra Pradesh
1700.00
T. Suresh Kumar, Project Director, Plot No. 21, Teachers Colony, Gurunanak Nagar Road, Vijayawada-520008, Andhra Pradesh. T: 0866-2483910, 2484620, M: 9848020905, vij@nhai.org, nhaivij@gmail.com
Roads/ Highways/ Bridges
67
National Highways Authority of India
Six laning of Vijayawada to Gundugolanu Section of NH-5 is being implemented by Vijayawada-Gundugolanu Road Project Pvt Ltd. from Km 1076.48 to 1022.48 including 6-lane Hanuman Junction bypass (length-6.72 km) and 4-lane Vijayawada by pass (Length-47.88 km) (Total Length: 103.59 Km ) in the state of Andhra Pradesh under NHDP Phase V to be executed in BOT (Toll) mode on DBFOT basis. The work has not yet started due to funding issues at the concessionaire end. The completion is targeted by February 2017.
68
Kerala Roads and Bridges Development Corporation (RBDCK)
Kochi Kerala The construction of 620-metre Palarivattom flyover is in delay mode. The flyover starts in front of the Spices Board office on the national highway and ends near SBI office. So far only 80% of the work is completed.
72.00
Thankachan M.T, Additional (GM), 2nd Floor, Preethi Building, M.V Road,Palarivattam, Kochi-682025, M: 9447134952, thankachanmt@gmail.com, (Mohammed Hanish, MD)
Roads/ Highways/ Bridges
69
National Highways Authority of India
Four laning of Krishnagar to Baharampore Section of NH-34 is being implemented by SEW Infrastructure Ltd. from Km. 115.000 to Km. 193.000 in the state of West Bengal under NHDP Phase-III on DBFOT (Annuity) basis (Package No. NHDP-III/BOT/ WB/02). The completion is targeted by February 2017.
Baharampore West Bengal
702.16
Ajit Kumar Singh, Project Director, P.O. & Vill.- Bhatjangla, Krishnagar, Dist.- Nadia-741102, T: 03472-271713, M: 9434208662, krishnagar@nhai.org
Roads/ Highways/ Bridges
*Figures are approximate ( `. Crore)
DOUBLING OF KIUL-GAYA RAILWAY LINE The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Narendra Modi has recently approved doubling of Kiul-Gaya Railway line project covering length of 124 km with a completion cost of `1,354.22 crore. Doubling of this line will greatly ease the ever increasing freight traffic between these sections. The project is likely to be completed by 2019-20.Lakhisarai, Sheikhpura, Nawadah and Gaya districts of Bihar will be benefited through this project.
Project Reporter • 19 • April 1, 2016
Project Under Implementation Sno Organisation
Project Title / Details
Location
Budget*
Contacts
Sector
Ashish Mathew, Senior Executive (Projects), PO Box 10, Amul Dairy Road, Anand 388 001, Gujarat. T: 02692-258506, 258507, 258508, 258509, 02742-253881, F: 240208, ashish.mathew@amul.coop, (R S Sodhi, Managing Director)
Dairy Products
Rohit Singh, DGM-Corp Comm, BHEL House, Siri Fort, New Delhi-110049. T: 011-23365669, 23742017- 20, F: 26493021, M: 9910997301, bhelrohit@gmail. com, (Atal Saraya, Director-Power
Hydro Power
70
Gujarat Cooperative Milk Marketing Federation (GCMMF)
Dairy products producer under the Amul brand is setting up two processing units in Kanpur and Lucknow. This would be ready in 6 months.
Uttar Pradesh
71
BHEL
The company is executing the Run of the River 3x40 MW Rammam Stage-III hydro-electric project of NTPC. The project is located approximately 150 Km from Bagdogra / Siliguri in Distt. Darjeeling.
Darjeeling district West Bengal
72
SAIL
The company is undertaking expansion of Bhilai Steel Plant targeting a capacity of 7 MTPA capacity after expansion. The completion is targeted by December, 2016.
Durg District Chhattisgarh
Iron & 17266.00 1) Vijay Mairal, DGM (PR), Bhilai Steel Steel Plant, Bhilai - 490001, Chhattisgarh. T: 0788-2223587, vijaymairal@sail-bhilaisteel.com, 2) Rakesh Kumar Singhal, GM (CAD) & Chief of CC, T: 011-24367211, 24367285, M: 9910055630, rksh.singhal@gmail.com
73
Odisha Power Generation Corporation Ltd (OPGCL)
The company is operating a coal power plant of capacity 2x210 MW (Unit1 and 2) at Banharpali Ib Thermal Power Station (ITPS) in Jharsuguda district. The company is expanding its power project of 2x660 MW (Unit 3 and 4). BHEL is the main plant contractor. BGR Energy Systems is the balance of plant contractor. The expansion project is in advanced stage of construction.
Jharsuguda District Odisha
11547.00 Ron Mcparland, ED (Construction unit 3 & 4), Ib Thermal, Power Station, Banharpali, DistJharsuguda, Odisha - 768234, T: 06645-222212, 289317, 0674-2303765, (Indranil Dutta, Managing Director)
74
National Highways Authority of India
Chhapra Four-laning of Chhapra to Hazipur Section of NH-19 is being implement- Bihar ed by Madhucon Projects Ltd. from km 143.200 to km 207.200 in the state of Bihar under NHDP III on DBFOT annuity basis. The completion is targeted by Dec 2016. So far around 52.7 per cent work is completed.
75
Public Works Department
Construction of Foot Over Bridge for Pedestrians across Nelson Mandela Marg (Road No. 17) near JNU Campus (in front of DLF mall) Delhi.
Delhi
76
National Highways Authority of India
Four laning of Chenani to Nashri Section of NH-1A is being implemented by Chenani Nashri Tunnelway Ltd. from km 89.00 to 130.00 (New Alignment) including 9 km long tunnel (2 lane) with parallel escape tunnel on BOT (Annuity) basis, in DBFOT pattern in the state of Jammu and Kashmir, (Package No-NHDP/ Phase-II/BOT/V/J&K). So far around 83.96 per cent of work is completed. The completion is targeted by May 2016.
Udhampur district Jammu and Kashmir
400.00
NA
812.50
3.82
2519.00
*Figures are approximate ( `. Crore)
Project Reporter • 21 • April 1, 2016
Col. Pranay Kumar, Project Director, 2nd Floor, Sharma House, Ramashish Chowk, Hajipur-844101, Bihar. T: 06224-274255, nhaihajipur@gmail.com
Power
Roads/ Highways/ Bridges
Roads/ S.K Rampal, Chief Engineer, MSO Highways/ Building, Police Head Quarter, New Delhi, 110002, T: 011-23317405, Bridges cepwddelhimzm1@gmail.com M T Attarde, Project Director, H.No. 315/1, 2nd Floor Channi Himmat Jammu, Jammu & Kashmir. T: 0191-2467491-92, 2467505, M: 9797577005, piujammu@gmail.com
Roads/ Highways/ Bridges
Project Under Implementation Sno Organisation
Project Title / Details
Location
Budget*
Contacts
Sector
Arvind Pandey, Nodal Officer (Projects), SHAJ, Deen Dayal Nagar, Booty Road, Ranchi-834008, Jharkhand, M: 9431190881, membertechnical.shaj@gmail.com
Roads/ Highways/ Bridges
77
State Highways Authority Of Jharkhand
Valecha Engineering is implementing upgradation of Ghaghra-Netarhat Road project covering length of 54.3 km in Jharkhand. The completion is targeted in 2017.
Jharkhand
112.00
78
National Highways Authority of India
Four-laning of a 257-km stretch of National Highway 50 near Kudligi bypass is likely to start soon.
Belgaum District Karnataka
1860.00
S. P. Somashekar, Project Director, J.M.I.T. Campus, NH-4 (Km 201) Chitradurga-577502, Karnataka. T: 08194-223344, 221929
Roads/ Highways/ Bridges
79
National Highways Authority of India
Four laning of Goa / Karnataka border to Kundapur section of NH-17 is being implemented by IRB Westcoast Tollway Pvt Ltd. from km 93.700 to km 283.300 in the state of Karnataka under NHDP phase IV on Design, Build, Operate, Transfer (DBFOT) toll basis. The completion is targeted by Dec 2017. So far around 33-35 per cent of the work is completed.
Karnataka
1655.01
Z. Samson Vijay Kumar, Project Director, NHAI, Mangalore, Karnataka. T: 08244-254499, M: 9686289595, man@nhai.org
Roads/ Highways/ Bridges
80
National Highways Authority of India
Four laning of Maharastra / Karnataka Border-Sangareddy Section of NH-9 is being implemented by L&T Infrasructure Developement Projects Ltd. from km 348.800 to km 493.00 of NH-9) in the states of Karnataka and Andhra Pradesh to be executed as BOT (Toll) on DBFOT basis under NHDP-phase-III. The completion is targeted by September 2016.
Karnataka
1544.18
Roads/ PS Dodamani, Project Director, PD-PIU (Project Implementation Unit) Highways/ Bridges Plot no#-65, Kothari Layout, Venkatesh Nagar, Gulbarga-585103, Karnataka. T: 08472-253756, M: 9686495934, piugulbarga@gmal.com, piugulbarga@nhai.org
81
National Highways Authority of India
Six laning of Vadakkencherry to Thrissur Section of NH-47 is being implemented by Thrissur Expressway Ltd. from km 240 to Km 270 in the State of Kerala (Contract Package: NS2/BOT/KL-03 to be executed as BOT (Toll) on DBFOT pattern under NHDP phase-II. So far around 22 per cent of the work is completed. The entire project completion is targeted by March 2017.
Palakkad district Kerala
910.28
C. T. Abraham, Project Director, Chandranagar, Palakkad, Kerala. T: 0491-2573790, M: 9895955844, nhaipalakkad@gmail.com, cochinnhai@gmail.com
Roads/ Highways/ Bridges
82
National Highways Authority of India
Four laning of Solapur-Maharashtra/ Karnataka border section of NH-9 is being implemented by Coastal & SREI from km 249.000 to km 348.800 (Design length 100.060 km) in the state of Maharashtra on DBFOT basis under NHDP phase-III. The completion is targeted by July 2017. As of now around 35 per cent of the work is completed.
