DeAngelis Diamond Sarasota & Tampa Division

Page 1

DEANGELIS DIAMOND SARASOTA & TAMPA

WHO WE ARE

Since 1996, DeAngelis Diamond has grown rapidly from a highly successful regional construction management company, to a nationally-known, well-respected, and innovative leader in the industry. Today, DeAngelis Diamond is an award-winning national construction firm with a highly diverse project portfolio. Named one of America’s fastest-growing companies by Inc. 5000, we have offices located in eight cities and are licensed in 37 states with a presence in the Caribbean

250+

2,300+ AWARDS WON HOURS VOLUNTEERED ANNUALLY

8
230+ OFFICE
16
LOCATIONS MARKET SEGMENTS TEAM MEMBERS

OUR CULTURE OUR CORE VALUES

Our team members lead by example, day in and day out, as they authentically live out our mission and values. We know that culture trumps everything, so the environment and culture of our workplace motivates, encourages, and promotes our people and their talents. We want our people to feel this is the most significant work experience they can have while keeping career and family life in balance. In this spirit, our culture focuses on developing and encouraging healthy team members and families.

FAITH IN GOD HONOR TO BUILD LASTING RELATIONSHIPS EXCELLENCE & QUALITY LEADERSHIP INTEGRITY HEALTHY ENVIRONMENT & CULTURE
work live worship travel learn WE DON’T JUST BUILD BUILDINGS, WE BUILD PLACES TO...

WHAT WE BUILD

DeAngelis Diamond produces excellent buildings with the highest levels of quality. We are proud to build in 16 different market segments, creating places to live, learn, work, play, worship, heal, and more.

heal play

OUR SARASOTA /

/ TAMPA OFFICE

Since its founding, DeAngelis Diamond has followed an organic expansion model based on growing markets. Our Sarasota/Tampa Division opened its doors in 2012 and was our second office, an exciting milestone as we looked to expand our services to other booming markets in our beautiful, home state.

Our skilled team of experts posses the knowledge and expertise necessary to handle everything from small-scale build-outs to large-scale complex projects. We use state-of-the-art equipment and cutting-edge technology to ensure that every aspect of the construction process is efficient and precise. Our commitment to excellence and attention to detail is highlighted in our company motto “The Honor to Build.” We consider it an honor to be involved in all of our clients’ projects and we understand the amount of trust our clients put in us to achieve their goals. We are therefore, committed to achieving them while making our clients’ experience enjoyable and successful.

DeAngelis Diamond’s Sarasota/Tampa office is lead by Scott Beck. Scott brings 18 years of construction leadership experience and expertise to his division. Scott works closely with our clients to understand their unique needs and provide tailored solutions that exceed their expectations. He inspires the team to approach every project with the goal of delivering every project on-time and within budget, without compromising on quality.

MEET ALL OUR DIVISION

LEADERS

DETROIT, MI
David Kovalik
NASHVILLE, TN
Brian Shunk
ORLANDO, FL
TJ Sellers

DIVISION PROJECT HIGHLIGHTS

MARINA BAY 880

MULTI-FAMILY

CLEARWATER, FL | 380,000 SQ. FT.

This project involves a stunning addition to the Clearwater, FL waterfront, comprising two impressive eight-story buildings, each containing 87 high-end condominium units. The development also features an expansive shared common area, including an 80,000 sq. ft. parking garage, providing residents with ample space to park their vehicles securely. In addition to the exceptional living spaces, the project boasts a range of world-class amenities, including an Olympic-sized lap pool, a fully equipped fitness room complete with sauna and steam rooms, and a common amenity deck featuring synthetic turf and a fully functioning marina. The luxury living spaces are complemented by breathtaking views of the surrounding area, providing residents with a serene and tranquil environment in which to live, work, and play. Overall, this project represents a significant investment in the Clearwater community, providing a range of exceptional living spaces and amenities to residents seeking the very best in waterfront living.

MARINA BAY 880 TOWNHOMES

MULTI-FAMILY

CLEARWATER, FL | 26,000 SQ. FT.

This project is the second phase of the Marina Bay 880 and features the construction of two buildings which house a total of eight three-story townhomes. These breathtaking units feature personal elevators for added convenience and large balconies offering stunning views of the bay.

