01 Pune - Comprehensive Bicycle Plan - PDA, iTrans, CEE, PMC, Parisar : Chetan Sodaye

Page 91

Concept visualization at (Sub-arterial) – S.B. Road

Concept visualization at (Arterial) Sinhagad Road

89

Current situation S.B. Road (Sub-arterial)

Current situation at Sinhagad Road

Figure 48: Treatment of arterial and sub-arterial roads

Segregated Cycle Track A Raised Segregated Cycle Track shall be developed on major Arterial Roads of the city. A segregated cycle track is required on roads with heavy traffic movement. Ideally the Segregated Cycle track should be separated by a buffer of 1m width.


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

4.3.6. Repair Shops, Resting Places and other Facilities

1min
page 105

4.3.5. Cycle Parking

2min
pages 102-103

Table 6: Activities for public awareness and outreach

5min
pages 111-113

4.3.4. Integration with Public Transit

1min
page 101

4.4. Traffic Management, Regulation and Enforcement

3min
pages 108-109

4.7. Implementation Schedule

1min
page 115

Figure 49: Treatment of Access Roads

1min
pages 93-94

4.3.3. Public Bicycle Sharing system

2min
pages 97-98

Figure 48: Treatment of Collector Roads

0
page 92

Figure 47: Treatment of arterial and sub-arterial roads

0
page 91

Figure 43: A smooth road surface, also at intersections, leads to better comfort

0
page 85

Figure 42: Interlocking paver blocks for cycle track surface may be appropriate provided these are affixed at level

0
page 84

left

1min
page 83

Figure 39: Road safety problems resulting from traffic going through the city centre (left) are resolved by leading all through-traffic around the city-centre (right

1min
page 81

4.2.2. Controlled Parking for Motorized Vehicles

1min
pages 71-72

Figure 19: Preferred route by cyclists

0
page 48

Figure 25: Percentage of households with cycle ownership across wards in Pune

2min
page 53

Figure 21: Perceived unsafe corridors

0
page 50

Table 4: Highlights of School-based Learning about Sustainable Transportation

2min
pages 57-58

Figure 27: Willingness to shift to cycling if infrastructure improves

2min
page 60

4.2. Cycling inclusive mobility planning proposals

3min
pages 67-68

3. Vision and Goals

1min
page 63

Figure 15 Assessment of Existing Cycle Tracks

1min
page 45

Figure 13: Encroachment of the NMT lane by hawkers due to absence of dedicated space for them42 Figure 14: Cyclists being forced to use the carriage way because of unplanned services in the NMT lanes (like public toilets

0
page 44

Figure 5: Inter and intra ward travel patterns of cycling commuters in Pune

1min
page 40

Figure 1: Potential of shift from other modes to cycling

27min
pages 13-25

Figure 1 Responses to an online survey on all proposals in the preliminary draft of Pune Cycle Plan

0
page 28

1.2. Methodology

2min
page 27

Figure 2: Framework to solve Pune's Transport and Mobility problem

2min
pages 33-34

Table 1: Summary of Sustainable Transportation Goals, Objectives and Performance Indicators

6min
pages 30-32

Preface by Municipal Commissioner

2min
page 8

Executive Summary

10min
pages 9-12

Preface by Mayor

1min
page 7
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.