Solapur Maharashtra
923.04
B. B. Ikhe, Project Director, NHAI, Solapur-413003, Jharkhand. T: 0217-2303379, M: 8805011173, solapur@nhai.org
Roads/ Highways/ Bridges
83
National Highways Authority of India
Four laning of Khed to Sinnar Section of NH-50 is being implemented by Khed Sinnar Expressway Ltd from Km. 42+000 to 177+000 (Design Length - 137.946 Km) under NHDP Phase IV in the state of Maharashtra on DBFOT basis. The completion is targeted by August 2017. So far around 67 per cent of the work is completed.
Maharashtra
1348.20
P G. Khodaskar, Project Director, NHAI, Nashik, Maharashtra. T: 0253-2372800, M: 9561709333, nashik@nhai.org
Roads/ Highways/ Bridges
*Figures are approximate ( `. Crore)
Project Reporter • 22 • April 1, 2016
Project Under Implementation Sno Organisation
Project Title / Details
Location
Budget*
84
National Highways Authority of India
Nagpur Four laning from MP/Maharashtra border to Nagpur I/C Kamptee Kanoon Maharashtra and Nagpur bypass is being implemented by CEG Ltd from km 689 to km 723 on BOT basis under NHDP Phase II. So far around 84 per cent of the work is completed and the rest is targeted by December 2017.
1900.00
85
Tamil Nadu Highways And Minor Ports Department
SPL Infrastructure is the contractor Perambalur who is implementing two-laning with Tamil Nadu paved shoulders of Perambalur-PeraliKunnam-Ariyalur-Keelappalur-Thiruvayaru-Kandiyur-Thanjavur section of NH 226 E covering length 66.2 km. The project is likely to complete by 2017.
NA
86
Greater Chennai Corporation
The corporation has has resumed work along Marina Loop Road. The project was delayed earlier due to environmental concerns. The Corporation has decided to construct the road and stormwater drain and all the other elements of the original proposals are left out.
Chennai Tamil Nadu
40.00
87
National Highways Authority of India
Six laning of Walajahpet to Poonamallee Section, NH-4 is being implemented by ESSEL Infra Projects Ltd. from Km. 106.800 to Km. 13.800 in the state of Tamil Nadu on DBFOT basis under NHDP Phase-V. The completion is targeted by March 2017.
Walajahpet Tamil Nadu
88
National Highways Authority of India
Six laning of Krishnagiri to Walajhapet Section is being implemented by Larsen & Toubro Ltd from Km 0.00 to Km 148.3 in state of Tamil Nadu on BOT basis under NHDP Phase V. The completion is targeted by December 2016. So far around 96 per cent of the work is completed.
89
National Highways Authority of India
90
National Highways Authority of India
Contacts
Shri Ram Mishra, Project Director, Bunglow No. 2, Shubhankar Apptt., Plot No. 159, Ambazari Hill Top, Ramnagar, Nagpur – 440033, Maharashtra. T: 0712-2249316, M: 9545556488, nag@nhai.org
Sector
Roads/ Highways/ Bridges
G. Thangamuthu, Chief Engineer (H), Roads/ Highways/ National Highways, HRS Campus, Bridges 76 Sardar Patel Road, Guindy, Chennai-600025, 044-22355701, 22350979, tncenh@gmial.com
B.V Babu, Executive Engineer, Special Project Dept, Ripon Building, Chennai-600003, Tamil Nadu. M: 9445190852, bvenkatesh@gmail.com, (Saidai Duraisamy, Mayor)
Roads/ Highways/ Bridges
1548.61
T.Parvateesam, Project Director, 259/1, Salem Main Road, Near KAKC Petrol Bunk, Krishnagiri-635001 Tamil Nadu. T: 04343-234250, M: 9442275834, kri@nhai.org, nhaikrishnagiri@gmail.com
Roads/ Highways/ Bridges
Krishnagiri Tamil Nadu
1250.00
T. Parvateesam, DGM (T), 259/1, Salem Main Road, Near KAKC Petrol Bunk, Krishnagiri-635001, Tamil nadu. T: 04343-234250, M: 9442275834, kri@nhai.org, nhaikrishnagiri@gmail.com
Roads/ Highways/ Bridges
Four laning of Raiganj to Dalkhola Section of NH-34 is implemented by Raiganj Dalkhola Highways Ltd. from Km 398.000 to Km 452.750 in the state of West Bengal under NHDP Phase-III on DBFOT (Toll) basis. The completion is targeted by July 2017. So far only 9 per cent of the work is completed.
Raiganj West Bengal
580.00
Dinesh Kr. Hansari, Project Director, Project Director, NHAI, Mangalbari, West Bengal. T: 03512-260630, M: 9735953686, malda@nhai.org
Roads/ Highways/ Bridges
Six laning of Barwa Adda to Panagarh section of NH-2 is being implemented by Barwa Adda Expressway Ltd. from Km.398.240 to Km.521.120 including Panagarh Bypass in the states of Jharkhand & West Bengal under NHDP Phase-V on BOT (Toll) on DBFOT pattern. The completion is targeted by September 2016. So far around 44 per cent of the work is completed.
West Bengal
1665.00
A. Handique, Project Director, PIU-Durgapur, NHAI Complex, Sector - 2(A), Bidhannagar. Durgapur-713212 , West Bengal. T: 0343-2535766, 2534815, dur@nhai.org, nhaipiudgp@yahoo.com
Roads/ Highways/ Bridges
*Figures are approximate ( `. Crore)
Project Reporter • 23 • April 1, 2016
Focus: Roads & Highways Sector
RISING AGAIN
T
he road sector in India seems to be on the revival path buzzing with lots of activity at the policy level and on the ground. Prime Minister Narendra Modi has recently launched ‘SETU BHARATAM’ PROGRAMME – an initiative to make National Highways free of railway level crossings by 2019. Another important programme ‘BHARATMALA’ is about to be launched with the aim to improve road connectivity to coastal/ border, backward, religious and tourist destinations. The overall growth of the economy very much depends on the connectivity provided by roads, bridges and highways spread across the length and breadth of the country. The sector is getting its due attention under the dynamic leadership of Prime Minister Modi. Under Special Accelerated Road Development Programme for the North East Region (SARDP-NE), efforts are being made to provide robust road connectivity to the North Eastern region. Hilly areas like Himachal Pradesh and Uttarkhand are receiving due attention from the Road Ministry. Better connectivity is being targeted for religious destinations like Char-Dham (Kedarnath, Badrinath, Yamunothri & Gangothri in Uttarakhand). The Centre is keen to spend around `50,000 crore on the construction and upgradation of National Highways including major bridges in the state of Bihar. Some of the recent announcements and updates are provided below: BHARATMALA PROJECT TO IMPROVE ROAD NETWORK ACROSS THE COUNTRY The Minister of State for Road Transport & Highways, Pon. Radhakrishnan has recently informed the Lok Sabha
about the Bharatmala Pariyojana which is yet to be formally launched. The road ministry has taken up detailed review of National Highways (NHs) network. The programme aims to improve road connectivity to coastal / border areas, backward areas, religious places, tourist places through construction / rehabilitation / widening of about 1,500 major bridges and 200 Railway Over Bridges (ROBs) / Railway Under Bridges (RUBs) on NHs, improvement of newly declared NHs providing connectivity to District Head Quarters, Connectivity Improvement Program for Char-Dham (Kedarnath, Badrinath, Yamunothri & Gangothri in Uttarakhand) under proposed Bharatmala Pariyojana. The Ministry has assigned the tasks of preparation of detailed project reports (DPRs) for about 17,200 km length of roads and about 205 ROBs / RUBs to various agencies in anticipation of approval of the programme; besides, the Ministry has invited bids for preparation of DPRs for about 1,500 major bridges on NHs. DELHI-JAIPUR HIGHWAY PROJECT UPDATE The Minister of State for Road Transport & Highways, Pon. Radhakrishnan has recently informed the Lok Sabha. The status of work on the Delhi-Jaipur Highway (NH-8) is as follows: • Total 93 structures (Flyovers/VUP/PUP) have been proposed on six laning of Delhi- Jaipur Project which is on BOT mode. • Out of the 93 structures, 9 structures have been deleted & 17 structures have been delinked due to non availability
Project Reporter • 24 • April 1, 2016
Focus: Roads & Highways Sector of land. Construction of the 17 delinked structures envisaged in the project for smooth flow of traffic depends upon availability of encumbrance free land. • Out of the balance 67 structures, 61 structures have been completed and 5 structures are targeted to be completed by June 2016 and one flyover (at Hero Honda Chowk) is targeted to be completed by May 2017. A budgetary provision of Rs. 53.90 crore has been kept during the financial year 2015-16 for construction of flyover at Hero Honda Chowk on EPC mode. After construction of flyover at Hero Honda Chowk, congestion on the project highway is likely to be decreased. Regarding the Delhi-Jaipur Expressway, feasibility study is in progress. In view of high cost of land acquisition, innovative financial options are being explored GOVERNMENT GEARS UP TO IMPROVE ROAD CONNECTIVITY IN NORTH EASTERN REGION To improve and provide better connectivity to the North East region, the Government of India has taken up various road improvement projects under Special Accelerated Road Development Programme for North East (SARDP-NE). National Highways & Infrastructure Development Corporation Ltd is set up to fast track road/highways project in North East and augment the capacity of the agencies involved in the development and maintenance of NH in the Region. Japan International Cooperation Agency (JICA) has pledged ODA loan of 96,457 million JPY (Yen) in two tranches for widening and upgradation to 2-Lane with paved shoulder and geometric improvements of the following National Highway (NH) projects: (i) NH-54 from Km 8.00 to Km 380.00 in the state of Mizoram. (ii) NH-51 Km. 85.00 to 95.00 and Km. 101.00 to 145.00 in the state of Meghalaya. Interest rates on the loan for construction works & procurement of goods & services are 1.4% per annum and for consulting services is 0.01%. Re-payment of ‘principal’ will be made in 20 years after the disbursement period of 10 years. GOVERNMENT LAUNCHES SETU BHARATAM PROGRAMME The Government of India has recently launched the Setu Bharatam programme for building bridges for safe and seamless travel on National Highways. The programme aims to make all National Highways free of railway level crossings by 2019. This is being done to prevent the frequent accidents and loss of lives at level crossings. As part of this programme, 208 Railway over Bridges (ROB)/Railway under Bridges (RUB) will be built at the level crossings at a cost of `20,800 crore as part of the programme. The details of 208 ROBs are as follows: Andhra Pradesh – 33, Assam – 12, Bihar – 20, Chhattisgarh – 5, Gujarat – 8, Haryana