2020-2021 SMH CAPITAL IMPROVEMENTS

HEALTHCARE

SARASOTA, FL

The Sarasota Memorial Hospital Captial Improvements in 2020-2021 consisted of several projects that aimed to update and expand upon the hospitals current facilities and capabilities. All of these were handled with the uptmost care in order to minimize the disruption of hospital functions. Key projects handled under these improvements included the phased renovation of several OR rooms, an upgrade to the Medium Voltage, 5-phased renovation of the Cardiology units including new 2 new EP labs and 1 cath lab, and an upgrade to the commercial kitchen that services the hospital patients, visitors, and staff.

PGD BAILEY TERMINAL EXPANSION

AVIATION

PUNTA

GORDA, FL | 58,000 SQ. FT.

After 16 months of hard work, the Punta Gorda Terminal Expansion project reached its successful completion. With four phases in total, this project included a stunning 40,000 sq.ft. addition to the existing terminal building, a complete remodel of the terminal for a total area of 57,000 sq.ft., and updates to both the conveyor belt system and chiller plant. This impressive feat was recognized by the Lee BIA Summit Awards, which awarded the project the title of Best Commercial Contractors Project - Public Works.

DeAngelis Diamond is currently managing an additional 51,500 sq. ft. terminal expansion for the Punta Gorda Airport set to begin construction in 2023.

SRQ AIRPORT TERMINAL EXPANSION

AVIATION

SARASOTA, FL | 150,000 SQ. FT.

*this project is currently under construction

A $95 million investment in the future of travel is currently underway at SRQ Airport. This tremendous expansion and renovation project consists of 5 packages that will span over a 2-year period. The first, an entirely new terminal with five new gates will be the centerpiece of the expansion and add an additional 70,000 sq. ft. to the existing airport. An additional 80,000 sq. ft. of renovations is planned as well for escalator upgrades, holdroom realignment, and utility relocation. This construction project is bringing a much-needed upgrade to the facilities, and we can’t wait to see it come to life.

SENIOR LIVING AT THE GREENS

SENIOR LIVING

ST. AUGUSTINE, FL | 91,000 SQ. FT.

The Senior Living at the Greens project featured a thoughtful approach to what a senior living community can be. This 91,000 sq. ft. single story senior living project offers topnotch amenities and a comfortable living experience. Within the facility, there are carefully designed spaces dedicated to assisted living and memory care suites, ensuring that the needs and requirements of the elderly residents are met with precision and compassion.

GLENRIDGE NORTH EXPANSION

SENIOR LIVING

SARASOTA, FL | 250,000 SQ. FT.

*this project is currently under construction

The Glenridge North Community expansion focuses on the development of over a 100 private homes and villas on a 60-acre site towards the north part of the property. Initial work included land clearing and the creation of streets and retention ponds throughout the property in preparation for the residential homes. Several models of club-style homes and villas offer future residents a variety of options when it comes to a comfortable living solution. Models vary from attached duplex style to two-bedroom private residences. Each comes with the comfort of modern living with custom finish options.

SMH BEHAVIORAL HEALTH HOSPITAL

SARASOTA,

FL | 95,600 SQ. FT.

The project involved constructing a brand new state-of-the-art behavioral health replacement hospital spanning over 95,600 sq. ft. The facility was designed to provide a healing environment for patients with 82-86 licensed inpatient beds. The hospital was equipped with cutting-edge technology and innovative treatment methods to provide the best possible care for patients. The project required careful planning and execution to ensure that the facility was built to meet the specific needs of the patient population, with a focus on safety, comfort, and privacy.

SMH JEAN & ALFRED GOLDSTEIN HEALTH CENTER

SARASOTA, FL | 6,000 SQ. FT.

This project featured the ground up construction of the all-new Jean & Alfred Goldstein Health Center for the Sarasota Memorial Hospital. This modern facility consists of 12 exam rooms fitted with state-of-the-art medical equipment and technology as well as administrative space to support the operation of the clinic. This clinic duo-functions as a clinical care facility and a place to support specialty training in internal medicine for Sarasota Memorial Hospital’s graduate education program. This project was a featured winner for the 2017 SRQ Silver Award.

HEALTHCARE HEALTHCARE

KAMBERG WELLNESS CENTER

MEDICAL OFFICE

SARASOTA, FL | 11,000 SQ. FT.

Construction on the all-new Kamberg Wellness Center is a part several projects aiming to expand and improve the community. Three central projects make up the whole, including the renovation of the Kiltie Café, the new-construction of the Kamberg Wellness Center, and the development of the Glenridge North Community.

The all-new Kamberg Center is part of the entire Glenridge on Palmer Ranch community expansion. This 10,732 sq. ft. facility is a modern solution to the needs for a healthcare solution. The center features a diverse portfolio of spaces designed to provide care for a multitude of healthcare needs and space for public gatherings.