– 10, Himachal Pradesh – 5, Jharkhand – 11, Karnataka – 17, Kerala – 4, Madhya Pradesh -6, Maharashtra – 12, Odisha – 4, Punjab – 10, Rajasthan – 9, Tamil Nadu – 9, Uttarakhand – 2, Uttar Pradesh – 9, West Bengal – 22. Detailed Project Reports have already been received for 73 ROBs and of these 64 ROBs are likely to be sanctioned with an estimated cost of `5600 crore soon. In addition to this, about 1500 old and worn down bridges will also be improved by replacement/widening/strengthening in a phased manner at a cost of about Rs. 30,000 crore. The Ministry has already invited bids for appointing consultancy for preparing Detailed Project Report for this. CENTRE APPROVES FOUR LANING OF RAMPURKATHGODAM SECTION The Centre has approved the four laning of RampurKathgodam section of NH-87 at a total project cost of `1,628.76 Cr. under NHDP-III for which bids have been invited. Forest Clearance has been accorded by Ministry of Environment & Forest (MOEF) and land acquisition notification under section 3(D) of NH Act 1956 has been published. CENTRE APPROVES FOUR LANING OF NAGINAKASHIPUR SECTION The Centre has approved the four laning of NaginaKashipur section of NH-74 is at a total project cost of `2,535.54 crore under NHDP-IV for which bids have been invited. Forest clearance is in process and to be accorded by MOEF. The completion is targeted by 2019. NATIONAL HIGHWAYS IN CHHATTISGARH In the state of Chhattisgarh, eight numbers of new National Highways - NH-343, NH-163A, NH-149B, NH-130A, NH-130B, NH-130C, NH-130D & NH-930 covering a total length of 843.20 km have been declared between the year 2010 to 2015. Seven works at the cost of `59.53 crore have been sanctioned on NH-343, NH-130A, NH-130C & NH-930 during the year 2011-2015. All works have been awarded. No expenditure was incurred on these works upto 31.03.2015. However, an expenditure amounting to Rs.21.67 crore has been incurred during 2015-16. These works are scheduled to be completed by May, 2016. BRIDGE OVER RIVER BRAHMAPUTRA The construction of a bridge is planned over the Brahmaputra River between Dhubri and Phulbari. The Ministry of Road Transport & Highways has awarded the consultancy work to AECOM India Pvt. Ltd in July, 2015 at a value of `697.88 lakh. The scope is to prepare Detailed Project Report this project. The Consultant has submitted the Inception Report and the alignment for the bridge has been approved.
Project Reporter • 25 • April 1, 2016
REALTY PROJECTS
Realty Projects 91 | SRD Gunji Height Details: The project is coming up at Khanamukh, Guwahati. It comprises 1 tower of G+6 storeys, having 2&3 BHK apartments of 1000 - 1250 sq.ft. with the basic amenities. Location: Guwahati Assam Completion: January 2017 Type: Residential Apartments Stage: Under Construction Sankardev Real Estate Contacts: H.O. Gramya Nagar, Bara Bazar, Pandu, Guwahati-12, Assam. M: 9864021017 / 8761875210, 9864021277 / 9864021244, srd_groups@yahoo.com
92 | Lodha Estrella Details: The project is coming up at Wadala, Mumbai. It comprises 512 units, having 1, 2 and 3 BHK apartments. The amenities include top-line mega gymnasium, squash courts, basketball court, amphitheatre, library, tennis courts, badminton courts, 3 kids pools, meditation/yoga center, 800 m elevated jogging track, cafe fine dining restaurant, etc. Location: Mumbai Maharashtra Completion: October 2018 Type: Residential Apartments Stage: Under Construction Lodha Group Contacts: Lodha Excelus, N,M Joshi marg, Mahalaxmi, Mumbai-400011. T: 022-23024400, 23000693 Architect: Kelly Hopper, ArchitectUnit 5, Vencourt Place, London W6 9NU. T: +44(0) 207 471 3350, info@kellyhoppen.co.uk
93 | Turquoise Details: The project is coming up at Mulund (W), Mumbai, comprising 1 tower, 936 units of stilt+46 floors, having 2, 2.5 & 3 BHK apartments. The amenities include video door phone, sun deck in all homes, podium garden, clubhouse, jogging track on podium level, swimming pool, steam and sauna, multipurpose tennis /basketball court, community room, etc. Location: Mumbai Maharashtra Completion: December 2017 Type: Residential Apartments Stage: Under Construction Nirmal Group Contacts: Avinash Rishi, Manager (Marketing & Brand Alliances), Nirmal Mall, 3rd Floor, Multiplex Building, L.B.S. Marg, Opp. Nirmal Nagar, Mulund (W), Mumbai - 400080. Maharashtra. T: 022-25937000, 100, F: 25937200, info@nirmallifestyle.com (Dharmesh S Jain, MD) Architect: Banka And Associates, 3rd Floor, Guwahati-Shillong Rd, N.H. Centre Point, Bora Service, Ulubari, Guwahati-781007, Assam. T: 0361-2463519 Project Reporter • 27 • April 1, 2016
Realty Projects 94 | Celestia Spaces Details: The project is coming up at Sewri, Mumbai, spread over 5.50 acre of land. It comprises 2 towers, 180 units of stilt+23 floors, 2&3 BHK apartments. The amenities include gymnasium, club house, children’s play area, intercom, fire fighting systems, multipurpose hall, party lawn, swimming pool, toddler pool, yoga/meditation area, landscape garden and rain water harvesting system. Location: Mumbai Maharashtra Completion: September 2019 Type: Residential Apartments Stage: Under Construction Peninsula Land Ltd Contacts: Rakesh Thoakar, Manager, 1, Peninsula Spenta, Mathuradas Mills, Senapati Bapat Marg, Lower Parel, Mumbai - 400013, Maharashtra. T: 022-66229300, marketing@peninsula.co.in Architect: Shama Waghmare, Architect, Mumbai, Maharashtra. T: 022-66229300, kshamawaghmare@peninsula.co.in
95 | Raj Altezza Details: The project is coming up at Mulund (W), Mumbai, spread over 1 acre of land. It comprises 1 tower, 168 units of G+28 storey, having 2&3 BHK apartments. The amenities include grand entrance lobby, video door phone with intercom, modern fire fighting systems, high speed passenger lift, children’s play area, car parking, gymnasium, etc. Location: Mumbai Maharashtra Completion: December 2016 Type: Residential Apartments Stage: Under Construction Rajesh LifeSpaces Contacts: C J Mathews, AVP (Marketing), R B House, Off Andheri Kurla Road, MIDC Cross Road “B”, J. B. Nagar Jn., Andheri (E), Mumbai-400059, Maharashtra. T: 022-67359900, F: 67359911, cj.mathews@rajeshlifespaces.com, marketing@rajeshlifespaces.com
96 | Shobha Aayu Details: The project is coming up at Chembur (West), Mumbai, comprising 1 tower, 15 units of G+13 floors, having 2&3 BHK apartments. The amenities include landscape garden, paved compound, rain water harvesting, sewage treatment, solar lighting, car parking, 24/7 water supply, gymnasium, multipurpose court, etc. Location: Mumbai Maharashtra Completion: December 2017 Type: Residential Apartments Stage: Under Construction Tridhaatu Realty & Infra Pvt Ltd Contacts: Rajas Joshi, Asst. Manager (Marketing), 5th Floor, B Wing, Shrikant Chambers, Next to R.K.Studios, Sion – Trombay Road, Chembur (E) – 400071, Maharashtra. T: 022-67083000, rajasj@ridhaatu.com
Project Reporter • 28 • April 1, 2016
Realty Projects 97 | Rudraksh Details: The project is coming up at Chembur, Mumbai, comprising 1 tower, 84 units of G+12 floors, having 2&3 BHK apartments. The amenities include CCTV camera security, vastu compliant, lift(s), children’s play area, badminton court, etc. Location: Mumbai Maharashtra Completion: April 2016 Type: Residential Apartments Stage: Under Construction Tridhaatu Realty & Infra Pvt Ltd Contacts: Rajas Joshi, Asst. Manager (Marketing), 5th Floor, B Wing, Shrikant Chambers, Next to R.K.Studios, Sion – Trombay Road, Chembur (E) – 400071, Maharashtra. T: 022-67083000, rajasj@ridhaatu.com Architect: Mahesh Khanolkar, Architect, Associated Architects, No. 501, Raunaq Apartments, 14th Road, Chembur East, Mumbai-400071, Maharashtra. T: 022-25211402, aarch501@yahoo.com