This design-build project involved converting an existing office space into a spacious and comfortable physicians’ lounge, complete with a food preparation area, ample seating, and a tv section. The project involved extensive demolition and required level 3 ICRA compliance, as well as precise coordination with the hospital cafeteria and strict adherence to noise and disruption control measures to ensure minimal disturbance to patients, visitors, and staff. Located on the building’s basement level and constructed on a massive 5 ft thick mat slab, the project required innovative solutions such as injector pumps to pump waste from sink locations to the main drain, highlighting the level of technical expertise involved in the project execution.

This design-build project entailed a comprehensive upgrade of an existing office space to create new, state-of-the-art office and patient amenities areas, with extensive asbestoscontaining materials (ACM) abatement requirements. The project involved the addition of two ADA bathrooms and the upgrading of two existing bathrooms with high-end fixtures and finishes. Due to its proximity to the main lobby and the ICU unit above, the project required level 3 ICRA compliance, with extensive measures taken to ensure negative pressure and maximum protection for workers through the use of clean suits and masks. The project’s success hinged on precise coordination and clear communication with user groups, Moffitt facilities, and construction managers, which allowed for uninterrupted progress and timely completion of the project within an aggressive schedule. It also used a design-build delivery method.

MAGNOLIA
MOFFIT CANCER CENTER PATIENT AMENITIES PAVILION TAMPA, FL | 1,900 SQ. FT. TAMPA, FL | 9,100 SQ. FT. MEDICAL OFFICE MEDICAL OFFICE
MOFFIT CANCER CENTER
PROVIDER LOUNGE

BOCA BAY PASS CLUBHOUSE

CLUBHOUSE

BOCA GRANDE, FL | 5,000 SQ. FT.

This transformative project at the Boca Bay Pass Club involved creating an enhanced dining experience by expanding the existing dining area into the covered terrace, as well as upgrading the casual dining room and bar, formal dining space, refrigerated wine exhibit, and outdoor covered pool bar. But that’s not all - we also added top-of-the-line ADA-compliant ramps at the front and rear of the clubhouse to ensure that everyone can enjoy the newly renovated facilities.

FIRST SARASOTA CHURCH

SARASOTA, FL | 8,400 SQ. FT.

The First Sarasota Church embarked on a project to enhance its offerings for children, resulting in the construction of an expansive and modern Children’s Center. The addition comprises several spacious and wellequipped classrooms, infant rooms designed to cater to the unique needs of babies, and performance rooms that provide an ideal space for children to showcase their talents.

EXTRA SPACE FOWLER STREET

TAMPA, FL | 120,000 SQ. FT.

This 120,000 sq. ft. 4-story self-storage building is a modern and secure facility designed to meet the storage needs of individuals and businesses alike. The building has a sleek and contemporary exterior, featuring a combination of decorative canopies and trellis. Upon entering the building, customers are greeted by a spacious and welcoming lobby that doubles as a sales center and administrative space for employees.

The storage units themselves are located on the upper floors, which can be accessed via elevators or stairways. These units are designed to be highly versatile, with a range of sizes available to suit different needs. Climate-controlled measures were implemented to ensure that each unit provides a stable and comfortable environment, free from the effects of extreme heat or cold.

In addition to the storage units, the building is equipped with a range of amenities to enhance the customer experience. These include loading docks, wide driveways, and ample parking spaces for easy access.

FAITH-BASED
STORAGE

NAPLES, FL

6635 Willow Park Dr

Naples, FL 34109

T: 239.594.1994

SARASOTA, FL

2601 Cattlemen Rd.

ORLANDO, FL 111 N. Orange Ave. Orlando, FL 32801 T: 407.367.5173 Suite 1650

T: 941.952.3846 Suite 404

Sarasota, FL 34232

FRANKLIN, TN

2179 Edward Curd Ln. Franklin, TN 37067

T: 615.922.3995

deangelisdiamond.com
Suite 202
Suite
Gulch
Suite
DETROIT, MI 39555 Orchard Hill Pl. Novi, MI 48375 T: 248.513.6112
235 NASHVILLE, TN
Union
1701 T: 615.922.3995 1222 Demonbreun St.
Rd. Vestavia Hills,
T:
BIRMINGHAM, AL 2871 Acton
AL 35243
205.977.7798 Suite 101B FORT MYERS, FL 12553 New Brittany Blvd. Fort Myers, FL 33907 T: 239.594.1994 Nashville, TN 37203

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.