98 | Venus Heights Details: The project is coming up at Chembur (East), Mumbai, spread over 1.72 acre of land comprising 1 tower, 103 units of G+15 floors, having 1&2 BHK apartments. The amenities include gymnasium, rainwater harvesting system, podium garden, sprinkler sysyem, water softener plant, car parking, 4 high speed elevators, jogging track, club house, etc. Location: Mumbai Maharashtra Completion: December 2018 Type: Residential Apartments Stage: Under Construction Unity Land Consultancy Contacts: Samruddhi Pisal, Architect, 1st floor, M.M. residency, Kurla Kadam CHS. Ltd, Jagruti Nagar, Kurla (E), Mumbai- 400024, Maharashtra. T: 022-60508086, pramodpisal@ymail.com Architect: Manoj Vishwakarma, Architect, Dot Architects, 875/ 2/ 1/ 6A, Ground Floor, M J G Colony, Gandhi Nagar, Bandra East, Mumbai-400051, Maharashtra. T: 022-26452311
99 | Vinay Harmony County Details: The project is coming up at Hyderabad, spread over 10 acre of land. It comprises 4 towers, 406 units of G+12 and stilt+24 floors. The amenities include fire fighting system, lift(s), 24/7 water supply, intercom, car parking, gymnasium, club house, children’s play area, etc. Location: Hyderabad Telangana Completion: June 2016 Type: Residential Apartments Stage: Under Construction SMR Holdings Contacts: Ayub Ahmed Quraishi, Project Manager, SMR House, 5th Floor, Plot No# 73, Nagarjuna Hills, Punjagutta, Hyderabad - 500082, Telangana. T: 040-23353722, info@smrholdings.in
Project Reporter • 29 • April 1, 2016
CONSULTANCY BIDS
Consultancy Bids 100 | Consultancy services for civil & HVAC work Engg./89 (C & E)/2015-16 | Tenders are invited for providing comprehensive consultancy services including civil, electrical, HVAC work etc. (Preparation of design, detailed project report tender documents cost estimation and supervision) for proposed state cancer institute building at Igims, Patna. Submission Date: 14/04/2016 Location: Patna Bihar Indira Gandhi Institute of Medical Science Contact Address: Director, 1 Sheikhpura, Patna - 800014, Bihar. T: 0612-2297099, F: 2297225. 101 | PMC for work of under ground sewerage system 23/BMC/SEWRAGE/2015-16 | Selection of project management consultant (PMC) for balance work of under ground sewerage system of Bilaspur from eligible consultancy firms/bidder. Submission Date: 08/04/2016 Location: Bilaspur District Chhattisgarh Bilaspur Municipal Corporation Contact Address: Executive Engineer, 2nd Floor, Vikas Bhawan, Nehru Chowk, Bilaspur, Chhattisgarh. T: 07752-222642, F: 413888, commissionerbmcbilaspur@gmail.com 102 | Development of integrated multimodal logistics hub DMIC/2016/03/002 | Prequalification are invited for selection of consultant for preparation of techno-economic feasibility study report for development of Integrated Multimodal Logistics Hub (IMLH) at Nangal Chaudhary in Haryana. Submission Date: 05/05/2016 Location: Mahendragarh district Haryana Delhi Mumbai Industrial Corridor Development Corporation Ltd Contact Address: Executive Engineer, Room No. 341-B, 3rd Floor, Hotel Ashok, Diplomatic Enclave, 50-B Chanakyapuri, New Delhi -110021, Delhi. T: 011-26118884-8, F: 26118889, contactus@dmicdc.com 103 | Construction of road including bridges Supervision consultancy services for the work of construction of road including bridges on JLN & JSB canal between
NH-10 to NH-71A between HUDA bye pass and NH-10 Bye pass in Rohtak City. Submission Date: 18/04/2016 Tender Value (Rs): 104500000 Location: Rohtak district Haryana Haryana State Roads And Bridges Development Corporation Ltd Contact Address: Deputy General Manager, Bay No. 13-14, Sector-2, Panchkula, Haryana. T: 0172-2585265 104 | DPR for construction of bridge EE/SWD/RR-Z/TEND/10/2015-16 | Tenders are invited for providing consultancy services for preparation of DPR for construction of bridge at SWD V-201 along BWSSB pipeline service road near Ganesha temple, backside beggers colony, Choudeshvari nagara and along BWSSB pipeline service road at the junction of P&T main road & pipeline road at Srinivasanagara ward no 73 of Kottigepalya in Rajarajeshvari nagara zone. Submission Date: 11/04/2016 Location: Karnataka Bruhat Bengaluru Mahanagara Palike Contact Address: Executive Engineer, SWD,R.R Nagara. BBMP, 9th Floor, Jayanagara Shopping Complex, 4th Block, Bangalore-560011, Karnataka. T: 080-22441077 105 | Consultant for safety audit of the highway project Tenders are invited for safety consultant for carrying out safety audit of the project highway etc. Submission Date: 15/04/2016 Location: Bangalore Karnataka Karnataka Road Development Corporation Ltd Contact Address: Chief Engineer, Miller Tank Bed Area, Bangalore - 560052, Karnataka. T: 080- 49071400 / 22380140, mdkrdcl@gmail.com, cekrdcl@gmail.com 106 | Consultants for project management of comprehensive services LUN/Constn/16/681 | Application are invited for empanelment of architects/ consultants for project management of comprehensive services (Civil, Electrical, Air Conditioning, Interior works and Infrastructure Development) etc. Submission Date: 16/04/2016 Project Reporter • 31 • April 1, 2016
Location: Bhopal Madhya Pradesh M. P. Laghu Udyog Nigam Ltd Contact Address: Chief General; Manager (E&C), Estate & Construction Department, 35 Sultania Road, Imamigate, Bhopal, Madhya Pradesh. T: 0755-2552971 107 | Consultant for civil works UADD/TENDER NO -13855 & Work No: 732/KUKSHI/2016 | Tenders are invited for appointment of consultant for different civil works Submission Date: 06/04/2016 Tender Value (`): 1000000 Location: Madhya Pradesh Urban Development & Environment Department Contact Address: Executive Engineer, Room No. 305, Second Floor, Palika Bhawan Shivaji Nagar, Bhopal, Pin - 462016, Madhya Pradesh. T: 0755 2675337 F: 2558796, enc@mpurban.gov.in 108 | PMC for integrated ticketing system T&C/MRTS/ITS/PMC/2015 | Tenders are invited for consultancy services for the updation of dpecifications and technical assistance & act as a project management consultants (PMC) for integrated ticketing system project in Mumbai. Metropolitan Region (MMR). Submission Date: 29/04/2016 Location: Mumbai Maharashtra Mumbai Metropolitan Region Development Authority Contact Address: P. R. K. Murthy, Chief, T&C Division, Bandra-Kurla Complex, Bandra (East), Mumbai - 400 051, Maharashtra. T: 022-26590001, 26594107 109 | 3 multi storey residential buildings 01/EE(CM)/EOI/DDN/2015-16 | Tenders are invited for consultancy services for construction of 3 multi storey residential buildings at Yamuna Colony, Dehradun. Submission Date: 11/04/2016 Tender Value (Rs): 4362000 Location: Dehradun Uttarakhand Uttarakhand Jal Vidyut Nigam Ltd Contact Address: General Manager, Bharat Sanchar Nigam Limited, Cross Rd, Race Course, Dehradun-248001, Uttarakhand. T: 0135-2763508, 2523100
B2B OPPORTUNITIES
B2B Opportunities Airport 110 | Construction of storage shed at IGI Airport Tenders are invited for construction of storage Shed for storing unserviceable tyres in avionics complex at Terminal-II, IGI Airport, New Delhi. Submission Date: 11/04/2016 Tenders Value (Rs): 9500000 Location: New Delhi Delhi Air India Ltd Contacts: Deputy General Manager (P&F), Terminal – 1 I.G.I.Airport, New Delhi-110037. T: 011-25675121 Extn.4736 25675178 & 25674899 111 | Resurfacing of runway Tenders are invited for resurfacing of runway and allied works at AF station Thoise. Submission Date: 29/04/2016 Tenders Value (Rs): 2020000000 Location: Udhampur District Jammu & Kashmir Military Engineer Services Contacts: Dy. Dir (Contracts), HQ Chief Engineer (AF) Zone Military Engineer Services C/o 39 Wing, AF -936839 C/O 56 APO, T: 01992-234037, dircontcezafu2-mes@nic.in 112 | Civil works at Dr. Babasaheb Ambedkar International Airport Tenders are invited for maintenance contract for repair and maintenance / urgent civil works at Dr. Babasaheb Ambedkar International Airport, Nagpur(2016-17) SH-non-operational area. Submission Date: 18/04/2016 Tenders Value (Rs): 2000000 Location: Nagpur Maharashtra Mihan India Ltd Contacts: Asst. GM (E-C), Dr. Babasaheb Ambedkar International Airport, 1 st Floor, Old Terminal Building, Nagpur- 440005, Maharashtra. T: 0712-6650100, 2807508 113 | Raising of Operational Boundary wall at Jaipur Airport Tenders are invited for raising of operational boundary wall at Jaipur Airport. Submission Date: 13/04/2016 Tenders Value (Rs): 4226000 Location: Jaipur Rajasthan
Airports Authority of India Contacts: Asstt. Gen. Mgr. (Engg-C), Jaipur International Airport, Jaipur-302029, Rajasthan. T: 0141-2725207, 2550623 114 | Waterproofing treatment for AIT at Chennai Airport Tenders are invited for waterproofing treatment for AIT at Chennai Airport. Submission Date: 06/04/2016 Tenders Value (Rs): 11066150 Location: Chennai Tamil Nadu Airports Authority of India Contacts: Airport Director, Sadarjung Airport, New Delhi-110003, Delhi. T: 011-24640859 115 | Provision of runway turn pads Tenders are invited for provision of turn pads at both ends of runway at AFS Gorakhpur. Submission Date: 16/04/2016 Tenders Value (Rs): 65000000 Location: Gorakhpur Uttar Pradesh Military Engineer Services Contacts: A K Gupta, CE, Hq Chief Engineer Air Force Mes, Bamrauli, Allahabad-212212, Uttar Pradesh. T: 0532-2581110, allahabadengrs@gmail.com Building Construction 116 | Construction of 24 nos of residential type (III) quarters Tenders are invited for construction of 24 nos of residential type (III) quarters and 04 nos 120 men barracks at ITBP BTC Bhanu, Panchkula, Haryana. Submission Date: 19/04/2016 Tenders Value (Rs): 211706259 Location: Panchkula Haryana National Buildings Construction Corporation Ltd Contacts: CGM, SBG Office, NBCC Ltd ,182 Mdc Sectror 4 Panchkula Haryana. M: 8288096382 , cpg.nbcc@gmail.com 117 | ATC building at AF station Thoise Tenders are invited for construction of ATC building at AF station Thoise. Submission Date: 21/04/2016 Tenders Value (Rs): 88100000 Location: Thoise Jammu & Kashmir Military Engineer Services Contacts: Dy. Dir (Contracts), HQ Chief Project Reporter • 33 • April 1, 2016
Engineer (AF) Zone Military Engineer Services C/o 39 Wing, AF -936839 C/O 56 APO, T: 01992-234037, dircontcezafu2-mes@nic.in 118 | E&D directorate office building at Dehradun Tenders are invited for construction of E&D directorate office building at Kaulagarh road, ONGC, Dehradun. Submission Date: 25/04/2016 Tenders Value (Rs): 144240987 Location: Dehradun Uttarakhand Oil and Natural Gas Corporation Ltd Contacts: Chief Engineer (Civil), Tel Bhawan, Dehradun- 248003, Uttarakhand. T: 0135-2759561, 2752161 Housing 119 | Integrated group housing in Vadodara Tenders are invited for development of integrated group housing facility over 64135.74 Smt. land at T.P. no. 44 at Ekta Nagar in Vadodara for package II on PPP. Submission Date: 11/04/2016 Tenders Value (Rs): 1108800000 Location: Vadodara Gujarat Vadodara Municipal Corporation Contacts: Executive Engineer, Affordable Housing & Pmay, Kanya Shalano. 3, Pratap Road, Raopura, Vadodara, Gujarat. M: 9879000713 120 | Housing and infrastructure development works Tenders are invited for housing and infrastructure development works of 1st year housing demand under Pradhan Mantri Awas Yojna in Khurai Distt Sagar. Submission Date: 16/04/2016 Tenders Value (Rs): 371900000 Location: Sagar District Madhya Pradesh Directorate of Urban Administration & Development Department Contacts: CMO, Sagar, Madhya Pradesh. T: 07581-240101, 9589138976, cmokhurai@mpurban.gov.in 121 | Construction work of LIG and EWS houses Tenders are invited for construction work of 20 LIG-B, 80 EWS-A and 68
B2B Opportunities EWS-B houses i/c W/S, S/F and compound wall with restrengthening of 3.93 Hect. Land development. at Adinath Nagar Housing Board Colony Sanawad Dist- Khargone. Submission Date: 20/04/2016 Tenders Value (Rs): 142675000 Location: Khargone district Madhya Pradesh MP Housing Board Contacts: Rajkumar B, Civil Line, Khandwa-450001, Madhya Pradesh. T: 0733-2223114, dnkhandwa@mphousing.in Power 122 | 220 KV transmission lines Tenders are invited for laying of tower foundations for 220 Kv transmission lines. Submission Date: 18/04/2016 Tenders Value (Rs): 22113000 Location: Jammu & Kashmir Govt of Jammu & Kashmir Contacts: Shafat Hussain, Executive Engineer, GCD, Bemina Srinagar, PDD, Kashmir, J&K. T: 0194-2491342, xengcdbemina@gmail.com 123 | Construction of 7 nos. new 33 Kv substations Tenders are invited for construction of 7 nos. new 33 Kv substations along with associated 33 Kv and 11 Kv line at different places in of electricity distribution zone Meerut on partial-turnkey basis under Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY). Submission Date: 06/04/2016 Tenders Value (Rs): 209600000 Location: Meerut Uttar Pradesh Paschimanchal Vidyut Vitran Nigam Ltd Contacts: Sanjai Kr. Gupta, Exec Engg (MM), PVVNL, Discom, HQ, Urja Bhavan, Victoria Park, Meerut-250001, Uttar Pradesh. T: 0121-2665734, 2666062, M: 9412749899, semmpvvnl@gmail.com Railways 124 | Doubling of track between Parbhani and Mudkhed Section Tenders are invited for doubling of track
between Parbhani and Mudkhed Section proposed supplying and stacking of stone ballast for railway track, machine crushed, clean, hard, angular and durable along side of proposed alignment / station yards from Ch: 350750 M to 371870 M (21.12 Kms) between Nanded (Excl.) and Mudkhed (Incl.) stations. Submission Date: 06/05/2016 Tenders Value (Rs): 43136500 Location: Andhra Pradesh South Central Railway Contacts: A.V.H. Mallikarju, Dy.Ce/C/ General-I, For Chief Admin. Officer, Construction, S.C.Rly, Secunderabad, Andhra Pradesh. T: 040-27820780, 27821538, M: 9752440222 125 | Construction of new BG line from Biratoli to Balumath Tenders are invited for design, drawing, supply, erection, testing and commissioning of 25Kv OHE in connection with construction of new BG line from Biratoli (Excl.) to Balumath (Excl.) coming under Tori-Shivpur Section. Submission Date: 29/04/2016 Tenders Value (Rs): 135373000 Location: Bihar East Central Railway Contacts: Dy.CEE, Office of the Divisional Railway Manager, Kulharia Complex, Patna-800004, Bihar. T: 0612-2301327, cco_hjp@claims.indianrail.gov.in Roads/Highways/Bridges 126 | Construction of road over bridge no. 34 Tenders are invited for construction of road over bridge no. 34 (Span 1 X 40.00 M Composite Steel Girder) at Ch. 17660 Km on Chhotaudepur - Alirajpur National Highway for crossing of new BG line between Chhotaudepur-Dhar. Submission Date: 25/04/2016 Tenders Value (Rs): 86538076 Location: Chhota Udaipur district Gujarat Western Railway Contacts: Dy.Chief Engineer (Construction), Western Railway, Pratapnagar, Vadodara-390 004, Gujarat. T: 0265-2630227
Project Reporter • 34 • April 1, 2016
127 | Repair of Ropar-NawashahirBanga-Phagwara Section Tenders are invited for special repair of Ropar-Nawashahir-Banga-Phagwara Section of National Highway No. 344 A from km 0+000 to km 88+000 in the state of Punjab (SW: P/L DBM, BC, Road Signage etc. Submission Date: 26/04/2016 Tenders Value (Rs): 124755000 Location: Punjab National Highways Authority of India Contacts: Chief General Manager (Tech), Bays no. 35-38, Sector -4, Panchkula, Haryana. T: 0172-2586818, F: 2573030 128 | Construction of 100 feet wide road in Sector-29 Tenders are invited for construction of 100 feet wide road in Sector-29, JDA, Jaipur (I) Airport road to Haldi Ghati Magr. (II) 160 feet wide road to 100 feet wide road. Submission Date: 21/04/2016 Tenders Value (Rs): 53000000 Location: Jaipur Rajasthan Jaipur Development Authority Contacts: P.K. Jain, Executive Engineer-SR, Room No. CCC TF 307, CCC Building, Ram Kishore Vyas Bhavan, Indira Circle, JawaharLal Nehru Marg, Jaipur-302004, Rajasthan. T: 0141-2569696, pradeep.jain@mailjda.org 129 | Construction of cement concrete internal roads Tenders are invited for construction of cement concrete internal roads in the neighbourhood village of Kundalia Phase-III. Submission Date: 22/04/2016 Tenders Value (Rs): 76957170 Location: Rajasthan Nuclear Power Corporation of India Ltd Contacts: Station Director , Rawatbhata Rajasthan Site, Post Office: Anushakti, Via Kota-323303, Rajasthan. T: 0147-5242001, gcdeondi@npcil.co.in 130 | Construction of roads under package-01 Tenders are invited for construction of various roads under package-01, Sikar
B2B Opportunities kums Sikar. Submission Date: 22/04/2016 Tenders Value (Rs): 20740000 Location: Sikar Rajasthan Rajasthan State Agricultural Marketing Board Contacts: Sheesh Ram Basera, Chief Engineer, R.S.A.M.B, Jaipur, Rajasthan. T: 0141-2740445, 2227336, M: 9413397019, ace.rsamb@rajasthan. gov.in, sejpr.rsamb@rajasthan.gov.in 131 | Widening and re-carpeting of roads Tenders are invited for work services for widening and re-carpeting of roads in technical and domestic area at AF Stn Memaura. Submission Date: 15/04/2016 Tenders Value (Rs): 131583000 Location: Lucknow Uttar Pradesh Military Engineer Services Contacts: R K Singh, Hq Chief Engineer Air Force Mes, Bamrauli, Allahabad-212212, Uttar Pradesh. T: 0532-2581110, allahabadengrs@gmail.com 132 | Widening of Rudraprayag bypass of NH-109 Bids are invited for widening and
strengthening of existing intermediate/2lane to 2 lane with paved shoulder configuration from km 0.000 (design km 0.000) to km 16.440 (Design km 18.700) including existing 3.470 km of Rudraprayag bypass of NH-109 in the state of Uttarakhand through an engineering, procurement and construction (EPC) contract. Submission Date: 12/05/2016 Tenders Value (Rs): 11287000 Location: Rudraprayag district Uttarakhand Ministry Of Road Transport & Highways Contacts: Project Director, 84, Vasant Vihar, Phase- II, Dehradun-248006, Uttarakhand. T: 0135-2769935, bids.piu.ddn@gmail.com Sewerage Treatment Plant 133 | Construction of sewerage system Tenders are invited for construction of sewerage system of Bhubaneswar sewerage district-ii on epc contract. Submission Date: 22/06/2016 Tenders Value (Rs): 1256999000 Location: Bhubaneswar Odisha
Advertise in Project Reporter Digital Edition and reach out to 50,000 individuals / companies from all over India.
Odisha Water Supply & Sewerage Board (OWSSB) Contacts: Member Secretary, Satya Nagar, Bhubaneswar-751007, Odisha. T: 0674-2571341, 2571185, msowssb@gmail.com Water Treatment 134 | 210 MLD water treatment plant at Palla Tenders are invited for design, construction, operation and maintenance of primary treatment works at Dehra (Ghaziabad) and 210 Mld (Output Capacity) water treatment plant at Palla (Greater Noida) and allied works under 85 CUSEC Ganga Jal Project on turnkey.. Submission Date: 13/05/2016 Tenders Value (Rs): 1343470000 Location: Noida Uttar Pradesh Greater Noida Industrial Development Authority Contacts: General Manager, 69, Chitvan Estate, Sector Gamma - II, Greater Noida-201308, Uttar Pradesh. T: 0120-2326150-51, 2326335-7, authority@gnida.in
Annual Subs
cription:
www.Proje
ctReporter.
co.in
Vol. 11 No. 12 l Decem
ber 15, 2015
India’s Proj ect Databa se
190
Projects & Tenders
For Advertising: Contact Sandeep Sharma on 91-22-24193000 / 24193096 Email: Sandeep@ASAPPinfoGlobal.com
Project Reporter • 35 • April 1, 2016
`3500/- (Down
loadable PDF)
INDUSTRIAL OPPORTUNITIES
Equipment Tender 135 | South Central Railway Details: DRM.Works.BZA.07.2016 dt.22-03-2016 â T.No.03.TM.2016 | Tenders are invited for reconditioning of tamping arms, tool holders and swivel bearings of Unimat Machines at Cpoh/Rayanapadu. Submission Date: 27/04/2016, Location: Vijayawada, Andhra Pradesh, Tender Value (`): 4722000 Contact: Ashesh Agarwal, Office Of The Sr.Den.Co.Ord.Bza, Drms Office Compound, Vijayawada-520001. T: 040-27830449, 27821641
Contact: Assistant Executive Engineer, CGWB, Division 17, Dhagwar, Dharamshala, Himachal Pradesh. T: 01892-208191, 208131
136 | South Central Railway Details: TN.GE.46.2015-16 | Tenders are invited for Guntakal division-hiring of 2 nos of pickup trucks of 2.0 tons capacity for a period of 24 months for Guntakal and Renigunta electrical maintenance depots. Submission Date: 25/04/2016, Location: Guntakal, Andhra Pradesh, Tender Value (`): 1144166 Contact: Senior Divisional Electrical Engineer/Maintenance/Drms Office Compound, Guntakal. T: 040-27824093, srdeem@sc.railnet.gov.in
141 | Rail Wheel Factory Details: LP155208 | Tenders are invited for air filter element outer 4445 / 4385 to voltas part no: MH40939d3 or m and m part no: 006000455f1 for the use of voltas 3 ton forklift model: dvmax3t kat bc. Submission Date: 06/12/2016, Location: Bengaluru, Karnataka Contact: Yelahanka , Bengaluru-560064, Karnataka. T: 080-28564611, 28460394, 28460780, F: 28460367, garg.js@rwf.railnet.gov.in
137 | Oil India Ltd Details: SDG0071P16 | Supply of vertical bore drilling spool. Submission Date: 04/05/2016, Location: Duliajan, Assam, Tender Value (`): 5966000 Contact: Duliajan-786602, Assam. T: 0374-2800548, F: 2803549 138 | Ministry of Defence Details: CPC/0102/0624/19-01-2011/ AR | Supply of special purpose drilling machine. Submission Date: 06/05/2016 Location: New Delhi, Delhi Contact: Room no 30, G Block, Nirman bhawan, New Delhi, Delhi. T: 011-23011572 139 | Central Ground Water Board Details: Div XVII/ST-14/E tender/2015-942 dated 04/03/2016 | Supply of 8.5 Inch 215.9 MM Tungsten carbide insert roller Bit TCR Bit for water well drilling. Period of Work: 45 Days. Submission Date: 26/04/2016, Location: Dharamshala, Himachal Pradesh, Tender Value (`): 425000
140 | Department Of Atomic Energy Details: Supply and warranty of pneumatically driven ss316l / ss304l vaccum conveyor system of capacity range of 100-1000kg. Submission Date: 05/05/2016, Location: Mysore, Karnataka Contact: PB No-1, Yelwai, Mysore, Karnataka. T: 0821-2402152, 2406430
142 | Oil and Natural Gas Corporation Ltd Details: Y15MC16003 | Supply, installation, calibration and commissioning with TPI certification of hydraulic load indicator on 66 nos. of cranes at unmanned platforms of MH asset (north & south) along with two nos. of hydraulic load indicator calibration kit with master gauge on turnkey basis. Submission Date: 02/05/2016, Location: Mumbai, Maharashtra Contact: Conference Hall, NBP Green Heights, 3F, Q3, BKC Plot C-69, Opposite MCA club, Bandra(East), Mumbai-400051, Maharashtra. T: 022-26599806, 26599808 143 | Indian Navy Details: DY/300/2015-16/EPC/5 | Tenders are invited for 6 ton electrical level luffing (Ell) crane. Period of Work: 720 Days. Submission Date: 28/04/2016, Location: Mumbai, Maharashtra, Tender Value (`): 90000000 Contact: CDR P S Malhotra, Room No. 14, A Wing, Sena Bhawan, Directorate Of Dockyards, New Delhi-110011, Delhi. T: 011-23011282, 23014167
Project Reporter • 37 • April 1, 2016
144 | Ordnance Factory Board Details: RR/09/2015-16/TE/2015-16/57/ EO | Tenders are invited for supply of surface grinding machine - 3 Nos. Submission Date: 05/05/2016, Location: Nagpur, Maharashtra Contact: Rajesh Bhide, Of Ambajhari, Nagpur, Maharashtra. T: 07104-246705, 246705, F: 246705 145 | Ordnance Factory Board Details: RR/05/2015-16/TE/2015-16/56/ EO | Supply of CNC internal cylindrical grinding machine - 1 No. Submission Date: 17/05/2016, Location: Nagpur, Maharashtra Contact: Rajesh Bhide, Of Ambajhari, Nagpur, Maharashtra. T: 07104-246705 146 | Ordnance Factory Board Details: 0132/14 RR 15-16/EO | Tenders are invited for fabrication/body building of superstructure of truck chassis on Tata model LPT 1613/Tc42 With Cowl Bs-Iii, Qty.- 01 No. Submission Date: 26/04/2016, Location: Varangaon, Maharashtra Contact: Ashok Kumar Meena, Ordnance Factory Varangaon, Bhusawal, Jalgaon-425308, Maharashtra. T: 0258-2277817 147 | Department of Higher Education, IIIT,Design and Manufacturing,Kancheepuram Details: IIITDMK/15-16/S AND P/CNC TRAINER MILLING/097 | Supply and installation of CNC trainer milling machine. Period of Work: 56 Days. Submission Date: 25/04/2016, Location: Chennai, Tamil Nadu, Tender Value (`): 2000000 Contact: IIITDM, Kancheepuram Melakottaiyur, Vandalur-Kelambakkam Road, Chennai-600127, Tamil Nadu. T: 044-27476300 148 | Ordnance Factory Board Details: OFMK/GST/S419715 DTD23.03.2016 | Tenders are invited for long travel drive shaft, MS flange, set of MS flanges, set of gear couplings for 10 t girder eot cranes. Submission Date: 26/04/2016, Location: Medak, Telangana, Tender Value (`): 587200 Contact: P Satyananda Kumar, Ordnance Factory Project, Yeddu Mailaram, Medak, Telangana. T: 040-23283621, F: 23292950, generalstores.ofmk@ofb.gov.in
Industrial Projects 149 | Animesh Ispat Pvt Ltd Industrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 22/01/2016 to undertake generation and distribution of biomass power. Location: Chattisgarh Contact: Manoj Kumar Agrawal, Director, A Block, 2nd Floor, G. E. Road, Maruti Business Park, Near Raj Kumar College, Raipur-492001, Chhattisgarh. csmanish@mahendragroup.net
154 | Fiorenza Granito Pvt Ltd Industrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 05/02/2016 to set up unit for manufacturing ceramic vitrfied tiles. Location: Gujarat Contact: 1) Survey No. 139 P1, P2 & P3, 8-A, National Highway, At: Ratavirda Morbi-363621, Gujarat. 2) Street No.5, Savsar Plot, Morbi-363641, Gujarat. fiorenzaindia@gmail.com
150 | Bhilai Engineering Corporation Ltd Industrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 01/02/2016 for the manufacture of parts and accessories of aircraft, space craft for civilian purpose (aerospace parts). Location: Durg, Chattisgarh Contact: Engineering Division, 31, Nariman Point, Maker Chambers-III, Mumbai-400021, Maharashtra. T: 022-22831724
155 | Galwalia Ispat Udyog Pvt Ltd Industrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 01/02/2016 for the manufacturing of molded industrial accessories of plastics (including elect. insulating fittings of plastics). Location: Udhamsingh Nagar, Uttarakhand Contact: 1) A-80, Vivek Vihar Phase-1, Delhi-110095, Delhi. 2) Narain Nagar Industrial Estate, Bajpur Road, Kashipur, Uttarakhand. T: 05947-262679, 9927748888, galwalia@kvsgroup.co.in
151 | Brakes India Pvt Ltd Industrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 29/01/2016 for the manufacture of grey iron, sg iron and alloy castings. Location: Nellore, Andhra Pradesh Contact: M. T. H. Road, TVS Lucas Flyover, Padi, Chennai, Tiruvallur-600050, Tamil Nadu. T: 044-26258161, F: 26257844, bi-marketing@brakesindia.co.in 152-153 | Dres Energy Pvt Ltd Industrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 03/02/2016 to set up electric power generation unit using solar energy. Location: Rangareddy, Telangana Industrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 03/02/2016 to set up electric power generation unit using solar energy. Location: Medak, Telangana Contact: Nandakumar Rachamadugu, Direector, 55, Solar Tower, 6th Main 11th Cross, Lakshmaiah Block, Ganganagar, Bangalore-560024, Karnataka. mahabaleshwar.b@emmvee.in
156-157 | Gamesa Renewable Pvt Ltd Industrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 01/02/2016 to set up unit for electric power generation using other non conventional sources. Location: Patan, Gujarat Industrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 04/02/2016 for the construction and maintenance of power plants. Location: Nellore, Andhra Pradesh Contact: Ishwar Subramanian, Director, The Futura Tech Park Block, 334 Rajiv Gandhi Salai, Sholinganallur, Chennai-600119, Tamil Nadu. vramakrishnan@gamesacorp.com 158 | Global Nanotech Pvt Ltd Industrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 01/02/2016 for the manufacturing of printing ink. Location: Ahmedabad, Gujarat Contact: Vivek Ojha, Director, 204 Elgin Chambers, 1A, Ashutosh Mukherjee Road, Kolkata-700020, West Bengal. reenakewat@gmail.com Project Reporter • 38 • April 1, 2016
159 | Golden Hatcheries Industrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 27/01/2016 to produce electricity from other non-conventional sources. Location: Bellary, Karnataka Contact: 1) No. 3, Golden Hatcheries, Queens Road Cross, Near Congress Committee Office Queens Road, Bengaluru-560052, Karnataka. 2) No.3, Queen’s Road Cross, Behind T N T Worldwide Express M T B Road, Bengaluru-560052, Karnataka. T: 080-2250220, 2202629, F: 22526 160| Himachal Futuristic Communications Ltd Industrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 04/02/2016 for the manufacture of various other chemical products n. e. c. Location: Bhind, Madhya Pradesh Contact: 1) 8, Commercial Complex, Masjid Moth, Greater Kailash - II, New Delhi-110048, Delhi. 2) 207-A, New Udyog Mandir No 2, Kamanwala Chamber, Moghul Lane, Mahim (W), Moghul Lane, Mumbai-400016, Maharashtra. T: 022-24444201 161 | India Safety Vaults (P) Ltd Industrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 01/02/2016 for the manufacture of other textiles / textile products. Location: Pune, Maharashtra Contact: Joseph P John, Branch Manager, Nityanand Complex, 247/A Bund Garden Road, Opposite Connaught Place, Pune-411001, Maharashtra. T: 020-26165899, 26162637, 26160447, F: 26162549, info@isvl.in 162 | International Packaging Products Pvt Ltd Industrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 03/02/2016 to set up unit for manufacturing tapes. Location: Silvassa, Dadra & Nagar Haveli Contact: 1) Unit No, 602, 6th Floor, Makwanaroad Antriksh Thakoor House, Andheri East, Marol Mumbai Mumbai-400093, Maharashtra. 2) Jitendra Agarwal, Dy. Manager Sales
Industrial Projects & Marketing, Survey No. 380/2, Village Dapada, Silvassa-396230, Dadra and Nagar Haveli. T: 0260-6451614, 2699388 163-164 | Jindal Urban Waste Management (Guntur) Ltd Industrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 27/01/2016 to set up power generation unit. Location: Guntur, Andhra Pradesh Industrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 27/01/2016 to set up power generation unit. Location: Visakhapatnam, Andhra Pradesh Contact: Anuj Kumar, Director, Jindal ITF Centre, 28, Shivaji Marg, Opp. Campa Cola Stop, Motinagar, New Delhi-110016, Delhi. alok.kumar@jindalitf.com 165 | Kamakhya Distillery Pvt Ltd Industrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 03/02/2016 for the manufacture of rectified spirit or extra neutral alcohol or ethanol (un denatured ethyl alcohol of an alcoholic strength by volume of 80% vol or high). Location: Bijnor, Uttar Pradesh Contact: 2nd Km Stone, Najibabad Road, Krishna Farm, Bijnore-246701, Uttar Pradesh. kamakhyasteel@gmail.com 166 | Karnataka Packing Plant (A Unit Of Shree Cement Ltd) IEM was filed with Department of Industrial Policy & Promotion on 03/02/2016 for the manufacture of portland cement, aluminous cement, slag cement and similar hydraulic cement. Location: Karnataka Contact: Shree Cement Ltd, Post Box 33, Bangur Nagar Beawar, Ajmer-305901, Rajasthan. 167 | Katbro Corporation IEM was filed with Department of Industrial Policy & Promotion on 01/02/2016 for the manufacture of all types of textile garments and clothing accessories.
Location: Gautam Buddha Nagar, UP Contact: Chandra Bhan Kataria, B-179, Second Floor, Shivalik, Near Malviya Nagar, Delhi-110017, Delhi. kunalkkataria@gmail.com 168 | Kent Residential And Industrial Park LLP IEM was filed with Department of Industrial Policy & Promotion on 01/02/2016 for the construction of other civil engineering projects Location: Ahmedabad, Gujarat Contact: Nilam Rajendrakumar Kataria, 212/1 Makaraba, Nr Adani Cng, Makarba, Ahmedabad-380051, Gujarat. chetan.g@kataria.co.in 169 | Leaspin Textile LLP IEM was filed with Department of Industrial Policy & Promotion on 02/02/2016 for the manufacture of cotton bales preparation of spinning of cotton. Location: Gujarat Contact: C/O. Leamak Health Care P. Ltd, Sarkhej, Bavla Highway, Matoda, Ahemdabad-382213, Gujarat. 170 | Maa Rewa Sugar Pvt Ltd IEM was filed with Department of Industrial Policy & Promotion on 29/01/2016 for the manufacture of reining of sugar sucrose. Location: Dhar, Madhya Pradesh Contact: Ajay Agrawal, Narmada Nagar, Kukshi, Dhar-454335, Madhya Pradesh. M: 9604356990 171 | Mahendra Power Pvt Ltd IEM was filed with Department of Industrial Policy & Promotion on 22/01/2016 to undertake generation and distribution of biomass power. Location: Janjgir-Champa, Chattisgarh Contact: A Block, 2nd Floor, G. E. Road, Maruti Business Park, Nr. Raj Kumar College, Raipur-492001. 172 | Mangal Industries Ltd IEM was filed with Department of Industrial Policy & Promotion on 01/02/2016 for the manufacture of moulded industrial accessories of plastics (including electrical insulating fittings). Location: Chittoor, Andhra Pradesh Contact: Terminal A, 1-18/1/AMR/NR, Nanakramguda, Gachibowli, Hyderabad– 500032, Telangana. T: 040-23139000, F: 23139001 Project Reporter • 39 • April 1, 2016
173 | Medak Solar Projects Pvt Ltd Industrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 29/01/2016 to set up electrical power generation using solar energy. Location: Medak, Telangana Contact: Jonathan Seth Winer, Director, Flat No. 1105 1106, Ashoka Estate, Barakhamba Road, New Delh-110001, Delhi. admin@nereuscap.com 174 | Musaddilal Holdings Pvt Ltd IEM was filed with Department of Industrial Policy & Promotion on 04/02/2016 to build storage & warehousing solutions. Location: Ashoknagar, Madhya Pradesh Contact: Pramod Kumar Gupta, 6-3-679, 1st Floor, Elite Plaza, Punjagutta, Hyderabad-500082, Telangana.rakhiagarwal79@yahoo.com 175 | Nadi Airtechnics Pvt Ltd IEM was filed with Department of Industrial Policy & Promotion on 05/02/2016 to set up manufacturing for industrial fans and blowers. Location: Thiruvallur, Tamil Nadu Contact: 34, Gnt Road, Ponniammanmedu, Madhavaram, Thiruvallur-600110, Tamil Nadu. T: 044-27984796, 27984797, 27984798, 27984799, info@nadiindia.com 176 | Orissa Metaliks Pvt Ltd IEM was filed with Department of Industrial Policy & Promotion on 27/01/2016 to undertake generation and transmission of electric energy produced in coal based thermal power plant. Location: Midnapur, West Bengal Contact: Subha Majumdar, Director, 1, Grastin Place, Near High Court, Kolkata-700001, West Bengal. btrade_co@yahoo.com 177 | Patlori Estates Pvt Ltd IEM was filed with Department of Industrial Policy & Promotion on 04/02/2016 to set up electric power generation using solar energy. Location: Warangal, Telangana Contact: Patlori Balakrishna Rao, Plot No. 67, Lotus Building, Delhiwala Sweet Home, Sikh Road, Secunderabad, Hyderabad-500009,
Industrial Projects Telangana. patlorinaresh@gmail.com 178 | Shashi Power Projects Pvt Ltd Industrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 01/02/2016 to undertake electric power generation using other non conventional sources (co-generation). Location: Sangli, Maharashtra Contact: Santaji Bhasker Patil, Director, House No. 215, 311/a, Opposite Court, Court, Islampur, Walwa, Sangli-415409, Maharashtra. santaji@wallams.com 179 | Shree Siddhivinayak Cotspin Pvt Ltd Industrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 04/02/2016 for the manufacture of cotton yarn. Location: Kolhapur, Maharashtra Contact: Office No. 4, Anant Niwas Building, 1st Floor, Masjid Bander, Narsinatha Street, Mumbai-400009, Maharashtra. T: 022-23456780 180 | Shri Balaji Indusrial Products Ltd Industrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 28/01/2016 for the manufacture of parts & accessories for machinery / equipment used by contruction & mining industries. Location: Durg, Chattisgarh Contact: Kanhaiya Kumar, Manager, 48, Industrial Area, Jhotwara. Jaipur-302012, Rajasthan. T: 0141-6623711, M: 9352816864
181 | Square Plus Life Sciences Pvt Ltd Industrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 03/02/2016 to set up unit for pharmaceutical ingredients advanced intermediates, intermeida for oncology products. Location: Tumkur, Karnataka Contact: Laxminarayan Mundra, Director, No. 71, 1st Floor Ajay Arcade, Vanivilas Road, Basavanagudi, Bengaluru-560004, Karnataka. sunil@naturalcapsules.com
184 | Trina Solar (India) Pvt Ltd Industrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 22/01/2016 to set up solar cell manufacturing unit. Location: Visakhapatnam, Andhra Pradesh Contact: 1) Flat No. 16, Sahodara Mansion, 5, Kirlampudi Layout, Behind Ymca, Vishakhapatnam-530017, Andhra Pradesh. 2) Unit No- 824, 8th Floor, DLF Tower- B, Jasola District Center, New Delhi-110025, Delhi. T: 011-45852204, F: 45852207
182 | Sree Rayalaseema Alkalies & Allied Chemicals Ltd Industrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 27/01/2016 for the manufacture of epichlorohydrin. Location: Kurnool, Andhra Pradesh Contact: Gondiparla, Kurnool-518004, Andhra Pradesh. 2) 25, 1st Floor, Radha Nivas, Shankara Park Road, Shankara Puram, Bengaluru-560004, Karnataka. T: 26608884, 32954744
185 | Vapi Infrastructure And Industrial Township Industrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 27/01/2016 to undertake construction of other civil engineering projects. Location: Valsad, Gujarat Contact: 301, Simran Plaza, 3rd & 4th Road Corner, Khar (west), Mumbai-400052, Maharashra. vinod@ladhasinghal.com
183 | Sreenidhi Spintex Pvt Ltd Industrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 05/02/2016 for the manufacture of cotton yarn. Location: Mahbubnagar, Telangana Contact: Door, No. 1-277, Padmavathi Colony, Shadnagar, Mehboobnagar district, Hyderabad-522007, Telangana. T: 08548-250261, 213307
186 | Welspun Energy Jharkhand Pvt Ltd Industrial Entrepreneurs Memorandum (IEM) was filed with Department of Industrial Policy & Promotion on 01/02/2016 to set up electric power generation using solar energy. Location: Gaya, Bihar Contact: Shivdarshan Lal Kapur, C-11, Sector-65, Noida, Gautam Budh Nagar-201307, Uttar Pradesh. deepak_modi@welspunenergy.com
Advertise in Project Reporter Digital Edition and reach out to 50,000 individuals / companies from all over India. For Advertising: Contact Sandeep Sharma on 91-22-24193000 / 24193096 Email: Sandeep@ASAPPinfoGlobal.com
Project Reporter • 40 • April 1, 2016
Annual Subscri
ption: `3500/-
(Downloadable
www.ProjectRe
porter.co.in
Vol. 11 No. 18 l March
15, 2016
Indian Pharm aceutical se ctor: Grow CAGR of 17 s at a .46 per cent in 2015. India’s Proje ct Datab ase
177 Projects & Tend
ers
®
PDF)
Power Statistics
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/ UTS LOCATED IN SOUTHERN REGION INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES (As on 30.11.2015) State
Ownership/ Sector
Modewise breakup Thermal Coal
New Andhra Pradesh
Telangana
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Gas
Diesel
Nuclear Total
Hydro (Renewable)
RES (MNRE)
Grand Total
State
3085.91
0.00
0.00
3085.91
0.00
1758.87
89.50
4934.28
Private
1950.00
3182.65
16.97
5149.62
0.00
0.00
2004.43
7154.05
Central
1473.30
0.00
0.00
1473.30
127.16
0.00
0.00
1600.46
Sub-Total
6509.21
3182.65
16.97
9708.83
127.16
1758.87
2093.93
13688.80
State
3606.59
0.00
0.00
3606.59
0.00
2055.66
0.00
5662.25
Private
270.00
1697.75
19.83
1987.58
0.00
0.00
72.25
2059.83
Central
1721.88
0.00
0.00
1721.88
148.62
0.00
0.00
1870.50
Sub-Total
5598.47
1697.75
19.83
7316.05
148.62
2055.66
72.25
9592.58
State
2720.00
0.00
127.92
2847.92
0.00
3599.80
155.25
6602.97
Private
2060.00
0.00
106.50
2166.50
0.00
0.00
4451.25
6617.75
Central*
1628.46
0.00
0.00
1628.46
475.86
0.00
0.00
2104.32
Sub-Total
6408.46
0.00
234.42
6642.88
475.86
3599.80
4606.50
15325.04
State
0.00
0.00
234.60
234.60
0.00
1881.50
123.92
2240.02
Private
0.00
174.00
0.00
174.00
0.00
0.00
92.13
266.13
Central
1038.69
359.58
0.00
1398.27
228.60
0.00
0.00
1626.87
Sub-Total
1038.69
533.58
234.60
1806.87
228.60
1881.50
216.05
4133.02
State
4770.00
524.08
0.00
5294.08
0.00
2182.20
122.70
7598.98
Private
1150.00
503.10
411.66
2064.76
0.00
0.00
8348.50
10413.26
Central
4155.10
0.00
0.00
4155.10
986.50
0.00
0.00
5141.60
Sub-Total
10075.10
1027.18
411.66
11513.94
986.50
2182.20
8471.20
23153.84
State
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Private
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Central
100.17
0.00
0.00
100.17
0.00
0.00
0.00
100.17
Sub-Total
100.17
0.00
0.00
100.17
0.00
0.00
0.00
100.17
State
0.00
32.50
0.00
32.50
0.00
0.00
0.00
0.03
Private
0.00
0.00
0.00
0.00
0.00
0.00
0.03
302.10
Central
249.32
0.00
0.00
249.32
52.78
0.00
0.00
334.63
Sub-Total
249.32
32.50
0.00
281.82
52.78
0.00
0.03
1823.56
Central - Unallocated
1523.08
0.00
0.00
1523.08
300.48
0.00
0.00
1823.56
Total (Western Region)
State
14182.50
556.58
362.52
15101.60
0.00
11478.03
491.37
27071.00
Private
5430.00
5557.50
554.96
11542.46
0.00
0.00
14968.59
26511.05
Central
11890.00
359.58
0.00
12249.58
2320.00
0.00
0.00
14569.58
Grand Total
31502.50
6473.66
917.48
38893.64
2320.00
11478.03
15459.96
68151.63
Project Reporter • 41 • April 1, 2016
Road Watch
4 LANING OF RAIGANJ – DALKHOLA SECTION Project Details
Four laning of Raiganj to Dalkhola Section of NH-34 from Km 398.000 to Km 452.750 in the State of West Bengal under NHDP Phase-III on DBFOT (Toll) basis.
Name of Authority
National Highways Authority of India
Concessionaire
Raiganj Dalkhola Highways Ltd
Independent Engineer
Brig. (Retd.) S. P. Gangopadhyay.
Project Cost
` 680 Crore
Concession Agreement Signing Date
28th June 2010
Date of Commencement
3rd February 2011
Concession Period
30 Years (Including 90 months of construction period)
Date of Completion
31st September 2013
Revised Date of Completion
31st March 2018
Current Status
12 Per Cent work is completed
Contacts
Sanjeev Kumar Sharma, Project Director, UCO Bank Building, 2nd Floor, Mangalbari (NH-34), P.O.: Mangalbari-732142, District- Malda, West Bengal. T: 03512-260630, M: 8967220777, malda@nhai.org, pdpiumalda@yahoo.co.in Project Reporter • 42 • April 1, 2016
Road Projects
NHDP Projects (BOT / SPV / ANNUITY) (As on 31st January 2016)
NH No
Length (Km)
Start Date
Estimated Completion Date
4-Laning of HoskoteDobbaspet Km 58+300 to Km 138+320 Karnataka BOT Under Implementation NHDP Phase IV
207
80.02
May 2014
May 2016
Transstroy-OJSC Consortium / M/s Aarvee Associates
6-Laning of DhankuniKhargpur Section Km 17.6 to Km 129 West Bengal BOT Under Implementation NHDP Phase V
6
111.4
April 2012
May 2016
Ashoka Buildcon Ltd / Aarvee Associates Architects Enginner & Consultant Pvt. Ltd
Chenani-Nashri Jammu Kashmir Annuity Under Implementation NHDP Phase II
1A
12
May 2011
May 2016
IL & FS Transportation Networks Ltd / Euroestudios S.L. in association with Segmental cons. And support ser. (P)
4-Laning of RajsamandGangapur-Bhilwara Km 0.00 to Km 86.400 Rajasthan BOT Under Implementation NHDP Phase IV
758
87.25
October 2013
April 2016
Sadbhav Engineering Ltd / Artfact Projects Ltd
Deoli - Kota Rajasthan BOT Under Implementation NHDP Phase III
12
83
January 2011
April 2016
GVK Development Projects Pvt Ltd / Scott Wilson Ltd-Scott Wilson India (JV)
Varanasi-Aurangabad Km 786 to Km 978.400 Bihar [135] / Uttar Pradesh [57.4] BOT Under Implementation NHDP Phase V
2
192.4
September 2011
April 2017
Isolux-Soma Consortium / ICT- Rodic (JV)
Delhi - Agra (Approved Length 180.3 Km) Haryana [74]/ Uttar Pradesh [105.5] BOT Under Implementation NHDP Phase V
2
179.5
October 2012
April 2016
Reliance Infrastructure Ltd / URS Scott Wilson Pvt. Ltd. In Jv with Rodic Consultant Pvt. Ltd
Stretch State Funded By Present Status Phase
Contractor / Independent Engineer Consultant (IEC)
Source: NHAI Project Reporter • 43 • April 1, 2016
ASAPP Info Global Services Pvt. Ltd. ASAPPinfoGlobal.com
ISSN 2277-6532 Date of Publication: 1st & 15th of Every Month.
High Visibility Opportunity to reach buyers
Over panies 1500 com ss listed acro gories 56+ cate
The most comprehensive and practical databank of the Construction Industry. India is the third-largest construction market, after China and the US. With infrastructure and housing sector requirements of the country leading the construction market, the opportunity for building materials, construction equipment, construction technology, etc. is phenomenal. The time is just ripe for manufacturers, suppliers and service providers to construction & design dĂŠcor industry, to exert a pull on the attention of key buyers. Advertising within C & D Infobank will provide suppliers with high visibility for their brand, and sure-shot entrance to consideration set of key buyers.
e k th Boo t Bes ow sN ition s o P
Contact
Abhijit Oak Email: Abhijit@ASAPPinfoGLOBAL.com Tel: +91 20 2605 2987 ÂŽ
www.ASAPPInfoGLOBAL.com www.ASAPPInfoGLOBAL